HomeMy WebLinkAbout25022-SouthBank Building-SIR-20240625DWM Brownfields Inspection Report
Submitted By: spwatson_ncdenr
Submitted Time: 06/25/2024 1:39 PM
I. Inspection Information
Date & Time: 06/25/2024 1:27 PM Inspection Type: Drive -By
Brownfields Staff: Other Personnel:
Sam Watson
Location:
Lat: 35.99762844863841, Long:-78.90435740969511
a DWM Brownflelds Recorded -A Complete
Inspection Survey RFR PC Complete L1 Active Eligible
i
.�2
4
2.
Pending No Further Fnterest
U Inactive Eligible
4 I
Mann+ng PI
Q
wmjmm�� iM
EC
36
ism Station
7sportatIon
Center
4- w -
Esn, NASA, NCA. USGS, FEMA I Esrt Community Maps Contributors, Du�c University, To--- Powered by Esri
Brownfields Inspection Report: South Bank Building, 25022-21-032
06/25/2024 1:27 PM
II. Project Information
Number: 25022-21-032
Address: 400 W. Main St. City: Durham
III. Environmental
Name: SouthBank Building
Current Use of Property: Commercial/Retail, Residential
Structures on Property: New Structures Violation: No
County: Durham
Summary: One large 27-story structure under construction on the property. The property
is under construction. Access to the construction area was not obtained during this site
visit. VIMS could not be observed.
Vapor Mitigation Systems: Not Observed Vapor Mitigation Violation: No
Summary:
Use of Surface Water or Groundwater: Not Observed Water Use Violation: No
Summary:
Exposed Soils: Not Observed Exposed Soils Violation: No
Summary: Construction is completed to such a point that no soils were exposed.
Page 2of8
Brownfields Inspection Report: South Bank Building, 25022-21-032
06/25/2024 1:27 PM
Use of Basements: Not Observed Basement Violation: No
Summary:
Storage of Chemicals: Not Observed Chemical Violation: No
Summary:
Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No
Condition:
Summary:
Current Exposure to Public/Public Risk:
No risk of exposure was observed during the site visit.
Page 3 of 8
Brownfields Inspection Report: South Bank Building, 25022-21-032
06/25/2024 1:27 PM
IV. Inspector Comments
No LUR violations were observed during the site inspection.
V. PHOTOGRAPHS
Page 4 of 8
Brownfields Inspection Report: South Bank Building, 25022-21-032
06/25/2024 1:27 PM
Photo 1: Photo taken from near the western corner of the property looking East.
Page 5 of 8
Brownfields Inspection Report: South Bank Building, 25022-21-032
06/25/2024 1:27 PM
d
fi
Photo 2: Photo taken from near the southern corner of the property looking NW.
Page 6 of 8
Brownfields Inspection Report: South Bank Building, 25022-21-032
06/25/2024 1:27 PM
Photo 3: Photo taken from east the southern corner of the property along Chapel Hill St,
looking NW.
Page 7of8
Brownfields Inspection Report: South Bank Building, 25022-21-032
06/25/2024 1:27 PM
Photo 4: Photo taken from the intersection of Morris St. and Morgan St., looking SW.
Page 8of8