Loading...
HomeMy WebLinkAbout9102T_INSP_20240722NORTH CARnLINAD_E Q�� o.n.mm.m m c.wm..rem.i a.i� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined LCID YW Transfer X Compost SLAS COUNTY: VANCE MSWLF PERMIT NO.: 9102T-TRANSFER-1997 Closed xxW White Incin T&P FIRM MSWLF goods FILE TYPE: COMPLIANCE CDLF TireT&P Tire Industrial DEMO SDTF Collection Monofill Landfill Date of Site Inspection: July 22, 2024 FACILITY NAME AND ADDRESS: Vance County Transfer Station 3453 NC Highway 39 North Henderson, NC 27536 GPS COORDINATES: Lat.: 35.37323' Date of Last Inspection: March 7, 2024 Long.:-78.42075' FACILITY CONTACT NAME AND PHONE NUMBER: Name: Randy Deming Phone: (206) 579-1861 Email address: randy.demingk0env.com FACILITY CONTACT ADDRESS: Waste Industries Vance County 241 Vanco Mill Road Henderson, NC 27537 PARTICIPANTS: Amanda Thompson, NCDEQ, Solid Waste Section Andrew Murray, GFL Environmental STATUS OF PERMIT: Life of Site permit was issued for 9102-TRANSFER-1997 on October 24, 2023 and will expire on December 31, 2057. PURPOSE OF SITE VISIT: Follow-up to a Fire and Partial Compliance Inspection STATUS OF PAST NOTED VIOLATIONS: None OBSERVED VIOLATIONS: None The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. Page 1 of 4 NORTH CARnLINAD_E Q�� o.n.mm.m m c.w.mmen.i a.i� ADDITIONAL COMMENTS FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section On July 17, 2024, Mr. Randy Deming contacted Ms. Thompson to report that a fire had occurred in a transfer trailer during loading. Upon noticing the smoke, the operator used a hose to saturate the trailer before removing the trailer from the loading bay and calling the fire department. Flames were observed in the trailer once outside the building. The Vance County Fire Department extinguished the fire. The water used to extinguish the fire was contained within the leachate collection system. The leachate collection system was pumped following the fire. 1. The facility is fenced and is secured by a locking gate when it is not open for operation. 2. The correct signage is at the entrance of the facility listing the facility name, permit number, and emergency contact information as well as material accepted at the facility. 3. The facility accepts waste Monday through Friday 0530 to 0700 for private operators, Monday through Friday 0730 to 1630 for the public, and Saturday 0730 to 1200. 4. The permit, operations plan, waste screening, and training records were not reviewed during this inspection. 5. Waste was observed on top of the push walls. Mr. Murray stated that the waste would be removed from the push wall at the end of the operating day. Continue to ensure that the waste on top of the push walls is removed and properly disposed of at the end of the operating day. 6. Waste was observed within the transfer trailer loading bay. Mr. Murray stated that the waste is removed from the loading bay as needed throughout the day. Ms. Thompson stated that it appears that the loading by has not been cleaned in a while. Ms. Thompson recommended cleaning the transfer trailer loading bay more frequently to assist in managing the windblown litter and to ensure that the leachate drains are functioning properly. Mr. Murray provided the Section with photographs of the cleaned transfer trailer loading bay at the end of the day. Ensure that the waste is removed from the transfer trailer loading bay as needed throughout the day and at the end of the operating day. 7. Minimal windblown waste was observed in the grasses around the facility. Mr. Murray stated that the facility has a dedicated person to pick up windblown waste throughout the operating day. Continue to ensure that the windblown waste is picked up prior to the end of the operating day. 8. Waste was observed around a roll -off container located to the south of the transfer trailer loading bay. Mr. Murray provided the Section with a photograph of the waste removed from around the roll -off prior to the end of the operating day. 9. An area of standing water and mud was observed near the southern end of the transfer trailer loading bay. Mr. Murray stated that the area of standing water was stormwater and the result of the recent heavy rains. The area should be graded to prevent ponding near the transfer trailer loading bay. 10. A new concrete retaining wall and push plates have been installed at the southern end of the transfer trailer loading bay which assist in the removal of the waste from the loading bay. 11. A new concrete drainage ditch has been poured along the haul road to help prevent erosion of the haul road. 12. Digital photographs were taken during the inspection. Please contact me if you have any questions or concerns regarding this inspection report. Digitally signed by Amanda Amanda Thompson Thompson Date:2024.07.29 15:50:11-04'00' Phone: (910) 433-3352 Amanda Thompson Environmental Senior Specialist Regional Representative Sent on: July 29, 2024 X Email Hand delivery US Mail Certified No. f _] Copies: Drew Hammonds, Field Operations Branch Head — Solid Waste Section Page 2 of 4 Oepartmenl o� Environmantal0uali� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section View of the tinning floor. View of waste around a roll -off container and an area of standing water. New concrete drainage ditch along the haul road. View of waste within the transfer trailer loading bay. a;. View of the new retaining wall and push plates at the southern end of the transfer station. Page 3 of 4 Oepartmenl o� Envimnmental0uali� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Andrew Murray on Jule T) ')md View of the cleaned transfer trailer loading bay. View of the waste having been picked up around the roll - of container. Page 4 of 4