Loading...
HomeMy WebLinkAbout3620_DukeAllen_DewateringWellAbandonment_FID1891032_20240730Moutos, Sarah From: Sent: To: Cc: Subject: Attachments: Importance: Follow Up Flag: Flag Status: Murphy, Courtney <Courtney.Murphy@duke-energy.com> Tuesday, July 30, 2024 7:43 PM Moutos, Sarah Russ, Jordan A; Stanley, Sherri; Witt, Kimberlee; Martin, Melonie Y; Hardin, Tyler; Houck, Blane; Costner, Brandy F [External] REQUEST FOR APPROVAL: Duke Energy-Allen-SSLF 3620-INDUS_Dewatering System Well Abandonment Duke Energy-Allen-SSLF 3620-INDUS_WL Monitoring Loc Fig_202407.pdf; Allen SSLF Pilot Dewater Sys_RecWellPerm it_WS0300028_20221209.docx.pdf; Allen SSLF FullScale Dewater Sys_RecWellPerm it_WS0300028_20230602_MOD.docx.pdf; Pilot EW_Well Construction GW1_20230120.pdf, Allen SSLF Dewatering FullScale_EW GW1 _Aug2023.pdf High Follow up Flagged CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Sarah — Duke Energy is hereby requesting approval to abandon the wells associated with the SSLF dewatering system that are within the SSLF footprint. The wells planned for abandonment are shown on the attached figure. I have placed a red box around the symbols in the legend that represent wells associated with the SSLF dewatering system and are part of the current planned abandonments. The eductor (extraction) wells will be abandoned per 15A NCAC 02C.0113. Specifically, the wells are planned to be abandoned via in -place tremie methods using a flexible grout that qualifies as an allowable grout per the aforementioned regulation. As required by the SSLF Permit (3620-INDUS-2022), a Licensed Geologist will oversee and certify the abandonments and copies of the GW-30 Well Abandonment Forms will be submitted to the Section. The vibrating wire piezometers (VWPZs) that are associated with the dewatering well system are already fully grouted below ground surface by design, so abandonment of those locations will simply comprise removing their surface instrumentation. For reference, I've attached copies of the respective NCDEQ DWR Recovery Well Construction Permits (original for pilot section and modified for full-scale expansion), as well as copies of the GW-1 Well Construction Forms for the eductorwells. The site and contractors are prepared to begin abandoning the wells associated with the SSLF dewatering system within the next week or two, pending your approval. If you have any questions or would like additional information, don't hesitate to reach out. Thankyou, Courtney Uh Murphy, PG Lead Environmental Specialist EHS Waste & Groundwater Programs Courtney.Murphy(a)duke-energy.com Office: 704.382.7171 Mobile: 704.718.7570 Submission ID# GW 1-2023-05987 Are you submitting a scanned form?* Yes No CONTACT INFORMATION ......... ......... ......... ............................ Email Address* Contact Name* Will.Keyes@GriffinDewatering.co William Keyes m Is this a revision to the form you have previously submitted? Yes No WELL CONSTRUCTION INFORMATION 1. Who is installing these wells?* Owner Well Contractor 1. Well Contractor Information: Certiticate # Cert Level First Name Last Name Company Name 4220 A WILLIAM KEYES Griffin 2. Well Construction Permit #: NA/ Private List all applicable well construction permits (i.e. Monitoring Wells, UIC- Underground Injection Control, CCPCUA-Central Coastal Plain Capacity Use Area, County, etc.) What type of well is this?* Injection Well Non -Water Supply Well Water Supply Well (includes irrigation wells) 3. Non -Water Supply Well* Monitoring Recovery 4. Date well was completed and ID# Date Well Completed* Well ID# Well Yield 8/18/2023 W 12 3 (gallons per minute)" 8/18/2023 W 13 3 (gallons per minute)" 8/18/2023 W 14 3 (gallons per minute)" 8/18/2023 W 15 3 (gallons per minute)" 8/18/2023 W 16 3 (gallons per minute)" 8/18/2023 W 17 3 (gallons per minute)" 8/18/2023 W 18 3 (gallons per minute)" 8/18/2023 W 19 3 (gallons per minute)" 8/18/2023 W20 3 (gallons per minute)" 8/18/2023 W21 3 (gallons per minute)" 8/18/2023 W22 3 (gallons per minute)" 8/18/2023 W23 3 (gallons per minute)" 8/18/2023 W24 3 (gallons per minute)" 8/18/2023 W25 3 (gallons per minute)" 8/18/2023 W26 3 (gallons per minute)" 8/18/2023 W27 3 (gallons per minute)" 8/18/2023 W28 3 (gallons per minute)" 8/18/2023 W29 3 (gallons per minute)" 8/18/2023 W30 3 (gallons per minute)" 8/18/2023 W31 3 (gallons per minute)" 8/18/2023 W32 3 (gallons per minute)" 8/18/2023 W33 3 (gallons per minute)" 8/18/2023 W34 3 (gallons per minute)" 8/19/2023 W35 3 (gallons per minute)" 8/18/2023 W36 3 (gallons per minute)" 8/18/2023 W37 3 (gallons per minute)" 8/18/2023 W38 3 (gallons per minute)" 8/18/2023 W39 3 (gallons per minute)" 8/18/2023 W40 3 (gallons per minute)" 5. Well Location Facility/Owner Name* Duke Energy Facility ID# (Required) (If applicable) County* Parcel Identification No. (PIN) Gaston * Physical Address Street Address Plant Allen Road Address Line 2 City State / Province / Region Belmont NC Postal / Zip Code Country 28012 US Latitude* 35.1870732000 Longitude*-81.0153993000 Decimal degrees Decimal degrees 6. Is(are) the well(s): * Permanent Temporary 7. Is this a repair to an existing well: * Yes No If this is a repair, fill out known well construction information and explain the nature of the repair under #21 remarks section or on the back of this form. For multiple Geoprobe/DPT or Closed -Loop Geothermal Wells having the same construction, only 1 GW-1 is needed. 8a. Indicate TOTAL NUMBER of wells drilled: 9. Total well depth below land surface: (ft.) 70 For multiple wells list all depths if different (example- 3@200' and 2@100') 10. Static water level below top of casing: (ft.) 17 If water level is above casing, use 9a. What is the depth of the casing from ground surface? in test 11. Borehole diameter: 8 in inches 12. Well construction method: Auger Air Rotary Direct Push Mud Rotary Other Cable Tool Rotosonic 14. WATER BEARING/FRACTURE ZONES From To Description 17 Medium Clay, Multiple sized gravel, coarse fractured bedrock in fleet in feet 15. OUTER CASING (for multi -cased wells) OR LINER (if applicable) From To Diameter Thickness Material in feet in feet in inches 17. SCREEN From To Diameter Thickness A in fee, teet in inche•< 18. GROUT From To Material 0.00 10.00 Bentonite in feet in feet 19. SAND/GRAVEL PACK (if applicable) From To Material 2a filter sand in feet in feet 20. DRILLING LOG From To 0.00 13.00 in feet in feet 50.00 in feet in feet 70.00 in feet in feet 21. Remarks Material Emplacment Method & Amount controlled pour Emplacment Method poured from surface Description (color, hardness, soil/rock type, grain size, etc.) orange clay/silts tan/gray silts partially weather rock Dewatering system addition with 29 more wells all drilled the same depth and construction 22. Site diagram or additional well details: You may upload additional well construction information here. 060123 Revised Preliminary Griffin SSLF Layout.pdf 9.46MB pdf only CERTIFICATION INFORMATION * By signing this form, I hereby certify that the well(s) was (were) constructed in accordance with 15A NCAC 02C .0100 or 15A NCAC 02C .0200 Well Construction Standards and that a copy of this record has been provided to the well owner. 23. Certification Signature of Certified Well Contractor ROY COOPER Govemar ELIZABETH S. B1SER Secretory RICHARD E. ROGERS, JR. birector Courtney Murphy Duke Energy Corporation 526 South Church Street Charlotte, NC 28202 Dear Ms. Murphy, (via email) June 2, 2023 RE: Recovery Well Construction Permit Permit # WS0300028 Duke Energy Carolinas, LLC Allen Steam Station 253 Plant Allen Road, Belmont Gaston County In accordance with your completed permit modification application received on June 2, 2023, we are forwarding herewith Water Supply Well Construction Permit No. WS0300028 dated June 2, 2023, issued to Duke Energy, for the construction of a water supply well system with an increased design capacity of 290,000 gallons per day. This Construction Permit covers the installation of an additional fifty-three (53) dewatering wells not to exceed a depth of 70 feet below land surface (bls). This Permit will be effective for one year from the date of issuance and shall be subject to the conditions and limitations as specified therein. Duke Energy should also verify with DWR's Complex Permitting Unit regarding coverage of the proposed additional discharges to the active ash basin at the facility under NPDES Permit NC0004987. Please note that, depending upon the volume of water withdrawn by the system per day, registration of the withdrawal may be necessary at: https://www.ncwater.org/WUDC/app/WWATR/page. Should you have any questions, please contact Edward Watson at (704) 235-2199, or by email at edward.watson@ncdenr.gov. Sincerely, EA DocuSigned by: fw w N P:z>t. F161F969A2D84A3... Andrew H. Pitner, P.G. Regional Supervisor Mooresville Regional Office Water Quality Regional Operations Section Division of Water Resources CC: WQROS, Central Office & Regional Office Staff (via Laserfiche) Griffin Dewatering (via email) North Carolina Department of Environmental Quality I Division of Water Resources Mooresville Regional Office 1 601 East Center Avenue, Suite 3011 Mooresville, NC 28115 NORTH CAROLINA ^ 704.663.1699 nep.m.m or �.n­l o..izllkla� NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES PERMIT FOR THE CONSTRUCTION OF A WATER SUPPLY WELL SYSTEM (Wells or Well Systems with a design capacity of 100,000 Gallons Per Day or Greater) In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws, Rules, and Regulations. PERMISSION IS HEREBY GRANTED TO Duke Energy Carolinas, LLC FOR THE CONSTRUCTION OF A WATER SUPPLY WELL SYSTEM consisting of fifty three (53) additional dewatering wells owned by DUKE ENERGY and located at the subject site at 253 Plant Allen Road, Belmont, North Carolina. This Permit is issued in accordance with the completed permit modification application received on June 2, 2023, in conformity with specifications and supporting data, all of which are filed with the Department of Environmental Quality and are considered integral parts of this Permit. This Permit is for well construction only, and does not waive any provision or requirement of any other applicable law or regulation. This Permit does not constitute approval of a site, for which the Public Water Supply Section may require additional information or approval of the proposed volume of water to be withdrawn, within an area defined as a Capacity Use Area, regulated by the Division of Water Resources. Construction of any well under this permit shall be in strict compliance with the North Carolina Well Construction Regulations and Standards (15A NCAC 02c .100), and other State and Local Laws and regulations pertaining to water supply well construction. If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing upon written request within 30 days of receipt of this Permit. The request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made, this Permit is final and binding. This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions, limitations, or exceptions as follows: 1. A well test for yield shall be conducted in accordance with 15A NCAC 02C .110(b) and the results of that test shall be submitted to the Division of Water Resource's Mooresville Regional Office within 30 days of the test conclusions. 2. Each well shall have a Well Contractor Identification Plate and a Pump Installation Information Plate in accordance with 15A NCAC 02C .0107Q) (2) and (3). 3. Well construction records (GW-1) for each well shall be submitted to the Division of Water Resources' Information Processing Unit within 30 days of the well completion. 4. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113 and a well abandonment record (GW-30) shall be submitted to the Division of Water Resources' Information Processing Unit within 30 days of the well abandonment. Permit issued the 2nd day of June 2023 FOR THE NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DocuSigned by: F161FB69A2D84A3... Andrew H. Pitner, P.G., Regional Supervisor Division of Water Resources By Authority of the Environmental Management Commission Permit No. # WS0300028 D ��� North Carolina Department of Environmental Quality i Division of Water Resources Mooresville Regional Office 1610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 NOR;T aH aouNn oenmm,am 0 �a onmi akr� /� 704.663.1699 ROY COOPER Govemar ELIZABETH S. B1SER Secretory RICHARD E. ROGERS, JR. birecfnr NORTH GAROLINA EY1dMnnmMkff Q=W December 9, 2022 Duke Energy Corporation (via email) c/o Courtney Murphy 526 South Church Street Charlotte, NC 28202 RE: Recovery Well Construction Permit Permit # WS0300028 Duke Energy Carolinas, LLC Allen Steam Station 253 Plant Allen Road, Belmont Gaston County Dear Ms. Murphy, In accordance with your completed application received on December 9, 2022, we are forwarding herewith Water Supply Well Construction Permit No. WS0300028 dated December 9, 2022, issued to Duke Energy, for the construction of a water supply well system with a design capacity for 158,400 gallons per day. This Construction Permit covers the installation of eleven (11) dewatering wells not to exceed a depth of 70 feet below land surface (bls). This Permit will be effective for one year from the date of issuance and shall be subject to the conditions and limitations as specified therein. Duke Energy should also verify with DWR's Complex Permitting Unit regarding coverage of the proposed additional discharges to the active ash basin at the facility under NPDES Permit NC0004987. Please note that, depending upon the volume of water withdrawn by the system per day, registration of the withdrawal may be necessary at: https://www.ncwater.org/WUDC/app/WWATR/page. Should you have any questions, please contact Edward Watson at (704) 235-2199, or by email at edward.watson@ncdenr.gov. Sincerely, EA DocuSigned by: #uw N P: 4kft F161F969A2D84A3... Andrew H. Pitner, P.G. Interim Regional Supervisor Mooresville Regional Office Water Quality Regional Operations Section Division of Water Resources CC: WQROS, Central Office (via Laserfiche) DWR, MRO Staff (via email) Griffin Dewatering (via email) North Carolina Department of Environmental Quality I Division of Water Resources Mooresville Regional Office 1 601 East Center Avenue, Suite 3011 Mooresville, NC 28115 NORTH CAROLINA ^ 704.663.1699 nep.m.m or �.n—1 o..izllkla� NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WATER RESOURCES PERMIT FOR THE CONSTRUCTION OF A WATER SUPPLY WELL SYSTEM (Wells or Well Systems with a design capacity of 100,000 Gallons Per Day or Greater) In accordance with the provisions of Article 7, Chapter 87, North Carolina General Statutes, and other applicable Laws, Rules, and Regulations. PERMISSION IS HEREBY GRANTED TO Duke Energy Carolinas, LLC FOR THE CONSTRUCTION OF A WATER SUPPLY WELL SYSTEM consisting of eleven (11) dewatering wells owned by DUKE ENERGY and located at the subject site at 253 Plant Allen Road, Belmont, North Carolina. This Permit is issued in accordance with the completed application received on December 9, 2022, in conformity with specifications and supporting data, all of which are filed with the Department of Environmental Quality and are considered integral parts of this Permit. This Permit is for well construction only, and does not waive any provision or requirement of any other applicable law or regulation. This Permit does not constitute approval of a site, for which the Public Water Supply Section may require additional information or approval of the proposed volume of water to be withdrawn, within an area defined as a Capacity Use Area, regulated by the Division of Water Resources. Construction of any well under this permit shall be in strict compliance with the North Carolina Well Construction Regulations and Standards (15A NCAC 02c .100), and other State and Local Laws and regulations pertaining to water supply well construction. If any requirements or limitations specified in this Permit are unacceptable, you have a right to an adjudicatory hearing upon written request within 30 days of receipt of this Permit. The request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, North Carolina 27699-6714. Unless such a demand is made, this Permit is final and binding. This Permit will be effective for one year from the date of its issuance and shall be subject to other specified conditions, limitations, or exceptions as follows: 1. A well test for yield shall be conducted in accordance with 15A NCAC 02C .110(b) and the results of that test shall be submitted to the Division of Water Resource's Mooresville Regional Office within 30 days of the test conclusions. 2. Each well shall have a Well Contractor Identification Plate and a Pump Installation Information Plate in accordance with 15A NCAC 02C .0107(j) (2) and (3). 3. Well construction records (GW-1) for each well shall be submitted to the Division of Water Resources' Information Processing Unit within 30 days of the well completion. 4. When the well is discontinued or abandoned, it shall be abandoned in accordance with 15A NCAC 02C .0113 and a well abandonment record (GW-30) shall be submitted to the Division of Water Resources' Information Processing Unit within 30 days of the well abandonment. Permit issued the 9th day of December 2022 FOR THE NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION [D—Sign,d by: Fi �i r-aanaeeaaa. . Andrew H. Pitner, P.G., Assistant Regional Supervisor Division of Water Resources By Authority of the Environmental Management Commission Permit No. # WS0300028 D ��� North Carolina Department of Environmental Quality i Division of Water Resources Mooresville Regional Office 1610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 NOR;T aH aouNn oenmm,a � 0 �a onmi akr� /� 704.663.1699 Submission ID# G W 1-2023-00350 Are you submitting a scanned form?* Yes No CONTACT INFORMATION ........................................................................__.. ......................... Email Address* Contact Name* Will.Keyes@GriffinDewatering.co Will Keyes m Is this a revision to the form you have previously submitted?* Yes No WELL CONSTRUCTION INFORMATION 1. Who is installing these wells?* Owner Well Contractor 1. Well Contractor Information: Certiticate # Cert Level First Name Last Name Company Name 4220 A WILLIAM KEYES Griffin Dewatering 2. Well Construction Permit #: NA/ Private List all applicable well construction permits (i.e. Monitoring Wells, UIC- Underground Injection Control, CCPCUA-Central Coastal Plain Capacity Use Area, County, etc.) What type of well is this?* Injection Well Non -Water Supply Well Water Supply Well (includes irrigation wells) 3. Non -Water Supply Well* Monitoring Recovery 4. Date well was completed and ID# Date Well Completed* Well ID# Well Yield 12/22/2022 EW-1 3 (gallons per minute)" 12/22/2022 EW-2 3 (gallons per minute)' 12/22/2022 EW-3 3 (gallons per minute)' 12/22/2022 EW-4 3 (gallons per minute)' 12/22/2022 EW-5 3 (gallons per minute)' 12/22/2022 EW-6 3 (gallons per minute)' 12/22/2022 EW-7 3 (gallons per minute)' 12/22/2022 EW-8 3 (gallons per minute)' 12/22/2022 EW-9 3 (gallons per minute)' 12/22/2022 EW-10 3 (gallons per minute)' 12/22/2022 EW-11 3 (gallons per minute)' 5. Well Location Facility/Owner Name* Duke Energy Facility ID# (Required) (If applicable) County* Parcel Identification No. (PIN) Gaston Physical Address* Street Address Plant Allen Road Address Line 2 City State / Province / Region Belmont NC Postal / Zip Code Country 28012 us Latitude* 35.1870732000 Longitude*81.0153993000 Decimal degrees Decimal degrees 6. Is(are) the well(s): * Permanent Temporary 7. Is this a repair to an existing well: * Yes No If this is a repair, fill out known well construction information and explain the nature of the repair under #21 remarks section or on the back of this form. For multiple Geoprobe/DPT or Closed -Loop Geothermal Wells having the same construction, only 1 GW-1 is needed. 8a. Indicate TOTAL NUMBER of wells drilled: 11 9. Total well depth below land surface: (ft.) 70 For multiple wells list all depths if different (example- 3@200' and 2@100') 10. Static water level below top of casing: (ft.) 23 If water level is above casing, use 12. Well construction method: Auger Air Rotary Direct Push Mud Rotary Other 9a. What is the depth of the casing from ground surface? 30 in feet 11. Borehole diameter: n inches 14. WATER BEARING/FRACTURE ZONES From To Description fine grained silts/ weathered structuring/ Clay rl k_cJ in feet 15. OUTER CASING (for multi -cased wells) OR LINER (if applicable) From To Diameter Thickness Material in feet in fee, it-, inches Cable Tool Rotosonic 17.SCREEN From To Diameter Thickness Material 4.00 Schd 40 PVC in 10et n t:ei in inches 18. GROUT From To Material in feet in feet 19. SAND/GRAVEL PACK (if applicable) From To Material #1a sand in feet in fact 20. DRILLING LOG From To 0.00 20.00 in feet in feet 20.00 50.00 in feet in feet r 70.00 n *eet in feet Emplacment Method & Amount Emplacment Method poured from surface Description (color, hardness, soil/rock type, grain size, etc.) orange clay/silts tan/gray silts partially weather rock 21. Remarks Twin pipe eductor wells inside 4" wells Dewatering system pilot test 22. Site diagram or additional well details: You may upload additional well construction information here. 121222 - SSLF Pilot Test - Layout.pdf 152.6KB pdf only CERTIFICATION INFORMATION * By signing this form, I hereby certify that the well(s) was (were) constructed in accordance with 15A NCAC 02C .0100 or 15A NCAC 02C .0200 Well Construction Standards and that a copy of this record has been provided to the well owner. 23. Certification Alm Signature of Certified Well Contractor 411 presure and 6" return HDPE Twin Pipe Eductors at +/-30ft OC GRIFFIN DEWATERING L.L.C. 5306 CLINTON DRIVE HOUSTON, TX 77020 TEL: (713) 676-8000 If FAX: (713) 676-8080 GFi1FFIN EMAIL:griffin@griffindewatering.com WEBSITE: www.griffindewatering.com Eductor Pump Station with 60HP electric jet pump and Diesel Standby QJ U Qj QJ UO O 0 0 2" Piezometers at 10ft, 20ft, 50ft, 100ft, and 200ft from pilot test -50ft deep -6" to 8"d i a m ete r borehole -Installed on side of test closest to SSLF excavation REV. I DESCRIPTION I DATE I BY I APPVD. This drawing is the property of Griffin Dewatering Corporation and its associated companies and is intended only for its sole or authorized use. It may contain proprietary, public or authorized third party information. Any alteration of this drawing is prohibited, without the express, written consent of an authorized representative of Griffin Dewatering Corporation Each Eductor will be: -70ft deep -8" diameter borehole -4" PVC Screen and Casing with 40ft of 20 slot screen 4" HDPE to discharge location Duke Energy DRAWN Allen Closure SCALE: Gaston County, GA I DATE SSLF - Pilot Test Layout I DWG: ML NTS 12/12/22 1