Loading...
HomeMy WebLinkAbout11044_CAMP_EMP Site 27-28 Multi-Family Apartments_20240530#C-1269 Engineering #C-245 Geology Environmental Management Plan 27/28 Multi-Family Apartments CAMP Brownfields Site Statesville Avenue and Woodward Avenue Charlotte, North Carolina Brownfields Project No. 11044-07-060 H&H Job No. ATL-008 November 4, 2023 (Revised May 30, 2024) CONTENTS Completed EMP Template Form Figures Figure 1 NCBP Diagram for Temporary Containment of Impacted or Potentially Impacted Soil Figure 2 Site Location Map Figure 3 Proposed Building Layout and Sample Location Map Appendices Appendix A Preliminary Site Plan Appendix B Preliminary Construction Schedule Appendix C Previous Environmental Assessment Data Tables Appendix D Preliminary Site Grading Plan and Cut/Fill Analysis     1  EMP Version 3, March 2023   NORTH CAROLINA BROWNFIELDS REDEVELOPMENT SECTION   ENVIRONMENTAL MANAGEMENT PLAN    This form is to be used to prepare an Environmental Management Plan (EMP) for projects in  the North Carolina Brownfields Redevelopment Section at the direction of a Brownfields  project manager.    The EMP is a standard requirement of a Brownfields Agreement (BFA).  Its purpose is to clarify  actions to be taken during demolition and construction at Brownfields properties in an effort  to avoid delays in the event of the discovery of new contamination sources or other  environmental conditions.  The EMP provides a means to document redevelopment plans and  environmental data for each applicable environmental medium to inform regulatory‐compliant  decision‐making at the site.  As much detail as possible should be included in the EMP,  including contingency planning for unknowns.  Consult your project manager if you have  questions.    Prospective Developers and/or their consultants must complete and submit this form and all  pertinent attachments, see checklist below, to their Brownfields project manager prior to any  earthmoving or other development‐related activities that have the potential to disturb soil at  the Brownfields Property, including demolition.  For the EMP to be valid for use, it must be  completed, reviewed by the Section, signed by all parties working on the project, and  approved by the Brownfields project manager.  Failure to comply with the requirements of the  EMP could jeopardize project eligibility, or in the event of a recorded agreement, be cause for  a reopener.      The EMP is valid only for the scope of work described herein and must be updated to be  applicable for new phases of redevelopment or after significant changes in applicable  regulatory guidance.  Risk characterization of a Brownfields Property to DEQ’s written  satisfaction is required prior to EMP approval.    Voluntary Metrics Tab  The NC Brownfields Redevelopment Section updates estimated capital investment (from the Brownfields Property Application) and estimated jobs created (from the Brownfields Agreement) whenever possible. As a voluntary measure, you may opt to complete the below information for capital investment and jobs created as estimated by your final redevelopment plans for the Brownfields Property: 1. Estimated capital investment in redevelopment project: Click or tap here to enter text. 2. Estimated jobs created: a. Construction Jobs: Click or tap here to enter text. b. Full Time Post-Redevelopment Jobs: Click or tap here to enter text.         2  EMP Version 3, March 2023   Table of Contents   NORTH CAROLINA BROWNFIELDS REDEVELOPMENT SECTION .................................................................. 1  ENVIRONMENTAL MANAGEMENT PLAN .................................................................................................... 1  GENERAL INFORMATION ........................................................................................................................ 4  COMMUNICATIONS ................................................................................................................................ 5  NOTIFICATIONS TO THE BROWNFIELDS REDEVELOPMENT SECTION ..................................................... 6  REDEVELOPMENT PLANS ........................................................................................................................ 6  CONTAMINATED MEDIA ......................................................................................................................... 8  PART 1. SOIL ........................................................................................................................................ 8  PART 2. GROUNDWATER .................................................................................................................. 19  PART 3. SURFACE WATER .................................................................................................................. 22  PART 4. SEDIMENT ............................................................................................................................ 22  PART 5.  SOIL VAPOR ......................................................................................................................... 23  PART 6. INDOOR AIR ......................................................................................................................... 24  VAPOR INTRUSION MITIGATION SYSTEM ............................................................................................. 25  CONTINGENCY PLAN ............................................................................................................................. 25  POST‐REDEVELOPMENT REPORTING ..................................................................................................... 27  APPROVAL SIGNATURES ....................................................................................................................... 29            3  EMP Version 3, March 2023   So that the EMP provides value in protecting Brownfields eligibility and public health, the  preparer shall ensure that the following steps have been completed prior to submitting the  EMP for review.  Any EMP prepared without completing all of the following is premature and may  be returned without comment.      ☒ Site sampling and assessment that meets Brownfields’ objectives is complete and has  been reviewed and approved by the Brownfields project manager.  ☒ Specific redevelopment plans, even if conceptual, have been developed for the project,  submitted and reviewed by the Brownfields project manager.    Please submit, along with the completed EMP form, the following attachments, as relevant  and applicable to the proposed redevelopment:    ☒ A set of redevelopment plans, including architectural/engineering plans, if available; if  not, conceptual plans may suffice if updated when detailed plans are drafted.    ☒ A figure overlaying redevelopment plans on a map of the extent of contamination for  each media.    ☒ Site grading plans that include a cut and fill analysis.    ☐ A figure showing the proposed location and depth of impacted soil that would remain  onsite after construction grading.    ☐ Any necessary permits for redevelopment (i.e. demolition, etc.).    ☒ A detailed construction schedule that includes timing and phases of construction.    ☒ Tabulated data summaries for each impacted media (i.e. soil, groundwater, soil gas,  etc.) applicable to the proposed redevelopment.    ☒ Figures with the sampling locations and contamination extents for each impacted media  applicable to the proposed redevelopment.    ☐ A full final grade sampling and analysis plan, if the redevelopment plan is final.    ☐ If known, information about each proposed potential borrow soil source, such as aerial  photos, historic site maps, historic Sanborn maps, a site history, necessary for  Brownfields approval.    ☒ Information and, analytical data if required, for quarries, or other borrow sources,  detailing the type of material proposed for import to the Brownfields Property.      4  EMP Version 3, March 2023     ☐ A work plan for the sampling and analysis of soil to be brought onto the Brownfields  Property.  Refer to Issue Resolution 15 in Brownfields Redevelopment Section  Guidelines.    ☐ A map of the Brownfields Property showing the location of soils proposed for export  and sampling data from those areas.    ☒ If a Vapor Intrusion Mitigation System (VIMS) is required by the Brownfields  Redevelopment Section, the VIMS plan will be signed and sealed by a NC Professional  Engineer.  The VIMS Plan may also be submitted under separate cover.    GENERAL INFORMATION      Date: 11/4/2023 Revision Date (if applicable): 5/30/2024    Brownfields Assigned Project Name: CAMP Brownfields Site – 27/28 Multi‐Family Apartments    Brownfields Project Number: 11044‐07‐060    Brownfields Property Address: The Brownfields property is located within the CAMP North End (CNE)  development and southeast of the intersection of  Statesville Avenue and Woodward Avenue at the  addresses 1832 Statesville Avenue and 820 Water Tower Drive in Charlotte, Mecklenburg County,  North Carolina.    Brownfields Property Area (acres): The Site is part of the CNE development that consists of seventeen  (17) buildings across the property.  The current property owner, NewCamp Landowner, LP  (NewCamp), purchased the property in December 2016 and entered the southern portion of the Site  (former Rite Aid) into a Brownfields Agreement with the North Carolina Department of Environmental  Quality (DEQ) which was finalized in October 2017 (#20050‐16‐060).  In 2016, NewCamp also  purchased the CAMP Brownfields property (#11044‐07‐060) located in the northern portion of the  Site, which was entered into the DEQ Brownfields Program in 2006 by a previous PD.  The Site is  located at the northwestern portion of the #11044‐07‐060 Brownfields Property located at Statesville  Avenue (to the west) and Woodward Avenue (to the north) in Charlotte, Mecklenburg County, North  Carolina (Site).  The multi‐family building project is referred to as Building 27/28 and the Woodward  Multi Family Development.  A Site location map is provided as Figure 2, and the Site and surrounding  area are shown in Figure 3.  Is Brownfields Property Subject to RCRA Permit?.......................☐ Yes   ☒ No  If yes enter Permit No.: Click or tap here to enter text.  Is Brownfields Property Subject to a Solid Waste Permit….……..☐ Yes   ☒ No  If yes, enter Permit No.: Click or tap here to enter text.          5  EMP Version 3, March 2023   COMMUNICATIONS    A copy of this EMP shall be distributed to all the parties below as well as any contractors or site workers  that may be exposed to site vapors, soil, groundwater, and/or surface water.  Additionally, a copy of the  EMP shall be maintained at the Brownfields Property during redevelopment activities in an area that is  prominently accessible to site workers.  NOTE, THE EMP DOES NOT TAKE THE PLACE OF A SITE‐SPECIFIC  HEALTH AND SAFETY PLAN.    Prospective Developer (PD): NewCamp Landowner, LP    Contact Person: Scott Carr, Director of Construction   Phone Numbers:   Office: (704) 682‐7159 Mobile: (704) 682‐7159    Email: scott@camp.nc        Contractor for PD: DE Looper & Co. (DELCO)    Contact Person: Matt Winters  Phone Numbers:   Office: (828) 324‐1284 (ext 306) Mobile:  NA    Email: mwinters@delcompany.com       Environmental Consultant: Hart & Hickman, PC     Contact Person: Matt Ingalls  Phone Numbers:   Office: (704) 887‐4617 Mobile: (704) 560‐5767    Email: mingalls@harthickman.com     Brownfields Redevelopment Section Project Manager:  Carolyn Minnich  Phone Numbers:   Office: (704) 661‐0330 Mobile: (704) 661‐0330    Email: carolyn.minnich@deq.cn.gov      Other DEQ Program Contacts (if applicable, i.e., UST Section, Inactive Hazardous Site Branch,  Hazardous Waste, Solid Waste):   Ray Livermore w/ USACE  FUDS Project Manager  U.S. Army Corps of Engineers, Wilmington District  Phone:  (910) 251‐4702   Email:  Raymond.R.Livermore@usace.army.mil    George Adams w/ DEQ Brownfields Phone: (919) 707-8131 Email: george.adams@deq.nc.gov and BFPropertyManagement@deq.nc.gov           6  EMP Version 3, March 2023     NOTIFICATIONS TO THE BROWNFIELDS REDEVELOPMENT SECTION    Written advance Notification Times to Brownfields project manager: Check each box to accept  minimum advance notice periods (in calendar days) for each type of onsite task:    On‐site assessment or remedial activities:……………………………………….…… 10 days Prior        ☒    Construction or grading start:……………………………………….………………………. 10 days Prior       ☒    Discovery of stained soil, odors, USTs, buried drums or waste, landfill, or other signs of previously  unknown contamination: ……………………………….……………………………………. Within 48 hours   ☒   Implementation of emergency actions (e.g. dewatering, flood or soil erosion control measures in  area of contamination, ventilation of work zones):…………….……….……… Within 48 hours  ☒    Installation of mitigation systems:………………………….………………….……….. 10 days Prior         ☒   Other notifications as required by local, state or federal agencies to implement redevelopment  activities: (as applicable): ……………………….…………………………………………..… Within 30 days     ☒  REDEVELOPMENT PLANS    1) Type of Redevelopment (check all that apply):  ☒Residential ☐Townhomes (Prior written DEQ approval REQUIRED regardless of ownership  structure) ☐Recreational ☐Institutional  ☒Commercial  ☒Office  ☒Retail  ☐Industrial  ☒Other specify:  Parking    2) Check the following activities that will be conducted prior to commencing earth‐moving activities  at the site:  ☒ Review of historic maps (Sanborn Maps, facility maps)  ☒ Conducting geophysical surveys to evaluate the location of suspect UST, fuel lines, utility  lines, etc.  ☒ Interviews with employees/former employees/facility managers/neighbors    3) Summary of Redevelopment Plans (MANDATORY: attach detailed plans or conceptual plans, if  detailed plans are not available. EMP review without such information would be premature):   Provide brief summary of redevelopment plans, including demolition, removal of building  slabs/pavement, grading plans and planned construction of new structures:   Planned redevelopment at the Brownfields property includes construction of a high‐density  apartment complex with amenity space(s), potential retail space(s), and a parking garage.  The      7  EMP Version 3, March 2023   redevelopment will consist of new construction of two (2) mix‐use buildings (referred to as  Buildings 27 and 28) that are approximately 161,920 and 210,362 square ft in size, respectively,  with five (5) levels, and comprised of 307 residential units (studios, 1‐ bedroom, 2‐bedroom, and  4‐bedroom), office/workspaces, and commercial spaces.  A third single‐story amenities building  (1,684 square ft) is also proposed along with a courtyard and swimming pool.  The parking  garage (650 vehicles) is also proposed with will consist of five (5) levels that total 218,038 sqaure  ft.  The buildings will be constructed with a slab on grade except for a portion of the parking lot  will be subgrade  one level.  Aggregate piers will be required for all building foundations.      Prior to redevelopment, the western portions of two (2) existing on‐Site structures (Hercules  North and Hercules South) will be razed and grading will be completed to achieve proposed final  grade elevations.  Copies of the civil site plan prepared by LandDesign and architectural plans  prepared by Dwell Design Studio are provided as Appendix A.    4) Do plans include demolition of structure(s)?:      ☒ Yes  ☐ No ☐ Unknown   ☒ If yes, please check here to confirm that demolition will be conducted in accordance with  applicable legal requirements, including without limitation those related to lead and asbestos  abatement that are administered by the Health Hazards Control Unit within the Division of Public  Health of the North Carolina Department of Health and Human Services.  If available, please  provide a copy of your demolition permit.     5) Are sediment and erosion control measures required by federal, state, or local regulations?   S&EC requirements can be found at: https://deq.nc.gov/about/divisions/energy‐mineral‐and‐land‐ resources/erosion‐and‐sediment‐control/erosion‐and‐sediment‐control‐laws‐and‐rules    ☒ Yes    ☐ No    ☐ Unknown   ☒  If yes, please check here to confirm that earth‐work will be conducted in accordance with  applicable legal requirements.  If soil disturbance is necessary to install sediment and erosion  control measures, they may not begin until this EMP is approved.     6) Which category of risk‐based screening level is used or is anticipated to be specified in the  Brownfields Agreement?  Note: If children frequent the property, residential screening levels shall  be cited in the Brownfields Agreement for comparison purposes.  ☒ Residential   ☐ Non‐Residential or Industrial/Commercial    7) Schedule for Redevelopment (attach construction schedule):  a) Construction start date: 9/1/2024     b) Anticipated duration (specify activities during each phase):   Redevelopment activities are expected to be completed in approximately 30 months.  A  construction schedule is included as Appendix B that notes a May 2024 start date.  However,  Scott Carr (Camp North End) indicated that the construction schedule has been extended  approximately 4 months with an estimated start date in Sept 2024.  Note this construction  start date is subject to change.      8  EMP Version 3, March 2023     c) Additional phases planned? ☐ Yes  ☒ No          If yes, specify the start date and/or activities if known:   Start Date:  Click or tap to enter a date.     Planned Activity:  Click or tap here to enter text.  Start Date:  Click or tap to enter a date.     Planned Activity:  Click or tap here to enter text.        Start Date: Click or tap to enter a date.     Planned Activity:  Click or tap here to enter text.  d) Provide the planned date of occupancy for new buildings: 10/1/2026       CONTAMINATED MEDIA  Please fill out the sections below, using detailed site plans, if available, or estimate using known areas  of contaminated soil and a conceptual redevelopment plan.  Provide a figure overlaying new  construction onto figure showing contaminated soil and groundwater locations.    1) Contaminated Media on the Brownfields Property  Part 1. Soil:        ☒  Yes   ☐ No   ☐ Suspected  ☐ Unknown  Part 2. Groundwater: .................................... ☐  Yes   ☐ No   ☒ Suspected  ☐ Unknown  Part 3. Surface Water:     ☐  Yes   ☐ No   ☐ Suspected  ☐ Unknown  ☒ N/A  Part 4. Sediment: .......................................... ☐  Yes   ☐ No   ☐ Suspected  ☐ Unknown  ☒ N/A  Part 5. Soil Vapor: ......................................... ☒  Yes   ☐ No   ☐ Suspected  ☐ Unknown  Part 6. Sub‐Slab Soil Vapor: .......................... ☒  Yes   ☐ No   ☐ Suspected  ☐ Unknown  Part 7. Indoor Air: ......................................... ☐  Yes   ☐ No   ☐ Suspected  ☒ Unknown    2) For the Area of Proposed Redevelopment on the Brownfields Property, attach tabulated data  summaries for each impacted media and figure(s) with sample locations.       PART 1. SOIL  1) Known or suspected contaminants in soil (list general groups of contaminants):  In March 2023, H&H conducted Brownfield Phase II Assessment activities at the Site.  A tabular  summary of the Phase II soil analytical data in comparison to the July 2022 DEQ Residential and      9  EMP Version 3, March 2023   Industrial/Commercial Preliminary Soil Remediation Goals (PSRGs) is included in Appendix C.   Approximate soil sample locations are shown on Figure 3, and a brief summary of the results is  provided below.    Volatile Organic Compounds (VOCs)  Laboratory analytical results indicate trace estimated (J‐flag) detections of the VOCs carbon  disulfide, methylene chloride, methyl ethyl ketone, and toluene in one or more soil samples  below all respective PSRGs.  The VOC acetone was detected in all soil samples collected at the  Site.  Acetone is a common laboratory artifact and is likely a result of laboratory‐introduced  contamination.  No other VOCs were detected above laboratory method detection limits (MDLs)  in soil samples collected at the Site.    Semi‐Volatile Organic Compounds (SVOCs)  No SVOCs were detected above laboratory MDLs in any soil sample collected at the Site.    Metals  Arsenic was detected in all soil samples collected at the Site at concentrations ranging from  0.700 mg/kg to 2.03 mg/kg, which are above the Residential PSRG of 0.68 mg/kg.  The detected  arsenic concentrations are consistent with Site‐specific background levels, are below the mean  published regional background range for North Carolina soils and are likely naturally occurring.   Hexavalent chromium was detected in soil samples SB‐8 (0.504 mg/kg), SB‐10 (0.354 mg/kg), and  SB‐11 (0.342 mg/kg) at concentrations above the Residential PSRG of 0.31 mg/kg, but within the  range of Site‐specific background.  Although the presence of arsenic and hexavalent chromium in  the environment may be the result of anthropogenic activity, arsenic and hexavalent chromium  appear to be present in background soil at the Site.  No other metals were detected above PSRGs  in soil samples collected at the Site.    2) Depth of known or suspected contaminants (feet):  Soil samples were collected at depths ranging from 0 to 5 ft from across the Site.  However,  hexavalent chromium detections above the Residential PSRG appear to be limited to shallow soil  in the southern portion of the Site (SB‐8, SB‐10, and SB‐11).      3) Area of soil disturbed by redevelopment (square feet):  The project portion of the Site will be stripped of asphalt pavement along with the western  portion of the northern and southern Hercules buildings (discussed above) for a total of  approximately 309,331 square ft area of disturbance.      4) Depths of soil to be excavated (feet):  The preliminary grading plan and cut/fill analysis are provided in Appendix D.  As indicated in the  cut‐fill analysis, cut areas primarily range in depth from 12.5 ft to 0.43 ft below ground surface  (bgs).  Please note that soil samples were not collected to 12.5 ft.  Since soil will remain on BF  property, it can be moved on‐Site and final grade sampling will be required.  If soil is disposed of  off‐site, additional soil sampling may be required for characterization purposes depending on the      10  EMP Version 3, March 2023   the export location.      5) Estimated volume of soil (cubic yards) to be excavated (attach grading plan):  Grading and construction activities for the proposed redevelopment at the Site will generate  approximately 24,264 cubic yards of soil that will likely need to be managed to achieve proposed  final grade elevations.  Currently, the PD plans to reuse the excavated soil from cut areas as  beneficial fill in the eastern portion of the CAMP Brownfields Site.  Therefore, the PD does not  anticipate exporting soil off‐Site during this project.    6) Estimated volume of excavated soil (cubic yards) anticipated to be impacted by contaminants:              Based on soil sample results and review of the cut‐fill analysis, it is unlikely grading activities will  encounter significant areas of impacted soil that will need to be managed.    7) Estimated volume of contaminated soil expected to be disposed of offsite, if applicable:    Soil excavated at the Site is proposed to be re‐used in fill areas during redevelopment.      PART 1.A. MANAGING ONSITE SOIL  If soil is anticipated to be excavated from the Brownfield Property, relocated on the Brownfields  Property, or otherwise disturbed during site grading or other redevelopment activities, please  provide a grading plan that clearly illustrates areas of cut and fill (approximate areas & volumes are  acceptable, if only preliminary data available).      1) HAZARDOUS WASTE DETERMINATION:   a) Does the soil contain a LISTED WASTE as defined in the North Carolina Hazardous  Waste Section under 40 CFR Part 261.31‐261.35?....................................... ☐Yes   ☒No  ☐ If yes, explain why below, including the level of knowledge regarding processes  generating the waste (include pertinent analytical results as needed).  Click or tap here to enter text.    ☐ If yes, do the soils exceed the “Contained‐Out” levels in Attachment 1 of the  North Carolina Contained‐In Policy?................................................. ☐ Yes   ☐ No    b) NOTE: IF SOIL MEETS THE DEFINITION OF A LISTED HAZARDOUS WASTE AND EXCEEDS  THE CONTAINED‐OUT LEVELS IN ATTACHMENT 1 TO THE NORTH CAROLINA  CONTAINED‐IN POLICY, THE SOIL MAY NOT BE RE‐USED ONSITE AND MUST BE  DISPOSED OF IN ACCORDANCE WITH DEQ HAZARDOUS WASTE SECTION RULES AND  REGULATIONS.      c)  Does the soil contain a CHARACTERISTIC WASTE?.................................... ☐ Yes   ☒ No  ☐ If yes, mark reason(s) why below (and include pertinent analytical results).  ☐ Ignitability  Click or tap here to enter text.                ☐ Corrosivity Click or tap here to enter text.      11  EMP Version 3, March 2023   ☐ Reactivity Click or tap here to enter text.  ☐ Toxicity Click or tap here to enter text.  ☐ TCLP results Click or tap here to enter text.  ☐ Rule of 20 results (20 times total analytical results for an individual  hazardous constituent on TCLP list cannot, by test method, exceed regulatory  TCLP standard)    Click or tap here to enter text.    ☒ If no, explain rationale:   Soil analytical data for the soil samples collected at the Site does not indicate  detections capable of exceeding TCLP criteria using the Rule of 20.  Further, the  soil does not contain a Listed Waste as defined in the North Carolina Hazardous  Waste Section under 40 CFR Part 261.31‐261.35.    d) NOTE: IF SOIL MEETS THE DEFINITION OF A CHARACTERISTIC HAZARDOUS WASTE, THE  SOIL MAY NOT BE RE‐USED ONSITE AND MUST BE DISPOSED OF IN ACCORDANCE WITH  DEQ HAZARDOUS WASTE SECTION RULES AND REGULATIONS.    2) Screening criteria by which soil disposition decisions will be made (e.g., left in place, capped in  place with low permeability barrier, removed to onsite location and capped, removed offsite):        ☒ Preliminary Health‐Based Residential SRGs         ☐ Preliminary Health‐Based Industrial/Commercial SRGs              ☒ Division of Waste Management Risk Calculator (For Brownfields Properties Only)      ☐ Site‐specific risk‐based cleanup level. Please provide details of methods used for  determination/explanation.   Click or tap here to enter text.    Additional comments:   Click or tap here to enter text.    3) If known impacted soil is proposed to be reused within the Brownfields Property boundary,  please check the measures that will be utilized to ensure safe placement and documentation of  same.   Please attach a proposed location diagram/site map.           ☒ Provide documentation of analytical report(s) to Brownfields project manager.  ☒ Provide documentation of final location, thickness and depth of relocated soil onsite map to  Brownfields project manager once known.  ☒ Geotextile to mark depth of fill material.   Provide description of material:   Geotextile fabric or fencing may be used.        12  EMP Version 3, March 2023   ☒ Manage soil under impervious cap ☒  or clean fill ☒   ☒ Describe cap or fill:   Should potentially impacted soil or fill materials be encountered during redevelopment that  do not require removal for geotechnical or construction purposes and meets the definition  of beneficial fill as outlined in the Beneficial Fill rule (15A NCAC 13B.0562), the potentially  impacted soil or fill materials may be placed beneath impervious surfaces (asphalt  pavement, sidewalks, access roads, buildings, etc.) or a minimum of 2 ft of clean fill.       ☒ Confer with NC BF project manager if Brownfield Plat must be revised (or re‐recorded if  actions are Post‐Recordation).                 ☒ GPS the location and provide site map with final location.  ☐ Other. Please provide a description of the measure:        4) Please describe the following action(s) to be taken during and following excavation and  management of site soils:  ☒ Check to confirm that management of fugitive dust from site activities will be handled in  accordance with applicable local, state, and federal requirements.    Field screening of site soil  At a minimum, contractors shall be made aware of protocols should impacted soils (e.g. staining,  unusual odors, fill materials) be identified.     Describe the field screening method, frequency of field screening, person conducting field  screening:   During soil disturbance at the Site, the workers or contractors will observe soil for evidence  of potential impacts.  Evidence of potentially impacted soil includes a distinct unnatural  color, strong odor, or filled or previously disposed materials of concerns (i.e., chemicals,  tanks, drums, etc.).  Should the above be noted during site work, the contractor will  contact the project environmental professional to observe the suspect condition.  If the  project environmental professional confirms that the material may be impacted, then the  procedures below will be implemented.  In addition, the DEQ Brownfields project manager  will be contacted within 48 hours to advise of the condition.    Soil sample collection  ☐ Yes    ☒ Not anticipated ‐ In order to avoid delays in construction, a plan shall be in place for sampling  of suspect soils should they be encountered during redevelopment.  If soil sample collection is  not anticipated but the need to do so is identified during redevelopment, notify the Brownfields  project manager of the anticipated sample and report dates for scheduling purposes.      Describe the sampling method (e.g., in‐situ grab, composite, stockpile, etc.) and confirm that all  Click or tap here to enter text.      13  EMP Version 3, March 2023   procedures outlined in applicable DEQ guidance for assessment shall be followed Typically, at  least one representative sample (per 500 yd3 for residential and 1,000 yd3 for commercial)  consisting of a 3 to 5‐point composite sample with grab sample for VOCs based on the highest PID  reading is required to determine soil management options:   If significant soil impact is encountered during grading and/or installation or removal of  utilities, excavation will proceed only as far as needed to allow grading or other  construction‐related activity to continue and/or only as far as needed to allow alternate  corrective measures as described below.  Suspect significantly impacted soil excavated  during redevelopment activities may be stockpiled and covered in a secure area to allow  construction to progress.  Suspect impacted soil will be stockpiled in accordance with  Figure 1, NCBP Diagram for Temporary Containment of Impacted or Potentially Impacted  Soil.  At least one representative soil sample (consisting of a 3 to 5‐point aliquot  composite sample for non‐VOC analysis with a grab sample for VOC analysis) at a sample  ratio of 1 soil sample per every approximately 1,000 cubic yards of soil will be collected  for analysis of total VOCs, SVOCs, RCRA metals, and hexavalent chromium.  If the soil  sample laboratory analytical results indicate that the soil could potentially exceed toxicity  characteristic hazardous waste criteria, then the soil will also be analyzed by TCLP for  those compounds that could exceed the toxicity characteristic hazardous waste criteria.   Impacted soil will be handled in the manner described in the table below based upon the  laboratory analyses.    Check applicable chemical analytes for soil samples:  ☒ Minimum Sample Requirements: Volatile organic compounds (VOCs) by EPA Method  8260; Semi‐volatile organic compounds (SVOCs) by EPA Method 8270; and Metals RCRA  List + Hexavalent Chromium by EPA Method 6020/7199    ☐ Pesticides: Specify Analytical Method Number(s):   Click or tap here to enter text.   ☐ PCBs: Specify Analytical Method Number(s):   Click or tap here to enter text.   ☐ Other Constituents & Respective Analytical Method(s) (e.g. Herbicides):  Click or tap here to enter text.   ☒ Check to confirm that by the owner’s signature and the North Carolina Professional  Engineer/Geologist sealing this EMP the consultant understands that no work plan for suspect  soil sample collection will be submitted beyond this EMP, and that it is the responsibility of the  sealing professional and property owner to ensure that all applicable guidelines and  methodologies are followed and reported to DEQ for determination and approval of soil  placement prior to final relocation.     If impacted soils above applicable PSRGs and/or site‐specific risk thresholds are proposed to  be relocated on‐site, prior to final placement on‐site, the following shall be submitted for DEQ  review/approval  ‐ Analytical data that has been sampled in accordance with the above referenced frequency and      14  EMP Version 3, March 2023   following procedures outlined in the most recent Brownfields Redevelopment Section  Environmental Site Assessment Work Plan Minimum Requirements Checklist (Checklist) and in  accordance with DEQ IHSB Guidelines for Assessment and Cleanup of Contaminated Sites  (Guidelines)  ‐ Figure outlining planned soil placement and any future site features including  buildings/hardscape/open areas  ‐ A North Carolina PE/PG recommendation of placement    Impacts  Options  Onsite Placement without  conditions  Onsite placement under 2 ft  of cap or clean fill1, 2  All Constituents below applicable  PSRGs X   Constituents3 below applicable  PSRGs; Metals below background  but above PSRGs  X   Constituents3 below applicable  PSRGs; Metals above Background  /PSRGs   X  Constituents above Applicable  PSRGs  X  1: Requires Prior Written DEQ Approval  2: VOC impacted soils above applicable PSRGs shall not be placed directly beneath building footprints  without prior written DEQ approval.  3: Constituents indicate any samples evaluated for other than metals.    ☒ Check to confirm that stockpiling of known or suspected impacted soils will be conducted in  accordance with Figure 1 of this EMP.  Stockpile methodology should provide erosion control,  prohibiting contact between surface water/precipitation and contaminated soil, and preventing  contaminated runoff.  Explain any variances or provide additional details as needed:    ☒ Final grade sampling of exposed native soil (i.e., soil that will not be under buildings or  permanent hardscape). Select chemical analyses for final grade samples with check boxes below  (Check all that apply):  ☒ Minimum Sample Requirements: Volatile organic compounds (VOCs) by EPA Method  8260; Semi‐volatile organic compounds (SVOCs) by EPA Method 8270; and Metals RCRA  List + Hexavalent Chromium by EPA Method 6020/7199    ☐ Pesticides: Specify Analytical Method Number(s):   Click or tap here to enter text.   ☐ PCBs: Specify Analytical Method Number(s):   Click or tap here to enter text.   ☐ Other Constituents & Respective Analytical Method(s) (e.g. Herbicides):  Click or tap here to enter text.   Click or tap here to enter text.      15  EMP Version 3, March 2023   Please provide a scope of work for final grade sampling, including a diagram of soil  sampling locations, number of samples to be collected, and brief sampling methodology.   Samples should be collected from 0‐2 ft below ground surface, with the exception of VOCs  which should be taken from 1‐2 ft below ground surface.  Alternatively, indicate if a work  plan for final grade sampling may be submitted under separate cover.  Following completion of soil disturbance for future Site development (i.e., after grading  and utility construction), Hart & Hickman will observe the Site for areas that will not be  covered upon completion of the redevelopment with a minimum of 2 ft of demonstrably  clean fill soil, building foundations, sidewalks, asphalt or concrete parking areas, driveways,  or other impervious areas (e.g., tightly spaced pavers or bricks).  If such areas exist, a Work  Plan will be prepared for final grade sampling for DEQ Brownfields review and approval.  It  is anticipated that one final grade soil sample will be collected for laboratory analysis for  each approximately 100 ft of linear landscape area or every approximately 1,000 sq ft of  open area.    Final grade soil samples will consist of 3 to 5‐point aliquot soil samples collected from  within each evaluation area which will be combined and homogenized to form one  composite soil sample representative of that evaluation area and submitted for analysis of  SVOCs and RCRA metals plus hexavalent chromium.  In addition, one grab soil sample will  be collected for each evaluation area and submitted for laboratory analysis of VOCs.  VOC  samples will be collected from the sample aliquot with the highest potential for impact  based on field screening results (i.e., highest PID reading).      If no such areas exist, documentation will be provided to the DEQ Brownfields  Redevelopment Section project manager and/or the DEQ Brownfields Property  Management Unit.  ☐ If final grade sampling was NOT selected, please explain rationale:  Click or tap here to enter text.      PART 1.B. IMPORTED FILL SOIL    NO SOIL MAY BE BROUGHT ONTO THE BROWNFIELDS PROPERTY WITHOUT PRIOR APPROVAL FROM  THE BROWNFIELDS REDEVELOPMENT SECTION.  According to the Brownfields IR 15, “Documenting  imported soil (by sampling, analysis, and reporting in accordance with review and written approval  in advance by the Brownfields Redevelopment Section), will safeguard the liability protections  provided by the brownfields agreement and is in the best interest of the prospective  developer/property owner.”    Requirements for importing fill:  ☒ Check to confirm that the import volumes outlined below have been confirmed based on  geotechnical evaluations.        16  EMP Version 3, March 2023   1) Will fill soil be imported to the site?................................................ ☐ Yes  ☒ No  ☐ Unknown    2) If yes, what is the estimated volume of fill soil to be imported?   Based on preliminary grading plans and cut/fill analysis, the PD does not anticipate import of fill  soil from an off‐site source during construction activities to achieve the desired grades.  However,  limited amounts of virgin organic rich topsoil may be imported from a commercial landscape  material vendor for use in proposed landscaped areas.    3) If yes, what is the anticipated depth that fill soil will be placed at the property? (If a range  of depths, list the range.)  Current plans include using cut soil to balance the 27/28 Multi‐Family Apartment project area in  addition to adding soil to other areas on the CAMP Brownfields property (eastern portion of the  Brownfields site).  Limited fill areas on the 27/28 Multi‐Family Apartment project will range from  8.25 ft to 0.12 ft above existing grade.  Fill soil in the eastern portion of the CAMP Brownfields  property will range from 12 ft to 0.68 ft above existing grade.    PRIOR TO SOIL PLACEMENT AT THE BROWNFIELDS PROPERTY, a Soil Import Request must be  submitted for DEQ Brownfields review and approval. The request shall consist of a data  package that details:   ‐ Fill source location/history (Phase I if available, current aerials, etc.)  ‐ Analytical data that has been sampled in accordance with the below frequency and  following procedures outlined in the most recent Brownfields Redevelopment Section  Environmental Site Assessment Work Plan Minimum Requirements Checklist (Checklist)  and in accordance with DEQ IHSB Guidelines for Assessment and Cleanup of  Contaminated Sites (Guidelines)  ‐ A table comparing the import soil to existing site concentrations  ‐ A PE/PG recommendation of import  ‐ All relevant attachments listed in the Checklist    Soil Import Sampling Requirements:  Source Sample Frequency Sample Analysis  Virgin Material from DEQ  Brownfields Pre‐ approved Quarry  None (Contact Brownfields project manager for list of pre‐ approved Quarries  DEQ Permitted Quarry  (Not Brownfields Pre‐ approved)  At least one  representative sample  from area of planned  import  VOCs, SVOCs, RCRA  Metals, any site specific  COCs (e.g. pesticides,  PCBs, etc.)  Other NC DEQ  Brownfields Property  At least one  representative sample  per 1,000 yd3 consisting  of a 3‐point composite  sample with grab sample  for VOCs based on the  highest PID reading  VOCs, SVOCs, RCRA  Metals, any site specific  COCs (e.g. pesticides,  PCBs, etc.)  Off‐site  unpermitted/regulated  property  Bulk Landscape Material No Sampling Required      17  EMP Version 3, March 2023   from Commercial Vendor  (i.e. topsoil)    If other special considerations apply, discuss:   Click or tap here to enter text.    ☒ Check to confirm that by the owner’s signature and the North Carolina Professional  Engineer/Geologist sealing this EMP the consultant understands that no work plan for suspect soil  sample collection will be submitted beyond this EMP, and that it is the responsibility of the sealing  professional and property owner to ensure that all applicable guidelines are followed and reported in  the Soil Import Request for DEQ approval. Failure to meet these requirements could result in  resampling and/or failure to approve import.     PART 1.C. SOIL EXPORT    NO SOIL MAY LEAVE THE BROWNFIELDS PROPERTY WITHOUT APPROVAL FROM THE  BROWNFIELDS REDEVELOPMENT SECTION.  Failure to obtain approval may violate a brownfields  agreement causing a reopener or jeopardizing eligibility in the Section, endangering liability  protections and making said action possibly subject to enforcement.  Justifications provided  below must be approved by the Section in writing prior to completing transport activities.  Refer  to Brownfields IR 15 for additional details.     1) If export from the Brownfields Property is anticipated, export soil must be sampled at a  frequency of one sample per 1,000 yd3 consisting of a 3‐point composite sample with a  grab sample for VOCs based on the highest PID reading.  Samples shall be analyzed at a  minimum for VOCs, SVOCs, and RCRA metals plus any site specific COCs.      PRIOR TO EXPORT FROM THE BROWNFIELDS PROPERTY, a Soil Export Request must be  submitted for DEQ Brownfields review and approval. The request shall consist of a Data  Package that details:     ‐ Proposed Receiving Facility  ‐ Analytical data that has been sampled in accordance with the above referenced  frequency and following procedures outlined in the most recent Brownfields  Redevelopment Section Environmental Site Assessment Work Plan Minimum  Requirements Checklist (Checklist) and in accordance with DEQ IHSB Guidelines for  Assessment and Cleanup of Contaminated Sites (Guidelines)  ‐ A table comparing the export soil to concentrations on the receiving site concentrations  including risk comparison (Note that calculated risk cannot be increased on the receiving  site)  ‐ A North Carolina PE/PG recommendation of export  ‐ Written approval from the receiving site property owner representative for export  ‐ All relevant attachments listed in the Checklist    Soil Export Options  Impacts Options      18  EMP Version 3, March 2023   Use as  Beneficial Fill  Off‐site disposal at  other Brownfields  Property2,6,7  Off‐site disposal  at LCID/CD  Landfill1, 3  Off‐site disposal at Subtitle  D MSW/Permitted  Landfarm4  All Constituents below  applicable PSRGs X X X X  Constituents5 below  applicable PSRGs; Metals  below background but  above PSRGs   X X X  Constituents5 below  applicable PSRGs; Metals  above Background /PSRGs   X X X  Constituents above  Applicable PSRGs  X   X  1: Requires Prior Written DEQ Approval  2: VOC impacted soils above applicable PSRGs shall not be placed directly beneath building footprints  without prior written DEQ approval.  3: Requires comparison to site specific metals concentrations.  4: Facility to determine if they can accept soil within their permit.  5: Constituents indicate any samples evaluated for other than metals.  6: Requires written approval from receiving site property owner representative.  7. Site COCs must be in comparable concentrations to receiving site and not significantly raise risk of  the receiving site.    ☒ Check to confirm that by the owner’s signature and the North Carolina Professional  Engineer/Geologist sealing this EMP the consultant understands that no work plan for suspect soil  sample collection will be submitted beyond this EMP, and that it is the responsibility of the sealing  professional and property owner to ensure that all applicable guidelines are followed and reported in  the Soil Export Request for DEQ approval. Failure to meet these requirements could result in  resampling and/or failure to approve export.     If other special considerations apply, discuss:   Click or tap here to enter text.    PART 1.D. MANAGEMENT OF UTILITY TRENCHES    ☐ Install liner between native impacted soils and base of utility trench before filling with clean fill  (Preferred)    ☒ Last out, first in principle for impacted soils (if soil can safely be reused onsite and is not a  hazardous waste), i.e., impacted soils are placed back at approximately the depths they were  removed from such that impacted soil is not placed at a greater depth than the original depth  from which it was excavated.    ☐ Evaluate whether necessary to install barriers in conduits to prevent soil vapor transport,  and/or degradation of conduit materials due to direct impact with contaminants.      19  EMP Version 3, March 2023   ☐ If yes, provide specifications on barrier materials or provide the results of this evaluation in the  Vapor Mitigation Plan. Note that if vapor mitigation is planned for site buildings, utility corridors  will need to be evaluated as part of mitigation designs:  Click or tap here to enter text.    ☒ If no, include rationale here:  The PD intends to install a vapor mitigation system for the proposed redevelopment.      ☐ Unknown, details to be provided in the Vapor Mitigation Plan for site buildings    Other comments regarding managing impacted soil in utility trenches:   Although not anticipated, in the event that evidence of contaminated soil and/or vapors (e.g.,  unusual odors and/or stained soil) is encountered in utility trenches during redevelopment  activities, the trench will be evacuated, and appropriate safety screening of the vapors will be  performed to protect workers.  If results indicate further action is warranted in response to  vapors to protect workers, appropriate engineering controls (such as use of industrial fans) will  be implemented.     The contractor and workers will observe soil for potential impacts during utility installation  activities. Evidence of potential significant impacted soil includes a distinct unnatural color,  strong odor, or filled or previously disposed materials of concern (i.e., chemicals, tanks, drums,  etc.).  Should the above be noted during utility work, the contractor will contact the project  environmental professional to observe the suspect condition and screen the soil using a PID or  other similar vapor field screening instrument.  If the project environmental professional  confirms that the material may be impacted, then the procedures outlined above in Managing  On‐Site Soil (Part 1.A.) will be implemented.  In addition, the environmental professional will  contact the DEQ Brownfields project manager within 48 hours to advise that person of the  condition.    PART 2. GROUNDWATER     1) What is the depth to groundwater at the Brownfields Property?  The depth to groundwater measured in a monitoring well installed in the central portion of the  Site during the March 2023 Brownfields Phase II ESA was approximately 9.5 ft bgs.       2) What is the maximum depth of soil disturbance onsite?   As indicated in the cut‐fill analysis (Appendix D), soil in the northern portion of the Site is  planned to be cut by up to 12.5 ft below existing grade.      3) Is groundwater known to be contaminated by ☐onsite  ☐offsite   ☒both or ☐unknown  sources?  Describe source(s):   Results of recent groundwater assessment activities during the March 2023 Brownfields Phase II  ESA did not indicate the presence of VOCs, SVOCs, or RCRA Metals at concentrations above  North Carolina 2L Groundwater Quality Standards (2L Standards) and/or DEQ Vapor Intrusion      20  EMP Version 3, March 2023   Groundwater Screening Levels (GWSLs).  A tabular summary of the groundwater analytical data  is provided in Appendix C.  Groundwater sample locations are shown on Figure 3.  A summary of  groundwater sample results completed during the Brownfields Phase II ESA  are summarized  below.    VOCs  Laboratory analytical results indicate the detection of the VOCs acetone and toluene above  laboratory MDLs, but below 2L Standards in the TMW‐1/GW‐DUP groundwater samples.  No  other VOCs were detected at concentrations above laboratory MDLs.    SVOCs  No SVOCs were detected at concentrations above laboratory MDLs.    Metals  As anticipated, several metals including arsenic, barium, chromium, and lead were detected  above laboratory MDLs in the groundwater samples collected at the Site.  No metals were  detected at concentrations above 2L Standards in the groundwater samples.    Although impacts were not detected in the project area during the March 2023 Brownfields  Phase II ESA, chlorinated solvents (specifically trichloroethylene [TCE]) have been detected at  concentrations above 2L Standards and GWSLs in groundwater samples collected on the CAMP  Brownfields Property at locations southeast and topographically upgradient of the 27/28 Project  Area.      4) What is the direction of groundwater flow at the Brownfields Property?   Groundwater flow at the Site is expected to mimic topography and flow in a generally north‐ northwesterly direction towards the on‐Site unnamed tributary of Irwin Creek located 200 ft  northwest of the Site.    5) Will groundwater likely be encountered during planned redevelopment activities (e.g.  footer/utility construction or helical pilings?)     ☐Yes    ☒No   If yes, describe these activities:  Although it is not anticipated groundwater will be encountered during redevelopment, if  deemed warranted groundwater management options may be evaluated further and may  include the dewatering of groundwater, the installation of waterproofing materials,  containerization for off‐site disposal, discharge to sanitary sewer, and/or NPDES permitting.      In the event that groundwater is encountered during redevelopment activities (even  if no is  checked above), list activities for contingent management of groundwater (e.g., dewatering  of groundwater from excavations or foundations, containerizing, offsite disposal, discharge to  sanitary sewer, NPDES permit, or sampling procedures).   Appropriate worker safety measures will be undertaken if groundwater gathers in an open  excavation within an area determined to be impacted (based on previous sampling data, strong  odor, unnatural color, sheen, etc.) during construction activities.  The contractor will contact the  environmental professional to observe the area(s) suspected to be impacted.  The accumulated  water will be allowed to evaporate/infiltrate to the extent time for dissipation does not disrupt      21  EMP Version 3, March 2023   the construction schedule.  Should the time needed for natural dissipation of accumulated  water be deemed inadequate, the water will be tested for the presence of VOCs, SVOCs, and  RCRA metals and disposed off‐site (if impacted).  If groundwater is not determined to be  impacted, accumulated water will be discharged to the storm sewer in accordance with  applicable municipal and State regulations for erosion control and construction stormwater  control.       6) Are monitoring wells currently present on the Brownfields Property?.................☒Yes   ☐No     If yes, are any monitoring wells routinely monitored through DEQ or other  agencies?..................................................................................................................☒Yes   ☐No     7) Please check methods to be utilized in the management of known and previously  unidentified wells.    ☒ Abandonment of site monitoring wells in accordance with all applicable regulations.  It  is the Brownfields Redevelopment Section’s intent to allow proper abandonment of  well(s) as specified in the Brownfields Agreement, except if required for active  monitoring through another section of DEQ or the EPA.    ☒ Location of existing monitoring wells marked  ☒ Existing monitoring wells protected from disturbance   ☒ Newly identified monitoring wells will be marked and protected from further  disturbance until notification to DEQ Brownfields can be made and approval for  abandonment is given.    8) Please provide additional details as needed:              Existing monitoring wells located within the project area associated with the US Army Corps of  Engineers (USACE) Formerly Used Defense Sites (FUDS) program will be protected (see MW31‐T and  MW31‐B below) or will be properly abandoned (see MW32T and MW32‐B below) if future plans  include disturbing the monitoring well(s) and will be replaced if needed and requested by the USACE.   The PD is in the process of coordinating these activities with the USACE.  Note, H&H will verify that  the temporary monitoring wells listed below and located in the area of the proposed development  (TW01‐TR, TW02‐T, TW03‐T, and TW04‐T) have been abandoned.                            22  EMP Version 3, March 2023   Please note, disturbance of existing site monitoring wells without approval by DEQ is not  permissible.  If monitoring wells are damaged and/or destroyed, DEQ may require that the PD  be responsible for replacement of the well.        PART 3. SURFACE WATER  1) Is surface water present at the property?  ☐ Yes ☒ No   2) If yes, attach a map showing the location of surface water at the Brownfields Property  3) Is surface water at the property known to be contaminated? ☐ Yes  ☐ No  ☐ Unknown  4) Will workers or the public be in contact with surface water during planned redevelopment  activities or as part of the final redevelopment?    ☐ Yes  ☒ No  5) In the event that contaminated surface water is encountered during redevelopment  activities, or clean surface water enters open excavations, list activities for management of  such events (e.g. flooding, contaminated surface water run‐off, stormwater impacts):  If surface water run‐off gathers in an open excavation within an area determined to be impacted  during construction activities, appropriate worker safety measures will be undertaken.  The  accumulated water will be allowed to evaporate/infiltrate to the extent that the time for  dissipation does not disrupt the construction schedule.  Should the time needed for natural  dissipation of accumulated water be deemed inadequate, the water will be tested and disposed  off‐Site or tested and discharged to the storm sewer in accordance with applicable municipal and  State regulations for erosion control and construction stormwater control.  Note, depending on  the testing results, a National Pollution Discharge Elimination System (NPDES) permit may be  required.  In addition, the environmental professional will contact the DEQ Brownfields project  manager.          PART 4. SEDIMENT  1) Are sediment sources present on the property?  ☐ Yes  ☒ No  2) If yes, is sediment at the property known to be contaminated? ☐ Yes  ☐ No ☐ Unknown  3) Will workers or the public be in contact with sediment during planned redevelopment  activities?   ☐ Yes ☒ No  4) Attach a map showing the location of known contaminated sediment at the property.  5) In the event that contaminated sediment is encountered during redevelopment activities, list  activities for management of such events (stream bed disturbance):  No surface water features, or associated areas of sediment deposit are present on the subject  Site.            23  EMP Version 3, March 2023           PART 5.  SOIL VAPOR    1) Do concentrations of volatile organic compounds at the Brownfields property exceed the  vapor intrusion screening levels (current version) in the following media:     Groundwater Exterior Soil Vapor Sub‐Slab Soil Vapor  Residential ☐ Yes ☒ No    ☐ Unknown  ☒ Yes ☐ No    ☐ Unknown  ☒ Yes ☐ No    ☐ Unknown  Commercial ☐ Yes ☒ No    ☐ Unknown  ☐ Yes ☒ No    ☐ Unknown  ☐ Yes ☒ No    ☐ Unknown    2) Attach a map showing the locations of all soil vapor samples including any soil vapor  contaminants that exceeds screening levels and overlays planned site development features.     3) If applicable, at what depth(s) is exterior soil vapor known to be contaminated?        4) If applicable, at what depth(s) is sub‐slab soil vapor known to be contaminated?  ☒0‐6 inches ☐Other, please describe:    As part of the March 2023 Brownfields Phase II ESA activities, sub‐slab vapor samples were  collected within the western portions of the Hercules North and South buildings (scheduled for  demolition) from an approximate depth of 0.5 ft bgs, which were also located near or within the  proposed building footprint.  Laboratory analytical results indicate the presence of multiple VOCs  at concentrations above the SGSLs.   A tabular summary of the soil gas laboratory analytical  results is provided in Appendix C and sample locations are presented on Figure 3.      As part of the March 2023 Brownfields Phase II ESA activities, exterior soil gas samples were collected  near or within the proposed building footprint from an approximate depth of 5 to 5.5 ft bgs.   Laboratory analytical results indicate the presence of multiple VOCs at concentrations above the DEQ  Vapor Intrusion Sub‐Slab and Exterior Soil Gas Screening Levels (SGSLs).   A tabular summary of the  soil gas laboratory analytical results is provided in Appendix C and sample locations are presented on  Figure 3.      Laboratory analytical results indicate the presence of several VOCs above laboratory MDLs.  The VOC  1,3‐butadiene was detected in soil gas sample SGV‐2 at a concentration of 20.3 μg/m3, which exceeds  the Residential SGSL of 3.1 μg/m3.  The VOCs benzene (23.8 μg/m3), ethylbenzene (61.5 μg/m3), and  vinyl chloride (125 μg/m3) were detected in soil gas sample SGV‐3 at concentrations above the  Residential SGSLs of 12 μg/m3, 37 μg/m3, and 125 μg/m3, respectively.  No other VOCs were detected  above SGSLs in the soil gas samples collected at the Site.      24  EMP Version 3, March 2023   Laboratory analytical results indicate the presence of several VOCs above laboratory MDLs.  The  VOC TCE was detected in soil gas sample SSV‐14 at an estimated (J‐flag) concentration of 0.612 J  μg/m3, which is below the Residential SGSL of 14 μg/m3.  The VOC naphthalene was detected in  sub‐slab vapor samples SSV‐4 (11.5 μg/m3) and SSV‐5 (3.07 μg/m3) above the Residential SGSL of  2.8 μg/m3.  No other VOCs were detected above SGSLs in the sub‐slab vapor samples collected at  the Site.    5) Will workers encounter contaminated exterior or sub‐slab soil vapor during planned  redevelopment activities?  ☐ Yes  ☐ No ☒ Unknown    In the event that apparent contaminated soil vapor is encountered (based on elevated PID  readings, unusual odors, etc.) during redevelopment activities (trenches, manways, basements or  other subsurface work,) list activities for management of such contact, INCLUDING notification to  DEQ within 48 hours of identification of the issue for determination of additional requirements:   The environmental professional will remain on call on an as‐needed‐basis during redevelopment  activities at the Site.  If contaminated soil vapors are suspected during redevelopment activities  (based on unusual or strong odors, dizziness, lightheadedness, coughing, difficulty breathing,  etc.), the excavation area will immediately be evacuated, and the environmental professional will  be called to perform appropriate safety screening of the vapors.  Safety screening activities  include monitoring the worker breathing zone with a calibrated multi‐gas monitor (or similar  instrument[s] capable of detecting VOCs and combustible gases) for VOCs, methane, oxygen,  carbon dioxide, and hydrogen sulfide photoionization detector.  If results indicate further action  is warranted, appropriate engineering controls (such as use of industrial fans) will be  implemented.  In addition, the environmental professional will contact the DEQ Brownfields  project manager within 48 hours regarding the condition.      PART 6. INDOOR AIR    1) Are indoor air data available for the Brownfields Property? ☐ Yes   ☒ No  2) If applicable, attach a map showing the location(s) where indoor air contaminants exceed site  screening levels.  3) If the structures where indoor air has been documented to exceed risk‐based screening levels will  not be demolished as part of redevelopment activities, will workers encounter contaminated  indoor air during planned redevelopment activities? ☐ Yes   ☐ No   ☐ Unknown  ☒ N/A    ☐ If no, include rationale here:  As indicated above, existing Site buildings will be demolished as part of the proposed  redevelopment activities.  4) In the event that contaminated indoor air is encountered during redevelopment activities, list  activities for management of such contact:  In the unlikely event there is evidence of potential indoor air issues (i.e., unusual odors are identified  or workers report lightheadedness or other unusual physical reaction) during future redevelopment      25  EMP Version 3, March 2023         VAPOR INTRUSION MITIGATION SYSTEM  1) Is a vapor intrusion mitigation system (VIMS) proposed for this Brownfields Property?  ☒ Yes   ☐ No   ☐ Unknown    ☐ If no or unknown, include rationale here as well as plans for pre‐occupancy sampling, as  necessary:  Click or tap here to enter text.    If yes, ☐ VIMS Plan Attached or ☒ VIMS Plan to be submitted separately    If submitted separately provide date:   The PD plans to install vapor intrusion mitigation systems during construction of the proposed  apartment complex.  A VIMS Plan will be submitted under separate cover.    VIMS Plan shall be signed and sealed by a NC Professional Engineer and follow the DEQ  Brownfields Redevelopment Section’s Vapor Intrusion Mitigation System Design Submittal  Requirements.    Note that approval of this EMP does not imply approval with any vapor intrusion mitigation land  use restrictions or requirements of the recorded or draft Brownfields Agreement and that  separate approval of mitigation measures will be required.       CONTINGENCY PLAN     In this section, please provide actions that will be taken to identify or manage unknown  potential new sources of contamination.   During redevelopment activities, it is not uncommon  that unknown tanks, drums, fuel lines, landfills, or other waste materials are encountered.   Notification to DEQ Brownfields project manager, UST Section, Fire Department, and/or other  officials, as necessary and appropriate, is required when new potential source(s) of  contamination are discovered.  These Notification Requirements were outlined on Page 1 of this  EMP.      Should potentially impacted materials be identified that are inconsistent with known site  impacts, the DEQ Brownfields project manager will be notified, and a sampling plan will be  prepared based on the EMP requirements and site‐specific factors.  Samples will generally be  collected to document the location of the potential impacts.      Check the following chemical analysis that are to be conducted on newly identified releases:  activities, the area will be evacuated, and appropriate safety screening of the indoor air will be  performed.  If warranted, safety screening procedures will include periodically screening indoor air for  volatile organic vapors with a calibrated PID.  If results indicate further action is warranted,  appropriate engineering controls (such as use of industrial fans) will be implemented.      26  EMP Version 3, March 2023   ☒ Minimum Sample Requirements: Volatile organic compounds (VOCs) by EPA Method 8260;  Semi‐volatile organic compounds (SVOCs) by EPA Method 8270; and Metals RCRA List +  Hexavalent Chromium by EPA Method 6020/7199    ☐ Pesticides: Specify Analytical Method Number(s):   Click or tap here to enter text.    ☐ PCBs: Specify Analytical Method Number(s):   Click or tap here to enter text.    ☐ Other Constituents & Analytical Method(s) (e.g. Herbicides)  Please note, if field observations indicate the need for additional analyses, they should  be conducted, even if not listed here.   Click or tap here to enter text.  Please provide details on the proposed methods of managing the following commonly  encountered issues during redevelopment of Brownfields Properties.    Underground Storage Tanks – Note that UST Section guidelines must be followed for sample  frequency during UST closure. Unless damage to onsite structures to remain as part of  redevelopment would occur, USTs shall be removed from the Brownfields Property:  In the event a UST or impacts associated with a UST release are discovered at the Site during  redevelopment activities, the UST and/or UST related impacts will be addressed through the  Brownfields Program.  DEQ Brownfields will be notified within 48 hours of discovery of the UST.      If an undocumented UST is encountered, residual fluids (if present) will be removed, sampled for  VOCs, SVOCs, and RCRA metals, and transported off‐Site for disposal at a suitable facility based on  the laboratory analytical results.  Following the removal of residual fluids, the tank will be removed  and closure soil sampling will be performed.  The number of soil samples will be consistent with  DEQ UST Section guidelines.  The soil samples will be submitted for laboratory analysis of VOCs,  SVOCs, and RCRA metals.  Impacted soil will be managed in accordance with the Managing On‐Site  Soil (Part 1.A.) section outlined above.    If the UST cannot be removed for geotechnical or construction purposes, DEQ will be notified for  approval of in‐place closure.  Following DEQ approval, closure soil sampling will be performed in  general accordance with the DEQ UST Section guidelines.  Where appropriate, the bottom of the  UST may be penetrated before abandonment to prevent fluid accumulation.  If the UST contains  residual fluids, the fluids will be removed, sampled for VOCs, SVOCs, and RCRA metals, and  transported off‐Site for disposal at a suitable facility based on the laboratory analytical results.  A  survey plat update may also be needed in the event of in‐place closure of USTs.    Sub‐Grade Feature/Pit:  If a sub‐grade feature or pit is encountered and does not require removal for geotechnical or  construction purposes, it will be filled with soil or suitable fill and construction will proceed.  Where      27  EMP Version 3, March 2023   appropriate, the bottom may be penetrated before back filling to prevent fluid accumulation.  If the  pit has waste in it, the waste may be set aside in a secure area and will be sampled for waste  disposal purposes for TCLP VOCs, TCLP SVOCs, and TCLP metals and disposed off‐Site at a permitted  facility or the waste will be managed in accordance with the Managing On‐Site Soil (Part 1.A.)  section outlined above, whichever is most applicable based on the type of waste present.  If the pit  must be removed and the observed waste characteristics indicate the concrete may potentially be  contaminated to a significant degree, the concrete will be sampled and analyzed by methods  specified by the disposal facility.    Buried Waste Material – Note that if buried waste, non‐native fill, or any obviously filled materials  is encountered, the DEQ Brownfields Redevelopment Section must be notified to determine if  investigation of landfill gases is required:  If excavation into buried wastes or significantly impacted soils occurs, the contractor is instructed to  stop work in that location and notify the environmental consultant.  The environmental consultant  will observe the suspect materials and collect samples if warranted.  In this event, confirmation  sampling will be conducted at representative locations in the base and the sidewalls of the  excavation after the waste or significantly impacted soil is removed.  The confirmation samples will  be analyzed for VOCs, SVOCs, and RCRA metals (or other analyses as appropriate based on the type  of waste material).  Information will be provided to DEQ Brownfields regarding the permitted  facility used for disposal of the waste or significantly impacted soil.  Areas of suspected  contaminated soil that remain at the Site after excavation is complete above the DEQ Residential  PSRGs will be managed pursuant to this plan.    Re‐Use of Impacted Soils Onsite:  Please refer to description outlined in the Managing On‐Site Soil section (Part 1.A.) of the EMP  above.    If unknown, impacted soil is identified onsite, management onsite can be considered after the  project team provides the necessary information, outlined in Part 1.A. Item 11, for Brownfields  project manager approval prior to final placement onsite.     If other potential contingency plans are pertinent, please provide other details or scenarios as  needed below:  Click or tap here to enter text.      POST‐REDEVELOPMENT REPORTING    ☒  Check this box to acknowledge that a Redevelopment Summary Report will be required for the  project.  If the project duration is longer than one year, an annual update is required and will be  due by January 31 of each year, or 30 days after each one‐year anniversary of the effective date of  this EMP (as agreed upon with the project manager).  These reports will be required for as long as  physical redevelopment of the Brownfields Property continues, except that the final      28  EMP Version 3, March 2023   Redevelopment Summary Report will be submitted within 90 days after completion of  redevelopment.  Based on the estimated construction schedule, the first Redevelopment Summary  Report is anticipated to be submitted on 1/31/2024     The Redevelopment Summary Report shall include environment‐related activities since the last  report, with a summary and drawings, that describes:   1. actions taken on the Brownfields Property;    2. soil grading and cut and fill actions;   3. methodology(ies) employed for field screening, sampling and laboratory analysis of  environmental media;   4. stockpiling, containerizing, decontaminating, treating, handling, laboratory analysis and  ultimate disposition of any soil, groundwater or other materials suspected or confirmed  to be contaminated with regulated substances; and   5. removal of any contaminated soil, water or other contaminated materials (for example,  concrete, demolition debris) from the Brownfields Property (copies of all legally required  manifests shall be included).    ☒ Check box to acknowledge consent to provide a NC licensed P.G. or P.E. sealed, Redevelopment  Summary Report in compliance with the site’s Brownfields Agreement.    Figures     30  EMP Version 3, March 2023         TITLE PROJECT SITE LOCATION MAP WOODWARD AVEENUE MULTI-FAMILY CAMP BROWNFIELDS SITE CAMP NORTH END CHARLOTTE, NORTH CAROLINA DATE: JOB NO: REVISION NO: FIGURE NO: 2-21-23 0 2ATL.008 0 2000 4000 APPROXIMATE SCALE IN FEET N U.S.G.S. QUADRANGLE MAP QUADRANGLE 7.5 MINUTE SERIES (TOPOGRAPHIC) CHARLOTTE EAST, NC 1967 REVISED/INSPECTED 1988 AND DERITA, NC 1993 SITE SGV-1/SB-3 SGV-3 SSV-15 SSV-1 SSV-10 SSV-12 SB-5/TMW-1 SSV-2 SSV-4 SSV-5 SSV-3 SGV-2/SB-4 SSV-16 SSV-14 SSV-13 SSV-11 SSV-9 SSV-8SSV-7 SSV-6 SB-1 SB-10 SB-7 BUILDING "A" BUILDING "B" SB-2 SB-6 SB-8 SB-9 SB-11SSV-17 BUILDING "C" REVISION NO. 0 JOB NO. ATL-008 DATE: 4-24-23 FIGURE NO. 3 WOODWARD MULTI-FAMILY CAMP BROWNFIELDS SITE CAMP NORTH END CHARLOTTE, NORTH CAROLINA PROPOSED BUILDING LAYOUT & SAMPLE LOCATION MAP LEGEND SITE PROPERTY BOUNDARY PARCEL BOUNDARY SURFACE WATER FEATURE SOIL BORING LOCATION 8 SAMPLES - SB-1, SB-2, AND SB-6 TO SB-11 CO-LOCATED TEMPORARY MONITORING WELL AND SOIL BORING LOCATION 1 SAMPLE - SB-5/TMW-1 EXTERIOR SOIL GAS SAMPLE LOCATION 1 SAMPLE - SGV-3 CO-LOCATED EXTERIOR SOIL GAS AND SOIL BORING LOCATION 2 SAMPLES - SVG-1/SB-3 TO SVG-2/SB-4 INTERIOR SUB-SLAB SOIL GAS SAMPLE LOCATION 17 SAMPLES - SSV-1 TO SSV-17 SURVEY POINT 2923 South Tryon Street-Suite 100Charlotte, North Carolina 28203704-586-0007(p) 704-586-0373(f)License # C-1269 / #C-245 Geology NOTES: 1. AERIAL IMAGERY OBTAINED FROM MECKLENBURG COUNTY GIS, 2022. ST A T E S V I L L E A V E N U E WOODWARD AVENUE S:\ A A A - M a s t e r P r o j e c t s \ A T C O L L C - A T C \ A T L - 0 0 8 W o o d w a r d A v e M u l t i - F a m i l y \ F I G U R E S \ A T L - 0 0 8 S I T E M A P . d w g , F I G 2 S I T E & P R O P , 4 / 2 4 / 2 0 2 3 1 2 : 0 7 : 5 5 P M , t m a r b u e r y Appendix A Preliminary Site Plan OWNER TOMMY MANN ATCO 300 CAMP ROAD CHARLOTTE, NC 28206 (980) 337-4603 ARCHITECT JASON R. SHEPARD DWELL DESIGN STUDIO, LLC 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 (770) 864-1035 CIVIL DAN MEVLIN LANDDESIGN 223 NORTH GRAHAM STREET CHARLOTTE, NC 28202 (704) 333-0325 MECHANICAL JONATHAN CRAVEY PHILLIPS GRADICK ENGINEERING 8215 ROSWELL ROAD, STE 925 ATLANTA, GA 30350 (770) 650-9061 ELECTRICAL QUENTON CLARK PHILLIPS GRADICK ENGINEERING 8215 ROSWELL ROAD, STE 925 ATLANTA, GA 30350 (770) 650-9061 PLUMBING BILL MILES PHILLIPS GRADICK ENGINEERING 8215 ROSWELL ROAD, STE 925 ATLANTA, GA 30350 (770) 650-9061 STRUCTURAL RACHEL YORK m2 STRUCTURAL 887 WEST MARIETTA STREET NW KING PLOW ARTS CENTER SUITE T-103 ATLANTA, GA 30318 (404) 829-2612 LANDSCAPE/HARDSCAPE DESIGN MATTHEW STRANGE CONFLUENCE 307 NORTH MICHIGAN AVENUE, SUITE 601 CHICAGO, IL 60601 (872) 762-8096 • 2018 NORTH CAROLINA STATE BUILDING CODE • 2018 NORTH CAROLINA STATE BUILDING CODE: RESIDENTIAL CODE • 2018 NORTH CAROLINA STATE BUILDING CODE: FIRE PREVENTION CODE • 2018 NORTH CAROLINA STATE BUILDING CODE: PLUMBING CODE • 2018 NORTH CAROLINA STATE BUILDING CODE: MECHANICAL CODE • 2018 NORTH CAROLINA STATE BUILDING CODE: FUEL GAS CODE. • 2017 NATIONAL ELECTRICAL CODE, WITH LOCAL AMENDMENTS. • 2018 NORTH CAROLINA STATE BUILDING CODE: ENERGY CONSERVATION CODE • ACCESSIBILITY: 2009 ANSI A117.1 INTERIOR CID DESIGN GROUP 9115 GALLERIA CT STE 100 NAPLES, FL 34109 C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: TEAM MEMBERS PROJECT INFORMATION PROJECT RENDERING VICINITY MAP CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH APPLICABLE CODES OR STATUS WHETHER OR NOT SPECIFICALLY REFERENCED IN THE CONSTRUCTION DOCUMENTS THE DRAWINGS FOR THIS PROJECT ARE THE PROPERTY OF DWELL DESIGN STUDIO, LLC. COPIES OF THE DRAWINGS MAY BE USED ONLY BY THE OWNER TO CONSTRUCT AND OCCUPY THIS PROJECT. NEITHER THE DRAWINGS NOR THE DESIGN INDICATED ON THE DRAWINGS MAY BE REPRODUCED NOR USED FOR ANY OTHER PROJECT OR PURPOSE. DWELL DESIGN STUDIO, LLC. ACCEPTS RESPONSIBILITY ONLY FOR THOSE DRAWINGS WHICH HAVE AN ORIGINAL SEAL, SIGNATURE, CONSTRUCTION ISSUE DATE, AND DATE OF FINAL REVISION FOR THE DRAWINGS REVISION DATE DESCRIPTION INCLUDED 12 / 1 9 / 2 0 2 2 3 : 5 6 : 1 5 P M C : \ U s e r s \ e l y t t l e \ D o c u m e n t s \ R e v i t \ C a m p N o r t h E n d _ B L D G 4 0 0 0 _ 2 0 2 2 _ e l y t t l e 3 C Q M P . r v t A00.00 Author Checker 2234301 COVER SHEET SCHEMATIC DESIGN CAMP NORTH END BUILDING 27/28 CHARLOTTE, NC 28206 SCHEMATIC DESIGN - 12/19/22 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV SHEET INDEX SHEET NUMBER SHEET NAME SD S E T 2 0 2 2 1 2 - 1 8 GENERAL A00.00 COVER SHEET X A00.01 SHEET INDEX X A00.06 GENERAL NOTES X A00.07 SUBMITTAL LIST X A00.10 ARCHITECTURAL SITE PLAN X CIVIL C1-00 COVER X C1-01 GENERAL NOTES X C1-02 EXISTING CONDITIONS PLAN X C1-04 FIRE ACCESS PLAN X C1-20 CAMP NORTH END - REZONING X C1-21 CAMP NORTH END - REZONING X C1-22 CAMP NORTH END - REZONING X C1-23 CAMP NORTH END - REZONING X C1-24 CAMP NORTH END - REZONING X C1-25 CAMP NORTH END - REZONING X C1-26 CAMP NORTH END - REZONING X C1-27 CAMP NORTH END - REZONING X C1-28 CAMP NORTH END - REZONING X C1-29 CAMP NORTH END - REZONING X C1-30 CAMP NORTH END - REZONING X C1-31 CAMP NORTH END - REZONING X C1-32 CAMP NORTH END - REZONING X C1-33 CAMP NORTH END - REZONING X C2-00 DEMOLITION PLAN X C3-00 OVERALL SITE PLAN X C4-00 GRADING PLAN X C5-00 PCCO TRACKING SUMMARY X C6-00 UTILITY PLAN X C7-00 OVERALL REQUIRED PLANTING PLAN X C7-01 PLANTING DETAILS X C10-00 OVERALL MATERIALS PLAN X CODE DATA A00.12 SITE DATA PLAN X A00.20 ACCESSIBLE ROUTE SITE PLAN X A00.21 FIRE APPARATUS PLAN X A00.22 PHASING PLAN X A00.30 LIFE SAFETY PLAN X A00.60 CODE DATA SHEET X A00.61 CODE DATA SHEET X A00.70 WALL PARTITIONS DETAIL X A00.71 WALL PARTITIONS DETAIL X A00.80 FLOOR / CEILING ASSEMBLY DETAILS X A00.90 UL ASSEMBLIES X A00.91 UL ASSEMBLIES X ARCHITECTURAL A02.00 OVERALL BASEMENT X A02.01 OVERALL LEVEL 1 X A02.02 OVERALL LEVEL 2 X A02.03 OVERALL LEVEL 3 X A02.04 OVERALL LEVEL 4 X A02.05 OVERALL LEVEL 5 X A02.06 OVERALL ROOF LEVEL X A04.00 UNIT NOTES X A04.01 UNIT S1 PLANS X A04.02 UNIT S2 PLANS X A04.03 UNIT A1 PLANS X A04.04 UNIT A2 PLANS X A04.05 UNIT A3 PLANS X A04.06 UNIT A4 PLANS X A04.07 UNIT A5 PLANS X A04.08 UNIT B1 PLANS X A04.09 UNIT B2 PLANS X A04.10 UNIT B3 PLANS X A04.11 UNIT B4 PLANS X A04.12 UNIT B5 PLANS X A04.13 UNIT B6 PLANS X A04.14 UNIT CL1 PLANS X A05.01 OVERALL ELEVATIONS X A06.01 OVERALL BUILDING SECTIONS X A06.10 TYPICAL WALL SECTIONS X A06.11 TYPICAL WALL SECTIONS X A07.50 ENLARGED TYPICAL WALL DETAILS X A07.51 ENLARGED TYPICAL WALL DETAILS X A07.90 ROOF DETAILS X A13.00 OVERALL PARKING DECK PLAN - BASEMENT LEVEL X A13.01 OVERALL PARKING DECK PLAN - LEVEL 1 X A13.02 OVERALL PARKING DECK PLAN - LEVEL 2 X A13.03 OVERALL PARKING DECK PLAN - LEVEL 3 X A13.04 OVERALL PARKING DECK PLAN - LEVEL 4 X A13.05 OVERALL PARKING DECK PLAN - LEVEL 5 X ELECTRICAL E7-01 ELECTRICAL RISER DIAGRAM X E7-02 ELECTRICAL RISER DIAGRAM X C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12 / 1 9 / 2 0 2 2 4 : 0 5 : 4 9 P M C : \ U s e r s \ e l y t t l e \ D o c u m e n t s \ R e v i t \ C a m p N o r t h E n d _ B L D G 4 0 0 0 _ 2 0 2 2 _ e l y t t l e 3 C Q M P . r v t A00.01 Author Checker 2234301 SHEET INDEX SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV AB.ANCHOR BOLT ABV.ABOVE ACT.ACOUSTICAL TILE ADH.ADHESIVE ADJ. ADJUSTABLE A.F.F ABOVE FINISH FLOOR ALUM.ALUMINUM ALT.ALTERNATE APPROX.APPROXIMATELY ARCH.ARCHITECT/ARCHITECTURAL ASHP.ASPHALT AVG.AVERAGE BALC.BALCONY BD.BOARD BDRM.BEDROOM BLDG.BUILDING BLKG.BLOCKING BM. BEAM BRK.BREAK B.O.BOTTOM OF BRNG.BEARING BSMT.BASEMENT B.T.U./HR.BRITISH THERMAL UNIT/OUR BF.BI-FOLD C. CELSIUS CAB.CABINET C.F.M.CUBIC FEET OF AIR PER MINUTE C.I.P.CAST-IN-PLACE C.I.S.CONTINUOUS INSULATION SYSTEM C.J.CONTROL JOINT C.L.CENTER LINE CLO.CLOSET CLG.CEILING C.M.U CONCRETE MASONRY UNIT COL. COLUMN COMP.COMPOSITION CONC.CONCRETE CONST.CONSTRUCTION CONT.CONTINUOUS CORR.CORRIDOR CPT.CARPET C.T.CERAMIC TILE DEG.DEGREE D.F.DRINKING FOUNTAIN DIA.DIAMETER DIM.DIMENSION DN.DOWN DR.DOOR D.S.DOWN SPOUT DWGS.DRAWINGS EA.EACH E.F.EXHAUST FAN E.J.EXPANSION JOINT EL.ELEVATION ELEC.ELECTRICAL ELEV.ELEVATOR E.O.C.END OF CARPET EQ.EQUAL EQUIP.EQUIPMENT E.W.EACH WAY E.W.C.ELECTRICAL WATER COOLER E.W.H ELECTRIC WATER HEATER EXIST.EXISTING EXP.EXPANSION EXT.EXTERIOR F.FAHRENHEIT FAB.FABRICATE F.A.C FIRE ALARM CABINET F.B.O.FURNISHED BY OTHER F.C.FIRE CODE F.D.FLOOR DRAIN FDN FOUNDATION F.E.FIRE EXTINGUISHER F.E.C.FIRE EXTINGUISHER CABINET F.F.FINISH FLOOR F.F.E.FINISH FLOOR ELEVATION FIN.FINISH FLASH.FLASHING FLOUR.FLUORESCENT FLR.FLOOR F.O.F.FACE OF FINISH F.P.FIRE PLACE F.P.M.FOOT/MINUTE FT.FOOT/FEET FTG.FOOTING FURN.FURNISHED FURR.FURRING FMG.FRAMING FR.FRAME GALV.GALVANIZED GA.GAUGE GEN.GENERAL G.C.GENERAL CONTRACTOR G.B GRAB BAR GL.GLASS G.P.M.GALLONS PER MINUTE GR.GRADE GYPBD.GYPSUM BOARD HC.HANDICAPPED HD. HT. HEAD HEIGHT HDR.HEADER HDW.HARDWARE H.M.HOLLOW METAL HORIZ.HORIZONTAL H.P.HORSE POWER HR.HOUR HT.HEIGHT H.V.A.C.HEATING, VENTILATION, & AIR CONDITIONING HWD.HARDWARE HZ.HERTZ I.D.INSIDE DIAMETER IN.INCH INSUL.INSULATION INT.INTERIOR JAN.JANITOR JB.JAMB JST.JOIST JT.JOINT KIT.KITCHEN L.LIGHT LAM.LAMINATE LAV.LAVATORY MAS.MASONRY MAT.MATERIAL MAX.MAXIMUM M.C.MEDICINE CABINET M.D.MASONRY DIMENSION M.D.O.MEDIUM DENSITY OVERLAY MECH.MECHANICAL MFR.MANUFACTURER MIN.MINIMUM MISC.MISCELLANEOUS M.M.MOLDED MASONITE M.O.MASONRY OPENING MTD.MOUNTED MTL METAL M.W.W.T.METAL WITH WOOD TRIM N.NORTH NAT.NATURAL N/A NOT APPLICABLE N.I.C NOT IN CONTRACT NO.NUMBER NOM.NOMINAL N.T.S NOT TO SCALE O.C.ON CENTER O.C.E.W ON CENTER EACH WAY O.D.OUTSIDE DIAMETER O.H.D OVER HEAD DOOR OPG.OPENING OPP.H.OPPOSITE HAND O.S.B ORIENTED STRAND BOARD PR.PAIR PART.PARTITION PC.PRE-CAST PL.PLATE PLAS.LAM.PLASTIC LAMINATE(PL.) PLYWD.PLYWOOD. PNT.PAINT(ED) PREFAB.PRE-FABRICATED P.S.F.POUND PER SQUARE FOOT P.S.I.POUND PER SQUARE INCH P.T.PRESSURE TREATED P.T.D PAPER TOWEL DISPENSER PVMT.PAVEMENT Q.T.QUARRY TILE QTY.QUANTITY R.RADIUS OR RISER R.D.ROOF DRAIN R & S ROD & SHELF RECPT.RECEPTION REF.REFRIGERATOR REINF.REINFORCING REQ'D REQUIRED REV.REVISION R.H.RIGHT HAND RM.ROOM R.O.ROUGH OPENING R.O.W RIGHT OF WAY RSTRM.RESTROOM S.SPECIFIED OR SPECIFICATION S.A.B.SOUND ATTENUATION BLANKET S.C.W.D SOLID CORE WOOD DOOR SCHED.SCHEDULE S.D.SOAP DISH SECT.SECTION S.F.SQUARE FOOT.(FEET) S.F.E.SUB FLOOR ELEVATION S.H.SHOWER HEAD SHT.SHEET SIM.SIMILAR SPEC.SPECIFICATION SQ.SQUARE S.R.SHOWER ROD S.R.O.SHEET ROCK OPENING S.T.C SOUND TRANSMISSION CLASS STD.STANDARD STL.STEEL STOR.STORAGE STRUC.STRUCTURAL SUSP.SUSPENDED T.THREAD, TILE OR TOP T.O.S.TOP OF SLAB T/-TOP OF _ T+G TONGUE AND GROOVE T.C.TOP OF CURB T.B.TOWEL BAR TEL.TELEPHONE TEMP.TEMPERATURE THK.THICK THR.THRESHOLD T.W.TOP OF WALL TYP.TYPICAL U.L.UNDERWRITERS LABORATORIES U.N.O UNLESS NOTED OTHERWISE UR.URINAL V.C.T VINYL COMPOSITION TILE VERT VERTICAL VEST.VESTIBULE VIN.VINYL V.W.C.VINYL WALL COVERING W.WEST OR WIDTH WD.WOOD W.I.C WALK IN CLOSET WT.WEIGHT W.W.F.WELDED WIRE FABRIC W.W.M.WELDED WIRE MESH W.W.W.T.WOOD WITH WOOD TRIM @ AT &AND #POUND, NUMBER OWNER 1. THE OWNER SHALL OBTAIN AND PAY FOR THE GENERAL BUILDING PERMITS AND IMPACT FEES. THESE PERMITS SHALL BE PROVIDED TO THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. 2. THE OWNER SHALL APPROVE ALL MATERIAL FINISH AND COLOR SELECTIONS, VIA CONTRACTOR SUBMITTED SHOP DRAWINGS, PRIOR TO ORDERING AND INSTALLATION FOR ANY EQUIPMENT. 3. THE OWNER SHALL COORDINATE AND SECURE AN AGREEMENT FOR ACCESS TO SITE CONSTRUCTION, STAGING AREA, AND STORAGE AREAS. CONTRACTOR 1. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ARCHITECT AND OWNER, IN WRITING, AND SHALL HAVE RESOLVED AND DOCUMENTED, IN WRITING, PRIOR TO CONTINUING WITH THE WORK IN QUESTION IF THERE ARE: A. ANY ERRORS, OMISSIONS, DISCREPANCIES, CONFLICTS, OR INCONSISTENCIES ON THESE CONTRACT DOCUMENTS. B. ANY VARIATION OR AMBIGUITIES BETWEEN THESE DRAWINGS AND ACTUAL SITE AND CONSTRUCTION CONDITIONS AND/OR REQUIREMENTS. C. DISCREPANCIES AND/OR UNCERTAINTIES AS TO WHAT MATERIAL OR PRODUCT IS TO BE USED. 2. THE CONTRACTOR SHALL NOT RELY SOLELY ON THE ELECTRONIC VERSIONS OF THE PLANS, SPECIFICATIONS, AND DATA FILES THAT ARE OBTAINED FROM THE DESIGNERS, BUT SHALL VERIFY THE LOCATION OF PROJECT FEATURE DIMENSIONS IN ACCORDANCE WITH THE HARD COPIES OF THE PLANS AND SPECIFICATIONS THAT ARE SUPPLIED AS PART OF THE CONTRACT DOCUMENTS. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR: A. COORDINATION OF CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES REQUIRED FOR SAFE EXECUTION OF EFFICIENT AND ORDERLY INSTALLATION OF EACH PART OF WORK TO BE COMPLETED. B. INITIATING, MAINTAINING, AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK. 4. THE CONTRACTOR SHALL: A. OBTAIN AND PAY FOR ALL OTHER PERMITS, CERTIFICATIONS AND APPROVALS REQUIRED IN CONNECTION WITH ALL WORK UNDER CONTRACT DOCUMENTS THAT ARE NOT PROVIDED BY THE OWNER. B. SURVEY THE PROJECT AND BECOME FAMILIAR WITH THE EXISTING CONDITIONS. VERIFY ALL SITE DIMENSIONS ON CIVIL DRAWINGS, EXISTING CONSTRUCTION GRADES AND UTILITIES ON PROJECT AT PROJECT SITE PRIOR TO BEGINNING PROJECT. C. EXAMINE AND BECOME FAMILIAR WITH ALL CONTRACT DOCUMENTS AND SCOPE OF WORK IN THEIR ENTIRETY. ALL ITEMS INDICATED ON ANY DRAWING SHALL BE INCLUDED AS A COMPLETE SYSTEM, UNLESS NOTED OTHERWISE. D. ALL COSTS SUBMITTED SHALL BE BASED ON THOROUGH KNOWLEDGE OF ALL WORK AND MATERIALS REQUIRED. E. INSURE THAT ALL AREAS ON THE ACCESSIBLE ROUTE THROUGHOUT THE SITE MEET THE REQUIREMENTS OF THE APPLICABLE ACCESSIBILITY CODES. COORDINATE BETWEEN CIVIL AND ARCHITECTURAL PLANS. F. VERIFY ALL DIMENSIONS IN THE FIELD, AND COORDINATE WORK BETWEEN ALL TRADES. G. PAINT ALL SURFACES WHICH REQUIRE PROTECTION FROM THE ELEMENTS WITH THE APPROPRIATE PAINT, INCLUDING NECESSARY PRIMER COATS AND BACK PRIMING. H. SEAL WITH THE APPROPRIATE TYPE OF SEALANT, AND FLASH AT ALL LOCATIONS NECESSARY TO PREVENT PENETRATION OF MOISTURE AT TRANSITIONS OF DISSIMILAR MATERIALS TO INCLUDE, BUT ARE NOT LIMITED TO: a. FLASHING: • CONTINUOUS 25 MIL MEMBRANE FLASHING TO ALL INSIDE AND OUTSIDE WALL CORNERS. • FLASHING SHALL BE INSTALLED AROUND ALL WINDOW OPENINGS, ROOF OPENINGS, AND AT THE INTERSECTION OF CHIMNEYS, WOOD CONSTRUCTION, AND FRAME WALLS. SEAL AND MAKE WEATHER-TIGHT. b. AIR IMPERMEABLE SEALANT: • CONTINUOUS AT ALL EXTERIOR JOINTS AROUND WINDOW FRAMES, DOOR FRAMES, BETWEEN WALL CAVITIES, BETWEEN WALL AND FOUNDATION, BETWEEN WALL AND ROOF, BETWEEN WALL AND PANELS, ALL PENETRATIONS AND UTILITIES THROUGH WALLS AND ROOFS, BETWEEN ALL DISSIMILAR MATERIALS, AND ALL OTHER OPENINGS IN BUILDING ENVELOPE. • PLUMBING & WIRING PENETRATIONS IN ENVELOPE. • SOLE PLATES AT EXTERIOR SLAB ON GRADE c. WEATHERSTRIP: • CONTINUOUS AT ALL EXTERIOR DOORS & WINDOWS. • CONTINUOUS AT ALL ATTIC ACCESSES IN CONDITIONED AREAS. • CONTINUOUS AT INTERIOR DOOR OPENINGS INTO UNTREATED SPACE. d. ALL EXTERIOR WORK SHALL BE INSTALLED IN WEATHER TIGHT MANNER AS REQUIRED. I. EMPLOY, AS REQUIRED BY GOVERNING AUTHORITIES, AN APPROVED TESTING LABORATORY TO MAKE ALL TESTS FOR CONCRETE, SOIL COMPACTION AND WELDING TO INSURE COMPLIANCE WITH PLANS, STANDARDS AND CODES. REFER TO CONCRETE SPECIFICATION FOR FREQUENCY OF TESTING REQUIRED. THESE COSTS SHALL BE INCLUDED IN THE CONTRACT. J. FIELD VERIFY ALL ROUGH OPENINGS. K. FULLY GUARANTEE THE WORK AND EQUIPMENT FOR ONE (1) YEAR FROM THE DATE OF FINAL PAYMENT AND ACCEPTANCE FROM ALL SUBCONTRACTORS AND MATERIAL SUPPLIERS. L. REMOVE RUBBISH FROM PREMISES AS OFTEN AS NECESSARY OR AS DIRECTED. ALL WORK AND EQUIPMENT SHALL BE CLEANED TO THE SATISFACTION OF THE OWNER BEFORE TURNING SAME OVER TO THE OWNER. M. INSPECT, REPAIR AND PREPARE FLOORS AS REQUIRED TO PROVIDE A SATISFACTORY SUB-FLOOR FOR FLOOR FINISH MATERIALS. SATISFACTORY SUB-FLOOR IS DEFINED AS A SURFACE THAT IS FREE FROM CRACKS, HOLES, RIDGES, COATINGS, OR DEFECTS THAT WOULD PREVENT ADHESIVE BOND OR IMPAIR PERFORMANCE OR APPEARANCE OF FINISHED MATERIALS. N. UPON COMPLETION OF THE WORK, REMOVE ALL TOOLS, EQUIPMENT, TEMPORARY PROTECTION, AND EXCESS MATERIALS FROM THE SITE. CLEAN / POLISH ALL HARDWARE AND FIXTURES. CLEAN / REMOVE ALL PAINT DRIPS / SPLATTERS AND STAINS. REMOVE ALL APPLIANCE PROTECTIONS AND LEAVE INTERIOR AREAS BROOM CLEAN, FREE OF STAINS, FILM AND FOREIGN SUBSTANCES. O. BRING TO THE ATTENTION OF THE OWNER ANY MATERIAL SUSPECTED OF BEING HAZARDOUS WHILE ENCOUNTERED DURING EXECUTION OF THE WORK. A DETERMINATION WILL BE MADE BY THE OWNER AS TO WHETHER THE CONTRACTOR SHALL PERFORM TESTS TO DETERMINE IF THE MATERIAL IS HAZARDOUS. 5. THE CONTRACTOR SHALL PROVIDE AND INSTALL: A. ALL NECESSARY FLASHING INCLUDING (BUT NOT LIMITED TO) THROUGH FLASHING, STEP FLASHING, COUNTER FLASHING, CAP FLASHING, BASE FLASHING, AND FLEXIBLE FLASHING, WHERE NECESSARY, TO ENSURE A WATER TIGHT BUILDING. B. CONTINUOUS METAL CORNER BEADS AT ALL GYPSUM BOARD EXTERIOR CORNERS FROM FLOOR TO CEILING. C. CONTINUOUS METAL 'L' BEADS AT ALL EXPOSED GYPSUM BOARD EDGES FROM FLOOR TO CEILING. D. ALL LOCKING DEVICES, SECURITY DEVICES, AND GLASS IN ACCORDANCE WITH FEDERAL, STATE, AND LOCAL LAWS, REGULATIONS AND REQUIREMENTS. E. AN INSULATION AND VAPOR BARRIER THAT IS CONTINUOUS AT WALLS, CEILINGS, AND FLOOR SURFACES AT ALL OCCUPIED SPACES EXPOSED TO NON-TEMPERED AREAS. 6. THE CONTRACTOR SHALL PROTECT: A. MATERIALS WHICH ARE SENSITIVE TO DETERIORATION. B. THE REQUIRED PROTECTION OVER SHEAR WALLS AT ALL RATED WALLS AS APPROVED BY THE BUILDING OFFICIAL. C. ALL EXISTING TREES, AS NOTED TO REMAIN ON CIVIL PLANS, SHALL BE PROTECTED FROM DAMAGE DURING CONSTRUCTION BY BOXING OR OTHER OWNER APPROVED MEANS. D. ALL EXISTING WORK, UTILITIES, CONDUIT, PIPING, EQUIPMENT, AND/OR ADJACENT AREAS NOT SHOWN TO BE ALTERED OR REMOVED FROM DAMAGE DURING EXECUTION OF THE WORK. THE CONTRACTOR SHALL BEAR THE TOTAL EXPENSE FOR, AND SHALL REPAIR TO EXISTING CONDITIONS, DAMAGE TO EXISTING CONSTRUCTION, EQUIPMENT, OR IMPROVEMENTS NOT INDICATED IN THE DRAWINGS SPECIFICATIONS TO RECEIVE ALTERATIONS, ADDITIONS, OR REMOVAL. E. EXISTING SURFACE STREET AND SURFACE PARKING AREAS IN A CLEAN CONDITION AND PROVIDE ADEQUATE MEANS TO CLEAN TRUCKS AND OTHER EQUIPMENT. 7. THE CONTRACTOR SHALL PROVIDE FULL SCALE, WOOD FRAMED MOCK-UP WITH ACCURATE DETAILS OF CONSTRUCTION. THE APPROXIMATE SIZE SHALL BE: 20' LONG X 10' HIGH. A. MOCK UP SHALL INCLUDE: 1 DOOR, 2 WINDOWS, CEMENTITIOUS PANEL, BRICK, METAL PANEL, METAL RAILING, ROOF MATERIAL. B. THE LOCATION OF THE MOCK-UP ON THE SITE TO BE APPROVED BY OWNER AND CONTRACTOR. GENERAL 1. THERE SHALL BE NO DEVIATION FROM SPECIFICATIONS WITHOUT THE WRITTEN APPROVAL OF THE OWNER, ARCHITECT, AND/OR ENGINEER 2. QUANTITIES INDICATED ON THE PLANS ARE PROVIDED FOR THE BENEFIT OF THE CONTRACTOR, BUT SHOULD NOT BE ASSUMED TO ALWAYS BE CORRECT. IN THE EVENT OF DISCREPANCY, THE PLAN TAKES PRECEDENCE OVER THE QUANTITY INDICATED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR HIS OWN QUANTITY CALCULATIONS AND THE LIABILITY PERTAINING TO THOSE QUANTITIES AND ANY OTHER RELATED CONTRACT DOCUMENTS AND/OR PRICE QUOTATIONS 3. “TYPICAL”MEANS THE REFERENCED DETAIL SHALL APPLY FOR ALL SIMILAR CONDITIONS UNLESS OTHERWISE NOTED. 4. ALL MATERIALS SHALL BE NEW AND SHALL BE INSTALLED IN STRICT CONFORMANCE WITH MANUFACTURER'S INSTRUCTIONS AND/OR RECOMMENDATIONS. 5. ROOFING SHALL BE CLASS -B OR BETTER, INSTALL PER MANUFACTURER'S RECOMMENDATIONS. 6. INSULATE ALL EXTERIOR WALLS & CONDITIONED SPACES W/ KRAFT FACED FIBERGLASS, UNLESS NOTED OTHERWISE, INSULATION. FRICTION FIT IS NOT ACCEPTABLE TO MEET REQUIRED ENERGY EFFICIENCY STANDARD. 7. FIELD MODIFICATION TO WORK IN PLACE MUST COMPLY WITH THE CUTTING AND PATCHING REQUIREMENTS. 8. GYPSUM WALL BOARD SHALL BE: A. INSTALLED IN CONFORMANCE WITH THE GYPSUM ASSOCIATION'S RECOMMENDED PRACTICES FOR THICKNESS, NAILING, TAPING, AND STUD SPACING. B. 5/8" TYPE "X" MADE IN USA. WITH MATERIAL SOURCE IN THE U.S.A. C. WATER-RESISTANT GYPSUM BOARD AT KITCHEN/TOILET BACKSPLASHES, AND LAUNDRY WET WALLS. 9. FILL ALL CONTROL JOINTS WITH TRAFFIC SEALANT AND EXPANSION JOINTS WITH EXPANSION JOINT SYSTEM IN PARKING DECK 10. SIZE AND LOCATION OF ALL FLOOR OPENINGS TO BE VERIFIED WITH TRADE AFFECTED BEFORE WORK. PATCH AND SEAL ALL PENETRATIONS IN FLOOR TO COMPLY WITH APPLICABLE BUILDING AND/ OR FIRE CODES. 11. MAXIMUM FLAME SPREAD RATING ON ALL INTERIOR FINISH MATERIALS SHALL NOT BE GREATER THAN THE REQUIREMENTS SPECIFIED IN IBC & NFPA 101. SITE 1. ALL SITEWORK AND LANDSCAPING SHALL BE ESTABLISHED AND DESIGNED BY OTHERS (THAN THE ARCHITECT). 2. ALL WORK AND EQUIPMENT SHALL BE CLEANED TO THE SATISFACTION OF THE OWNER BEFORE TURNING SAME OVER TO OWNER. 3. STORE MATERIALS IN SPACES DESIGNATED BY OWNER. 4. REFER TO CIVIL DRAWINGS FOR DIMENSIONAL CONTROL PLAN AND GRADING, FIRE HYDRANT LOCATIONS, AND CURB CUTS. 5. REFER TO LANDSCAPING DRAWINGS FOR LOCATION OF SIDEWALKS AND DETAILS. 6. REFER TO CIVIL AND LANDSCAPE DRAWINGS FOR SITE DETAILS. 7. REFER TO ELECTRICAL AND LANDSCAPING DRAWINGS FOR EXTERIOR BUILDING LIGHTING AND TRANSFORMER LOCATIONS. STRUCTURAL / FRAMING 1. DIMENSIONS: A. ALL DIMENSIONS ON PLANS ARE TO FACE OF STRUCTURE/STUD UNLESS OTHERWISE NOTED. B. ALL ANGLED WALLS ARE 45 DEGREES UNLESS NOTED OTHERWISE. C. DOOR LOCATIONS NOT DIMENSIONED SHALL BE LOCATED AT MIDPOINT OF WALL OR 4" CLEAR OF ROOM, FROM ADJACENT WALL CORNER, TYPICAL IF CLEARANCE ALLOWS. D. DOORS AND WINDOWS ARE DIMENSIONED TO THE CENTERLINE OF THE ELEMENT U.N.O. 2. STRUCTURAL AND FIRE RESISTIVE INTEGRITY IS TO BE MAINTAINED AT ALL PENETRATIONS IN ACCORDANCE WITH THE REQUIREMENTS OF GOVERNING CODES AND AUTHORITIES. 3. SEE STRUCTURAL DRAWINGS FOR SHEAR WALL & NAILING PATTERN TABLE FOR GYPSUM WALL BOARD. 4. WIND BRACE WALLS PER STRUCTURAL DRAWINGS AND PER BUILDING-CODE. 5. FLOOR TOLERANCE: IN LAYING OUT AND DETAILING THE WORK TO BE COMPLETED CONSIDERATION SHALL BE GIVEN TO VARIATIONS IN THE FLOOR LEVEL RESULTING FROM CONSTRUCTION QUALITY AND LIVE AND DEAD LOADS IMPOSED ON THE STRUCTURE. FIELD VERIFICATION SHALL BE MADE OF CONDITIONS TO VERIFY CONSTRUCTION TOLERANCES. 6. ALIGNMENT OF DOOR HEADS AND OTHER HORIZONTAL ELEMENTS SHALL BE MAINTAINED AT A CONSTANT LEVEL AND SHALL NOT FOLLOW VARIATIONS IN FLOOR PLANE. 7. ALL WOOD SILLS IN CONTACT WITH CONCRETE TO BE PRESSURE TREATED AND HAVE A CONTINUOUS SILL SEALER. PROVIDE TERMITE SHIELDS AT CONCEALED UNDER FLOOR SPACES. 8. ALL CHIMNEYS SHALL TERMINATE 2'-0" MINIMUM HEIGHT ABOVE A POINT MEASURED 10'-0 HORIZONTALLY FROM THE NEAREST BUILDING OR ROOF. 9. LUMBER / WALLS: A. COORDINATE LOCATION, CONSTRUCTION AND DETAIL OF LOAD BEARING WALLS BEFORE WORK B. ALL LUMBER SHALL BE GRADE MARKED. C. O.S.B. IS AN ACCEPTABLE SUBSTITUTE FOR PLYWOOD EXCEPT WHERE SPECIFIED BY STRUCTURAL ENGINEER. D. STUD WALLS ARE DIMENSIONED 3-1/2", 5-1/2", OR 7-1/4", UNLESS NOTED OTHERWISE. E. PARTY WALLS ARE DIMENSIONED 8" (3-1/2" + 1" + 3-1/2") F. PLUMBING WALLS SHALL BE FRAMED WITH 2X6 OR 2X8 STUDS, UNLESS NOTED OTHERWISE. G. REFER TO UNIT PLANS FOR LOCATION OF 2X6 WALLS. H. REFER TO STRUCTURAL DRAWINGS FOR UNUSUAL OR SPECIAL FRAMING CONDITIONS I. WATER RESISTANT 1/2" CERAMIC TILE BACK BOARD SHALL BE INSTALL IN BOTH TUB AND SHOWER SURROUNDS, UNLESS NOTED OTHERWISE. J. ALL PENETRATIONS IN GYPSUM DRYWALL CONSTRUCTION SHALL BE SEALED WITH JOINT COMPOUND OR APPROVED ACOUSTICAL SEALANT TO PREVENT SOUND LEAKAGE. K. ALL CAVITY OR CONCEALED SPACES SHALL BE DRAFT STOPPED & FIRE BLOCKED.PROVIDE BLOCKING FOR ALL CABINETS, CEILING FANS, AND BATH ACCESSORIES. INCLUDE BLOCKING FOR GRAB BARS AT ALL LOCATIONS. 10. PATIOS AND BALCONIES SHALL BE SLOPED MIN. 1/4" PER 1'-0"" IN DIRECTION INDICATED OR TO OUTERMOST EDGE OF BUILDING STRUCTURE. 11. ALL EXPOSED MATERIALS FOR BALCONIES, PATIOS, SOFFITS, OVERHANGS ETC. SHALL BE APPROVED EXTERIOR GRADE. 12. BALCONY AND PATIO SUPPORTS VARY ACCORDING TO THE EXTERIOR ELEVATIONS. SEE ELEVATIONS FOR LOCATION OF BRICK PIER, STONE PIER, POLY COLUMN OR RAILINGS AT BALCONIES. 13. PROVIDE GALVANIZED METAL ANCHOR FOR WOOD POSTS BEARING DOWN ON CONCRETE SLABS, UNLESS NOTED OTHERWISE. 14. ALL CONCRETE WORK SHALL CONFORM TO ACI 301 "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS" AND THAT DESIGN IS BASED ON ACI 318 "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE”AND ACI 318.1. “CONCRETE TEST REPORTS”WILL BE AVAILABLE ON JOB SITE IN CONSTRUCTION TRAILER. 15. ALL FRAMING TO BE IN CONFORMANCE WITH THE NATIONAL FOREST PRODUCTS "MANUAL FOR HOUSE FRAMING." 16. FIREBLOCKING SHALL BE PROVIDED TO FORM EFFECTIVE FIRE BARRIERS BETWEEN STORIES AND BETWEEN A STORY AND ROOF SPACE. WHERE FIREBLOCKS ARE WOOD, THEY SHALL NOT BE LESS THAN A NOMINAL TWO INCHES IN THICKNESS. FIRESTOPS SHALL BE LOCATED IN EXTERIOR AND INTERIOR WALLS, PARTITIONS AT CEILING AND FLOOR LEVELS. MECHANICAL, ELECTRICAL, AND PLUMBING 1. ALL PLUMBING CHASES ARE TO EXTEND TO THE UNDERSIDE OF STRUCTURE ABOVE, UNLESS NOTED OTHERWISE. 2. WHERE ELECTRICAL, MECHANICAL, AND/OR OTHER WALL MOUNTED DEVICES OCCUR AT THE SAME LOCATION BUT DIFFERENT HEIGHTS, THEY SHALL BE CENTERED ABOVE EACH OTHER. 3. WATER SERVICE SHALL NOT BE PLACED IN CONCEALED SPACES OUTSIDE OF THE CONDITIONED BUILDING ENVELOPE (BREEZEWAY OR PATIO FLOOR SPACES OR ATTICS). 4. PENETRATIONS AND FIXTURES TO ALIGN VERTICALLY FROM FLOOR TO FLOOR. 5. PROVIDE SUPPORT/REINFORCEMENT TO ACCOMMODATE WALL MOUNTED EQUIPMENT INCLUDING SUPPORT OF FUTURE GRAB BARS IN ALL BATHROOMS AS REQUIRED BY ADA AND/OR FAIR HOUSING ACT. 6. COORDINATE LOCATION AND/OR ELEVATION OF FLOOR DRAINS, REGISTERS, GRILLES, LOUVERS CONVECTORS, PANELS, ETC. WITH MECHANICAL AND ELECTRICAL CONTRACTORS 7. FIRE PROTECTION SYSTEM SHALL BE DESIGNED BY THE FIRE PROTECTION CONTRACTOR. A. PROVIDE COMPLETE DESIGN AND SHOP DRAWINGS FOR FIRE SPRINKLER SYSTEM. B. PROVIDE FOR ALL STATE AND LOCAL SUBMITTALS AND/OR APPROVALS FOR QUICK RESPONSE SPRINKLER SYSTEM. C. ALL SPRINKLER PIPING SUBJECT TO FREEZING SHALL BE DRY-TYPE SYSTEMS WHERE PERMITTED. 8. VENT DRYERS TO OUTSIDE. SEE MECHANICAL DRAWINGS. 9. ALL OUTLETS @ KITCHEN SINK & BATH LAVATORY COUNTERS TO BE GFCI. 10. MECHANICAL DUCTWORK TO BE SEPARATED FROM ELECTRICAL PANELS. 11. SMOKE DETECTORS SHALL NOT BE PLACED IN FRONT OF EXHAUST GRILLS. 12. SMOKE DETECTORS SHALL BE CONTINUOUSLY BE POWERED BY BUILDING ELECTRICAL SYSTEM AND INSTALLED IN ACCORDANCE WITH NFPA AND IBC W/ BATTERY BACK UP. CODE 1. THE CONTRACTOR SHALL MEET: A. ALL REQUIREMENTS OF THE BUILDING CODE AND FEDERAL, STATE, AND LOCAL LAWS, REGULATIONS, AND REQUIREMENTS, EVEN IF IT REQUIRES LABOR AND/OR MATERIALS NOT INDICATED ON PLANS. B. ALL LAWS, ORDINANCES, RULES AND REGULATIONS OF ALL AUTHORITIES HAVING JURISDICTION. C. ALL WORK PERFORMED UNDER, AND IN CONNECTION WITH THESE DRAWINGS SHALL BE IN STRICT COMPLIANCE WITH THE LATEST O.S.H.A SAFETY AND HEALTH STANDARDS. D. OPERATING FEATURES SHALL COMPLY WITH IBC AND NFPA WHILE BUILDING IS UNDER CONSTRUCTION. E. ALL INSTALLED SIGNAGE TO COMPLY WITH 2010 ADA SECTIONS 216 AND 703. 2. PROVIDE ACCESS PANELS AS MANDATED BY LOCAL GOVERNING AUTHORITIES. 3. PROJECT SITE, BUILDINGS AND UNITS SHALL MEET OR EXCEED THE FAIR HOUSING ACCESSIBILITY GUIDELINES AS PUBLISHED IN THE FEDERAL REGISTER VOLUME 56, NUMBER 44, ON MARCH 6, 1991. THE FOLLOWING ARE ADDRESSED IN MEETING THE GUIDELINES: A. ACCESSIBLE ENTRANCES/ ACCESSIBLE ROUTES. B. PUBLIC AND COMMON AREAS MEETING ADA/ANSI AND ADA TITLE II REQUIREMENTS C. USABLE DOORS D. ACCESSIBLE ROUTE INTO AND THROUGH THE COVERED UNIT E. LIGHT SWITCHES, ELECTRICAL OUTLETS, THERMOSTAT, AND ENVIRONMENTAL LOCATIONS F. GRAB BAR REINFORCEMENT LOCATIONS. G. USABLE BATHROOMS AND KITCHENS. 4. ALL HANDICAPPED RAMPS SHALL BE BROOM FINISHED PERPENDICULAR TO SLOPE. SLOPE RAMPS AT 1:12 (MAX). 5. NO FRAMING AT ANY TIME IS TO BE CONCEALED PRIOR TO INSPECTION BY GOVERNING AUTHORITIES 6. WHILE BUILDING IS UNDER CONSTRUCTION, OPERATING FEATURES SHALL COMPLY WITH IBC CHAPTER 33 & NFPA 241. EARTH CONCRETE STEEL CONCRETE MASONRY UNITS WOOD FINISHES WOOD- CONTINUOUS WOOD- BLOCKING INSULATION- BATTS PLYWOOD BRICK GYPSUM- BOARD GRAVEL ALUMINUM INSULATION- RIGID GLAZING (ELEVATION) INTERIOR ELEVATION MARKER EXTERIOR ELEVATION MARKER LEVEL HEAD UNIT TAG SECTION MARK CENTERLINE ENLARGED PLAN MARK NORTH ARROW B01DOOR TYPE W10WINDOW TYPE WALL TYPE STRUCTURAL GRIDLINE BUBBLE ACCESSIBILITY SYMBOL WB1 022 A4-03 3 4 2 1 REFERENCE NUMBER A3-03 6 7 8 5 REFERENCE NUMBER SHEET NUMBER SHEET NUMBER A6-03 3 REFERENCE NUMBER SIMILAR DETAIL SHEET NUMBER SIM. N EW S 2103 BUILDING NUMBER FLOOR NUMBER UNIT NUMBER UNIT # SHEET # UNIT TYPE STOREFRONT TYPE SF01 A2-03 3 REFERENCE NUMBER SIMILAR DETAIL SHEET NUMBER SIM. 55.5 0 CL BUILDING CONTROL- GRID BUBBLE UNIT CENTERLINE BUBBLE C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12 / 1 9 / 2 0 2 2 3 : 5 6 : 2 0 P M C : \ U s e r s \ e l y t t l e \ D o c u m e n t s \ R e v i t \ C a m p N o r t h E n d _ B L D G 4 0 0 0 _ 2 0 2 2 _ e l y t t l e 3 C Q M P . r v t A00.06 Author Checker 2234301 GENERAL NOTES SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 SYMBOLS GRAPHIC REPRESENTATION ABBREVIATIONS DATE DESCRIPTION REV Tax# 075-106-20 #1853 Statesville Ave Hebrew Cemetery Association of Charlotte DB 13165 Pg 441 F. D. C. 723'-0" 722'-0" 715'-0" 711'-0" 709'-0"710'-0"712'-0" 714'-0" 716'-0" 716'-0" 717'-0" 718'-0" 720'-0" 721'-0" 719'-0" 714'-0" 713'-0" 712'-0" 723'-0" 724'-0" 724'-0" 725'-0" 725' STAIR E FIREWALL FI R E W A L L ST A I R C BUILDING 1000 BUILDING 2000 BU I L D I N G 1 0 0 0 BU I L D I N G 2 0 0 0 723'-0" 724'-0" 724'-0" ELEV 3 OPEN AIR 2 HOUR EXIT ENCLOSURE 2 STORY PASS THRU BR I D G E A T 2 N D PASS THRU TO GARAGE SHAFT ABOVE SHAFT ABOVE 9 98 PARKS 19 19 4 RESIDENTIAL TRASH POOL COURTYARD OPEN AIR EXISTING POLE/ EASEMENT ASSUMED TO BE REMOVED LOADING 4,890 SF CO-WORKING COVERED OUTDOOR AREA RETAIL UTILITY 25 22 DOG WASH DNUP STAIR A ELEV 1 ST A I R B ELEV 2 ELEV LOBBY ELEV LOBBY STAIR D ELEV LOBBY 4,890 SF CO-WORKING AMENITY 2,264 SQ FT POOL 1000 SQ FT 5,248 SF LEASING/ AMENITY 10,988 SF RETAIL T T T T AVERAGE GRADE PLANE NCBC 2018 -STORY ABOVE GRADE PLANE: ANY STORY HAVING ITS FINISHED FLOOR SURFACE ENTIRELY ABOVE GRADE PLANE, OR IN WHICH THE FINISH SURFACE OF THE FLOOR NEXT ABOVE IS: 1. MORE THAN 6'-0" ABOVE GRADE PLANE OR 2. MORE THAN 12 FEET ABOVE THE FINISHED GROUND LEVEL AT ANY POINT AVERAGE GRADE PLANE CALCULATION BUILDING 27 POINTS AVERAGE GRADE 10 -11 864'-6"(864'-6" + 864'-6") / 2 11 -12 864'-3"(864'-6" + 864'-0") / 2 12 -13 13 -14 14 -15 15 -16 16 -17 17 -18 18 -19 859' -7 3/4" 7736'-10"TOTAL AVERAGE GRADE: AVERAGE GRADE PLANE CALCULATION BUILDING 28 POINTS AVERAGE GRADE 20 -21 854'-1 13/16"(854'-3 5/8" + 854'-0") / 2 854'-0"(854'-0" + 854'-0") / 2 861' -7 3/16" 7754'-4 13/16"TOTAL AVERAGE GRADE: BUILDING 27 AVERAGE GRADE PLANE STORY ABOVE GRADE NO854'-4"BASEMENT LEVEL LEVEL 1 LEVEL 2 YES YES 859' -7 3/4" 865'-0" 875'-8" BUILDING 28 AVERAGE GRADE PLANE STORY ABOVE GRADE NO854'-4"BASEMENT LEVEL LEVEL 1 LEVEL 2 YES YES 861' -7 3/16" 865'-0" 875'-8" (864'-0" + 861'-0") / 2 862'-6" (861'-0" + 860'-6") / 2 860'-9" (860'-6" + 862'-7") / 2 861'-6 1/2" (862'-7" + 861'-0") / 2 861'-9 1/2" (861'-0" + 852'-0") / 2 856'-6" (852'-0" + 852'-0") / 2 852'-0" (852'-0" + 854'-0") / 2 853'-0" 21 -22 22 -23 23 -24 24 -25 25 -26 26 -27 27 -28 28 -29 (854'-0" + 864'-6") / 2 (864'-6" + 864'-6") / 2 (864'-6" + 864'-6") / 2 (864'-6" + 864'-6") / 2 (864'-6" + 864'-6") / 2 (864'-6" + 864'-6") / 2 (864'-6" + 864'-6") / 2 859'-3" 864'-6" 864'-6" 864'-6" 864'-6" 864'-6" 864'-6" T ELECTRICAL TRANSFORMER ON CONCRETE SLAB. PROVIDE UNDERGROUND SERVICE TO BUILDING FROM TRANSFORMER. FIRE HYDRANT FIRE APPARATUS LEGEND ARROW INDICATES EGRESS POINT FROM BUILDING BUILDING MOUNTED FIRE DEPARTMENT CONNECTION HATCH REPRESENTS FIRE DEPARTMENT PEDESTRIAN ROUTE HATCH REPRESENTS FIRE DEPARTMENT ACCESS LANE FIRE ALARM CONTROL PANEL ARROW INDICATES ACCESS POINT FOR FIRE PERSONNEL. STANDPIPE C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12 / 1 9 / 2 0 2 2 3 : 5 6 : 2 7 P M C : \ U s e r s \ e l y t t l e \ D o c u m e n t s \ R e v i t \ C a m p N o r t h E n d _ B L D G 4 0 0 0 _ 2 0 2 2 _ e l y t t l e 3 C Q M P . r v t A00.10 Author Checker 2234301 ARCHITECTURAL SITE PLAN SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/64" = 1'-0"1 ARCHITECTURAL SITE PLAN LIFE SAFETY PLAN LEGEND AMENITIES - EXTERIOR AMENITIES - INTERIOR BALCONY CIRCULATION CIRCULATION - VERTICAL PARKING RESIDENTIAL RETAIL SUPPORT C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12 / 1 9 / 2 0 2 2 3 : 5 7 : 2 0 P M C : \ U s e r s \ e l y t t l e \ D o c u m e n t s \ R e v i t \ C a m p N o r t h E n d _ B L D G 4 0 0 0 _ 2 0 2 2 _ e l y t t l e 3 C Q M P . r v t A00.12 Author Checker 2234301 SITE DATA PLAN SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 1/64" = 1'-0"1 SITE DATA PLAN - BASEMENT 1/64" = 1'-0"2 SITE DATA PLAN - LEVEL 1 1/64" = 1'-0"3 SITE DATA PLAN - LEVEL 2 1/64" = 1'-0"4 SITE DATA PLAN - LEVEL 3-4 1/64" = 1'-0"6 SITE DATA PLAN - LEVEL 5 OVERALL GROSS BLDG AREAS Area BASEMENT 32784.10 SF 32784.10 SF LEVEL 1 105015.04 SF 105015.04 SF LEVEL 2 103195.66 SF 103195.66 SF LEVEL 3 105434.04 SF 105434.04 SF LEVEL 4 105434.04 SF 105434.04 SF LEVEL 5 105434.04 SF 105434.04 SF 557296.93 SF GROSS BLDG A AREAS PER LEVEL BUILDING Area Use Area BASEMENT BLDG A BALCONY 491.07 SF BLDG A CIRCULATION 2292.35 SF BLDG A CIRCULATION - VERTICAL 540.33 SF BLDG A RESIDENTIAL 8958.13 SF BLDG A SUPPORT 149.77 SF 12431.65 SF LEVEL 1 BLDG A AMENITIES - INTERIOR 5164.55 SF BLDG A BALCONY 887.26 SF BLDG A CIRCULATION 3828.44 SF BLDG A CIRCULATION - VERTICAL 540.33 SF BLDG A RESIDENTIAL 17634.25 SF BLDG A SUPPORT 700.65 SF 28755.48 SF LEVEL 2 BLDG A BALCONY 1231.85 SF BLDG A CIRCULATION 4882.59 SF BLDG A CIRCULATION - VERTICAL 540.33 SF BLDG A RESIDENTIAL 23453.51 SF BLDG A SUPPORT 361.07 SF 30469.36 SF LEVEL 3 BLDG A BALCONY 1231.85 SF BLDG A CIRCULATION 4882.59 SF BLDG A CIRCULATION - VERTICAL 540.33 SF BLDG A RESIDENTIAL 23453.51 SF BLDG A SUPPORT 361.07 SF 30469.36 SF LEVEL 5 BLDG A AMENITIES - EXTERIOR 504.46 SF BLDG A AMENITIES - INTERIOR 505.05 SF BLDG A BALCONY 1231.85 SF BLDG A CIRCULATION 5055.02 SF BLDG A CIRCULATION - VERTICAL 540.33 SF BLDG A RESIDENTIAL 22444.01 SF BLDG A SUPPORT 188.65 SF 30469.36 SF TOTAL 132595.22 SF GROSS BLDG B AREAS PER LEVEL BUILDING Area Use Area LEVEL 1 BLDG B AMENITIES - EXTERIOR 1095.35 SF BLDG B AMENITIES - INTERIOR 5617.70 SF BLDG B BALCONY 1100.20 SF BLDG B CIRCULATION 2830.43 SF BLDG B CIRCULATION - VERTICAL 823.16 SF BLDG B RESIDENTIAL 16916.40 SF BLDG B RETAIL 11406.19 SF BLDG B SUPPORT 1708.15 SF 41497.58 SF LEVEL 2 BLDG B AMENITIES - INTERIOR 5617.70 SF BLDG B BALCONY 1100.20 SF BLDG B CIRCULATION 2500.42 SF BLDG B CIRCULATION - VERTICAL 823.16 SF BLDG B RESIDENTIAL 17549.22 SF BLDG B RETAIL 11406.68 SF BLDG B SUPPORT 1405.34 SF 40402.72 SF LEVEL 3 BLDG B BALCONY 2007.16 SF BLDG B CIRCULATION 4427.42 SF BLDG B CIRCULATION - VERTICAL 822.59 SF BLDG B RESIDENTIAL 34699.11 SF BLDG B SUPPORT 684.83 SF 42641.10 SF LEVEL 4 BLDG B BALCONY 2007.16 SF BLDG B CIRCULATION 4427.42 SF BLDG B CIRCULATION - VERTICAL 822.59 SF BLDG B RESIDENTIAL 34699.11 SF BLDG B SUPPORT 684.83 SF 42641.10 SF LEVEL 5 BLDG B BALCONY 2007.16 SF BLDG B CIRCULATION 4427.42 SF BLDG B CIRCULATION - VERTICAL 822.59 SF BLDG B RESIDENTIAL 34699.11 SF BLDG B SUPPORT 684.83 SF 42641.10 SF TOTAL 209823.60 SF GROSS BLDG C AREAS PER LEVEL BUILDING Area Use Area LEVEL 1 BLDG C AMENITIES - EXTERIOR 496.55 SF BLDG C AMENITIES - INTERIOR 1941.85 SF 2438.40 SF TOTAL 2438.40 SF GROSS PARKING GARAGE AREAS PER LEVEL BUILDING Area Use Area BASEMENT PARKING GARAGE CIRCULATION - VERTICAL 476.97 SF PARKING GARAGE PARKING 19875.48 SF 20352.45 SF LEVEL 1 PARKING GARAGE CIRCULATION - VERTICAL 773.63 SF PARKING GARAGE PARKING 30879.21 SF PARKING GARAGE SUPPORT 670.74 SF 32323.58 SF LEVEL 2 PARKING GARAGE CIRCULATION - VERTICAL 773.63 SF PARKING GARAGE PARKING 31421.33 SF PARKING GARAGE SUPPORT 128.62 SF 32323.58 SF LEVEL 3 PARKING GARAGE CIRCULATION - VERTICAL 773.63 SF PARKING GARAGE PARKING 31421.33 SF PARKING GARAGE SUPPORT 128.62 SF 32323.58 SF LEVEL 4 PARKING GARAGE CIRCULATION - VERTICAL 773.63 SF PARKING GARAGE PARKING 31421.33 SF PARKING GARAGE SUPPORT 128.62 SF 32323.58 SF LEVEL 5 PARKING GARAGE CIRCULATION - VERTICAL 773.63 SF PARKING GARAGE PARKING 31421.33 SF PARKING GARAGE SUPPORT 128.62 SF 32323.58 SF TOTAL 181970.35 SF GROSS BLDG AREAS PER LEVEL 1 Area Use Area AMENITIES - EXTERIOR 1591.90 SF AMENITIES - INTERIOR 12724.10 SF BALCONY 1987.46 SF CIRCULATION 6658.87 SF CIRCULATION - VERTICAL 2137.12 SF PARKING 30879.21 SF RESIDENTIAL 34550.65 SF RETAIL 11406.19 SF SUPPORT 3079.53 SF TOTAL 105015.04 SF GROSS BLDG AREAS PER LEVEL 2 Area Use Area AMENITIES - INTERIOR 5617.70 SF BALCONY 2332.05 SF CIRCULATION 7383.02 SF CIRCULATION - VERTICAL 2137.12 SF PARKING 31421.33 SF RESIDENTIAL 41002.73 SF RETAIL 11406.68 SF SUPPORT 1895.03 SF TOTAL 103195.66 SF GROSS BLDG AREAS PER LEVEL 3-4 Area Use Area BALCONY 6478.02 SF CIRCULATION 18792.46 SF CIRCULATION - VERTICAL 4273.10 SF PARKING 62842.65 SF RESIDENTIAL 116305.24 SF SUPPORT 2176.62 SF TOTAL 210868.09 SF GROSS BLDG AREAS PER LEVEL 5 Area Use Area AMENITIES - EXTERIOR 504.46 SF AMENITIES - INTERIOR 505.05 SF BALCONY 3239.01 SF CIRCULATION 9482.44 SF CIRCULATION - VERTICAL 2136.55 SF PARKING 31421.33 SF RESIDENTIAL 57143.11 SF SUPPORT 1002.10 SF TOTAL 105434.04 SF GROSS BLDG AREAS PER BASEMENT LEVEL Area Use Area BALCONY 491.07 SF CIRCULATION 2292.35 SF CIRCULATION - VERTICAL 1017.30 SF PARKING 19875.48 SF RESIDENTIAL 8958.13 SF SUPPORT 149.77 SF TOTAL 32784.10 SF UNIT AVERAGE 814 SF TOTAL UNITS 11 43 51 71 71 70 317 449 258,029 SF 272,872 SF 317 449 258,029 SF 272872 SF 100.00% TOTALS 10 40 14,800 14,800 10 40 14,800 14800 3.15% CL4 4 BEDROOM / 4 BATH 4 1,480 0 1,480 SF 2 2 2 2 2 10 40 14,800 SF 14,800 SF CL4 10 40 14,800 SF 14800 SF 3.15% 4 BEDROOM UNITS TOTALS 102 204 108,256 114,653 102 204 108,256 114653 32.18% B6 2 BEDROOM / 2 BATH 2 1,143 51 1,194 SF 1 1 1 1 1 5 10 5,715 SF 5,970 SF B6 5 10 5,715 SF 5970 SF 1.58% B5 2 BEDROOM / 2 BATH 2 1,073 80 1,153 SF 3 5 7 12 12 12 51 102 54,723 SF 58,803 SF B5 51 102 54,723 SF 58803 SF 16.09% B4 2 BEDROOM / 2 BATH 2 1,134 55 1,189 SF 1 1 1 3 6 3,402 SF 3,567 SF B4 3 6 3,402 SF 3567 SF 0.95% B3 2 BEDROOM / 2 BATH 2 1,015 0 1,015 SF 1 2 3 5 5 4 20 40 20,300 SF 20,300 SF B3 20 40 20,300 SF 20300 SF 6.31% B2 2 BEDROOM / 2 BATH 2 1,096 100 1,196 SF 2 2 2 2 2 10 20 10,960 SF 11,960 SF B2 10 20 10,960 SF 11960 SF 3.15% B1 2 BEDROOM / 2 BATH 2 1,012 69 1,081 SF 2 2 3 3 3 13 26 13,156 SF 14,053 SF B1 13 26 13,156 SF 14053 SF 4.10% 2 BEDROOM UNITS TOTALS 141 141 99,597 108,043 141 141 99,597 108043 44.48% A5 1 BEDROOM / 1 BATH 1 676 0 676 SF 2 2 2 6 6 4,056 SF 4,056 SF A5 6 6 4,056 SF 4056 SF 1.89% A4 1 BEDROOM / 1 BATH 1 714 56 770 SF 3 10 12 15 15 15 70 70 49,980 SF 53,900 SF A4 70 70 49,980 SF 53900 SF 22.08% A3 1 BEDROOM / 1 BATH 1 745 78 823 SF 1 1 1 745 SF 823 SF A3 1 1 745 SF 823 SF 0.32% A2 1 BEDROOM / 1 BATH 1 704 74 778 SF 2 2 4 4 4 16 16 11,264 SF 12,448 SF A2 16 16 11,264 SF 12448 SF 5.05% A1 1 BEDROOM / 1 BATH 1 699 68 767 SF 7 8 11 11 11 48 48 33,552 SF 36,816 SF A1 48 48 33,552 SF 36816 SF 15.14% 1 BEDROOM UNITS TOTALS 64 64 35,376 35,376 64 64 35,376 35376 20.19% S2 STUDIO 1 642 642 SF 3 4 5 5 5 22 22 14,124 SF 14,124 SF S2 22 22 14,124 SF 14124 SF 6.94% S1 STUDIO 1 506 0 506 SF 3 7 8 8 8 8 42 42 21,252 SF 21,252 SF S1 42 42 21,252 SF 21252 SF 13.25% STUDIO UNITS HEATED* BALCONY GROSS**HEATED* GROSS*HEATED* GROSS* UNIT TYPE DESCRIPTION BEDS AREA B 1 2 3 4 5 TOTAL UNITS TOTAL BEDS BUILDING AREA UNIT TOTAL UNITS TOTAL BEDS TOTAL AREA % UNIT MIX BUILDING TOTAL 12/6/2022 PARKING COUNT LEVEL B 45 LEVEL 1 98 LEVEL 2 106 LEVEL 3 106 LEVEL 4 106 LEVEL 5 103 TOTAL 564 PARKING REQUIRED MULTI-FAMILY ZONING 1/ UNIT REQUIRED = 324 SPACES MULTI-FAMILY OWNER 1/BEDROOM = 435 SPACES RETAIL 1/250 SF = 42 SPACES CO WORKING 1/500 SF = 10 SPACES TOTAL REQUIRED = 487 SPACES C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12 / 1 9 / 2 0 2 2 3 : 5 7 : 2 3 P M C : \ U s e r s \ e l y t t l e \ D o c u m e n t s \ R e v i t \ C a m p N o r t h E n d _ B L D G 4 0 0 0 _ 2 0 2 2 _ e l y t t l e 3 C Q M P . r v t A00.60 Author Checker 2234301 CODE DATA SHEET SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV BUILDING CODE DATA BUILDING IDENTIFICATION : BUILDING OCCUPANCY CLASSIFICATION : AREA ALLOWED (PER 506.2.3): TYPE OF CONSTRUCTION : BUILDING HEIGHT ALLOWANCE (PER 504.3): BUILDING HEIGHT PROVIDED : NUMBER OF STORIES ALLOWED (PER 504.4): NUMBER OF STORIES PROVIDED : FIRE RATING : SHAFT ENCLOSURES GREATER THAN 4 STORIES (PER 713.4): MIXED OCCUPANCY SEPARATION (PER 508.4): INTERIOR BEARING WALLS (PER 601): EXT. BEARING WALLS (PER 601): EXT. NON-BEARING WALLS: LESS THAN 30' SEPARATION (PER 602): CORRIDOR WALLS (PER 1020.1): ELEVATOR SHAFT WALLS (PER 713.4): REFUSE CHUTE SHAFT WALLS AND TERMINATION ROOM (PER 713.13): REFUSE ACCESS AND ROOMS (PER 713.13): FLOOR / CEILING CONSTRUCTION (PER 601): ROOF CEILING CONSTRUCTION (PER 601): PRIMARY STRUCTURAL FRAME (PER 601): INTERIOR NON-BEARING WALLS (PER 601): WALLS AND PARTITIONS OPENING PROTECTION FIRE WALLS (PER 706.4): STAIRS : STAIR WIDTH (PER 1009.1): ELEVATOR LOBBIES REQUIRED (PER 3006.3): FLOOR LOCATIONS: FIRE PROTECTION SYSTEM SPRINKLER SYSTEM PROVIDED (PER 903.3.1.1): STANDPIPES REQUIRED (PER 905): FIRE EXTINGUISHERS (PER 906): EXITS REQUIRED BUILDING EXITS (PER 1021.1): HORIZONTAL EXITS (PER 1025): TRAVEL DISTANCE (PER 1017.2): DEAD END CORRIDOR (PER 1020.4 EXCEPTION 2): UNITS OF EGRESS (PER 1005.1):CORRIDOR WIDTH = .20 PER OCCUPANT ROOF ACCESS ROOF ACCESS PROVIDED: ATTIC VENTILATION ATTIC VENTILATION REQUIRED (PER 1202.2): ATTIC VENTILATION TYPE: STAIR WIDTH = .30 PER OCCUPANT AREA ALLOWED PER FLOOR (PER 506.2) : EXT. NON-BEARING WALLS: GREATER THAN 30' SEPARATION (PER 602): AREA PROVIDED SQ.FT. INCREASE ALLOWED BY AREA MODIFICATIONS (PER 506) MIN. REQUIRED: 44" BUILDING B (SOUTH BUILDING) R-2, B, A 273,600 SQ.FT. III-A 85' -0" 64' -6" 5 5 2 HOUR 1 HOUR 1 HOUR 0 HOUR 1 HOUR 2 HOUR 2 HOUR 1 HOUR 1 HOUR 1 HOUR 1 HOUR 1 HOUR 3 HOUR MIN. PROVIDED 44" YES ALL NFPA 13 YES. WET PIPE SYSTEM WITH STANDPIPES LOCATED IN STAIRWELLS MINUMUM RATING OF 1-A:10-B:C. 75 FEET MAXIMUM TRAVEL DISTANCE PER FLOOR: 2 SEE PLANS 50 FEET ALLOWED YES NO. UNVENTED ATTIC PER 1202.3 72,000 SQ.FT. 0 HOUR 2 HOUR 250 FEET BUILDING CODE DATA BUILDING IDENTIFICATION : BUILDING OCCUPANCY CLASSIFICATION : AREA ALLOWED (PER 506.2.3): TYPE OF CONSTRUCTION : BUILDING HEIGHT ALLOWANCE (PER 504.3): BUILDING HEIGHT PROVIDED : NUMBER OF STORIES ALLOWED (PER 504.4): NUMBER OF STORIES PROVIDED : FIRE RATING : SHAFT ENCLOSURES GREATER THAN 4 STORIES (PER 713.4): MIXED OCCUPANCY SEPARATION (PER 508.4): INTERIOR BEARING WALLS (PER 601): EXT. BEARING WALLS (PER 601): EXT. NON-BEARING WALLS: LESS THAN 30' SEPARATION (PER 602): CORRIDOR WALLS (PER 1020.1): ELEVATOR SHAFT WALLS (PER 713.4): REFUSE CHUTE SHAFT WALLS AND TERMINATION ROOM (PER 713.13): REFUSE ACCESS AND ROOMS (PER 713.13): FLOOR / CEILING CONSTRUCTION (PER 601): ROOF CEILING CONSTRUCTION (PER 601): PRIMARY STRUCTURAL FRAME (PER 601): INTERIOR NON-BEARING WALLS (PER 601): WALLS AND PARTITIONS OPENING PROTECTION FIRE WALLS (PER 706.4): STAIRS : STAIR WIDTH (PER 1009.1): ELEVATOR LOBBIES REQUIRED (PER 3006.3): FLOOR LOCATIONS: FIRE PROTECTION SYSTEM SPRINKLER SYSTEM PROVIDED (PER 903.3.1.1): STANDPIPES REQUIRED (PER 905): FIRE EXTINGUISHERS (PER 906): EXITS REQUIRED BUILDING EXITS (PER 1021.1): HORIZONTAL EXITS (PER 1025): TRAVEL DISTANCE (PER 1017.2): DEAD END CORRIDOR (PER 1020.4 EXCEPTION 2): UNITS OF EGRESS (PER 1005.1):CORRIDOR WIDTH = .20 PER OCCUPANT ROOF ACCESS ROOF ACCESS PROVIDED: ATTIC VENTILATION ATTIC VENTILATION REQUIRED (PER 1202.2): ATTIC VENTILATION TYPE: STAIR WIDTH = .30 PER OCCUPANT AREA ALLOWED PER FLOOR (PER 506.2) : EXT. NON-BEARING WALLS: GREATER THAN 30' SEPARATION (PER 602): AREA PROVIDED SQ.FT. INCREASE ALLOWED BY AREA MODIFICATIONS (PER 506) MIN. REQUIRED: 44" BUILDING A (NORTH BUILDING) R-2, B 273,600 SQ.FT. III-A 85' -0" 72' -6" 5 5 2 HOUR 1 HOUR 1 HOUR 0 HOUR 1 HOUR 2 HOUR 2 HOUR 1 HOUR 1 HOUR 1 HOUR 1 HOUR 1 HOUR 3 HOUR MIN. PROVIDED 44" YES ALL NFPA 13 YES. WET PIPE SYSTEM WITH STANDPIPES LOCATED IN STAIRWELLS MINUMUM RATING OF 1-A:10-B:C. 75 FEET MAXIMUM TRAVEL DISTANCE PER FLOOR: 2 SEE PLANS 50 FEET ALLOWED YES NO. UNVENTED ATTIC PER 1202.3 72,000 SQ.FT. 0 HOUR 2 HOUR 250 FEET BUILDING CODE DATA BUILDING IDENTIFICATION : BUILDING OCCUPANCY CLASSIFICATION : AREA ALLOWED (PER 506.2.3): TYPE OF CONSTRUCTION : BUILDING HEIGHT ALLOWANCE (PER 504.3): BUILDING HEIGHT PROVIDED : NUMBER OF STORIES ALLOWED (PER 504.4): NUMBER OF STORIES PROVIDED : FIRE RATING : SHAFT ENCLOSURES GREATER THAN 4 STORIES (PER 713.4): MIXED OCCUPANCY SEPARATION (PER 508.4): INTERIOR BEARING WALLS (PER 601): EXT. BEARING WALLS (PER 601): EXT. NON-BEARING WALLS: LESS THAN 30' SEPARATION (PER 602): CORRIDOR WALLS (PER 1020.1): ELEVATOR SHAFT WALLS (PER 713.4): REFUSE CHUTE SHAFT WALLS AND TERMINATION ROOM (PER 713.13): REFUSE ACCESS AND ROOMS (PER 713.13): FLOOR / CEILING CONSTRUCTION (PER 601): ROOF CEILING CONSTRUCTION (PER 601): PRIMARY STRUCTURAL FRAME (PER 601): INTERIOR NON-BEARING WALLS (PER 601): WALLS AND PARTITIONS OPENING PROTECTION FIRE WALLS (PER 706.4): STAIRS : STAIR WIDTH (PER 1009.1): ELEVATOR LOBBIES REQUIRED (PER 3006.3): FLOOR LOCATIONS: FIRE PROTECTION SYSTEM SPRINKLER SYSTEM PROVIDED (PER 903.3.1.1): STANDPIPES REQUIRED (PER 905): FIRE EXTINGUISHERS (PER 906): EXITS REQUIRED BUILDING EXITS (PER 1021.1): HORIZONTAL EXITS (PER 1025): TRAVEL DISTANCE (PER 1017.2): DEAD END CORRIDOR (PER 1020.4 EXCEPTION 2): UNITS OF EGRESS (PER 1005.1):CORRIDOR WIDTH = .20 PER OCCUPANT ROOF ACCESS ROOF ACCESS PROVIDED: ATTIC VENTILATION ATTIC VENTILATION REQUIRED (PER 1202.2): ATTIC VENTILATION TYPE: STAIR WIDTH = .30 PER OCCUPANT AREA ALLOWED PER FLOOR (PER 506.2) : EXT. NON-BEARING WALLS: GREATER THAN 30' SEPARATION (PER 602): AREA PROVIDED SQ.FT. INCREASE ALLOWED BY AREA MODIFICATIONS (PER 506) MIN. REQUIRED: 44" BUILDING C (STAND ALONE AMENITY BUILDING) A 273,600 SQ.FT. 0' -0" 0' -0" 4 4 2 HOUR 1 HOUR 1 HOUR 0 HOUR 1 HOUR 2 HOUR 2 HOUR 1 HOUR 1 HOUR 1 HOUR 1 HOUR 1 HOUR 3 HOUR MIN. PROVIDED 44" 0 SQ.FT. 1 HOUR 2 HOUR ABOVE GRADE PLANE ABOVE GRADE PLANE ABOVE GRADE PLANE ABOVE GRADE PLANE C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12 / 1 9 / 2 0 2 2 3 : 5 7 : 2 4 P M C : \ U s e r s \ e l y t t l e \ D o c u m e n t s \ R e v i t \ C a m p N o r t h E n d _ B L D G 4 0 0 0 _ 2 0 2 2 _ e l y t t l e 3 C Q M P . r v t A00.61 Author Checker 2234301 CODE DATA SHEET SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 BUILDING CODE DATA BUILDING IDENTIFICATION : BUILDING OCCUPANCY CLASSIFICATION : AREA ALLOWED (PER 506.2.3): TYPE OF CONSTRUCTION : BUILDING HEIGHT ALLOWANCE (PER 504.3): BUILDING HEIGHT PROVIDED : NUMBER OF STORIES ALLOWED (PER 504.4): NUMBER OF STORIES PROVIDED : FIRE RATING : SHAFT ENCLOSURES GREATER THAN 4 STORIES (PER 713.4): MIXED OCCUPANCY SEPARATION (PER 508.4): INTERIOR BEARING WALLS (PER 601): EXT. BEARING WALLS (PER 601): EXT. NON-BEARING WALLS: LESS THAN 30' SEPARATION (PER 602): CORRIDOR WALLS (PER 1020.1): ELEVATOR SHAFT WALLS (PER 713.4): REFUSE CHUTE SHAFT WALLS AND TERMINATION ROOM (PER 713.13): REFUSE ACCESS AND ROOMS (PER 713.13): FLOOR / CEILING CONSTRUCTION (PER 601): ROOF CEILING CONSTRUCTION (PER 601): PRIMARY STRUCTURAL FRAME (PER 601): INTERIOR NON-BEARING WALLS (PER 601): WALLS AND PARTITIONS OPENING PROTECTION FIRE WALLS (PER 706.4): STAIRS : STAIR WIDTH (PER 1009.1): ELEVATOR LOBBIES REQUIRED (PER 3006.3): FLOOR LOCATIONS: FIRE PROTECTION SYSTEM SPRINKLER SYSTEM PROVIDED (PER 903.3.1.1): STANDPIPES REQUIRED (PER 905): FIRE EXTINGUISHERS (PER 906): EXITS REQUIRED BUILDING EXITS (PER 1021.1): HORIZONTAL EXITS (PER 1025): TRAVEL DISTANCE (PER 1017.2): DEAD END CORRIDOR (PER 1020.4 EXCEPTION 2): UNITS OF EGRESS (PER 1005.1):CORRIDOR WIDTH = .20 PER OCCUPANT ROOF ACCESS ROOF ACCESS PROVIDED: ATTIC VENTILATION ATTIC VENTILATION REQUIRED (PER 1202.2): ATTIC VENTILATION TYPE: STAIR WIDTH = .30 PER OCCUPANT AREA ALLOWED PER FLOOR (PER 506.2) : EXT. NON-BEARING WALLS: GREATER THAN 30' SEPARATION (PER 602): AREA PROVIDED SQ.FT. INCREASE ALLOWED BY AREA MODIFICATIONS (PER 506) MIN. REQUIRED: 44" PARKING DECK S-2 0 SQ.FT. I-B 160' -0" 77' -0" 11 6 2 HOUR 2 HOUR 2 HOUR 0 HOUR 1 HOUR 2 HOUR 2 HOUR 1 HOUR 2 HOUR 1 HOUR 2 HOUR 1 HOUR 3 HOUR MIN. PROVIDED 44" YES ALL YES YES. DRY MANUAL AT STAIRWELLS MINUMUM RATING OF 1-A:10-B:C. 75 FEET MAXIMUM TRAVEL DISTANCE PER FLOOR: 2 SEE PLANS 50 FEET ALLOWED YES N/A 79,000 SQ.FT. 0 HOUR 2 HOUR 300 FEET DATE DESCRIPTION REV PARTITION NOTES 1. DO NOT SCALE DRAWINGS 7. ALL RATED WALLS MUST MEET REQUIREMENT OF THE INDICATED TEST NUMBER. 8. METAL STUD MUST SIZED AND SPACED SO AS NOT TO EXCEED L/240 DESIGN CRITERIA. MIN. STUD GAUGE = 25. PARTITIONS SHALL BE LIMITED IN HEIGHT IN ACCORDANCE WITH STM C754. 9. REFER TO THE REFLECTED CEILING PLANS AND ARCHITECTURAL DRAWINGS FOR INDICATION OF WHICH NON-RATED PARTITIONS EXTEND TO CEILING HEIGHT OR TO UNDERSIDE OF STRUCTURE. IF DISCREPANCY EXIST, G.C. TO CONTACT ARCHITECT 10. WHERE NON-RATED PARTITIONS DO NOT EXTEND TO STRUCTURE, STOP GWB 6" ABOVE CEILING AND EXTEND OR BRACE METAL STUDS TO STRUCTURE. 11. PROVIDE MAX. 16" O.C. STUD SPACING BEHIND ALL CERAMIC TILE OR STONE VENEER WALLS. 12. PROVIDE UL APPROVED FIRE RESISTANT GWB WHERE REQUIRED BY RATING. 13. APPLY ACOUSTICAL SEALANT ALONG CENTERLINE OF STUD TRACKS TO ENTIRE PERIMETER OF ALL DEMISING AND CORRIDOR WALLS. 14. PROVIDE FIRE RATED SEALANT TO BOTH SIDES OF ENTIRE PERIMETER OF FIRE RATED WALLS AND AROUND ALL PENETRATIONS TO APPLICABLE U.L. LISTING REQUIREMENT OF WALL BEING PENETRATED 15. CONTRACTOR TO STAGGER ALL ELECTRICAL, COMMUNICATIONS, TELEPHONE AND OTHER SIMILAR OUTLET BOXES AT A MIN. OF 12" O.C. IN FIRE RATED AND SOUND RATED WALLS. 16. G.C. TO PROVIDE PUTTY PADS ON ALL ELECTRICAL OUTLET BOXES ON FIRE AND SOUND RATED WALLS. 17. REFER TO I.D. DRAWINGS FOR LOCATION OF ALL INTERIOR FINISHES. 18. PROVIDE WATER RESISTANT GWB AT ALL SHOWER AND BATH TUB WALL SURROUNDS (DENS-SHIELD OR APPROVED EQUAL). 19. PROVIDE IN-WALL BLOCKING FOR ALL CABINETRY, TOILET ACCESSORIES, CLOSET SHELVING, MILLWORK, WALLSTOPS, ARTWORK, WALL BUMPERS/GUARDS, DRAPERY LOCATIONS, STONEWORK, GRAB BARS, MODULAR OFFICE WALLS, AND OTHER SIMILAR CONDITIONS. 20. THE U.L. NUMBER INDICATED REFERENCE VOLUME 1, 2 AND 2B OF THE MOST RECENT FIRE RESISTANCE DIRECTORY PUBLISHED BY UNDERWRITERS LABORATORIES INC. -SEE SHEET CD-80 TO CD-86 FOR MORE INFORMATION. 21. ALL THROUGH WALL PENETRATIONS OF FIRE RATED WALLS/PARTITIONS MUST BE SEALED WITH FIRESTOP SYSTEM APPROVED BY U.L. FOR PENETRATIONS IN APPLICABLE WALL OR AS NOTED BY ARCHITECT. SEE ARCH/MEP DRAWINGS FOR ADDITIONAL INFORMATION. 22. DEFLECTION TRACKS TO BE PROVIDED AT TOP RUNNERS OF ALL METAL STUDS PARTITIONS THAT EXTEND TO UNDERSIDE OF STRUCTURAL DECK. TRACK MUST BE DESIGNED TO ALLOW UP TO 1/2" DEFLECTION. 23. ALL SMOKE AND FIRE RATED PARTITIONS MUST BE IDENTIFIED WITH PAINTED STENCILS ABOVE CEILINGS. 24. WALLS THAT EXTEND "TO STRUCTURE" SHALL EXTEND TO UNDERSIDE OF C.I.P CONCRETE SLAB METAL DECK OR PRECAST. 2. ALL DIMENSION ARE FROM FACE OF STUD WALL TO FACE OF STUD WALL OR FROM CENTERLINE OF COLUMN TO FACE OF STUD WALL UNLESS NOTED OTHERWISE. 3. REFER TO PARTITION LEGEND AND PARTITION TAG FOR GRAPHIC SYMBOLS CLARIFICATION 4 . THE CENTERLINE OF THE PARTITION SHOULD BE ALIGNED WITH THE CENTERLINE OF AN EXTERIOR WINDOW MULLION UNLESS NOTED OTHERWISE IN THE ARCHITECTURAL PLANS. PROVIDE NEOPRENE GASKET CLOSURE BETWEEN PARTITION AND MULLION. 25. PROVIDE FIRE TREATED WOOD BLOCKING OR PLYWOOD INSIDE WALLS AND OTHER CONCEALED SPACES. 5. CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES PRIOR TO PARTITION AND INSTALLATION. 26. CONTRACTOR TO COORDINATE PARTITION LAYOUT WITH M.E.P. WORK AND NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO INSTALLATION OF METAL/PLUMBING SLEEVES AT TIME OF CONCRETE PLACEMENT. 27. CONTRACTOR TO VERIFY SIZE AND LOCATION OF ALL EQUIPMENT. 6. SEE GENERAL NOTES FOR ADDITIONAL INFORMATION. 28. COORDINATE LOCATIONS OF FIRE PULL STATIONS, FIRE STROBES/SPEAKERS AND FIREMAN'S TELEPHONE JACK WITH INTERIOR DESIGN ELEMENTS. 29. VERIFY ALL THERMOSTAT LOCATIONS WITH INTERIOR DESIGNER FOR COORDINATION WITH DESIGN ELEMENTS PRIOR TO INSTALLATION. 30. REFER TO ELECTRICAL DRAWINGS FOR POWER, TELEPHONE, AND DATA OUTLET LOCATIONS. 31. SEAL ALL SOUND PARTITIONS WITH ACOUSTICAL SEALANT AT BASE, HEAD, AND ALL PENETRATIONS. 32. ALL EXPOSED TOP EDGES OF WALLS OR WHERE WALL ABUTS COLUMN OR OTHER CONCRETE STRUCTURE TO HAVE A ZIP BEAD FINISH. 33. G.C. TO PROVIDE A ZIP BEAD FINISH ALONG THE TOP EDGE OF ALL WALL WHERE WALL ABUTS AN EXPOSED OR SKIM COAT FINISH COLUMN AND OR CONCRETE STRUCTURE. 34. SOME WALL INDICATED MAY REQUIRE AN EXTERIOR FINISH SYSTEM NOT INDICATED ON PARTITION SCHEDULE. SEE ARCHITECTURAL DRAWING ADDITIONAL INFORMATION. 35. IN TYPICAL TOWER RESIDENTIAL UNITS, GWB ON WALL TO STOP AT GWB CEILINGS (STUDS TO CONTINUE TO STRUCTURE) EXCEPT AT CEILING BATHROOMS AND MECHANICAL CLOSETS, BOTH STUDS AND GWB WILL EXTEND TO STRUCTURE. 36. WALL TYPE IS BASED ON USG CRITERIA. 37. CAVITIES OF ALL CMU INTERIOR AND/OR EXTERIOR WALL ADJACENT TO HEATED SPACES TO RECEIVE MIN. R19 SPRAY FOAM INSULATION, TYP. SSMA METAL STUD SIZES 1 5/8" = 162 S 125 -xx 2 1/2" = 250 S 125 -xx 3 5/8" = 362 S 125 -xx 4" = 400 S 125 -xx 6" = 600 S 125 -xx 8" = 800 S 125 -xx MEMBER SIZE MEMBER DEPTH S = STUD MATERIAL THICKNESS FLANGE WITH IN 1/100 INCHES WW3 33 1ST LETTER INDICATES STRUCTURAL MATERIAL C POURED IN PLACE CONCRETE F METAL FURRING / WOOD FURRING M MASONRY P PRECAST CONCRETE S METAL STUD / CHANNEL W WOOD 2ND LETTER INDICATES INSULATION O NONE B BATT INSULATION C CELLULOSE D BATT + BOARD INSULATION R BOARD INSULATION S SOUND FIRE RATING 1 1 HOUR 2 2 HOUR 3 3 HOUR 4 4 HOUR NUMBER INDICATES VARIATIONS Structural Number Component Size & Composition Material Designation Non-Stud if if Applicable Stud if Applicable C,M,P 00-09 MATERIAL C,F,M,P,S,W 10-19 MATERIAL +< 2x4 WOOD STUD 20-39 MATERIAL +2x4 WOOD STUD 40-59 MATERIAL +2x6 WOOD STUD 60-69 > 2x6 WOOD STUD C,M,P,S,W 70-79 MATERIAL +2x4 WOOD STUD EACH SIDE 80-89 MATERIAL +2x6 WOOD STUD EACH SIDE 90-99 MATERIAL VARYING DOUBLE STUD CONDITIONS C,F,M,P,S,W 100-109 MATERIAL +< 3 5/8" METAL STUD 110-129 MATERIAL +3 5/8" =< 6" METAL STUD 130-149 MATERIAL +>= 6" METAL STUD 150-159 MATERIAL +3 5/8"=< 6" METAL STUD EACH SIDE 160-169 MATERIAL +>=6" METAL STUD EACH SIDE C,M,P,S,W 170-179 MATERIAL +VARYING DOUBLE STUD CONDITIONS M 180-189 OTHER MASONRY *FIRE AND SOUND TEST NUMBERS BASED ON THE FOLLOWING: -FIRE RESISTANCE DIRECTORY 2019 EDITION BY UL (UNDERWRITERS LAB INC.) -FIRE RESISTANCE, AND SOUND CONTROL DESIGN MANUAL 22ND EDITION 2019 BY GYPSUM ASSOCIATIONS. WALL TYPE LEGEND: BUILDING INSULATION SCHEDULE PER 2018 NORTH CAROLINA BUILDING CODE: ENERGY CONSERVATION CODE PROJECT FALLS INTO ZONE 3A, GROUP R (TABLES: R303.1,C402.1.3 & C402.1.4) R-VALUE R-25ci R-38 R-38 ROOFS: INSULATION ENTIRELY ABOVE ROOF DECK ATTIC AND OTHER -WOOD FRAMING ATTIC AND OTHER -STEEL FRAMING WALLS, ABOVE GRADE: MASS METAL FRAMED WOOD FRAMED AND OTHER ALL OTHER GROUP R ALL OTHER GROUP R U-VALUE SHGC R-25ci R-38 R-38 R-7.6ci R-13 + R-7.5ci R-13 + R-3.8ci OR R-20 R-9.5ci R-13 + R-7.5ci R-13 + R-3.8ci OR R-20 LOCATION / ASSEMBLY FLOORS: MASS JOIST / FRAMING R-12.5ci R-30 R-12.5ci R-30 SLAB ON GRADE FLOORS: UNHEATED SLABS HEATED SLABS NR R-15 FOR 24" R-10 FOR 24" R-15 FOR 24" U-0.70 U-0.50 OPAQUE DOORS: SWINGING FENESTRATION: METAL -SINGLE METAL WITH THERMAL BREAK -SINGLE NONMETAL OR METAL CLAD -SINGLE DEFAULT DOOR UNINSULATED METAL INSULATED METAL WOOD DEFAULT GLAZED SINGLE GLAZED CLEAR SINGLE GLAZED TINTED U-1.20 U-1.10 U-0.95 U-1.20 U-0.60 U-0.50 0.8 0.7 NOTES: 1. CI = CONTINUOUS INSULATION 2. NR = NO REQUIRED 3. SHGC = SOLAR HEAT GAIN COEFFICIENT 2X4 WOOD STUDS 5/8" TYPE "X" GYPSUM BOARD 1" AIR SPACE SHAFT CORRIDOR STRUCTURAL SHEATHING AS REQUIRED BY STRUCTURAL EXPOSED TO FIRE FROM SEPARATION WALL SIDE ONLY SB2 041 1/2" RESILIENT CHANNEL 5/8" TYPE "X" GYPSUM BOARD 2" 2" REINFORCED AUTOCLAVED AERATED CONCRETE PANELS ATTACHMENT CLIPS 1" BATT INSULATION 2X WOOD STUD WALL 1 HOUR BEARING STUD WALL: (CALCULATED PER IBC CH. 7) -2X WOOD STUDS @ 16" O.C. -(1) LAYER 5/8" TYPE "X" GYPSUM BOARD AT FIRE DOOR JAMB & HEAD UNIT DEMISING WALL: MIN. 3 1/2" BATT INSULATION @ 2X4 STUD WALL. (MIN. 5 1/2" @ 2X6) GAP 1" MAX 0' - 4"GAP 1" MAX AT FIRE DOOR JAMB & HEAD 4" REINFORCED AUTOCLAVED AERATED CONCRETE JAMB & HEAD PANELS. 12" MINIMUM WIDTH 2X WOOD STUD WALL 1 HOUR BEARING STUD WALL: (CALCULATED PER IBC CH. 7) -2X WOOD STUDS @ 16" O.C. -(1) LAYER 5/8" TYPE "X" GYPSUM BOARD UNIT DEMISING WALL: MIN. 3 1/2" BATT INSULATION @ 2X4 STUD WALL. (MIN. 5 1/2" @ 2X6) (4" MAX) 1 1/2" GAP AAC PANEL 0' - 3"(4" MAX) 1 1/2" GAP AT FIRE WALL 3" REINFORCED AUTOCLAVED AERATED CONCRETE PANELS FIRE RATED DOOR FRAME, GROUT SOLID CONTINUOUS SEALANT AT FIRE WALL 0' - 6"STC : 63MIN C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12 / 1 9 / 2 0 2 2 3 : 5 7 : 2 5 P M C : \ U s e r s \ e l y t t l e \ D o c u m e n t s \ R e v i t \ C a m p N o r t h E n d _ B L D G 4 0 0 0 _ 2 0 2 2 _ e l y t t l e 3 C Q M P . r v t A00.70 Author Checker 2234301 WALL PARTITIONS DETAIL SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV UL# U210 -2 HR RATED SHAFT WALLSB2 021 UL# U210 - 3 HR RATED AUTOCLAVED AERATED CONCRETE (AAC) FIREWALLPB3 070 1 HOUR BEARING STUD WALL: (CALCULATED PER IBC CH. 7) -2X WOOD STUDS @ 16" O.C. -(1) LAYER 5/8" TYPE "X" GYPSUM BOARD INTERIOR 1" AIR SPACE SEPARATION FROM ANY WALL OR FOUNDATION, U.N.O. 1" STRUCTURAL THICKNESS PERCO2 002 CO2 001 PO2 001 2 HOUR CONCRETE WALL -WALL TYPE CO2 001 (PER TABLE 721.1(2) -ITEM 4-1.1 -NCBC CHAPTER 7) -SILICEOUS AGGREGATE CONCRETE 2 HOUR RATING- MIN. FINISH THICKNESS OF 5.0" -CARBONDATE AGGREGATE CONCRETE: 2 HOUR RATING - MIN. FINISHED THICKNESS OF 4.6" PO3 001 PO2 002 2 HR. -12" 2 HR. -10" 2 HR. -8" 2 HR. -8" PRECAST 2 HR. -12" PRECAST 3 HR. -8" PRECAST (1) LAYER 5/8" TYPE "X" GYPSUM BOARD EXTERIOR INTERIOR FRT EXTERIOR SHEATHING, SEE STRUCTURAL. MULTIPLE FINISH CONDITIONS, SEE ELEVATIONS AIR/MOISTURE BARRIER BATT INSULATION, PRESSURE FIT TO FILL STUD CAVITY MULTIPLE FINISH CONDITIONS 2X FRT WOOD STUDS AS SPACED AND SIZED BY STRUCTURAL 3/8" THK X 1 1/2" WIDE VERTICAL FURRING STRIPS FILL AS REQUIRED BY STRUCTURAL CONCAVE MORTAR JOINT (TYP.) UL# U905 2 HR RATED 8" CMU 0' - 1" 1" AIR SPACE 1 HOUR BEARING STUD WALL: (CALCULATED PER IBC CH. 7) -2X WOOD STUDS @ 16" O.C. -(1) LAYER 5/8" TYPE "X" GYPSUM BOARD 5/8" TYPE 'X' GYP BD. *3 1/2" BATT INSULATION IN BOTH WALLS 2X WD STUDS STAGGERED @ 16"- SEE STRUCTURAL 1" AIRSPACE 5/8" TYPE 'X' GYP. BD. STRUCTURAL SHEATHING ONE SIDE OF AIR SPACE AS REQUIRED BY STRUCTURAL DRAWINGS. 0' - 1" *STC -58 INTERIOR INTERIOR TEST REPORT: TL-93-263WB1 080 2x6 WOOD STUD 5/8" TYPE "X" GYPSUM BOARD EACH SIDE (TYP.) 2X4 WOOD STUD (SEE STRUCTURAL) NOTE: USE 5/8" CEMENT BACKER UNIT W/ CERAMIC TILE WHERE INDICATED ON FINISH SCHEDULE STRUCTURAL SHEATHING AS REQUIRED BY STRUCTURAL DRAWINGS UNIT INTERIOR CORRIDOR 1/2" RESILIENT CHANNEL DELUXE **STC 50 MIN. **MIN. R-13 BATT INSULATION, PRESSURE FIT TO FILL STUD CAVITY TEST REPORT: TL-93-098 WB1 041 2x6 WOOD STUD 2X FRT WOOD STUDS AS SPACED AND SIZED BY STRUCTURAL (1) LAYER 5/8" TYPE "X" GYPSUM BOARD EXTERIOR INTERIOR FRT EXTERIOR SHEATHING, SEE STRUCTURAL AIR/MOISTURE BARRIER BATT INSULATION, PRESSURE FIT TO FILL STUD CAVITY CEMENTITIOUS PANEL CEMENTITIOUS PANEL 3/8" THK. X 1 1/2" WIDE VERTICAL WOOD FURRING STRIPS FIRE RETARDANT WOOD STUDS AS SPACED AND SIZED BY STRUCTURAL (2) LAYERS 5/8" TYPE "X" GYPSUM BOARD EXTERIOR INTERIOR 1/2" LP FLAMEBLOCK FIRE RETARDANT EXTERIOR WOOD SHEATHING AIR/MOISTURE BARRIER BATT INSULATION, PRESSURE FIT TO FILL STUD CAVITY CEMENTITIOUS PANEL CEMENTITIOUS PANEL 3/8" THK. X 1 1/2" WIDE VERTICAL WOOD FURRING STRIPS WB1 052 2x8 WOOD STUD FIRE RETARDANT WOOD STUDS AS SPACED AND SIZED BY STRUCTURAL (2) LAYERS 5/8" TYPE "X" GYPSUM BOARD EXTERIOR INTERIOR 1/2" LP FLAMEBLOCK FIRE RETARDANT EXTERIOR WOOD SHEATHING AIR/MOISTURE BARRIER BATT INSULATION, PRESSURE FIT TO FILL STUD CAVITY MULTIPLE FINISH CONDITIONS, SEE ELEVATIONS MULTIPLE FINISH CONDITIONS 3/8" THK. X 1 1/2" WIDE VERTICAL FURRING STRIPS EXTERIOR (2) LAYERS 5/8" TYPE "X" GYPSUM BOARD 1/2" EXTERIOR SHEATHING AIR/MOISTURE BARRIER 2X FIRE RETARDANT WOOD STUDS AS SPACED BY STRUCTURAL BATT INSULATION TO FILL STUD CAVITY MULTIPLE FINISHES, SEE ELEVATION 3/8" VERTICAL FRT FURRING STRIPS INTERIOREXTERIORINTERIOR (1) LAYER 5/8" TYPE "X" GYPSUM BOARD 1/2" EXTERIOR SHEATHING AIR/MOISTURE BARRIER 2X FIRE RETARDANT WOOD STUDS AS SPACED BY STRUCTURAL BATT INSULATION TO FILL STUD CAVITY MULTIPLE FINISHES, SEE ELEVATION 3/8" VERTICAL FRT FURRING STRIPS UL#905 2HR RATED 8" CMU FILL AS REQUIRED BY STRUCTURAL MO1 001 1-HR RATED INTERIOR EXTERIOR FLUID ELASTOMERIC COATING 3/8" INTUMESCENT COATING PRIMER COATING STEEL TUBE COLUMN SEE STRUCTURAL DRAWINGS FOR SIZE 5/8" TYPE "X" GYPSUM BOARD EACH SIDE (TYP.) WOOD STUD (SEE STRUCTURAL) NOTE: USE 5/8" CEMENT BACKER UNIT W/ CERAMIC TILE WHERE INDICATED ON FINISH SCHEDULE INTERIOR INTERIOR WB1 020 W/ BATT INSULATION 5/8" TYPE 'X' GYP (FOR RATED WALL ) BD @ EACH SIDE WOOD STUD (SEE STRUCTURAL) NOTE: USE 1/2" CEMENT BACKER UNIT W/ CERAMIC TILE WHERE INDICATED ON FINISH SCHEDULE INTERIORINTERIOR **BATT INSULATION PER WALL TAG PARTITION NOTES 1. DO NOT SCALE DRAWINGS 7. ALL RATED WALLS MUST MEET REQUIREMENT OF THE INDICATED TEST NUMBER. 8. METAL STUD MUST SIZED AND SPACED SO AS NOT TO EXCEED L/240 DESIGN CRITERIA. MIN. STUD GAUGE = 25. PARTITIONS SHALL BE LIMITED IN HEIGHT IN ACCORDANCE WITH STM C754. 9. REFER TO THE REFLECTED CEILING PLANS AND ARCHITECTURAL DRAWINGS FOR INDICATION OF WHICH NON-RATED PARTITIONS EXTEND TO CEILING HEIGHT OR TO UNDERSIDE OF STRUCTURE. IF DISCREPANCY EXIST, G.C. TO CONTACT ARCHITECT 10. WHERE NON-RATED PARTITIONS DO NOT EXTEND TO STRUCTURE, STOP GWB 6" ABOVE CEILING AND EXTEND OR BRACE METAL STUDS TO STRUCTURE. 11. PROVIDE MAX. 16" O.C. STUD SPACING BEHIND ALL CERAMIC TILE OR STONE VENEER WALLS. 12. PROVIDE UL APPROVED FIRE RESISTANT GWB WHERE REQUIRED BY RATING. 13. APPLY ACOUSTICAL SEALANT ALONG CENTERLINE OF STUD TRACKS TO ENTIRE PERIMETER OF ALL DEMISING AND CORRIDOR WALLS. 14. PROVIDE FIRE RATED SEALANT TO BOTH SIDES OF ENTIRE PERIMETER OF FIRE RATED WALLS AND AROUND ALL PENETRATIONS TO APPLICABLE U.L. LISTING REQUIREMENT OF WALL BEING PENETRATED 15. CONTRACTOR TO STAGGER ALL ELECTRICAL, COMMUNICATIONS, TELEPHONE AND OTHER SIMILAR OUTLET BOXES AT A MIN. OF 12" O.C. IN FIRE RATED AND SOUND RATED WALLS. 16. G.C. TO PROVIDE PUTTY PADS ON ALL ELECTRICAL OUTLET BOXES ON FIRE AND SOUND RATED WALLS. 17. REFER TO I.D. DRAWINGS FOR LOCATION OF ALL INTERIOR FINISHES. 18. PROVIDE WATER RESISTANT GWB AT ALL SHOWER AND BATH TUB WALL SURROUNDS (DENS-SHIELD OR APPROVED EQUAL). 19. PROVIDE IN-WALL BLOCKING FOR ALL CABINETRY, TOILET ACCESSORIES, CLOSET SHELVING, MILLWORK, WALLSTOPS, ARTWORK, WALL BUMPERS/GUARDS, DRAPERY LOCATIONS, STONEWORK, GRAB BARS, MODULAR OFFICE WALLS, AND OTHER SIMILAR CONDITIONS. 20. THE U.L. NUMBER INDICATED REFERENCE VOLUME 1, 2 AND 2B OF THE MOST RECENT FIRE RESISTANCE DIRECTORY PUBLISHED BY UNDERWRITERS LABORATORIES INC. -SEE SHEET CD-80 TO CD-86 FOR MORE INFORMATION. 21. ALL THROUGH WALL PENETRATIONS OF FIRE RATED WALLS/PARTITIONS MUST BE SEALED WITH FIRESTOP SYSTEM APPROVED BY U.L. FOR PENETRATIONS IN APPLICABLE WALL OR AS NOTED BY ARCHITECT. SEE ARCH/MEP DRAWINGS FOR ADDITIONAL INFORMATION. 22. DEFLECTION TRACKS TO BE PROVIDED AT TOP RUNNERS OF ALL METAL STUDS PARTITIONS THAT EXTEND TO UNDERSIDE OF STRUCTURAL DECK. TRACK MUST BE DESIGNED TO ALLOW UP TO 1/2" DEFLECTION. 23. ALL SMOKE AND FIRE RATED PARTITIONS MUST BE IDENTIFIED WITH PAINTED STENCILS ABOVE CEILINGS. 24. WALLS THAT EXTEND "TO STRUCTURE" SHALL EXTEND TO UNDERSIDE OF C.I.P CONCRETE SLAB METAL DECK OR PRECAST. 2. ALL DIMENSION ARE FROM FACE OF STUD WALL TO FACE OF STUD WALL OR FROM CENTERLINE OF COLUMN TO FACE OF STUD WALL UNLESS NOTED OTHERWISE. 3. REFER TO PARTITION LEGEND AND PARTITION TAG FOR GRAPHIC SYMBOLS CLARIFICATION 4 . THE CENTERLINE OF THE PARTITION SHOULD BE ALIGNED WITH THE CENTERLINE OF AN EXTERIOR WINDOW MULLION UNLESS NOTED OTHERWISE IN THE ARCHITECTURAL PLANS. PROVIDE NEOPRENE GASKET CLOSURE BETWEEN PARTITION AND MULLION. 25. PROVIDE FIRE TREATED WOOD BLOCKING OR PLYWOOD INSIDE WALLS AND OTHER CONCEALED SPACES. 5. CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD AND NOTIFY THE ARCHITECT OF ANY DISCREPANCIES PRIOR TO PARTITION AND INSTALLATION. 26. CONTRACTOR TO COORDINATE PARTITION LAYOUT WITH M.E.P. WORK AND NOTIFY ARCHITECT OF ANY DISCREPANCIES PRIOR TO INSTALLATION OF METAL/PLUMBING SLEEVES AT TIME OF CONCRETE PLACEMENT. 27. CONTRACTOR TO VERIFY SIZE AND LOCATION OF ALL EQUIPMENT. 6. SEE GENERAL NOTES FOR ADDITIONAL INFORMATION. 28. COORDINATE LOCATIONS OF FIRE PULL STATIONS, FIRE STROBES/SPEAKERS AND FIREMAN'S TELEPHONE JACK WITH INTERIOR DESIGN ELEMENTS. 29. VERIFY ALL THERMOSTAT LOCATIONS WITH INTERIOR DESIGNER FOR COORDINATION WITH DESIGN ELEMENTS PRIOR TO INSTALLATION. 30. REFER TO ELECTRICAL DRAWINGS FOR POWER, TELEPHONE, AND DATA OUTLET LOCATIONS. 31. SEAL ALL SOUND PARTITIONS WITH ACOUSTICAL SEALANT AT BASE, HEAD, AND ALL PENETRATIONS. 32. ALL EXPOSED TOP EDGES OF WALLS OR WHERE WALL ABUTS COLUMN OR OTHER CONCRETE STRUCTURE TO HAVE A ZIP BEAD FINISH. 33. G.C. TO PROVIDE A ZIP BEAD FINISH ALONG THE TOP EDGE OF ALL WALL WHERE WALL ABUTS AN EXPOSED OR SKIM COAT FINISH COLUMN AND OR CONCRETE STRUCTURE. 34. SOME WALL INDICATED MAY REQUIRE AN EXTERIOR FINISH SYSTEM NOT INDICATED ON PARTITION SCHEDULE. SEE ARCHITECTURAL DRAWING ADDITIONAL INFORMATION. 35. IN TYPICAL TOWER RESIDENTIAL UNITS, GWB ON WALL TO STOP AT GWB CEILINGS (STUDS TO CONTINUE TO STRUCTURE) EXCEPT AT CEILING BATHROOMS AND MECHANICAL CLOSETS, BOTH STUDS AND GWB WILL EXTEND TO STRUCTURE. 36. WALL TYPE IS BASED ON USG CRITERIA. 37. CAVITIES OF ALL CMU INTERIOR AND/OR EXTERIOR WALL ADJACENT TO HEATED SPACES TO RECEIVE MIN. R19 SPRAY FOAM INSULATION, TYP. SSMA METAL STUD SIZES 1 5/8" = 162 S 125 -xx 2 1/2" = 250 S 125 -xx 3 5/8" = 362 S 125 -xx 4" = 400 S 125 -xx 6" = 600 S 125 -xx 8" = 800 S 125 -xx MEMBER SIZE MEMBER DEPTH S = STUD MATERIAL THICKNESS FLANGE WITH IN 1/100 INCHES WW3 33 1ST LETTER INDICATES STRUCTURAL MATERIAL C POURED IN PLACE CONCRETE F METAL FURRING / WOOD FURRING M MASONRY P PRECAST CONCRETE S METAL STUD / CHANNEL W WOOD 2ND LETTER INDICATES INSULATION O NONE B BATT INSULATION C CELLULOSE D BATT + BOARD INSULATION R BOARD INSULATION S SOUND FIRE RATING 1 1 HOUR 2 2 HOUR 3 3 HOUR 4 4 HOUR NUMBER INDICATES VARIATIONS Structural Number Component Size & Composition Material Designation Non-Stud if if Applicable Stud if Applicable C,M,P 00-09 MATERIAL C,F,M,P,S,W 10-19 MATERIAL +< 2x4 WOOD STUD 20-39 MATERIAL +2x4 WOOD STUD 40-59 MATERIAL +2x6 WOOD STUD 60-69 > 2x6 WOOD STUD C,M,P,S,W 70-79 MATERIAL +2x4 WOOD STUD EACH SIDE 80-89 MATERIAL +2x6 WOOD STUD EACH SIDE 90-99 MATERIAL VARYING DOUBLE STUD CONDITIONS C,F,M,P,S,W 100-109 MATERIAL +< 3 5/8" METAL STUD 110-129 MATERIAL +3 5/8" =< 6" METAL STUD 130-149 MATERIAL +>= 6" METAL STUD 150-159 MATERIAL +3 5/8"=< 6" METAL STUD EACH SIDE 160-169 MATERIAL +>=6" METAL STUD EACH SIDE C,M,P,S,W 170-179 MATERIAL +VARYING DOUBLE STUD CONDITIONS M 180-189 OTHER MASONRY *FIRE AND SOUND TEST NUMBERS BASED ON THE FOLLOWING: -FIRE RESISTANCE DIRECTORY 2019 EDITION BY UL (UNDERWRITERS LAB INC.) -FIRE RESISTANCE, AND SOUND CONTROL DESIGN MANUAL 22ND EDITION 2019 BY GYPSUM ASSOCIATIONS. WALL TYPE LEGEND: C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12 / 1 9 / 2 0 2 2 3 : 5 7 : 2 8 P M C : \ U s e r s \ e l y t t l e \ D o c u m e n t s \ R e v i t \ C a m p N o r t h E n d _ B L D G 4 0 0 0 _ 2 0 2 2 _ e l y t t l e 3 C Q M P . r v t A00.71 Author Checker 2234301 WALL PARTITIONS DETAIL SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 1-HOUR RATED WOOD FURRING WALLFB1 020 RATED PRE-CAST / CONCRETE WALLC02 003 UL#356 - 1-HR EXT. BEARING WOOD STUD WALL W/ MULTIPLE FINISH CONDITIONSWB1 042 UL# 905 2-HR 8" CMU - ELEVATOR / STAIR ADJACENT TO INTERIOR WOOD STUDMO2 002 UL# U341 1-HR RATED DEMISING WALLWB1 070 UL# U344 1-HR INT. BEARING WALL @ CORRIDORWB1 021 UL# U349 2-HR EXT BEARING WOOD STUD WALL W/ CEMENTITIOUS PANELWB2 O42 UL# U349 - 2 HR RATED EXTERIOR WALL OVERFRAME W/ MULTIPLE FINISHESWB2 080 UL# U356 - 1 HR RATED EXTERIOR WALL OVERFRAME W/ MULTIPLE FINISHESWB1 080 UL# U905 2-HR 8" CMU WALLMO2 001 UL# X650 - 1-HOUR RATED TUBE STEEL COLUMN WO1 020 - UL# U305 1 HR INTERIOR BEARING WALLWO1 020 WO 020 - NON-RATED & NON-BEARING INTERIOR WALLWO 020 1" GYPCRETE TOPPING FLOOR SHEATHING, SEE STRUCTURAL 18" PRE-FAB WOOD FLOOR TRUSS, SEE STRUCTURAL ACOUSTIC-MAT 1/4 SOUND ISOLATION MAT (AT REQUIRED LOCATIONS) BLOWN-IN INSULATION 1 LAYER 5/8" TYPE 'C' GYP. BD. (DRYWALL SCREWS ARE NOT TO PENETRATE WOOD TRUSS JOISTS) INTERIOR OF UNIT INTERIOR OF UNIT 1/2" RESILIENT CHANNELS @ 24" O.C. NOTE: FILL CAVITY WITH BLOWN-IN INSULATION; TOP OF INSULATION TO BE WITHIN 2" OF BOTTOM OF FLOOR SHEATHING (FIRE SPRINKLING OF INTERSTITIAL SPACE NOT REQUIRED) *STC -59 TEST: MAXXON *IIC -51-54 1" GYPCRETE TOPPING FRT. FLOOR SHEATHING -REFER TO STRUCTURAL PRE-FAB WOOD FLOOR TRUSS -REFER TO STRUCTURAL 1 LAYER 5/8" TYPE 'C' GYPSUM BOARD (DRYWALL SCREWS ARE NOT TO PENETRATE WOOD TRUSS JOISTS) CORRIDOR 1/2" RESILIENT CHANNELS @ 24" O.C. CORRIDOR FULL CAVITY BLOWN-IN FIBERGLASS INSULATION NOTE: FILL CAVITY WITH BLOWN-IN INSULATION; TOP OF INSULATION TO BE WITHIN 2" OF BOTTOM OF FLOOR SHEATHING (FIRE SPRINKLING OF INTERSTITIAL SPACE NOT REQUIRED) CONCRETE TOPPING -BROOM FINISH METAL DECKING -REFER TO STRUCTURAL STAIR METAL POUR STOP STEEL STAIR SUPPORT -REFER TO STRUCTURAL FLOOR SHEATHING -REFER TO STRUCTURAL WATERPROOF MEMBRANE, CONSIDER 60MIL SELF-ADHERING SYSTEM, SIMILAR TO POLYGUARD BALCONY-GUARD SYSTEM. EXTERIOR EXTERIOR PRE-FAB WOOD TRUSS -SLOPE STRUCTURE -SEE ARCH PLANS FOR SLOPE RATIO -REFER TO STRUCTURAL DRAINAGE MAT 1-1/2" MINIMUM LIGHTWEIGHT CONCRETE 1 LAYER 5/8" TYPE 'C' GYP. BD. (DRYWALL SCREWS ARE NOT TO PENETRATE WOOD TRUSS JOISTS) 1/2" RESILIENT CHANNELS @ 12" O.C. RIP 2X OVERBUILD TO CREATE POSITIVE SLOPE ON CANTILEVERED BEAMS, SEE STRUCT DRAWINGS TOP CHORD SLOPED TRUSSES: PREFAB WOOD TRUSS, SEE STRUCTURAL 1/2" RESILIENT CHANNELS @ 12" O.C. 1 LAYER 5/8" TYPE 'C' GYPSUM BOARD (DRYWALL SCREWS ARE NOT TO PENETRATE WOOD TRUSS JOISTS) EXTERIOR INTERIOR FRT. ROOF SHEATHING, SEE STRUCTURAL 60 MIL SINGLE PLY TPO ROOFING MEMBRANE OVER 1/2" PROTECTION BOARD *INSTALL TAPERED INSULATION AS NEEDED FULL CAVITY BLOWN-IN FIBERGLASS INSULATION ROOF CRICKETS FROM RIGID INSULATION STAIRFLOOR SHEATHING SEE STRUCT 2 X 10 LEDGER, SEE STRUCT BALLOONED FRAMED STUDS, SEE STRUCT CONT. GYP BOARD EA PER UL# U301, SEE STRUCT 2X STAIR JOIST W/FACE MOUNT HANGER SEE STRUCT ELEVATED CAST-IN-PLACE CONCRETE SLAB, SEE STRUCT. DWGS. 1 LAYER 5/8" GYPSUM BOARD CEILING ON HANGERS @ 24" O.C. (TYPICAL) DRAINAGE MAT OVER DUAL WATERPROOFING SYSTEM SIMILAR TO POLYGUARD DUAL CORE *STC -70 *IIC -52 1-1/2" MINIMUM LIGHTWEIGHT CONCRETE TOPPING SLAB SPRAY-APPLIED FOAM INSULATION (CLOSED CELL), UNDERSIDE OF P.T. SLAB. PROVIDE MINIMUM STC 50 RATING SLOPE 1/4" PER FT MIN 1" GYPCRETE FLOOR SHEATHING, SEE STRUCTURAL 18" PRE-FAB WOOD FLOOR TRUSS, SEE STRUCTURAL QUIET QURL 65/075 SOUND ISOLATION MAT 2 LAYERS 5/8" TYPE 'C' GYP. BD. (DRYWALL SCREWS ARE NOT TO PENETRATE WOOD TRUSS JOISTS) ONLY OCCURS BELOW SKY LOUNGE AMENITY AREA RESILIENT CHANNELS PER UL NOTE: FILL CAVITY WITH BLOWN-IN INSULATION; TOP OF INSULATION TO BE WITHIN 2" OF BOTTOM OF FLOOR SHEATHING (FIRE SPRINKLING OF INTERSTITIAL SPACE NOT REQUIRED.) 1/ 2 " M I N KINETICS ICW HANGER R-38 BLOWN IN INSULATION C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12 / 1 9 / 2 0 2 2 4 : 0 5 : 5 0 P M C : \ U s e r s \ e l y t t l e \ D o c u m e n t s \ R e v i t \ C a m p N o r t h E n d _ B L D G 4 0 0 0 _ 2 0 2 2 _ e l y t t l e 3 C Q M P . r v t A00.80 Author Checker 2234301 FLOOR / CEILING ASSEMBLY DETAILS SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 UL# L528, 1-HR FLOOR / CEILING ASSEMBLY @ UNITFCA 1 UL# L512 1-HR FLOOR / CEILING ASSEMBLYFCA 2 FLOOR / CEILING ASSEMBLY @ STAIRFCA 3 FLOOR / CEILING ASSEMBLY @ BALCONYFCA 4 UL# P580 1-HR ROOF / CEILING ASSEMBLY @ UNITFCA 5 FLOOR / CEILING ASSEMBLY @ WOOD STAIRFCA 7 IBC CHAPTER 7, CALCULATED 3-HR RATED FLOOR / CEILING ASSEMBLY BFCA 8 UL# L521 / STC 76 - 1-HR FLOOR / CEILING ASSEMBLY BELOW 5TH FLOOR AMENITYFCA 9 DATE DESCRIPTION REV Tax# 075-106-20 #1853 Statesville Ave Hebrew Cemetery Association of Charlotte DB 13165 Pg 441 9 21 45 PARKS MAINT. STAIR A 715'-0" 711'-0" 709'-0"710'-0"712'-0" 714'-0" 716'-0" 716'-0" 717'-0" 718'-0" 720'-0" 718'-0" 714'-0" 713'-0" 712'-0" OPEN AIR EXIT/ PASS THRU ELEV 1 PARKING COUNT LEVEL B 45 LEVEL 1 98 LEVEL 2 106 LEVEL 3 106 LEVEL 4 106 LEVEL 5 103 TOTAL 564 PARKING REQUIRED MF ZONING 1/ UNIT = 324 SPACES MF OWNER 1/BEDROOM = 435 SPACES RETAIL 1/250 SF = 42 SPACES CO WORKING 1/500 SF = 10 SPACES TOTAL REQUIRED = 487 SPACES 15 UP B3 A4 B5 B5B5 A3A4 ST A I R B ELEV 2 ELEV LOBBY S1 S1 S1 A4 714'-3" 3/4" / 12" ELEC A A13.00 1 18 2 ' - 5 1 / 2 " 288' - 7 5/8" 15' - 9 1/4"18' - 8 7/8" 12 9 ' - 5 " 1 A06.01 2 A06.01 3 A06.01 A05.01 1 A05.01 2 A05.01 3 A05.014 BUILDING 1000 BUILDING 2000 BU I L D I N G A B O V E BUILDING ABOVE BUILDING ABOVE C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12 / 1 9 / 2 0 2 2 3 : 5 7 : 3 3 P M C : \ U s e r s \ e l y t t l e \ D o c u m e n t s \ R e v i t \ C a m p N o r t h E n d _ B L D G 4 0 0 0 _ 2 0 2 2 _ e l y t t l e 3 C Q M P . r v t A02.00 Author Checker 2234301 OVERALL BASEMENT SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 3/64" = 1'-0"1 OVERALL BASEMENT 15' 30'60'0' N EW S DATE DESCRIPTION REV Tax# 075-106-20 #1853 Statesville Ave Hebrew Cemetery Association of Charlotte DB 13165 Pg 441 723'-0" 722'-0" 715'-0" 711'-0" 709'-0"710'-0"712'-0" 714'-0" 716'-0" 716'-0" 717'-0" 718'-0" 720'-0" 721'-0" 719'-0" 714'-0" 713'-0" 712'-0" 723'-0" 724'-0" 724'-0" 725'-0" 725' STAIR E FIREWALL FI R E W A L L ST A I R C 723'-0"724'-0" 724'-0" ELEV 3 OPEN AIR 2 HOUR EXIT ENCLOSURE 2 STORY PASS THRU BR I D G E A T 2 N D PASS THRU TO GARAGE SHAFT ABOVE SHAFT ABOVE 9 98 PARKS 19 19 4 RESIDENTIAL TRASH POOL COURTYARD OPEN AIR EXISTING POLE/ EASEMENT ASSUMED TO BE REMOVED LOADING 4,890 SF CO-WORKING COVERED OUTDOOR AREA RETAIL UTILITY 25 22 A2 A2 B3 B1A1 A4 A4 A4 A1 B3 CL4 S2 A4 A1A1 A1S2 DOG WASH DNUP B5B5B5B5A4 AMENITY 2,264 SQ FT POOL 1000 SQ FT STAIR A ELEV 1 ELEC A ST A I R B ELEV 2 ELEV LOBBY ELEV LOBBY STAIR D ELEV LOBBY ELEC B S1 S1 S1 S1 MECH A4S1 MECH 3/4" / 12" RETAIL TRASH ELEC C 179' - 7 3/4" 333' - 10" 22 2 ' - 1 1 5 / 8 " 207' - 11" 107' - 8 7/8" 70' - 3 3/8" 1 A06.01 2 A06.01 3 A06.01 A05.01 1 A05.01 2 A05.01 3 A05.014 A4 2943 A1A4 B2CL4 B6 A4 S1 B5 B2 S2 S1 B1 A4 40 6 ' - 8 3 / 8 " 311' - 2 1/4" 84 ' - 3 " 148' - 7" 3/4" / 12" 10,988 SF RETAIL 5,248 SF LEASING/ AMENITY C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12 / 1 9 / 2 0 2 2 3 : 5 7 : 4 2 P M C : \ U s e r s \ e l y t t l e \ D o c u m e n t s \ R e v i t \ C a m p N o r t h E n d _ B L D G 4 0 0 0 _ 2 0 2 2 _ e l y t t l e 3 C Q M P . r v t A02.01 Author Checker 2234301 OVERALL LEVEL 1 SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 3/64" = 1'-0"1 OVERALL LEVEL 1 15' 30'60'0' N EW S DATE DESCRIPTION REV OPEN TO RETAIL BELOW LEASING/ AMENITY BR I D G E OPEN AIR OPEN AIR 9 106 PARKS B2 A2 A2 B2 A1 A4 A4 B3 B1A1 S2 B5 S2 A4 B1 A1 A4 A4 A4 A1 CL4 B6 B3 B3 CL4 A1 S2 A4 A4 A1A1 A1S2 B5B5B5B5A4 TRASH 9 19 19 25 25 A4 B5 B5 A4 STAIR E ST A I R C ELEV 3 STAIR A ELEV 1 TELE COM A ST A I R B ELEV 2 ELEV LOBBY ELEV LOBBY STAIR D ELEV LOBBY TELE COM B S1 S1 S1 S1 S1 S1 S1 MECH A4S1 MECH SHAFT ABOVE SHAFT ABOVE DNUP 3/4" / 12" ELEC C A13.02 1 40 6 ' - 8 3 / 8 " 333' - 10" 21 0 ' - 6 " 253' - 7 1/2" 311' - 2 1/4" 179' - 10 1/2" 107' - 8 7/8" 70' - 3 3/8" 1 A06.01 2 A06.01 3 A06.01 A05.01 1 A05.01 2 A05.01 3 A05.014 84 ' - 3 " 148' - 7" 3/4" / 12" C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12 / 1 9 / 2 0 2 2 3 : 5 7 : 5 1 P M C : \ U s e r s \ e l y t t l e \ D o c u m e n t s \ R e v i t \ C a m p N o r t h E n d _ B L D G 4 0 0 0 _ 2 0 2 2 _ e l y t t l e 3 C Q M P . r v t A02.02 Author Checker 2234301 OVERALL LEVEL 2 SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 3/64" = 1'-0"1 OVERALL LEVEL 2 15' 30'60'0' N EW S DATE DESCRIPTION REV A2 B2 A2 A2 A2 B2 B1B5 A1 A4 A4 B3 B1A1 B3 B3 S2 S2B5 B5 B5 S2 A4 B1 A4A4 A1 A1 A4 A4 A4 A1 A5 A5 CL4 B6 SHAFT STAIR B5 B3 B3 CL4 A1 A1A1 A4 S2 A4 A4 OPEN AIR OPEN AIR A1A1 A1S2 B5B5B5B5A4 TRASH 99 19 19 25 106 PARKS 25 B5 A4 B5 B5 A4 STAIR E ST A I R C ELEV 3 STAIR A ELEV 1 ST A I R B ELEV 2 ELEV LOBBY ELEV LOBBY STAIR D ELEV LOBBY ELEC B ELEC D S1 S1 S1 S1 S1 S1 MECH A4S1 S1 MECH B4 SHAFT DNUP 3/4" / 12" ELEC A ELEC C A13.03 1 179' - 10 1/2" 312' - 6 1/4" 40 6 ' - 8 3 / 8 " 333' - 10" 21 0 ' - 6 " 253' - 7 1/2" 84 ' - 3 " 86' - 3" 148' - 7" 1 A06.01 2 A06.01 3 A06.01 A05.01 1 A05.01 2 A05.01 3 A05.014 66' - 0" BR I D G E A B O V E A T 4 T H 3/4" / 12" C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12 / 1 9 / 2 0 2 2 3 : 5 8 : 0 1 P M C : \ U s e r s \ e l y t t l e \ D o c u m e n t s \ R e v i t \ C a m p N o r t h E n d _ B L D G 4 0 0 0 _ 2 0 2 2 _ e l y t t l e 3 C Q M P . r v t A02.03 Author Checker 2234301 OVERALL LEVEL 3 SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 3/64" = 1'-0"1 OVERALL LEVEL 3 15' 30'60'0' N EW S DATE DESCRIPTION REV A2 B2 A2 A2 A2 B2 B1B5 A1 A4 A4 B3 B1A1 B3 B3 S2 S2B5 B5 B5 S2 A4 B1 A4A4 A1 A1 A4 A4 A4 A1 A5 A5 CL4 B6 B5 B3 B3 CL4 A1 A1A1 A4 S2 A4 A4 A1A1 A1S2 B5B5B5B5A4 B5 A4 B5 B5 A4 SHAFT STAIR OPEN AIR OPEN AIR TRASH 99 19 19 25 106 PARKS 25 STAIR E ST A I R C ELEV 3 STAIR A ELEV 1 ST A I R B ELEV 2 ELEV LOBBY ELEV LOBBY STAIR D ELEV LOBBY TELECOM D S1 S1 S1 S1 S1 S1 MECH ELEC C B4 A4S1 S1 MECH SHAFT TELE COM A TELE COM B DNUP 3/4" / 12" A13.04 1 179' - 10 1/2" 312' - 6 1/4" 40 6 ' - 8 3 / 8 " 333' - 10" 21 0 ' - 6 " 253' - 7 1/2" 84 ' - 3 " 86' - 3" 148' - 7" 1 A06.01 2 A06.01 3 A06.01 A05.01 1 A05.01 2 A05.01 3 A05.014 66' - 0" BR I D G E 3/4" / 12" C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12 / 1 9 / 2 0 2 2 3 : 5 8 : 1 2 P M C : \ U s e r s \ e l y t t l e \ D o c u m e n t s \ R e v i t \ C a m p N o r t h E n d _ B L D G 4 0 0 0 _ 2 0 2 2 _ e l y t t l e 3 C Q M P . r v t A02.04 Author Checker 2234301 OVERALL LEVEL 4 SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 3/64" = 1'-0"1 OVERALL LEVEL 4 15' 30'60'0' N EW S DATE DESCRIPTION REV A2 B2 A2 A2 A2 B2 B1B5 A1 A4 A4 B3 B1A1 B3 B3 S2 S2B5 B5 B5 S2 A4 B1 A4A4 A1 A1 A4 A4 A4 A1 A5 A5 CL4 B6 B5 B3 CL4 A1 A1A1 A4 S2 A4 A4 A1A1 A1S2 B5B5B5B5A4 B5 A4 B5 B5 A4 SHAFT STAIR OPEN AIR OPEN AIR DN TRASH 99 19 19 25 106 PARKS 25 STAIR E ST A I R C ELEV 3 STAIR A ELEV 1 ELEC A ST A I R B ELEV 2 ELEV LOBBY ELEV LOBBY STAIR D ELEV LOBBY ELEC B MECH ELEC D S1 S1 S1 S1 S1 S1 B4 A4S1 S1 MECH SHAFT ELEC C AMENITY 1,034 SQ FT A13.05 1 179' - 10 1/2" 312' - 6 1/4" 40 6 ' - 8 3 / 8 " 333' - 10" 21 0 ' - 6 " 254' - 1 1/2" 84 ' - 3 " 148' - 7" 86' - 3" 66' - 0" 1 A06.01 2 A06.01 3 A06.01 A05.01 1 A05.01 2 A05.01 3 A05.014 BR I D G E B E L O W A T 4 T H 3/4" / 12" C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12 / 1 9 / 2 0 2 2 3 : 5 8 : 2 3 P M C : \ U s e r s \ e l y t t l e \ D o c u m e n t s \ R e v i t \ C a m p N o r t h E n d _ B L D G 4 0 0 0 _ 2 0 2 2 _ e l y t t l e 3 C Q M P . r v t A02.05 Author Checker 2234301 OVERALL LEVEL 5 SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 3/64" = 1'-0"1 OVERALL LEVEL 5 15' 30'60'0' N EW S DATE DESCRIPTION REV 1 A06.01 2 A06.01 3 A06.01 A05.01 1 A05.01 2 A05.01 3 A05.014 1/8" / 12" 1/8" / 12" 1/8" / 12" 1/8 " / 1 2 " 1/8 " / 1 2 " 1/8 " / 1 2 " 1/8" / 12" 1/8" / 12" 1/8 " / 1 2 " 1/8 " / 1 2 " 1/8 " / 1 2 " 1/8" / 12" 1/8" / 12" 1/8" / 12" 1/8" / 12" 1/8" / 12" 1/8" / 12" 1/8" / 12" 1/8" / 12" 1/8" / 12" 1/8" / 12" 1/8" / 12" 1/8" / 12" 1/8" / 12" 1/8" / 12" 1/8" / 12" REFER TO: 1 / A02.01A REFER TO: 1 / A02.01B RE F E R T O : 1 / A 0 2 . 0 1 A RE F E R T O : 1 / A 0 2 . 0 1 B C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12 / 1 9 / 2 0 2 2 3 : 5 8 : 2 8 P M C : \ U s e r s \ e l y t t l e \ D o c u m e n t s \ R e v i t \ C a m p N o r t h E n d _ B L D G 4 0 0 0 _ 2 0 2 2 _ e l y t t l e 3 C Q M P . r v t A02.06 Author Checker 2234301 OVERALL ROOF LEVEL SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/64" = 1'-0"1 OVERALL TRUSS BEARING 48 " 30" 48" 30 " 48" 30 " 48" 30 " 1. ALL CABINETS ARE ON 3" MODULE. 2. KITCHEN BASE CABINETS SHALL BE 24" DEEP AND WALL CABINETS SHALL BE 12" DEEP, UNLESS OTHERWISE NOTED. 3. MAXIMUM WIDTH OF CABINET DOORS NOT TO EXCEED 24". DOOR SWING AS INDICATED ON INTERIOR ELEVATIONS. 4. BATHROOM VANITY CABINETS SHALL BE 21" DEEP, UNLESS OTHERWISE NOTED. 5. ALL SHELVES TO HAVE HARD SURFACE EDGES. 6. FIELD VERIFY ALL DIMENSIONS. 7. DWR = DRAWERS H = HAMPER MC= MEDICINE CABINET 8. PROVIDE BLIND CABINET IN CORNERS OF ALL CABINETS. 9. CABINET SUB TO CONSTRUCT AND INSTALL ALL DESK COUNTERTOPS SO THAT THEY DO NOT DEFLECT UNDER LOADS OF 75 LBS. 10. ALL DESK COUNTERTOPS TO HAVE A SLIDE-OUT COMPUTER KEYBOARD TRAY MOUNTED TO BOTTOM OF COUNTERTOP. 11. REFER TO FINISH PACKAGES FOR CABINET, HARDWARE, COUNTERTOP FINISHES AND APPLIANCES. 12. PROVIDE SCRIBE MOLDING AND/OR FINISHED ENDS AS REQUIRED. 13. SUPPLIER TO FIELD VERIFY AREA OF WORK AFTER ROUGH FRAMING TO ASSURE FIT. THE CABINETS SHALL MATCH PLANS (NOTIFY ARCHITECT IN WRITING OF ANY DISCREPANCIES.) 14. SUBMIT SHOP DRAWINGS TO ARCHITECT FOR APPROVAL PRIOR TO FABRICATIONS. 1. ALL FLOOR PLAN DIMENSIONS ARE TO FACE OF STUD FRAMING UNLESS NOTED OTHERWISE. 2. ALL REFLECTED CEILING PLAN DIMENSIONS ARE TO FACE OF STUD FRAMING UNLESS NOTED OTHERWISE. 3. ALL ANGLED WALLS ARE 45 DEGREES UNLESS NOTED OTHERWISE 4. REFER TO STRUCTURAL DRAWINGS FOR SHEAR WALL LOCATIONS. 5. REFERENCE BUILDING PLAN WITH ELEVATIONS TO COORDINATE WINDOW LOCATION. PARTICULAR CONDITIONS MAY EXIST. NOTIFY ARCHITECT IN WRITING WITH QUESTIONS PRIOR TO COMMENCEMENT OF CONSTRUCTION. 6. DOOR LOCATIONS NOT DIMENSIONED SHALL BE LOCATED AT MIDPOINT OF ROOM OR 4" CLEAR FROM ADJACENT WALL CORNER, TYPICAL. 7. ALL PLUMBING WALLS SHALL BE FRAMED WITH 2X6 STUDS, REFER TO PLANS FOR LOCATIONS. 8. CONTRACTOR TO PROVIDE STENCIL LABELING ON ALL FIRE RATED WALLS (TYP. ALL WALLS) 9. ALL GYP. BD TO BE 5/8" TYPE "X". PROVIDE WATER-RESISTANT GYPSUM BOARD AT ALL WET LOCATIONS (KITCHEN/TOILET) BACKSPLASHES, TUB SURROUNDS AND LAUNDRY WET WALLS). 10. PROVIDE 2'-8" DEEP PLATFORM IN MECHANICAL CLOSET (3/4" PLYWOOD OVER 2X6 FRAMING @ 16" O.C.) WHERE WATER HEATER OCCURS. 11. CONTRACTOR TO VERIFY AND COORDINATE PLUMBING ROUGH-IN DIMENSIONS WITH PLUMBER. 12. FOR TYPICAL BATHTUB INSTALLATION, SEE DETAIL . 13. FRAMING CONTRACTOR SHALL PROVIDE BLOCKING FOR ALL CABINETS, CEILING FANS, AND BATH ACCESSORIES. INCLUDE BLOCKING FOR GRAB BARS AT ALL LOCATIONS. 14. SHADED AREAS INDICATE FURR DOWN BELOW THE 1 HR. RATED FLOOR/CEILING ASSEMBLY FOR MECHANICAL EQUIPMENT. OTHER FURR DOWN AREAS ARE INDICATED. 15. VENT DRYERS TO OUTSIDE. SEE MECHANICAL DRAWINGS. 16. MECHANICAL DUCTWORK TO BE SEPARATED FROM ELECTRICAL PANELS. 17. CONTRACTOR TO COORDINATE RECESSED LIGHTING WITH MECHANICAL DUCT LOCATIONS. 18. ALL OUTLETS @ KITCHEN SINK & BATH LAVATORY COUNTER TO BE GFCI. 19. PROVIDE (1) 5 LB ABC FIRE EXTINGUISHER @ KITCHEN CABINET RANGE, TYP. 20. SMOKE DETECTORS SHALL NOT BE PLACED IN FRONT OF EXHAUST GRILLS. 21. SMOKE DETECTORS SHALL BE CONTINUOUSLY POWERED BY BUILDING ELECTRICAL SYSTEM AND INSTALLED IN ACCORDANCE WITH NFPA 101, 7-6.29 AND NFPA 74 W/ BATTERY BACK UP. 22. QUICK RESPONSE SPRINKLER SYSTEM TO BE PROVIDED THROUGHOUT, EXACT DESIGN AND SPECIFICATIONS TO BE NFPA 13 SUBMITTED BY CONTRACTOR TO ARCHITECT FOR SHOP DRAWING APPROVAL 23. INSPECT, REPAIR, AND PREPARE FLOORS AS REQUIRED TO PROVIDE A SATISFACTORY SUB-FLOOR FOR FLOOR FINISH MATERIALS. SATISFACTORY SUB-FLOOR IS DEFINED AS A SURFACE THAT IS FREE FROM CRACKS, HOLES, RIDGES, COATINGS, OR DEFECTS THAT WOULD PREVENT ADHESIVE BOND OR IMPAIR PERFORMANCE OR APPEARANCE OF FINISHED MATERIALS. 24. SEE FINISH SCHEDULES FOR ACTUAL FLOOR FINISH MATERIALS. FLOOR DEMARCATION LINES ON PLANS ARE FOR REFERENCE WHEN MATERIALS ARE TO DIFFER. 25. CONTRACTOR TO COORDINATE WITH CABINET MANUFACTURER FOR EXACT LOCATIONS OF KITCHEN EQUIPMENT AND FIXTURES. CONTRACTOR TO REVIEW PLUMBING, ELECTRICAL, AND FINISH LOCATIONS WITH CABINET DESIGN. 26. ALL SHELVING IN CLOSETS, LAUNDRY ROOMS, AND LINEN CLOSETS TO BE VENTILATED W/ OPEN WIRE SHELVING, PROVIDED AND MOUNTED IN ACCORDANCE WITH SHELVING PROFILES ON A3-00. 27. ALL SHELVING IN PANTRY CLOSETS TO BE "CLOSET MESH" VENTILATED WIRE SHELVING SYSTEM, PROVIDED AND MOUNTED IN ACCORDANCE WITH SHELVING PROFILES ON A3-00 28. PROVIDE 2" FAUX WOOD BLINDS AT ALL APARTMENT FRENCH DOORS AND WINDOWS. 29. MEZZANINE WINDOWS DO NOT RECEIVE MINI BLINDS. 1. INTERIOR ELEVATIONS ARE DRAWN TO FACE OF INTERIOR FINISH, U.N.O. 2.BATHROOM ACCESSORIES ARE TO BE MOUNTED AT THE FOLLOWING HEIGHTS. A. PROVIDE TOILET PAPER HOLDER ON WALL ADJACENT TO WATER CLOSET, TYPICAL ( 2'-0" A.F.F. TO CENTER). B. PROVIDE 18" TOWEL BAR, TYPICAL (4'-2" A.F.F. TO CENTER) C. PROVIDE CERAMIC TOWEL BAR OPPOSITE WET WALL AT BATHTUB, TYPICAL (4'-0" A.F.F. +/-TO CENTER) D. PROVIDE CERAMIC SOAP DISH, CENTERED ON BATHTUB SIDEWALL, TYPICAL (2'-2" A.F.F. TO CENTER) E. SHOWER HEAD SHALL BE MOUNTED AT 6'-6" A.F.F. F. SHOWER CURTAIN ROD TO BE AT 6'-8" A.F.F. TO CENTER. G. TILE TUB SURROUND SHALL EXTEND 5'-0" ABOVE RIM OF BATHTUB (6'-4" A.F.F.). 3.WALL MOUNTED LIGHT FIXTURES SHALL BE LOCATED PER ARCHITECT. 4.REFER TO ENLARGED UNIT PLANS FOR MILLWORK ELEVATIONS. UNIT PLAN NOTES UNIT ELEVATION NOTES CABINET NOTES TOILET TUB / SHOWERBATH VANITY 3' - 6" MAX. TOWEL BAR ABOVE TOILET AT 60" A.F.F. OTHERWISE AT 50" T.P. AT 24" A.F.F. 7' - 6 " A . F . F . T O C E N T E R L I N E O F S H O W E R A R M 1' - 8 " 4' - 0 " T O S H E L F / N I C H E SOFFIT HEIGHT 8' - 6 " OF MIRROR 7' - 0 " T O T O P 44" H. MIRROR 4" BACKSPLASH, TYP. INSTALL SO THAT TOP OF COUNTER IS AT 34" MAX. A.F.F., TYP. WOOD BASE BASE OF DESIGN OF NICHE IS TILE REDI MODEL RN1620S-BI EQ 1' - 4"EQ 6" WHEN PROVIDED ABOVE TOILET ON UNIT PLANS TUB TP SHOWER HEAD AND CONTROLS TO BE CENTERED ON TUB 2' - 6 " 4' - 0 " T O S H E L F EQ EQ EQ EQ EQ EQ TILE TO BE CENTERED ON SHOWER HEAD AND CONTROLS A. F . F . T O C E N T E R L I N E O F C U R T A I N R O D MANUF. VE R I F Y W I T H OF TOWEL BAR 5' - 0 " A . F . F . T O C E N T E R L I N E SOAP SHELF ON OPPOSITE WALL FROM SHOWER HEAD TYP. UNIT DOOR CENTERED DOOR PLACEMENT EQ EQ VARIES0' - 4" VARIES SEE UNIT PLANS TYP. UNIT DOOR OFFSET 0' - 6" U1 2' - 0" CORRIDOR UNIT TYP. UNIT ENTRY DOOR CABINETRY @ RANGE KITCHEN ISLAND TYPICAL 2' - 3 " 1' - 3 " 4' - 6 " RECEPTACLE IN CABINET MICROWAVE RANGE 3' - 6 " 1' - 6 " 3' - 0 " FULL TILE BACKSPLASH 3' - 0 " 0' - 10"0' - 1" 3' - 0 " KITCHEN CABINETRY PROFILES @ TYPICAL UNITS FULL TILE BACKSPLASH CABINET LIGHT, ADD ALTERNATE 1' - 6 " TO B O T T O M O F PE N D A N T L I G H T FI X T U R E CABINETRY TAG LEGEND VS48_4 FIRST POSITION •B = BASE CABINET •DB = DRAWER BANK •FP = FILLER PANEL •L = LINEN CLOSET •P = PANTRY •SB = SINK BASE CABINET •VS = VANITY SINGLE SINK •VD = VANITY DOUBLE SINK •W = WALL CABINET THIRD POSITION IF APPLICABLE •_ = WIDTH OF DRAWERS •- = DEPTH SECOND POSITION •WIDTH •WIDTH & HEIGHT W3624-24 NOTE: DIMENSIONS SHOWN ARE IN INCHES TYPICAL 3' - 0 " 1' - 1 0 " 2' - 1 0 " FULL TILE BACKSPLASH CABINET LIGHT, ADD ALTERNATE KITCHEN ISLAND 3' - 2 " 0' - 10"0' - 1" 2' - 1 0 " TO B O T T O M O F PE N D A N T L I G H T FI X T U R E 1' - 6 " 3' - 4 " 2' - 1 0 " RECEPTACLE IN CABINET HOOD RANGE FULL TILE BACKSPLASH 2' - 1 0 " CABINETRY @ RANGE KITCHEN CABINETRY PROFILES @ TYPE A UNITS 8' - 0 " 7' - 8 " 7' - 8 " TYP. TOP LOAD WASHER AND FRONT LOAD DRYER CLEAR FLOOR SPACE REQUIREMENTS @ WASHER AND DRYER TYP. FRONT LOAD WASHER AND DRYER EQ EQ VA R I E S EQ EQ TYP. STACK LAUNDRY VA R I E S VA R I E S / -5 SHELVES CLOSET -1R/1S CLOSET -2R/2S 1' - 1 " 1' - 1 " 1' - 1 " 1' - 1 " 1' - 8 " 3' - 0 " SHELF 6' - 0 " LAUNDRY -1 SHELF 5' - 0 " SHELF SHELVING PROFILES @ TYPICAL UNITS 6' - 0 " B C D E A 1' - 4" 1' - 0". CLOSET -1R/1S @ H.C. UNITS 4' - 0 " D @ TYPE A UNITS BATH VANITY @ TYPE A UNITS OF MIRROR 40" MAX TO BOTTOM BATHROOM PROFILES REFLECTING SURFACE 3' - 4 " T O B O T T O M O F TUB / SHOWER -TYPE B UNIT GRAB BAR LOCATIONS CONTROL WALLBACK WALL 9"-12" 24 " - 2 7 " 3 6 " M I N . GRAB BAR BLOCKING 18 " M I N . 69 " M I N . 9"-12" TUB / SHOWER -TYPE B UNIT GRAB BAR LOCATIONS HEAD WALL 8" - 10" ABOVE TUB RIM . 12" MAX.24" MAX. GRAB BAR BLOCKING GRAB BARS TO BE INSTALLED IN ALL SHOWERS AND TUB/SHOWER COMBINATIONS, PER 2018 NFPA 101 (LIFE SAFETY), SECTION 24.2.8 INSTALL VERTICAL GRAB BAR ON EITHER CONTROL WALL OR HEAD WALL. GRAB BAR IS NOT REQUIRED ON BOTH WALLS. INSTALL ON SIDE THAT IS LEAST OBSTRUCTIVE FOR ENTRY AND EGRESS. WHEN PROVIDED ABOVE TOILET ON UNIT PLANS SHOWER TP SHOWER HEAD AND CONTROLS TO BE CENTERED ON SHOWER PAN 2' - 6 " 4' - 0 " T O S H E L F EQ EQ EQ EQ EQ EQ TILE TO BE CENTERED ON SHOWER HEAD AND CONTROLS OF SHOWER ARM 6' - 8 " A . F . F . T O C E N T E R L I N E OF TOWEL BAR 5' - 0 " A . F . F . T O C E N T E R L I N E CORNER SOAP SHELF ON OPPOSITE WALL FROM SHOWER HEAD HEAD WALL 9"-12" 36 " - 3 9 " 2 4 " M I N . GRAB BAR BLOCKING 30 " M I N . 69 " M I N . 9"-12" SHOWER -TYPE B UNIT GRAB BAR LOCATIONS INSTALL VERTICAL GRAB BAR ON EITHER CONTROL WALL OR HEAD WALL. GRAB BAR IS NOT REQUIRED ON BOTH WALLS. INSTALL ON SIDE THAT IS LEAST OBSTRUCTIVE FOR ENTRY AND EGRESS. CONTROL WALL SHOWER BATHROOM PROFILES 7' - 0 " T O T O P O F G L A S S REFER TO UNIT PLANS CEILING HEIGHT VA R I E S 3' - 3 " 6' - 8 " A . F . F . T O C E N T E R L I N E O F S H O W E R A R M 4' - 0 " T O S H E L F CORNER SOAP SHELF ON OPPOSITE WALL FROM SHOWER HEAD 1' - 6" 1' - 6" 2' - 10" 0' - 8" 3' - 0" OPEN SHELVING 0' - 3 1/2" 0' - 2"2X BLOCKING WITH PAINTED BASE CEILING HEIGHT COAT HOOKS, AT BACK WALL (4 TOTAL) OPEN SHELVING OPEN SHELVING 8' - 0" EQ. EQ. 3/4" LAMINATED PLYWOOD; PAINTED WHITE 3/4" LAMINATED PLYWOOD; PAINTED WHITE 1' - 6" 3' - 6" 3' - 0" SEE UNIT PLANS WIDTH VARIES COAT HOOKS 18" BENCH DEPTH CEILING HEIGHT 0' - 3 1/2" UNITS:S1, A6, B3 BEAD BOARD PANELING PAINTED TO MATCH ADJACENT SHELVING 2' - 8 3/4" 2' - 10" 3' - 0" 2X BLOCKING WITH PAINTED BASE CEILING HEIGHT OPEN SHELVING OPEN SHELVING 8' - 6 3/4" EQ. EQ. 3/4" LAMINATED PLYWOOD; PAINTED WHITE 3/4" LAMINATED PLYWOOD; PAINTED WHITE 0' - 1"2' - 6" 2' - 6 " UNITS:S1, A4, A5, B1, B2 DISTANCE TO EDGE OF SURROUNDING WALLS MUD ROOM AREA BUILD-OUT DIMENSIONSDESK AREA BUILD-OUT DIMENSIONS 2' - 8 3/4" 2' - 10" 3' - 0" SEE UNIT PLANS WIDTH VARIES 30" DESK DEPTHCEILING HEIGHT EQ EQ 8' - 6 3/4" BEAD BOARD PANELING PAINTED TO MATCH ADJACENT SHELVING 2' - 6 " EQ EQ EQ EQ EQ EQ EQ EQ EQ EQ C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:58:30 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A04.00 Author Checker 2234301 UNIT NOTES SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV x10' -4"9' -3" LIVING ROOM x7' -0"13' -6" KITCHEN x9' -11"8' -11" BEDROOM x9' -11"5' -4" BATHROOM x4' -1"2' -9" DESK x5' -6"2' -4" CLOSET 506.06 SF UNIT S1 10 ' - 5 1 / 4 " 3' - 7 3 / 4 " 3' - 1 0 " 4' - 1 " 6' - 0 " 18' - 0" 3' - 0"7' - 7"7' - 5" 9' - 9 1 / 4 " 9' - 4 " 2' - 9 " 6' - 1 3 / 4 " 28 ' - 0 " 18' - 0" 28 ' - 0 " MECH W/D BE N C H REF. 30"X60" TUB DW WB1 070 WO1 021 WB1 041 1' - 3 1/2" WALL OPENING AT 6'-6" TO 8'-6" 8' - 0"1' - 3 1/2" WO 020 WO 020 WO 020 WO 020 WO 040 FO 040 WO 020 CEILING FAN W/ LIGHT KIT SWITCH FAN SEPARATE FROM LIGHT PENDANT LIGHT FIXTURES TRACK LIGHT VANITY LIGHT TOILET EXHAUST FAN, SIDEWALL MOUNTED IN 2X6 WALLS, MOUNT AT 7'-0" A.F.F. WALL MOUNTED LIGHT ( AT LAUNDRY AND SMALL CLOSETS) RECESSED CAN LIGHT IN FURR DOWN EXTERIOR WALL MOUNT BALCONY LIGHT SURFACE MOUNT FIXTURE UNIT LEGEND 1 HVAC UNIT/WATER HEATER SEE MECHANICAL DWGS 2 WASHER 3 PANTRY CABINET 4 WASHER & DRYER - STACKABLE 5 DISHWASHER 6A 22 CU.FT. REFRIGERATOR 7 RANGE W/ MICROWAVE ABOVE & VENTLESS HOOD 8 DRYER 9A 36" x 60" GARDEN TUB 10 THERMOSTAT CONTROL 11 ELECTRICAL PANEL 12 SOAP DISH 13 SHOWER CURTAIN ROD 14 PEDESTAL SINK 15 FOLDING GRAB BAR 16 MOVEABLE ISLAND W/ COUNTERTOP ON ALUMINIUM CASTERS 17A 36" x 36" 17B 42" x 34" 17C 42" x 42" 17D 60" x 34" 21 SINGLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 22 DOUBLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 23 SINGLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 24 DOUBLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 25 TOILET PAPER HOLDER 26 TOWEL BAR (24") 27 MIRROR 28 ELONGATED TOILET 29 SHOWER HEAD 30 SHOWER & TUB FAUCET 31 TUB FAUCET 32 EXHAUST 33 CORNER GRAB BAR 34 DOUBLE OVEN 35 TILE BACKSPLASH 6B 25 CU.FT. REFRIGERATOR 9B 42" x 60" GARDEN TUB 9C 30" x 60" GARDEN TUB F COMPUTER DESK WITH (1) WOOD SHELF ABOVE AND GRANITE COUNTERTOP 17 SHOWER PAN WITH ACRYLIC BASE 18 TILE SHOWER SURROUND, SEE 7/A3-00 19 ROBE HOOK 20 TOWEL RING UNIT SHELVING LEGEND A (1) 12" DEEP SHELF @ WASHER / DRYER B (5) 16" DEEP SHELVES C (5) 12" DEEP SHELVES D DOUBLE HANGING ROD & SHELF E HANGING ROD AND SHELF ACCESSIBILITY LEGEND 41 SINGLE BOWL STAINLESS STEEL SINK, WITH ADA FAUCET, PROVIDE PIPE WRAP BELOW, BASE CABINET TO BE REMOVABLE WITH FLOOR AND WALL FINISH BELOW, BOWL TO BE AT 34" MAX. HIGH A.F.F. 42 34" HIGH WORK SURFACE, MIN. 30" WIDE WITH FLOOR AND WALL FINISH BELOW, MIN. 27" KNEE HEIGHT CLEARANCE 43 SIDE BY SIDE REFRIGERATOR 44 RECIRCULATING EXHAUST HOOD WITH LIGHT, SWITCH FROM WALL ADJACENT TO STOVE 45 ALL IN ONE WASHER/ DRYER 46 ELONGATED ADA TOILET BOWL WITH SEAT HEIGHT AT 18" AND FLUSH VALVE ON OPEN SIDE OF WATER CLOSET 47 FUTURE GRAB BAR - SEE ELEVATIONS FOR SIZES 48 REMOVABLE BASE CABINET AT VANITY, PROVIDE FLOOR AND WALL FINISH BELOW, WRAP ALL PIPES 49 SHOWER HEAD WITH SLIDE BAR AND ADJUSTABLE HEIGHT HEAD 50 LOCATION OF FUTURE BATHING SEAT 51 ADA RANGE WITH CONTROLS ON FRONT OF RANGE 52 CLOSET SHELF AND ROD AT 48" MAX HEIGHT 53 ONE (1) WINDOW SHALL BE ACCESSIBLE W/ OPERABLE PARTS LOACTED AT 48" MAX HEIGHT 54 ADA DISHWASHER UNDER 34" HIGH COUNTER 1. REFER TO SHEET A3-00 FOR UNIT PLAN NOTES 2. ELECTRICAL OUTLETS SHALL NOT BE CUT INTO MIRROR 3. NOTE T INDICATES THERMOSTAT 4. REFER TO SHEET A3-00 FOR STANDARD ARCHWAY DETAIL 5. REFER TO "CD" SERIES FOR FAIR HOUSING CONSTRUCTION REQUIREMENTS. ALL UNITS TO RECEIVE BLOCKING AS SHOWN IN "CD" SERIES 6. CEILING FIXTURES NOT DIMENSIONED ARE TO BE CENTERED ON ROOM NOTES RCP LEGEND 55 ADA COMBINATION WASHER/DRYER SOFFIT (8'-0" A.F.F) UNIT NAMING LEGEND A1 BASE UNIT A1A UNIT INTERIOR VARIATION A1.1 UNIT EXTERIOR VARIATION A1-HC MOBILITY ACCESSIBLE VARIATION C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:58:33 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A04.01 Author Checker 2234301 UNIT S1 PLANS SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/8" = 1'-0"2 UNIT S1 PLANS BEDROOMS TOTAL # OF UNITS UNIT AREA 1 506 SF42 BUILDING 27/28 -UNIT SUMMARY x7' -0"15' -6" KITCHEN x11' -11"10' -6" LIVING ROOM x11' -6"10' -2" BEDROOM x11' -4"5' -9" BATHROOM x 5' - 3" 3' - 0" DE S K x7' -8"3' -5" CLOSET 642.29 SF UNIT S2 1' - 2 " 5' - 4 3 / 4 " 3' - 1 0 " 10 ' - 7 " 11 ' - 0 1 / 4 " 20' - 0" 8' - 1 1/2"8' - 6 1/2"3' - 4" 20' - 0" 32 ' - 0 " 32 ' - 0 " MECH W/D BE N C H REF. 36"X60" TUB DW WB1 031 WB1 070 6' - 3 " 3' - 1 0 5 / 8 " 5' - 9 3 / 8 " 3' - 6 " 12 ' - 7 " WO 020 WO 020 WO 040 WO 020 WO 020 WB1 051 WB1 080 WO 020 WO 040 FO 040 2' - 1" WALL OPENING AT 6'-6" TO 8'-6" 8' - 0"2' - 1" CEILING FAN W/ LIGHT KIT SWITCH FAN SEPARATE FROM LIGHT PENDANT LIGHT FIXTURES TRACK LIGHT VANITY LIGHT TOILET EXHAUST FAN, SIDEWALL MOUNTED IN 2X6 WALLS, MOUNT AT 7'-0" A.F.F. WALL MOUNTED LIGHT ( AT LAUNDRY AND SMALL CLOSETS) RECESSED CAN LIGHT IN FURR DOWN EXTERIOR WALL MOUNT BALCONY LIGHT SURFACE MOUNT FIXTURE UNIT LEGEND 1 HVAC UNIT/WATER HEATER SEE MECHANICAL DWGS 2 WASHER 3 PANTRY CABINET 4 WASHER & DRYER - STACKABLE 5 DISHWASHER 6A 22 CU.FT. REFRIGERATOR 7 RANGE W/ MICROWAVE ABOVE & VENTLESS HOOD 8 DRYER 9A 36" x 60" GARDEN TUB 10 THERMOSTAT CONTROL 11 ELECTRICAL PANEL 12 SOAP DISH 13 SHOWER CURTAIN ROD 14 PEDESTAL SINK 15 FOLDING GRAB BAR 16 MOVEABLE ISLAND W/ COUNTERTOP ON ALUMINIUM CASTERS 17A 36" x 36" 17B 42" x 34" 17C 42" x 42" 17D 60" x 34" 21 SINGLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 22 DOUBLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 23 SINGLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 24 DOUBLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 25 TOILET PAPER HOLDER 26 TOWEL BAR (24") 27 MIRROR 28 ELONGATED TOILET 29 SHOWER HEAD 30 SHOWER & TUB FAUCET 31 TUB FAUCET 32 EXHAUST 33 CORNER GRAB BAR 34 DOUBLE OVEN 35 TILE BACKSPLASH 6B 25 CU.FT. REFRIGERATOR 9B 42" x 60" GARDEN TUB 9C 30" x 60" GARDEN TUB F COMPUTER DESK WITH (1) WOOD SHELF ABOVE AND GRANITE COUNTERTOP 17 SHOWER PAN WITH ACRYLIC BASE 18 TILE SHOWER SURROUND, SEE 7/A3-00 19 ROBE HOOK 20 TOWEL RING UNIT SHELVING LEGEND A (1) 12" DEEP SHELF @ WASHER / DRYER B (5) 16" DEEP SHELVES C (5) 12" DEEP SHELVES D DOUBLE HANGING ROD & SHELF E HANGING ROD AND SHELF ACCESSIBILITY LEGEND 41 SINGLE BOWL STAINLESS STEEL SINK, WITH ADA FAUCET, PROVIDE PIPE WRAP BELOW, BASE CABINET TO BE REMOVABLE WITH FLOOR AND WALL FINISH BELOW, BOWL TO BE AT 34" MAX. HIGH A.F.F. 42 34" HIGH WORK SURFACE, MIN. 30" WIDE WITH FLOOR AND WALL FINISH BELOW, MIN. 27" KNEE HEIGHT CLEARANCE 43 SIDE BY SIDE REFRIGERATOR 44 RECIRCULATING EXHAUST HOOD WITH LIGHT, SWITCH FROM WALL ADJACENT TO STOVE 45 ALL IN ONE WASHER/ DRYER 46 ELONGATED ADA TOILET BOWL WITH SEAT HEIGHT AT 18" AND FLUSH VALVE ON OPEN SIDE OF WATER CLOSET 47 FUTURE GRAB BAR - SEE ELEVATIONS FOR SIZES 48 REMOVABLE BASE CABINET AT VANITY, PROVIDE FLOOR AND WALL FINISH BELOW, WRAP ALL PIPES 49 SHOWER HEAD WITH SLIDE BAR AND ADJUSTABLE HEIGHT HEAD 50 LOCATION OF FUTURE BATHING SEAT 51 ADA RANGE WITH CONTROLS ON FRONT OF RANGE 52 CLOSET SHELF AND ROD AT 48" MAX HEIGHT 53 ONE (1) WINDOW SHALL BE ACCESSIBLE W/ OPERABLE PARTS LOACTED AT 48" MAX HEIGHT 54 ADA DISHWASHER UNDER 34" HIGH COUNTER 1. REFER TO SHEET A3-00 FOR UNIT PLAN NOTES 2. ELECTRICAL OUTLETS SHALL NOT BE CUT INTO MIRROR 3. NOTE T INDICATES THERMOSTAT 4. REFER TO SHEET A3-00 FOR STANDARD ARCHWAY DETAIL 5. REFER TO "CD" SERIES FOR FAIR HOUSING CONSTRUCTION REQUIREMENTS. ALL UNITS TO RECEIVE BLOCKING AS SHOWN IN "CD" SERIES 6. CEILING FIXTURES NOT DIMENSIONED ARE TO BE CENTERED ON ROOM NOTES RCP LEGEND 55 ADA COMBINATION WASHER/DRYER SOFFIT (8'-0" A.F.F) UNIT NAMING LEGEND A1 BASE UNIT A1A UNIT INTERIOR VARIATION A1.1 UNIT EXTERIOR VARIATION A1-HC MOBILITY ACCESSIBLE VARIATION C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:58:35 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A04.02 Author Checker 2234301 UNIT S2 PLANS SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/8" = 1'-0"2 UNIT S2 PLANS BEDROOMS TOTAL # OF UNITS UNIT AREA 1 642 SF22 BUILDING 27/28 -UNIT SUMMARY x9' -2"13' -8" KITCHEN x9' -8"9' -1" BATHROOM x11' -0"10' -11" BEDROOM x11' -11"14' -6" LIVING ROOM x6' -0"7' -2" CLOSET x12' -8"5' -6" BALCONY DWR 698.75 SF UNIT A1 67.99 SF 11' - 8"12' - 4" 13 ' - 6 " 15 ' - 6 " 6' - 10"3' - 8"5' - 7"3' - 7 3/4"4' - 3 1/4" 24' - 0" 11 ' - 6 " 9' - 6 " 8' - 0 " 29 ' - 0 " 24' - 0" 29 ' - 0 " 6" LIN MECH W/D REF. 36"X60" SHOWER DW P. WO 020 WO1 020 WB1 070 WO 020 WO1 020 WO1 040 WB1 080 WO 020 WO 040 WB1 070 WB1 070 CEILING FAN W/ LIGHT KIT SWITCH FAN SEPARATE FROM LIGHT PENDANT LIGHT FIXTURES TRACK LIGHT VANITY LIGHT TOILET EXHAUST FAN, SIDEWALL MOUNTED IN 2X6 WALLS, MOUNT AT 7'-0" A.F.F. WALL MOUNTED LIGHT ( AT LAUNDRY AND SMALL CLOSETS) RECESSED CAN LIGHT IN FURR DOWN EXTERIOR WALL MOUNT BALCONY LIGHT SURFACE MOUNT FIXTURE UNIT LEGEND 1 HVAC UNIT/WATER HEATER SEE MECHANICAL DWGS 2 WASHER 3 PANTRY CABINET 4 WASHER & DRYER - STACKABLE 5 DISHWASHER 6A 22 CU.FT. REFRIGERATOR 7 RANGE W/ MICROWAVE ABOVE & VENTLESS HOOD 8 DRYER 9A 36" x 60" GARDEN TUB 10 THERMOSTAT CONTROL 11 ELECTRICAL PANEL 12 SOAP DISH 13 SHOWER CURTAIN ROD 14 PEDESTAL SINK 15 FOLDING GRAB BAR 16 MOVEABLE ISLAND W/ COUNTERTOP ON ALUMINIUM CASTERS 17A 36" x 36" 17B 42" x 34" 17C 42" x 42" 17D 60" x 34" 21 SINGLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 22 DOUBLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 23 SINGLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 24 DOUBLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 25 TOILET PAPER HOLDER 26 TOWEL BAR (24") 27 MIRROR 28 ELONGATED TOILET 29 SHOWER HEAD 30 SHOWER & TUB FAUCET 31 TUB FAUCET 32 EXHAUST 33 CORNER GRAB BAR 34 DOUBLE OVEN 35 TILE BACKSPLASH 6B 25 CU.FT. REFRIGERATOR 9B 42" x 60" GARDEN TUB 9C 30" x 60" GARDEN TUB F COMPUTER DESK WITH (1) WOOD SHELF ABOVE AND GRANITE COUNTERTOP 17 SHOWER PAN WITH ACRYLIC BASE 18 TILE SHOWER SURROUND, SEE 7/A3-00 19 ROBE HOOK 20 TOWEL RING UNIT SHELVING LEGEND A (1) 12" DEEP SHELF @ WASHER / DRYER B (5) 16" DEEP SHELVES C (5) 12" DEEP SHELVES D DOUBLE HANGING ROD & SHELF E HANGING ROD AND SHELF ACCESSIBILITY LEGEND 41 SINGLE BOWL STAINLESS STEEL SINK, WITH ADA FAUCET, PROVIDE PIPE WRAP BELOW, BASE CABINET TO BE REMOVABLE WITH FLOOR AND WALL FINISH BELOW, BOWL TO BE AT 34" MAX. HIGH A.F.F. 42 34" HIGH WORK SURFACE, MIN. 30" WIDE WITH FLOOR AND WALL FINISH BELOW, MIN. 27" KNEE HEIGHT CLEARANCE 43 SIDE BY SIDE REFRIGERATOR 44 RECIRCULATING EXHAUST HOOD WITH LIGHT, SWITCH FROM WALL ADJACENT TO STOVE 45 ALL IN ONE WASHER/ DRYER 46 ELONGATED ADA TOILET BOWL WITH SEAT HEIGHT AT 18" AND FLUSH VALVE ON OPEN SIDE OF WATER CLOSET 47 FUTURE GRAB BAR - SEE ELEVATIONS FOR SIZES 48 REMOVABLE BASE CABINET AT VANITY, PROVIDE FLOOR AND WALL FINISH BELOW, WRAP ALL PIPES 49 SHOWER HEAD WITH SLIDE BAR AND ADJUSTABLE HEIGHT HEAD 50 LOCATION OF FUTURE BATHING SEAT 51 ADA RANGE WITH CONTROLS ON FRONT OF RANGE 52 CLOSET SHELF AND ROD AT 48" MAX HEIGHT 53 ONE (1) WINDOW SHALL BE ACCESSIBLE W/ OPERABLE PARTS LOACTED AT 48" MAX HEIGHT 54 ADA DISHWASHER UNDER 34" HIGH COUNTER 1. REFER TO SHEET A3-00 FOR UNIT PLAN NOTES 2. ELECTRICAL OUTLETS SHALL NOT BE CUT INTO MIRROR 3. NOTE T INDICATES THERMOSTAT 4. REFER TO SHEET A3-00 FOR STANDARD ARCHWAY DETAIL 5. REFER TO "CD" SERIES FOR FAIR HOUSING CONSTRUCTION REQUIREMENTS. ALL UNITS TO RECEIVE BLOCKING AS SHOWN IN "CD" SERIES 6. CEILING FIXTURES NOT DIMENSIONED ARE TO BE CENTERED ON ROOM NOTES RCP LEGEND 55 ADA COMBINATION WASHER/DRYER SOFFIT (8'-0" A.F.F) UNIT NAMING LEGEND A1 BASE UNIT A1A UNIT INTERIOR VARIATION A1.1 UNIT EXTERIOR VARIATION A1-HC MOBILITY ACCESSIBLE VARIATION C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:58:38 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A04.03 Author Checker 2234301 UNIT A1 PLANS SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/8" = 1'-0"2 UNIT A1 PLANS BEDROOMS TOTAL # OF UNITS UNIT AREA 1 699 SF48 BUILDING 27/28 -UNIT SUMMARY x11' -7"9' -11" LIVING ROOM x14' -8"11' -3" BEDROOM x9' -10"8' -7" BATHROOM x8' -7"12' -9" KITCHEN x6' -5"7' -5" CLOSET x 4' -11" 2' -7" DES K x14' -6"4' -6" BALCONY 704.49 SF UNIT A2 74.36 SF 10' - 8"3' - 10"4' - 1"5' - 5 1/2"3' - 7 3/4"4' - 3 3/4" 13 ' - 0 " 10 ' - 6 " 4' - 5 " 5' - 8 1 / 2 " 3' - 5 " 2' - 9 3 / 4 " 11 ' - 1 1 1 / 4 " 5' - 6" 15' - 6 1/2" 6' - 8 1/8" 22' - 2 5/8" 23 ' - 6 " 32' - 0" LIN MECHW/D REF. 36"X60" SHOWER DW P. WO 040 WB1 051 WO 020 WO 020 WO 020 WO 020 WO1 020 WB1 070 WO 020 WO 020 WO 020 WB1 070 WB1 070 FO 130 WO 020 CEILING FAN W/ LIGHT KIT SWITCH FAN SEPARATE FROM LIGHT PENDANT LIGHT FIXTURES TRACK LIGHT VANITY LIGHT TOILET EXHAUST FAN, SIDEWALL MOUNTED IN 2X6 WALLS, MOUNT AT 7'-0" A.F.F. WALL MOUNTED LIGHT ( AT LAUNDRY AND SMALL CLOSETS) RECESSED CAN LIGHT IN FURR DOWN EXTERIOR WALL MOUNT BALCONY LIGHT SURFACE MOUNT FIXTURE UNIT LEGEND 1 HVAC UNIT/WATER HEATER SEE MECHANICAL DWGS 2 WASHER 3 PANTRY CABINET 4 WASHER & DRYER - STACKABLE 5 DISHWASHER 6A 22 CU.FT. REFRIGERATOR 7 RANGE W/ MICROWAVE ABOVE & VENTLESS HOOD 8 DRYER 9A 36" x 60" GARDEN TUB 10 THERMOSTAT CONTROL 11 ELECTRICAL PANEL 12 SOAP DISH 13 SHOWER CURTAIN ROD 14 PEDESTAL SINK 15 FOLDING GRAB BAR 16 MOVEABLE ISLAND W/ COUNTERTOP ON ALUMINIUM CASTERS 17A 36" x 36" 17B 42" x 34" 17C 42" x 42" 17D 60" x 34" 21 SINGLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 22 DOUBLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 23 SINGLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 24 DOUBLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 25 TOILET PAPER HOLDER 26 TOWEL BAR (24") 27 MIRROR 28 ELONGATED TOILET 29 SHOWER HEAD 30 SHOWER & TUB FAUCET 31 TUB FAUCET 32 EXHAUST 33 CORNER GRAB BAR 34 DOUBLE OVEN 35 TILE BACKSPLASH 6B 25 CU.FT. REFRIGERATOR 9B 42" x 60" GARDEN TUB 9C 30" x 60" GARDEN TUB F COMPUTER DESK WITH (1) WOOD SHELF ABOVE AND GRANITE COUNTERTOP 17 SHOWER PAN WITH ACRYLIC BASE 18 TILE SHOWER SURROUND, SEE 7/A3-00 19 ROBE HOOK 20 TOWEL RING UNIT SHELVING LEGEND A (1) 12" DEEP SHELF @ WASHER / DRYER B (5) 16" DEEP SHELVES C (5) 12" DEEP SHELVES D DOUBLE HANGING ROD & SHELF E HANGING ROD AND SHELF ACCESSIBILITY LEGEND 41 SINGLE BOWL STAINLESS STEEL SINK, WITH ADA FAUCET, PROVIDE PIPE WRAP BELOW, BASE CABINET TO BE REMOVABLE WITH FLOOR AND WALL FINISH BELOW, BOWL TO BE AT 34" MAX. HIGH A.F.F. 42 34" HIGH WORK SURFACE, MIN. 30" WIDE WITH FLOOR AND WALL FINISH BELOW, MIN. 27" KNEE HEIGHT CLEARANCE 43 SIDE BY SIDE REFRIGERATOR 44 RECIRCULATING EXHAUST HOOD WITH LIGHT, SWITCH FROM WALL ADJACENT TO STOVE 45 ALL IN ONE WASHER/ DRYER 46 ELONGATED ADA TOILET BOWL WITH SEAT HEIGHT AT 18" AND FLUSH VALVE ON OPEN SIDE OF WATER CLOSET 47 FUTURE GRAB BAR - SEE ELEVATIONS FOR SIZES 48 REMOVABLE BASE CABINET AT VANITY, PROVIDE FLOOR AND WALL FINISH BELOW, WRAP ALL PIPES 49 SHOWER HEAD WITH SLIDE BAR AND ADJUSTABLE HEIGHT HEAD 50 LOCATION OF FUTURE BATHING SEAT 51 ADA RANGE WITH CONTROLS ON FRONT OF RANGE 52 CLOSET SHELF AND ROD AT 48" MAX HEIGHT 53 ONE (1) WINDOW SHALL BE ACCESSIBLE W/ OPERABLE PARTS LOACTED AT 48" MAX HEIGHT 54 ADA DISHWASHER UNDER 34" HIGH COUNTER 1. REFER TO SHEET A3-00 FOR UNIT PLAN NOTES 2. ELECTRICAL OUTLETS SHALL NOT BE CUT INTO MIRROR 3. NOTE T INDICATES THERMOSTAT 4. REFER TO SHEET A3-00 FOR STANDARD ARCHWAY DETAIL 5. REFER TO "CD" SERIES FOR FAIR HOUSING CONSTRUCTION REQUIREMENTS. ALL UNITS TO RECEIVE BLOCKING AS SHOWN IN "CD" SERIES 6. CEILING FIXTURES NOT DIMENSIONED ARE TO BE CENTERED ON ROOM NOTES RCP LEGEND 55 ADA COMBINATION WASHER/DRYER SOFFIT (8'-0" A.F.F) UNIT NAMING LEGEND A1 BASE UNIT A1A UNIT INTERIOR VARIATION A1.1 UNIT EXTERIOR VARIATION A1-HC MOBILITY ACCESSIBLE VARIATION C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:58:40 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A04.04 Author Checker 2234301 UNIT A2 PLANS SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/8" = 1'-0"2 UNIT A2 PLANS BEDROOMS TOTAL # OF UNITS UNIT AREA 1 704 SF16 BUILDING 27/28 -UNIT SUMMARY x9' -2"13' -3" KITCHEN x12' -0"17' -10" LIVING ROOM x11' -3"11' -9" BEDROOM x5' -8"11' -11" BATHROOM x6' -1"4' -5" CLOSET x11' -6"7' -0" BEDROOM DWR 744.90 SF UNIT A3 78.11 SF 3' - 7 " 9' - 1 " 12 ' - 4 " 7' - 0 " 6' - 6 1/2"4' - 1"3' - 10"5' - 7"3' - 7 3/4"2' - 11 3/4" 26' - 8" 32 ' - 0 " 11' - 6"12' - 7"2' - 7" 26' - 8" 13 ' - 5 " 18 ' - 7 " 32 ' - 0 " LIN MECH W/D REF. 36"X60" TUB DW P. WO1 020 WO 020 WO 020 WO 020 WB1 080 WO 020 WO1 020 WB1 070 WO1 020 WO 020 CEILING FAN W/ LIGHT KIT SWITCH FAN SEPARATE FROM LIGHT PENDANT LIGHT FIXTURES TRACK LIGHT VANITY LIGHT TOILET EXHAUST FAN, SIDEWALL MOUNTED IN 2X6 WALLS, MOUNT AT 7'-0" A.F.F. WALL MOUNTED LIGHT ( AT LAUNDRY AND SMALL CLOSETS) RECESSED CAN LIGHT IN FURR DOWN EXTERIOR WALL MOUNT BALCONY LIGHT SURFACE MOUNT FIXTURE UNIT LEGEND 1 HVAC UNIT/WATER HEATER SEE MECHANICAL DWGS 2 WASHER 3 PANTRY CABINET 4 WASHER & DRYER - STACKABLE 5 DISHWASHER 6A 22 CU.FT. REFRIGERATOR 7 RANGE W/ MICROWAVE ABOVE & VENTLESS HOOD 8 DRYER 9A 36" x 60" GARDEN TUB 10 THERMOSTAT CONTROL 11 ELECTRICAL PANEL 12 SOAP DISH 13 SHOWER CURTAIN ROD 14 PEDESTAL SINK 15 FOLDING GRAB BAR 16 MOVEABLE ISLAND W/ COUNTERTOP ON ALUMINIUM CASTERS 17A 36" x 36" 17B 42" x 34" 17C 42" x 42" 17D 60" x 34" 21 SINGLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 22 DOUBLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 23 SINGLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 24 DOUBLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 25 TOILET PAPER HOLDER 26 TOWEL BAR (24") 27 MIRROR 28 ELONGATED TOILET 29 SHOWER HEAD 30 SHOWER & TUB FAUCET 31 TUB FAUCET 32 EXHAUST 33 CORNER GRAB BAR 34 DOUBLE OVEN 35 TILE BACKSPLASH 6B 25 CU.FT. REFRIGERATOR 9B 42" x 60" GARDEN TUB 9C 30" x 60" GARDEN TUB F COMPUTER DESK WITH (1) WOOD SHELF ABOVE AND GRANITE COUNTERTOP 17 SHOWER PAN WITH ACRYLIC BASE 18 TILE SHOWER SURROUND, SEE 7/A3-00 19 ROBE HOOK 20 TOWEL RING UNIT SHELVING LEGEND A (1) 12" DEEP SHELF @ WASHER / DRYER B (5) 16" DEEP SHELVES C (5) 12" DEEP SHELVES D DOUBLE HANGING ROD & SHELF E HANGING ROD AND SHELF ACCESSIBILITY LEGEND 41 SINGLE BOWL STAINLESS STEEL SINK, WITH ADA FAUCET, PROVIDE PIPE WRAP BELOW, BASE CABINET TO BE REMOVABLE WITH FLOOR AND WALL FINISH BELOW, BOWL TO BE AT 34" MAX. HIGH A.F.F. 42 34" HIGH WORK SURFACE, MIN. 30" WIDE WITH FLOOR AND WALL FINISH BELOW, MIN. 27" KNEE HEIGHT CLEARANCE 43 SIDE BY SIDE REFRIGERATOR 44 RECIRCULATING EXHAUST HOOD WITH LIGHT, SWITCH FROM WALL ADJACENT TO STOVE 45 ALL IN ONE WASHER/ DRYER 46 ELONGATED ADA TOILET BOWL WITH SEAT HEIGHT AT 18" AND FLUSH VALVE ON OPEN SIDE OF WATER CLOSET 47 FUTURE GRAB BAR - SEE ELEVATIONS FOR SIZES 48 REMOVABLE BASE CABINET AT VANITY, PROVIDE FLOOR AND WALL FINISH BELOW, WRAP ALL PIPES 49 SHOWER HEAD WITH SLIDE BAR AND ADJUSTABLE HEIGHT HEAD 50 LOCATION OF FUTURE BATHING SEAT 51 ADA RANGE WITH CONTROLS ON FRONT OF RANGE 52 CLOSET SHELF AND ROD AT 48" MAX HEIGHT 53 ONE (1) WINDOW SHALL BE ACCESSIBLE W/ OPERABLE PARTS LOACTED AT 48" MAX HEIGHT 54 ADA DISHWASHER UNDER 34" HIGH COUNTER 1. REFER TO SHEET A3-00 FOR UNIT PLAN NOTES 2. ELECTRICAL OUTLETS SHALL NOT BE CUT INTO MIRROR 3. NOTE T INDICATES THERMOSTAT 4. REFER TO SHEET A3-00 FOR STANDARD ARCHWAY DETAIL 5. REFER TO "CD" SERIES FOR FAIR HOUSING CONSTRUCTION REQUIREMENTS. ALL UNITS TO RECEIVE BLOCKING AS SHOWN IN "CD" SERIES 6. CEILING FIXTURES NOT DIMENSIONED ARE TO BE CENTERED ON ROOM NOTES RCP LEGEND 55 ADA COMBINATION WASHER/DRYER SOFFIT (8'-0" A.F.F) UNIT NAMING LEGEND A1 BASE UNIT A1A UNIT INTERIOR VARIATION A1.1 UNIT EXTERIOR VARIATION A1-HC MOBILITY ACCESSIBLE VARIATION C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:58:42 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A04.05 Author Checker 2234301 UNIT A3 PLANS SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/8" = 1'-0"2 UNIT A3 PLANS BEDROOMS TOTAL # OF UNITS UNIT AREA 1 745 SF1 BUILDING 27/28 -UNIT SUMMARY x9' -4"15' -5" KITCHEN x11' -7"15' -9" LIVING ROOM x11' -3"10' -9" BEDROOM x6' -1"9' -6" BATHROOM x11' -6"5' -0" BALCONY DWR 713.82 SF UNIT A4 55.62 SF MECH W/D REF. 30"X60" TUB PA N T R Y CL O S E T CL O S E T DW P. 5' - 0 " 11 ' - 4 " 5' - 6 " 7' - 2 " 3' - 0 " 24' - 0" 1' - 6 3/4"5' - 4 3/4"3' - 8"5' - 6"3' - 7 3/4"4' - 2 3/4" 24' - 0" 12 ' - 8 " 3' - 0 " 16 ' - 4 " 32 ' - 0 " 11' - 6"12' - 6" 32 ' - 0 " WO1 020 WB2 071 WO 020 WO 020WO 020 WB1 080 WO 040 WO1 020 WO1 020 FO 040 WB1 070 CEILING FAN W/ LIGHT KIT SWITCH FAN SEPARATE FROM LIGHT PENDANT LIGHT FIXTURES TRACK LIGHT VANITY LIGHT TOILET EXHAUST FAN, SIDEWALL MOUNTED IN 2X6 WALLS, MOUNT AT 7'-0" A.F.F. WALL MOUNTED LIGHT ( AT LAUNDRY AND SMALL CLOSETS) RECESSED CAN LIGHT IN FURR DOWN EXTERIOR WALL MOUNT BALCONY LIGHT SURFACE MOUNT FIXTURE UNIT LEGEND 1 HVAC UNIT/WATER HEATER SEE MECHANICAL DWGS 2 WASHER 3 PANTRY CABINET 4 WASHER & DRYER - STACKABLE 5 DISHWASHER 6A 22 CU.FT. REFRIGERATOR 7 RANGE W/ MICROWAVE ABOVE & VENTLESS HOOD 8 DRYER 9A 36" x 60" GARDEN TUB 10 THERMOSTAT CONTROL 11 ELECTRICAL PANEL 12 SOAP DISH 13 SHOWER CURTAIN ROD 14 PEDESTAL SINK 15 FOLDING GRAB BAR 16 MOVEABLE ISLAND W/ COUNTERTOP ON ALUMINIUM CASTERS 17A 36" x 36" 17B 42" x 34" 17C 42" x 42" 17D 60" x 34" 21 SINGLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 22 DOUBLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 23 SINGLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 24 DOUBLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 25 TOILET PAPER HOLDER 26 TOWEL BAR (24") 27 MIRROR 28 ELONGATED TOILET 29 SHOWER HEAD 30 SHOWER & TUB FAUCET 31 TUB FAUCET 32 EXHAUST 33 CORNER GRAB BAR 34 DOUBLE OVEN 35 TILE BACKSPLASH 6B 25 CU.FT. REFRIGERATOR 9B 42" x 60" GARDEN TUB 9C 30" x 60" GARDEN TUB F COMPUTER DESK WITH (1) WOOD SHELF ABOVE AND GRANITE COUNTERTOP 17 SHOWER PAN WITH ACRYLIC BASE 18 TILE SHOWER SURROUND, SEE 7/A3-00 19 ROBE HOOK 20 TOWEL RING UNIT SHELVING LEGEND A (1) 12" DEEP SHELF @ WASHER / DRYER B (5) 16" DEEP SHELVES C (5) 12" DEEP SHELVES D DOUBLE HANGING ROD & SHELF E HANGING ROD AND SHELF ACCESSIBILITY LEGEND 41 SINGLE BOWL STAINLESS STEEL SINK, WITH ADA FAUCET, PROVIDE PIPE WRAP BELOW, BASE CABINET TO BE REMOVABLE WITH FLOOR AND WALL FINISH BELOW, BOWL TO BE AT 34" MAX. HIGH A.F.F. 42 34" HIGH WORK SURFACE, MIN. 30" WIDE WITH FLOOR AND WALL FINISH BELOW, MIN. 27" KNEE HEIGHT CLEARANCE 43 SIDE BY SIDE REFRIGERATOR 44 RECIRCULATING EXHAUST HOOD WITH LIGHT, SWITCH FROM WALL ADJACENT TO STOVE 45 ALL IN ONE WASHER/ DRYER 46 ELONGATED ADA TOILET BOWL WITH SEAT HEIGHT AT 18" AND FLUSH VALVE ON OPEN SIDE OF WATER CLOSET 47 FUTURE GRAB BAR - SEE ELEVATIONS FOR SIZES 48 REMOVABLE BASE CABINET AT VANITY, PROVIDE FLOOR AND WALL FINISH BELOW, WRAP ALL PIPES 49 SHOWER HEAD WITH SLIDE BAR AND ADJUSTABLE HEIGHT HEAD 50 LOCATION OF FUTURE BATHING SEAT 51 ADA RANGE WITH CONTROLS ON FRONT OF RANGE 52 CLOSET SHELF AND ROD AT 48" MAX HEIGHT 53 ONE (1) WINDOW SHALL BE ACCESSIBLE W/ OPERABLE PARTS LOACTED AT 48" MAX HEIGHT 54 ADA DISHWASHER UNDER 34" HIGH COUNTER 1. REFER TO SHEET A3-00 FOR UNIT PLAN NOTES 2. ELECTRICAL OUTLETS SHALL NOT BE CUT INTO MIRROR 3. NOTE T INDICATES THERMOSTAT 4. REFER TO SHEET A3-00 FOR STANDARD ARCHWAY DETAIL 5. REFER TO "CD" SERIES FOR FAIR HOUSING CONSTRUCTION REQUIREMENTS. ALL UNITS TO RECEIVE BLOCKING AS SHOWN IN "CD" SERIES 6. CEILING FIXTURES NOT DIMENSIONED ARE TO BE CENTERED ON ROOM NOTES RCP LEGEND 55 ADA COMBINATION WASHER/DRYER SOFFIT (8'-0" A.F.F) UNIT NAMING LEGEND A1 BASE UNIT A1A UNIT INTERIOR VARIATION A1.1 UNIT EXTERIOR VARIATION A1-HC MOBILITY ACCESSIBLE VARIATION C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:58:45 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A04.06 Author Checker 2234301 UNIT A4 PLANS SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/8" = 1'-0"2 UNIT A4 PLANS BEDROOMS TOTAL # OF UNITS UNIT AREA 1 714 SF70 BUILDING 27/28 -UNIT SUMMARY x13' -7"14' -2" LIVING ROOM x11' -2"12' -8" BEDROOM x5' -5"11' -4" BATHROOM x6' -1"16' -5" KITCHEN DWR 679.57 SF UNIT A5 MECH W/D REF.36"X60" TUB CLOSET CLOSET DW LIN P. 15 ' - 3 " 16 ' - 9 " 14' - 0"11' - 10 1/4" 10' - 2 1/4"5' - 11 1/2"9' - 10 1/4" 12 ' - 2 " 3' - 7 " 3' - 0 " 13 ' - 3 " 15 ' - 9 " 16 ' - 3 " 32 ' - 0 " 25' - 10 1/4" 32 ' - 0 " 2' - 1"7' - 9 1/4" WB1 080 WO 020 WO1 040 WB1 070 WB1 070 WB1 041 WB1 080 WB1 080 CEILING FAN W/ LIGHT KIT SWITCH FAN SEPARATE FROM LIGHT PENDANT LIGHT FIXTURES TRACK LIGHT VANITY LIGHT TOILET EXHAUST FAN, SIDEWALL MOUNTED IN 2X6 WALLS, MOUNT AT 7'-0" A.F.F. WALL MOUNTED LIGHT ( AT LAUNDRY AND SMALL CLOSETS) RECESSED CAN LIGHT IN FURR DOWN EXTERIOR WALL MOUNT BALCONY LIGHT SURFACE MOUNT FIXTURE UNIT LEGEND 1 HVAC UNIT/WATER HEATER SEE MECHANICAL DWGS 2 WASHER 3 PANTRY CABINET 4 WASHER & DRYER - STACKABLE 5 DISHWASHER 6A 22 CU.FT. REFRIGERATOR 7 RANGE W/ MICROWAVE ABOVE & VENTLESS HOOD 8 DRYER 9A 36" x 60" GARDEN TUB 10 THERMOSTAT CONTROL 11 ELECTRICAL PANEL 12 SOAP DISH 13 SHOWER CURTAIN ROD 14 PEDESTAL SINK 15 FOLDING GRAB BAR 16 MOVEABLE ISLAND W/ COUNTERTOP ON ALUMINIUM CASTERS 17A 36" x 36" 17B 42" x 34" 17C 42" x 42" 17D 60" x 34" 21 SINGLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 22 DOUBLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 23 SINGLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 24 DOUBLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 25 TOILET PAPER HOLDER 26 TOWEL BAR (24") 27 MIRROR 28 ELONGATED TOILET 29 SHOWER HEAD 30 SHOWER & TUB FAUCET 31 TUB FAUCET 32 EXHAUST 33 CORNER GRAB BAR 34 DOUBLE OVEN 35 TILE BACKSPLASH 6B 25 CU.FT. REFRIGERATOR 9B 42" x 60" GARDEN TUB 9C 30" x 60" GARDEN TUB F COMPUTER DESK WITH (1) WOOD SHELF ABOVE AND GRANITE COUNTERTOP 17 SHOWER PAN WITH ACRYLIC BASE 18 TILE SHOWER SURROUND, SEE 7/A3-00 19 ROBE HOOK 20 TOWEL RING UNIT SHELVING LEGEND A (1) 12" DEEP SHELF @ WASHER / DRYER B (5) 16" DEEP SHELVES C (5) 12" DEEP SHELVES D DOUBLE HANGING ROD & SHELF E HANGING ROD AND SHELF ACCESSIBILITY LEGEND 41 SINGLE BOWL STAINLESS STEEL SINK, WITH ADA FAUCET, PROVIDE PIPE WRAP BELOW, BASE CABINET TO BE REMOVABLE WITH FLOOR AND WALL FINISH BELOW, BOWL TO BE AT 34" MAX. HIGH A.F.F. 42 34" HIGH WORK SURFACE, MIN. 30" WIDE WITH FLOOR AND WALL FINISH BELOW, MIN. 27" KNEE HEIGHT CLEARANCE 43 SIDE BY SIDE REFRIGERATOR 44 RECIRCULATING EXHAUST HOOD WITH LIGHT, SWITCH FROM WALL ADJACENT TO STOVE 45 ALL IN ONE WASHER/ DRYER 46 ELONGATED ADA TOILET BOWL WITH SEAT HEIGHT AT 18" AND FLUSH VALVE ON OPEN SIDE OF WATER CLOSET 47 FUTURE GRAB BAR - SEE ELEVATIONS FOR SIZES 48 REMOVABLE BASE CABINET AT VANITY, PROVIDE FLOOR AND WALL FINISH BELOW, WRAP ALL PIPES 49 SHOWER HEAD WITH SLIDE BAR AND ADJUSTABLE HEIGHT HEAD 50 LOCATION OF FUTURE BATHING SEAT 51 ADA RANGE WITH CONTROLS ON FRONT OF RANGE 52 CLOSET SHELF AND ROD AT 48" MAX HEIGHT 53 ONE (1) WINDOW SHALL BE ACCESSIBLE W/ OPERABLE PARTS LOACTED AT 48" MAX HEIGHT 54 ADA DISHWASHER UNDER 34" HIGH COUNTER 1. REFER TO SHEET A3-00 FOR UNIT PLAN NOTES 2. ELECTRICAL OUTLETS SHALL NOT BE CUT INTO MIRROR 3. NOTE T INDICATES THERMOSTAT 4. REFER TO SHEET A3-00 FOR STANDARD ARCHWAY DETAIL 5. REFER TO "CD" SERIES FOR FAIR HOUSING CONSTRUCTION REQUIREMENTS. ALL UNITS TO RECEIVE BLOCKING AS SHOWN IN "CD" SERIES 6. CEILING FIXTURES NOT DIMENSIONED ARE TO BE CENTERED ON ROOM NOTES RCP LEGEND 55 ADA COMBINATION WASHER/DRYER SOFFIT (8'-0" A.F.F) UNIT NAMING LEGEND A1 BASE UNIT A1A UNIT INTERIOR VARIATION A1.1 UNIT EXTERIOR VARIATION A1-HC MOBILITY ACCESSIBLE VARIATION C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:58:46 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A04.07 Author Checker 2234301 UNIT A5 PLANS SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/8" = 1'-0"2 UNIT A5 PLANS BEDROOMS TOTAL # OF UNITS UNIT AREA 1 680 SF6 BUILDING 27/28 -UNIT SUMMARY x12' -0"13' -11" LIVING ROOM x11' -3"11' -10" BEDROOM 2 x11' -3"11' -8" BEDROOM 1 x8' -11"9' -1" BATHROOM 1 x5' -9"9' -2" BATHROOM 2 x9' -2"13' -3" KITCHEN x9' -3"5' -6" CLOSET 1 x8' -4"5' -5" CLOSET 2 x12' -9"5' -6" BALCONY 1012.13 SF UNIT B1 68.66 SF MECH W/D REF. 30"X60" TUB 36"X60" SHOWER BENCH DW P. 35' - 10 1/4" 6' - 4 " 9' - 6 " 12 ' - 2 " 1' - 2"5' - 4 3/4"6' - 0"5' - 7"3' - 7 3/4"4' - 6 1/2"9' - 8" 28 ' - 0 " 36' - 0" 12 ' - 2 " 5' - 1 0 " 6' - 1 0 " 3' - 2 " 28 ' - 0 " 11' - 8"12' - 5"11' - 9 1/4" WO 040 WO 020 WB1 020 WO1 020 WO 040WO 020 WO 040 WO 020 WO 020 WO1 020 FO 040 WB1 080 WB1 070 WB1 070 WB1 080 WO 040 CEILING FAN W/ LIGHT KIT SWITCH FAN SEPARATE FROM LIGHT PENDANT LIGHT FIXTURES TRACK LIGHT VANITY LIGHT TOILET EXHAUST FAN, SIDEWALL MOUNTED IN 2X6 WALLS, MOUNT AT 7'-0" A.F.F. WALL MOUNTED LIGHT ( AT LAUNDRY AND SMALL CLOSETS) RECESSED CAN LIGHT IN FURR DOWN EXTERIOR WALL MOUNT BALCONY LIGHT SURFACE MOUNT FIXTURE UNIT LEGEND 1 HVAC UNIT/WATER HEATER SEE MECHANICAL DWGS 2 WASHER 3 PANTRY CABINET 4 WASHER & DRYER - STACKABLE 5 DISHWASHER 6A 22 CU.FT. REFRIGERATOR 7 RANGE W/ MICROWAVE ABOVE & VENTLESS HOOD 8 DRYER 9A 36" x 60" GARDEN TUB 10 THERMOSTAT CONTROL 11 ELECTRICAL PANEL 12 SOAP DISH 13 SHOWER CURTAIN ROD 14 PEDESTAL SINK 15 FOLDING GRAB BAR 16 MOVEABLE ISLAND W/ COUNTERTOP ON ALUMINIUM CASTERS 17A 36" x 36" 17B 42" x 34" 17C 42" x 42" 17D 60" x 34" 21 SINGLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 22 DOUBLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 23 SINGLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 24 DOUBLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 25 TOILET PAPER HOLDER 26 TOWEL BAR (24") 27 MIRROR 28 ELONGATED TOILET 29 SHOWER HEAD 30 SHOWER & TUB FAUCET 31 TUB FAUCET 32 EXHAUST 33 CORNER GRAB BAR 34 DOUBLE OVEN 35 TILE BACKSPLASH 6B 25 CU.FT. REFRIGERATOR 9B 42" x 60" GARDEN TUB 9C 30" x 60" GARDEN TUB F COMPUTER DESK WITH (1) WOOD SHELF ABOVE AND GRANITE COUNTERTOP 17 SHOWER PAN WITH ACRYLIC BASE 18 TILE SHOWER SURROUND, SEE 7/A3-00 19 ROBE HOOK 20 TOWEL RING UNIT SHELVING LEGEND A (1) 12" DEEP SHELF @ WASHER / DRYER B (5) 16" DEEP SHELVES C (5) 12" DEEP SHELVES D DOUBLE HANGING ROD & SHELF E HANGING ROD AND SHELF ACCESSIBILITY LEGEND 41 SINGLE BOWL STAINLESS STEEL SINK, WITH ADA FAUCET, PROVIDE PIPE WRAP BELOW, BASE CABINET TO BE REMOVABLE WITH FLOOR AND WALL FINISH BELOW, BOWL TO BE AT 34" MAX. HIGH A.F.F. 42 34" HIGH WORK SURFACE, MIN. 30" WIDE WITH FLOOR AND WALL FINISH BELOW, MIN. 27" KNEE HEIGHT CLEARANCE 43 SIDE BY SIDE REFRIGERATOR 44 RECIRCULATING EXHAUST HOOD WITH LIGHT, SWITCH FROM WALL ADJACENT TO STOVE 45 ALL IN ONE WASHER/ DRYER 46 ELONGATED ADA TOILET BOWL WITH SEAT HEIGHT AT 18" AND FLUSH VALVE ON OPEN SIDE OF WATER CLOSET 47 FUTURE GRAB BAR - SEE ELEVATIONS FOR SIZES 48 REMOVABLE BASE CABINET AT VANITY, PROVIDE FLOOR AND WALL FINISH BELOW, WRAP ALL PIPES 49 SHOWER HEAD WITH SLIDE BAR AND ADJUSTABLE HEIGHT HEAD 50 LOCATION OF FUTURE BATHING SEAT 51 ADA RANGE WITH CONTROLS ON FRONT OF RANGE 52 CLOSET SHELF AND ROD AT 48" MAX HEIGHT 53 ONE (1) WINDOW SHALL BE ACCESSIBLE W/ OPERABLE PARTS LOACTED AT 48" MAX HEIGHT 54 ADA DISHWASHER UNDER 34" HIGH COUNTER 1. REFER TO SHEET A3-00 FOR UNIT PLAN NOTES 2. ELECTRICAL OUTLETS SHALL NOT BE CUT INTO MIRROR 3. NOTE T INDICATES THERMOSTAT 4. REFER TO SHEET A3-00 FOR STANDARD ARCHWAY DETAIL 5. REFER TO "CD" SERIES FOR FAIR HOUSING CONSTRUCTION REQUIREMENTS. ALL UNITS TO RECEIVE BLOCKING AS SHOWN IN "CD" SERIES 6. CEILING FIXTURES NOT DIMENSIONED ARE TO BE CENTERED ON ROOM NOTES RCP LEGEND 55 ADA COMBINATION WASHER/DRYER SOFFIT (8'-0" A.F.F) UNIT NAMING LEGEND A1 BASE UNIT A1A UNIT INTERIOR VARIATION A1.1 UNIT EXTERIOR VARIATION A1-HC MOBILITY ACCESSIBLE VARIATION C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:58:49 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A04.08 Author Checker 2234301 UNIT B1 PLANS SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/8" = 1'-0"2 UNIT B1 PLANS BEDROOMS TOTAL # OF UNITS UNIT AREA 2 1012 SF13 BUILDING 27/28 -UNIT SUMMARY x10' -11"8' -10" LIVING ROOM x11' -7"12' -4" BEDROOM 2 x 15' -0" 12' -3" BEDROOM 1 x 8' -10" 8' -1" CLOSET 1x9' -4"9' -0" BATHROOM 2 x9' -5"13' -4" KITCHEN x11' -9"7' -1" BATHROOM 1 x 5' -0" 2' -6" DES K x9' -6"6' -0" CLOSET 2 x16' -0"6' -0" BALCONY 1096.23 SF UNIT B2 100.27 SF LIN MECHW/D REF. 36"X60" TUB 36"X60" SHOWER DW P. 10' - 2"8' - 5"6' - 5"4' - 0"3' - 10"9' - 0"3' - 2" 12 ' - 1 1 " 9' - 5 " 6' - 8 " 45' - 0" 4' - 0 1 / 2 " 5' - 4 3 / 4 " 2' - 6 " 11 ' - 1 1 1 / 4 " 5' - 4" 15' - 7 1/4" 6' - 9" 22' - 4 1/4" 29 ' - 0 " 12' - 5 1/2"11' - 2" 23' - 7 1/2" 8' - 11 7/8" WO1 020 WO 020 WO1 020 WO1 020 WO 020 WO 020 WO 020 WO 020 WO 040 WB1 051 FO 040 WB1 070 WB1 070 WB1 080 WB1 070 WO1 020 WO 020 WO 040 WO 020 CEILING FAN W/ LIGHT KIT SWITCH FAN SEPARATE FROM LIGHT PENDANT LIGHT FIXTURES TRACK LIGHT VANITY LIGHT TOILET EXHAUST FAN, SIDEWALL MOUNTED IN 2X6 WALLS, MOUNT AT 7'-0" A.F.F. WALL MOUNTED LIGHT ( AT LAUNDRY AND SMALL CLOSETS) RECESSED CAN LIGHT IN FURR DOWN EXTERIOR WALL MOUNT BALCONY LIGHT SURFACE MOUNT FIXTURE UNIT LEGEND 1 HVAC UNIT/WATER HEATER SEE MECHANICAL DWGS 2 WASHER 3 PANTRY CABINET 4 WASHER & DRYER - STACKABLE 5 DISHWASHER 6A 22 CU.FT. REFRIGERATOR 7 RANGE W/ MICROWAVE ABOVE & VENTLESS HOOD 8 DRYER 9A 36" x 60" GARDEN TUB 10 THERMOSTAT CONTROL 11 ELECTRICAL PANEL 12 SOAP DISH 13 SHOWER CURTAIN ROD 14 PEDESTAL SINK 15 FOLDING GRAB BAR 16 MOVEABLE ISLAND W/ COUNTERTOP ON ALUMINIUM CASTERS 17A 36" x 36" 17B 42" x 34" 17C 42" x 42" 17D 60" x 34" 21 SINGLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 22 DOUBLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 23 SINGLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 24 DOUBLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 25 TOILET PAPER HOLDER 26 TOWEL BAR (24") 27 MIRROR 28 ELONGATED TOILET 29 SHOWER HEAD 30 SHOWER & TUB FAUCET 31 TUB FAUCET 32 EXHAUST 33 CORNER GRAB BAR 34 DOUBLE OVEN 35 TILE BACKSPLASH 6B 25 CU.FT. REFRIGERATOR 9B 42" x 60" GARDEN TUB 9C 30" x 60" GARDEN TUB F COMPUTER DESK WITH (1) WOOD SHELF ABOVE AND GRANITE COUNTERTOP 17 SHOWER PAN WITH ACRYLIC BASE 18 TILE SHOWER SURROUND, SEE 7/A3-00 19 ROBE HOOK 20 TOWEL RING UNIT SHELVING LEGEND A (1) 12" DEEP SHELF @ WASHER / DRYER B (5) 16" DEEP SHELVES C (5) 12" DEEP SHELVES D DOUBLE HANGING ROD & SHELF E HANGING ROD AND SHELF ACCESSIBILITY LEGEND 41 SINGLE BOWL STAINLESS STEEL SINK, WITH ADA FAUCET, PROVIDE PIPE WRAP BELOW, BASE CABINET TO BE REMOVABLE WITH FLOOR AND WALL FINISH BELOW, BOWL TO BE AT 34" MAX. HIGH A.F.F. 42 34" HIGH WORK SURFACE, MIN. 30" WIDE WITH FLOOR AND WALL FINISH BELOW, MIN. 27" KNEE HEIGHT CLEARANCE 43 SIDE BY SIDE REFRIGERATOR 44 RECIRCULATING EXHAUST HOOD WITH LIGHT, SWITCH FROM WALL ADJACENT TO STOVE 45 ALL IN ONE WASHER/ DRYER 46 ELONGATED ADA TOILET BOWL WITH SEAT HEIGHT AT 18" AND FLUSH VALVE ON OPEN SIDE OF WATER CLOSET 47 FUTURE GRAB BAR - SEE ELEVATIONS FOR SIZES 48 REMOVABLE BASE CABINET AT VANITY, PROVIDE FLOOR AND WALL FINISH BELOW, WRAP ALL PIPES 49 SHOWER HEAD WITH SLIDE BAR AND ADJUSTABLE HEIGHT HEAD 50 LOCATION OF FUTURE BATHING SEAT 51 ADA RANGE WITH CONTROLS ON FRONT OF RANGE 52 CLOSET SHELF AND ROD AT 48" MAX HEIGHT 53 ONE (1) WINDOW SHALL BE ACCESSIBLE W/ OPERABLE PARTS LOACTED AT 48" MAX HEIGHT 54 ADA DISHWASHER UNDER 34" HIGH COUNTER 1. REFER TO SHEET A3-00 FOR UNIT PLAN NOTES 2. ELECTRICAL OUTLETS SHALL NOT BE CUT INTO MIRROR 3. NOTE T INDICATES THERMOSTAT 4. REFER TO SHEET A3-00 FOR STANDARD ARCHWAY DETAIL 5. REFER TO "CD" SERIES FOR FAIR HOUSING CONSTRUCTION REQUIREMENTS. ALL UNITS TO RECEIVE BLOCKING AS SHOWN IN "CD" SERIES 6. CEILING FIXTURES NOT DIMENSIONED ARE TO BE CENTERED ON ROOM NOTES RCP LEGEND 55 ADA COMBINATION WASHER/DRYER SOFFIT (8'-0" A.F.F) UNIT NAMING LEGEND A1 BASE UNIT A1A UNIT INTERIOR VARIATION A1.1 UNIT EXTERIOR VARIATION A1-HC MOBILITY ACCESSIBLE VARIATION C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:58:52 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A04.09 Author Checker 2234301 UNIT B2 PLANS SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/8" = 1'-0"2 UNIT B2 PLANS BEDROOMS TOTAL # OF UNITS UNIT AREA 2 1196 SF10 BUILDING 27/28 -UNIT SUMMARY x13' -1"12' -11" LIVING ROOM x10' -0"11' -9" BEDROOM 2 x13' -4"10' -6" BEDROOM 1 x11' -4"6' -8" BATHROOM 1 x5' -8"9' -9" BATHROOM 2 x9' -4"13' -0" KITCHEN x9' -4"3' -0" CLOSET 1 x3' -4"4' -9" DESK DWR 1015.35 SF UNIT B3 MECH W/D REF. 30"X60" TUB 36"X60" SHOWER BE N C H DW 36' - 0" 10' - 4"11' - 9"13' - 11" 12 ' - 4 " 7' - 5 " 2' - 9 " 5' - 6 " 11 ' - 2 " 3' - 4 " 13 ' - 6 " 28 ' - 0 " 10' - 8"2' - 4"23' - 0" 36' - 0" 28 ' - 0 " WO1 020 WB1 070 WO 020 WO 020 WO 020WB1 080 WO 020 WB1 080 WO1 040 WO 020 WB1 070 WO1 020 WO 020 CEILING FAN W/ LIGHT KIT SWITCH FAN SEPARATE FROM LIGHT PENDANT LIGHT FIXTURES TRACK LIGHT VANITY LIGHT TOILET EXHAUST FAN, SIDEWALL MOUNTED IN 2X6 WALLS, MOUNT AT 7'-0" A.F.F. WALL MOUNTED LIGHT ( AT LAUNDRY AND SMALL CLOSETS) RECESSED CAN LIGHT IN FURR DOWN EXTERIOR WALL MOUNT BALCONY LIGHT SURFACE MOUNT FIXTURE UNIT LEGEND 1 HVAC UNIT/WATER HEATER SEE MECHANICAL DWGS 2 WASHER 3 PANTRY CABINET 4 WASHER & DRYER - STACKABLE 5 DISHWASHER 6A 22 CU.FT. REFRIGERATOR 7 RANGE W/ MICROWAVE ABOVE & VENTLESS HOOD 8 DRYER 9A 36" x 60" GARDEN TUB 10 THERMOSTAT CONTROL 11 ELECTRICAL PANEL 12 SOAP DISH 13 SHOWER CURTAIN ROD 14 PEDESTAL SINK 15 FOLDING GRAB BAR 16 MOVEABLE ISLAND W/ COUNTERTOP ON ALUMINIUM CASTERS 17A 36" x 36" 17B 42" x 34" 17C 42" x 42" 17D 60" x 34" 21 SINGLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 22 DOUBLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 23 SINGLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 24 DOUBLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 25 TOILET PAPER HOLDER 26 TOWEL BAR (24") 27 MIRROR 28 ELONGATED TOILET 29 SHOWER HEAD 30 SHOWER & TUB FAUCET 31 TUB FAUCET 32 EXHAUST 33 CORNER GRAB BAR 34 DOUBLE OVEN 35 TILE BACKSPLASH 6B 25 CU.FT. REFRIGERATOR 9B 42" x 60" GARDEN TUB 9C 30" x 60" GARDEN TUB F COMPUTER DESK WITH (1) WOOD SHELF ABOVE AND GRANITE COUNTERTOP 17 SHOWER PAN WITH ACRYLIC BASE 18 TILE SHOWER SURROUND, SEE 7/A3-00 19 ROBE HOOK 20 TOWEL RING UNIT SHELVING LEGEND A (1) 12" DEEP SHELF @ WASHER / DRYER B (5) 16" DEEP SHELVES C (5) 12" DEEP SHELVES D DOUBLE HANGING ROD & SHELF E HANGING ROD AND SHELF ACCESSIBILITY LEGEND 41 SINGLE BOWL STAINLESS STEEL SINK, WITH ADA FAUCET, PROVIDE PIPE WRAP BELOW, BASE CABINET TO BE REMOVABLE WITH FLOOR AND WALL FINISH BELOW, BOWL TO BE AT 34" MAX. HIGH A.F.F. 42 34" HIGH WORK SURFACE, MIN. 30" WIDE WITH FLOOR AND WALL FINISH BELOW, MIN. 27" KNEE HEIGHT CLEARANCE 43 SIDE BY SIDE REFRIGERATOR 44 RECIRCULATING EXHAUST HOOD WITH LIGHT, SWITCH FROM WALL ADJACENT TO STOVE 45 ALL IN ONE WASHER/ DRYER 46 ELONGATED ADA TOILET BOWL WITH SEAT HEIGHT AT 18" AND FLUSH VALVE ON OPEN SIDE OF WATER CLOSET 47 FUTURE GRAB BAR - SEE ELEVATIONS FOR SIZES 48 REMOVABLE BASE CABINET AT VANITY, PROVIDE FLOOR AND WALL FINISH BELOW, WRAP ALL PIPES 49 SHOWER HEAD WITH SLIDE BAR AND ADJUSTABLE HEIGHT HEAD 50 LOCATION OF FUTURE BATHING SEAT 51 ADA RANGE WITH CONTROLS ON FRONT OF RANGE 52 CLOSET SHELF AND ROD AT 48" MAX HEIGHT 53 ONE (1) WINDOW SHALL BE ACCESSIBLE W/ OPERABLE PARTS LOACTED AT 48" MAX HEIGHT 54 ADA DISHWASHER UNDER 34" HIGH COUNTER 1. REFER TO SHEET A3-00 FOR UNIT PLAN NOTES 2. ELECTRICAL OUTLETS SHALL NOT BE CUT INTO MIRROR 3. NOTE T INDICATES THERMOSTAT 4. REFER TO SHEET A3-00 FOR STANDARD ARCHWAY DETAIL 5. REFER TO "CD" SERIES FOR FAIR HOUSING CONSTRUCTION REQUIREMENTS. ALL UNITS TO RECEIVE BLOCKING AS SHOWN IN "CD" SERIES 6. CEILING FIXTURES NOT DIMENSIONED ARE TO BE CENTERED ON ROOM NOTES RCP LEGEND 55 ADA COMBINATION WASHER/DRYER SOFFIT (8'-0" A.F.F) UNIT NAMING LEGEND A1 BASE UNIT A1A UNIT INTERIOR VARIATION A1.1 UNIT EXTERIOR VARIATION A1-HC MOBILITY ACCESSIBLE VARIATION C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:58:54 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A04.10 Author Checker 2234301 UNIT B3 PLANS SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/8" = 1'-0"2 UNIT B3 PLANS BEDROOMS TOTAL # OF UNITS UNIT AREA 2 1015 SF20 BUILDING 27/28 -UNIT SUMMARY x12' -1"13' -0" LIVING ROOMx11' -3"11' -0" BEDROOM 2 x11' -2"11' -7" BEDROOM 1 x8' -10"11' -7" BATHROOM 1 x5' -8"12' -0" BATHROOM 2 x9' -0"14' -0" KITCHEN x9' -0"7' -0" CLOSET 1 x5' -0"2' -6" DESK x5' -0"4' -5" CLOSET 2 DWR 1072.71 SF UNIT B4 MECHW/D REF. 36"X60" TUB 36"X60" SHOWER BE N C H PA N T R Y P. LIN LIN SHAFT 11' - 5"8' - 7"3' - 7 1/4"3' - 0 1/4"9' - 4 1/2" 36' - 0" 7' - 1 0 " 12 ' - 0 " 12 ' - 2 " 32 ' - 0 " 11' - 8"12' - 6"11' - 10" 36' - 0" 8' - 0 1 / 2 " 3' - 4 1 / 2 " 9' - 0 " 11 ' - 7 " 32 ' - 0 " WO1 020 WO1 020 WB1 070 WB1 070 WO 020 WO 020 WB1 042 WB1 042 WB1 080 WO 020 WO 020 WO 020 WO 040 WB1 070 WB1 080 WO1 020 WO 020 WO 020 WO 020 WO 020 CEILING FAN W/ LIGHT KIT SWITCH FAN SEPARATE FROM LIGHT PENDANT LIGHT FIXTURES TRACK LIGHT VANITY LIGHT TOILET EXHAUST FAN, SIDEWALL MOUNTED IN 2X6 WALLS, MOUNT AT 7'-0" A.F.F. WALL MOUNTED LIGHT ( AT LAUNDRY AND SMALL CLOSETS) RECESSED CAN LIGHT IN FURR DOWN EXTERIOR WALL MOUNT BALCONY LIGHT SURFACE MOUNT FIXTURE UNIT LEGEND 1 HVAC UNIT/WATER HEATER SEE MECHANICAL DWGS 2 WASHER 3 PANTRY CABINET 4 WASHER & DRYER - STACKABLE 5 DISHWASHER 6A 22 CU.FT. REFRIGERATOR 7 RANGE W/ MICROWAVE ABOVE & VENTLESS HOOD 8 DRYER 9A 36" x 60" GARDEN TUB 10 THERMOSTAT CONTROL 11 ELECTRICAL PANEL 12 SOAP DISH 13 SHOWER CURTAIN ROD 14 PEDESTAL SINK 15 FOLDING GRAB BAR 16 MOVEABLE ISLAND W/ COUNTERTOP ON ALUMINIUM CASTERS 17A 36" x 36" 17B 42" x 34" 17C 42" x 42" 17D 60" x 34" 21 SINGLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 22 DOUBLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 23 SINGLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 24 DOUBLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 25 TOILET PAPER HOLDER 26 TOWEL BAR (24") 27 MIRROR 28 ELONGATED TOILET 29 SHOWER HEAD 30 SHOWER & TUB FAUCET 31 TUB FAUCET 32 EXHAUST 33 CORNER GRAB BAR 34 DOUBLE OVEN 35 TILE BACKSPLASH 6B 25 CU.FT. REFRIGERATOR 9B 42" x 60" GARDEN TUB 9C 30" x 60" GARDEN TUB F COMPUTER DESK WITH (1) WOOD SHELF ABOVE AND GRANITE COUNTERTOP 17 SHOWER PAN WITH ACRYLIC BASE 18 TILE SHOWER SURROUND, SEE 7/A3-00 19 ROBE HOOK 20 TOWEL RING UNIT SHELVING LEGEND A (1) 12" DEEP SHELF @ WASHER / DRYER B (5) 16" DEEP SHELVES C (5) 12" DEEP SHELVES D DOUBLE HANGING ROD & SHELF E HANGING ROD AND SHELF ACCESSIBILITY LEGEND 41 SINGLE BOWL STAINLESS STEEL SINK, WITH ADA FAUCET, PROVIDE PIPE WRAP BELOW, BASE CABINET TO BE REMOVABLE WITH FLOOR AND WALL FINISH BELOW, BOWL TO BE AT 34" MAX. HIGH A.F.F. 42 34" HIGH WORK SURFACE, MIN. 30" WIDE WITH FLOOR AND WALL FINISH BELOW, MIN. 27" KNEE HEIGHT CLEARANCE 43 SIDE BY SIDE REFRIGERATOR 44 RECIRCULATING EXHAUST HOOD WITH LIGHT, SWITCH FROM WALL ADJACENT TO STOVE 45 ALL IN ONE WASHER/ DRYER 46 ELONGATED ADA TOILET BOWL WITH SEAT HEIGHT AT 18" AND FLUSH VALVE ON OPEN SIDE OF WATER CLOSET 47 FUTURE GRAB BAR - SEE ELEVATIONS FOR SIZES 48 REMOVABLE BASE CABINET AT VANITY, PROVIDE FLOOR AND WALL FINISH BELOW, WRAP ALL PIPES 49 SHOWER HEAD WITH SLIDE BAR AND ADJUSTABLE HEIGHT HEAD 50 LOCATION OF FUTURE BATHING SEAT 51 ADA RANGE WITH CONTROLS ON FRONT OF RANGE 52 CLOSET SHELF AND ROD AT 48" MAX HEIGHT 53 ONE (1) WINDOW SHALL BE ACCESSIBLE W/ OPERABLE PARTS LOACTED AT 48" MAX HEIGHT 54 ADA DISHWASHER UNDER 34" HIGH COUNTER 1. REFER TO SHEET A3-00 FOR UNIT PLAN NOTES 2. ELECTRICAL OUTLETS SHALL NOT BE CUT INTO MIRROR 3. NOTE T INDICATES THERMOSTAT 4. REFER TO SHEET A3-00 FOR STANDARD ARCHWAY DETAIL 5. REFER TO "CD" SERIES FOR FAIR HOUSING CONSTRUCTION REQUIREMENTS. ALL UNITS TO RECEIVE BLOCKING AS SHOWN IN "CD" SERIES 6. CEILING FIXTURES NOT DIMENSIONED ARE TO BE CENTERED ON ROOM NOTES RCP LEGEND 55 ADA COMBINATION WASHER/DRYER SOFFIT (8'-0" A.F.F) UNIT NAMING LEGEND A1 BASE UNIT A1A UNIT INTERIOR VARIATION A1.1 UNIT EXTERIOR VARIATION A1-HC MOBILITY ACCESSIBLE VARIATION C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:58:57 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A04.11 Author Checker 2234301 UNIT B4 PLANS SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/8" = 1'-0"2 UNIT B4 PLANS BEDROOMS TOTAL # OF UNITS UNIT AREA 2 1072 SF3 BUILDING 27/28 -UNIT SUMMARY DWR x12' -2"13' -1" LIVING ROOM x11' -3"11' -10" BEDROOM 2 x11' -1"11' -7" BEDROOM 1 x8' -9"11' -7" BATHROOM 1 x5' -4"12' -0" BATHROOM 2 x9' -2"13' -10" KITCHEN x8' -11"7' -2" CLOSET 1 x5' -0"2' -6" DESK x5' -6"4' -4" CLOSET 2 x11' -6"7' -0" BALCONY 1076.72 SF UNIT B5 78.11 SF LIN LIN MECHW/D REF. 36"X60" TUB 36"X60" SHOWER DW P. 32 ' - 0 " 36' - 0" 1' - 1 3/4"5' - 4 3/4"4' - 1"3' - 10"5' - 7"3' - 7 1/4"3' - 0 1/4"9' - 4" 19 ' - 1 0 " 12 ' - 2 " 32 ' - 0 " 11' - 6"12' - 9"11' - 9" 36' - 0" 3' - 7 " 9' - 1 " 12 ' - 4 " 7' - 0 " WB1 070 WO1 020 WB1 070WO1 020 WO 020 WO 020 WB1 080 WB1 070 WO1 020 WO1 020 WO 040 WB1 080 WO 020 WO 020 WO 020 WO 020 WO 020 CEILING FAN W/ LIGHT KIT SWITCH FAN SEPARATE FROM LIGHT PENDANT LIGHT FIXTURES TRACK LIGHT VANITY LIGHT TOILET EXHAUST FAN, SIDEWALL MOUNTED IN 2X6 WALLS, MOUNT AT 7'-0" A.F.F. WALL MOUNTED LIGHT ( AT LAUNDRY AND SMALL CLOSETS) RECESSED CAN LIGHT IN FURR DOWN EXTERIOR WALL MOUNT BALCONY LIGHT SURFACE MOUNT FIXTURE UNIT LEGEND 1 HVAC UNIT/WATER HEATER SEE MECHANICAL DWGS 2 WASHER 3 PANTRY CABINET 4 WASHER & DRYER - STACKABLE 5 DISHWASHER 6A 22 CU.FT. REFRIGERATOR 7 RANGE W/ MICROWAVE ABOVE & VENTLESS HOOD 8 DRYER 9A 36" x 60" GARDEN TUB 10 THERMOSTAT CONTROL 11 ELECTRICAL PANEL 12 SOAP DISH 13 SHOWER CURTAIN ROD 14 PEDESTAL SINK 15 FOLDING GRAB BAR 16 MOVEABLE ISLAND W/ COUNTERTOP ON ALUMINIUM CASTERS 17A 36" x 36" 17B 42" x 34" 17C 42" x 42" 17D 60" x 34" 21 SINGLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 22 DOUBLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 23 SINGLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 24 DOUBLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 25 TOILET PAPER HOLDER 26 TOWEL BAR (24") 27 MIRROR 28 ELONGATED TOILET 29 SHOWER HEAD 30 SHOWER & TUB FAUCET 31 TUB FAUCET 32 EXHAUST 33 CORNER GRAB BAR 34 DOUBLE OVEN 35 TILE BACKSPLASH 6B 25 CU.FT. REFRIGERATOR 9B 42" x 60" GARDEN TUB 9C 30" x 60" GARDEN TUB F COMPUTER DESK WITH (1) WOOD SHELF ABOVE AND GRANITE COUNTERTOP 17 SHOWER PAN WITH ACRYLIC BASE 18 TILE SHOWER SURROUND, SEE 7/A3-00 19 ROBE HOOK 20 TOWEL RING UNIT SHELVING LEGEND A (1) 12" DEEP SHELF @ WASHER / DRYER B (5) 16" DEEP SHELVES C (5) 12" DEEP SHELVES D DOUBLE HANGING ROD & SHELF E HANGING ROD AND SHELF ACCESSIBILITY LEGEND 41 SINGLE BOWL STAINLESS STEEL SINK, WITH ADA FAUCET, PROVIDE PIPE WRAP BELOW, BASE CABINET TO BE REMOVABLE WITH FLOOR AND WALL FINISH BELOW, BOWL TO BE AT 34" MAX. HIGH A.F.F. 42 34" HIGH WORK SURFACE, MIN. 30" WIDE WITH FLOOR AND WALL FINISH BELOW, MIN. 27" KNEE HEIGHT CLEARANCE 43 SIDE BY SIDE REFRIGERATOR 44 RECIRCULATING EXHAUST HOOD WITH LIGHT, SWITCH FROM WALL ADJACENT TO STOVE 45 ALL IN ONE WASHER/ DRYER 46 ELONGATED ADA TOILET BOWL WITH SEAT HEIGHT AT 18" AND FLUSH VALVE ON OPEN SIDE OF WATER CLOSET 47 FUTURE GRAB BAR - SEE ELEVATIONS FOR SIZES 48 REMOVABLE BASE CABINET AT VANITY, PROVIDE FLOOR AND WALL FINISH BELOW, WRAP ALL PIPES 49 SHOWER HEAD WITH SLIDE BAR AND ADJUSTABLE HEIGHT HEAD 50 LOCATION OF FUTURE BATHING SEAT 51 ADA RANGE WITH CONTROLS ON FRONT OF RANGE 52 CLOSET SHELF AND ROD AT 48" MAX HEIGHT 53 ONE (1) WINDOW SHALL BE ACCESSIBLE W/ OPERABLE PARTS LOACTED AT 48" MAX HEIGHT 54 ADA DISHWASHER UNDER 34" HIGH COUNTER 1. REFER TO SHEET A3-00 FOR UNIT PLAN NOTES 2. ELECTRICAL OUTLETS SHALL NOT BE CUT INTO MIRROR 3. NOTE T INDICATES THERMOSTAT 4. REFER TO SHEET A3-00 FOR STANDARD ARCHWAY DETAIL 5. REFER TO "CD" SERIES FOR FAIR HOUSING CONSTRUCTION REQUIREMENTS. ALL UNITS TO RECEIVE BLOCKING AS SHOWN IN "CD" SERIES 6. CEILING FIXTURES NOT DIMENSIONED ARE TO BE CENTERED ON ROOM NOTES RCP LEGEND 55 ADA COMBINATION WASHER/DRYER SOFFIT (8'-0" A.F.F) UNIT NAMING LEGEND A1 BASE UNIT A1A UNIT INTERIOR VARIATION A1.1 UNIT EXTERIOR VARIATION A1-HC MOBILITY ACCESSIBLE VARIATION C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:58:59 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A04.12 Author Checker 2234301 UNIT B5 PLANS SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/8" = 1'-0"2 UNIT B5 PLANS BEDROOMS TOTAL # OF UNITS UNIT AREA 2 1077 SF51 BUILDING 27/28 -UNIT SUMMARY DWR x16' -10"13' -8" LIVING ROOM x12' -0"11' -3" BEDROOM 2 x13' -3"12' -0" BEDROOM 1 x10' -8"9' -0" BATHROOM 1 x5' -4"9' -9" BATHROOM 2 x14' -2"9' -2" KITCHEN x5' -9"8' -4" CLOSET 1 x3' -3"5' -0" DESK x10' -0"5' -4" BALCONY 1143.16 SF UNIT B6 50.99 SF MECH W/D REF. 30"X60" TUB 36"X60" SHOWER BE N C H CLOSET LINEN DW P. 3' - 10"7' - 7 1/8" 7' - 2 1/4" 5' - 6 3/4" 5' - 5 1/2" 13' - 9 1/2" 32' - 0" 12' - 7" 13' - 9 1/256" 26' - 4 1/256" 12' - 3 1/2"10' - 5 1/2"16' - 8 3/8" 11 ' - 0 " 7' - 4 1 / 2 " 2' - 9 " 3' - 9 1 / 2 " 4' - 1 " 29 ' - 0 " 39' - 5 3/8" 11' - 5 1/8" WO 020 WO1 040 WO1 040 WO1 020 WO 020 WO 020 WB1 080 WO1 020 WO 020 WO 020 WO 020 WB1 070 WB1 070 WO 020 CEILING FAN W/ LIGHT KIT SWITCH FAN SEPARATE FROM LIGHT PENDANT LIGHT FIXTURES TRACK LIGHT VANITY LIGHT TOILET EXHAUST FAN, SIDEWALL MOUNTED IN 2X6 WALLS, MOUNT AT 7'-0" A.F.F. WALL MOUNTED LIGHT ( AT LAUNDRY AND SMALL CLOSETS) RECESSED CAN LIGHT IN FURR DOWN EXTERIOR WALL MOUNT BALCONY LIGHT SURFACE MOUNT FIXTURE UNIT LEGEND 1 HVAC UNIT/WATER HEATER SEE MECHANICAL DWGS 2 WASHER 3 PANTRY CABINET 4 WASHER & DRYER - STACKABLE 5 DISHWASHER 6A 22 CU.FT. REFRIGERATOR 7 RANGE W/ MICROWAVE ABOVE & VENTLESS HOOD 8 DRYER 9A 36" x 60" GARDEN TUB 10 THERMOSTAT CONTROL 11 ELECTRICAL PANEL 12 SOAP DISH 13 SHOWER CURTAIN ROD 14 PEDESTAL SINK 15 FOLDING GRAB BAR 16 MOVEABLE ISLAND W/ COUNTERTOP ON ALUMINIUM CASTERS 17A 36" x 36" 17B 42" x 34" 17C 42" x 42" 17D 60" x 34" 21 SINGLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 22 DOUBLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 23 SINGLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 24 DOUBLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 25 TOILET PAPER HOLDER 26 TOWEL BAR (24") 27 MIRROR 28 ELONGATED TOILET 29 SHOWER HEAD 30 SHOWER & TUB FAUCET 31 TUB FAUCET 32 EXHAUST 33 CORNER GRAB BAR 34 DOUBLE OVEN 35 TILE BACKSPLASH 6B 25 CU.FT. REFRIGERATOR 9B 42" x 60" GARDEN TUB 9C 30" x 60" GARDEN TUB F COMPUTER DESK WITH (1) WOOD SHELF ABOVE AND GRANITE COUNTERTOP 17 SHOWER PAN WITH ACRYLIC BASE 18 TILE SHOWER SURROUND, SEE 7/A3-00 19 ROBE HOOK 20 TOWEL RING UNIT SHELVING LEGEND A (1) 12" DEEP SHELF @ WASHER / DRYER B (5) 16" DEEP SHELVES C (5) 12" DEEP SHELVES D DOUBLE HANGING ROD & SHELF E HANGING ROD AND SHELF ACCESSIBILITY LEGEND 41 SINGLE BOWL STAINLESS STEEL SINK, WITH ADA FAUCET, PROVIDE PIPE WRAP BELOW, BASE CABINET TO BE REMOVABLE WITH FLOOR AND WALL FINISH BELOW, BOWL TO BE AT 34" MAX. HIGH A.F.F. 42 34" HIGH WORK SURFACE, MIN. 30" WIDE WITH FLOOR AND WALL FINISH BELOW, MIN. 27" KNEE HEIGHT CLEARANCE 43 SIDE BY SIDE REFRIGERATOR 44 RECIRCULATING EXHAUST HOOD WITH LIGHT, SWITCH FROM WALL ADJACENT TO STOVE 45 ALL IN ONE WASHER/ DRYER 46 ELONGATED ADA TOILET BOWL WITH SEAT HEIGHT AT 18" AND FLUSH VALVE ON OPEN SIDE OF WATER CLOSET 47 FUTURE GRAB BAR - SEE ELEVATIONS FOR SIZES 48 REMOVABLE BASE CABINET AT VANITY, PROVIDE FLOOR AND WALL FINISH BELOW, WRAP ALL PIPES 49 SHOWER HEAD WITH SLIDE BAR AND ADJUSTABLE HEIGHT HEAD 50 LOCATION OF FUTURE BATHING SEAT 51 ADA RANGE WITH CONTROLS ON FRONT OF RANGE 52 CLOSET SHELF AND ROD AT 48" MAX HEIGHT 53 ONE (1) WINDOW SHALL BE ACCESSIBLE W/ OPERABLE PARTS LOACTED AT 48" MAX HEIGHT 54 ADA DISHWASHER UNDER 34" HIGH COUNTER 1. REFER TO SHEET A3-00 FOR UNIT PLAN NOTES 2. ELECTRICAL OUTLETS SHALL NOT BE CUT INTO MIRROR 3. NOTE T INDICATES THERMOSTAT 4. REFER TO SHEET A3-00 FOR STANDARD ARCHWAY DETAIL 5. REFER TO "CD" SERIES FOR FAIR HOUSING CONSTRUCTION REQUIREMENTS. ALL UNITS TO RECEIVE BLOCKING AS SHOWN IN "CD" SERIES 6. CEILING FIXTURES NOT DIMENSIONED ARE TO BE CENTERED ON ROOM NOTES RCP LEGEND 55 ADA COMBINATION WASHER/DRYER SOFFIT (8'-0" A.F.F) UNIT NAMING LEGEND A1 BASE UNIT A1A UNIT INTERIOR VARIATION A1.1 UNIT EXTERIOR VARIATION A1-HC MOBILITY ACCESSIBLE VARIATION C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:59:01 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A04.13 Author Checker 2234301 UNIT B6 PLANS SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/8" = 1'-0"2 UNIT B6 PLANS BEDROOMS TOTAL # OF UNITS UNIT AREA 2 1143 SF5 BUILDING 27/28 -UNIT SUMMARY x10' -1"13' -6" LIVING ROOM x10' -1"8' -0" DINING ROOM x9' -3"11' -3" BEDROOM 4 x9' -3"11' -3" BEDROOM 3 x9' -3"11' -3" BEDROOM 2 x8' -11"11' -7" BEDROOM 1 x5' -4"8' -10" BATHROOM 1 x5' -4"8' -10" BATHROOM 2 x5' -4"8' -10" BATHROOM 3 x5' -4"8' -10" BATHROOM 4 x16' -0"6' -5" KITCHEN CEILING FAN W/ LIGHT KIT SWITCH FAN SEPARATE FROM LIGHT PENDANT LIGHT FIXTURES TRACK LIGHT VANITY LIGHT TOILET EXHAUST FAN, SIDEWALL MOUNTED IN 2X6 WALLS, MOUNT AT 7'-0" A.F.F. WALL MOUNTED LIGHT ( AT LAUNDRY AND SMALL CLOSETS) RECESSED CAN LIGHT IN FURR DOWN EXTERIOR WALL MOUNT BALCONY LIGHT SURFACE MOUNT FIXTURE UNIT LEGEND 1 HVAC UNIT/WATER HEATER SEE MECHANICAL DWGS 2 WASHER 3 PANTRY CABINET 4 WASHER & DRYER - STACKABLE 5 DISHWASHER 6A 22 CU.FT. REFRIGERATOR 7 RANGE W/ MICROWAVE ABOVE & VENTLESS HOOD 8 DRYER 9A 36" x 60" GARDEN TUB 10 THERMOSTAT CONTROL 11 ELECTRICAL PANEL 12 SOAP DISH 13 SHOWER CURTAIN ROD 14 PEDESTAL SINK 15 FOLDING GRAB BAR 16 MOVEABLE ISLAND W/ COUNTERTOP ON ALUMINIUM CASTERS 17A 36" x 36" 17B 42" x 34" 17C 42" x 42" 17D 60" x 34" 21 SINGLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 22 DOUBLE STAINLESS STEEL KIT. SINK W/ DISPOSAL 23 SINGLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 24 DOUBLE BOWL & OVERFLOW COUNTERTOP - GRANITE UNDERMOUNT 25 TOILET PAPER HOLDER 26 TOWEL BAR (24") 27 MIRROR 28 ELONGATED TOILET 29 SHOWER HEAD 30 SHOWER & TUB FAUCET 31 TUB FAUCET 32 EXHAUST 33 CORNER GRAB BAR 34 DOUBLE OVEN 35 TILE BACKSPLASH 6B 25 CU.FT. REFRIGERATOR 9B 42" x 60" GARDEN TUB 9C 30" x 60" GARDEN TUB F COMPUTER DESK WITH (1) WOOD SHELF ABOVE AND GRANITE COUNTERTOP 17 SHOWER PAN WITH ACRYLIC BASE 18 TILE SHOWER SURROUND, SEE 7/A3-00 19 ROBE HOOK 20 TOWEL RING UNIT SHELVING LEGEND A (1) 12" DEEP SHELF @ WASHER / DRYER B (5) 16" DEEP SHELVES C (5) 12" DEEP SHELVES D DOUBLE HANGING ROD & SHELF E HANGING ROD AND SHELF ACCESSIBILITY LEGEND 41 SINGLE BOWL STAINLESS STEEL SINK, WITH ADA FAUCET, PROVIDE PIPE WRAP BELOW, BASE CABINET TO BE REMOVABLE WITH FLOOR AND WALL FINISH BELOW, BOWL TO BE AT 34" MAX. HIGH A.F.F. 42 34" HIGH WORK SURFACE, MIN. 30" WIDE WITH FLOOR AND WALL FINISH BELOW, MIN. 27" KNEE HEIGHT CLEARANCE 43 SIDE BY SIDE REFRIGERATOR 44 RECIRCULATING EXHAUST HOOD WITH LIGHT, SWITCH FROM WALL ADJACENT TO STOVE 45 ALL IN ONE WASHER/ DRYER 46 ELONGATED ADA TOILET BOWL WITH SEAT HEIGHT AT 18" AND FLUSH VALVE ON OPEN SIDE OF WATER CLOSET 47 FUTURE GRAB BAR - SEE ELEVATIONS FOR SIZES 48 REMOVABLE BASE CABINET AT VANITY, PROVIDE FLOOR AND WALL FINISH BELOW, WRAP ALL PIPES 49 SHOWER HEAD WITH SLIDE BAR AND ADJUSTABLE HEIGHT HEAD 50 LOCATION OF FUTURE BATHING SEAT 51 ADA RANGE WITH CONTROLS ON FRONT OF RANGE 52 CLOSET SHELF AND ROD AT 48" MAX HEIGHT 53 ONE (1) WINDOW SHALL BE ACCESSIBLE W/ OPERABLE PARTS LOACTED AT 48" MAX HEIGHT 54 ADA DISHWASHER UNDER 34" HIGH COUNTER 1. REFER TO SHEET A3-00 FOR UNIT PLAN NOTES 2. ELECTRICAL OUTLETS SHALL NOT BE CUT INTO MIRROR 3. NOTE T INDICATES THERMOSTAT 4. REFER TO SHEET A3-00 FOR STANDARD ARCHWAY DETAIL 5. REFER TO "CD" SERIES FOR FAIR HOUSING CONSTRUCTION REQUIREMENTS. ALL UNITS TO RECEIVE BLOCKING AS SHOWN IN "CD" SERIES 6. CEILING FIXTURES NOT DIMENSIONED ARE TO BE CENTERED ON ROOM NOTES RCP LEGEND 55 ADA COMBINATION WASHER/DRYER SOFFIT (8'-0" A.F.F) UNIT NAMING LEGEND A1 BASE UNIT A1A UNIT INTERIOR VARIATION A1.1 UNIT EXTERIOR VARIATION A1-HC MOBILITY ACCESSIBLE VARIATION 1486.07 SF UNIT CL1 CLOSET MECH W/D REF. 36"X60" TUB 36"X60" TUB 36"X60" TUB 36"X60" TUB CLOSETCLOSET CLOSET DW P. 31 ' - 0 " 49' - 0" 5' - 10 1/2"3' - 9"6' - 9 3/4"6' - 11 1/4"9' - 3"11' - 3 1/4"3' - 6 1/2"1' - 6 3/4" 2' - 0 " 25 ' - 2 " 3' - 1 0 " 9' - 7 1/2"9' - 7 1/2"9' - 7"9' - 10"10' - 4" 49' - 0" 9 1 / 2 " 28 ' - 2 1 / 2 " 2' - 0 " 31 ' - 0 " WO1 020 WO1 040 WO1 040 WO1 040 WO 020 WO 020 WO 020 WO 020 WO1 020 WO1 020 WO1 020 C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:59:04 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A04.14 Author Checker 2234301 UNIT CL1 PLANS SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/8" = 1'-0"2 UNIT CL1 PLANS BEDROOMS TOTAL # OF UNITS UNIT AREA 4 1486 SF10 BUILDING 27/28 -UNIT SUMMARY LEVEL 1 S.F.E. = 721' -8 5/8" LEVEL 2 S.F.E. = 735' -5 5/8" LEVEL 3 S.F.E. = 746' -2 1/4" LEVEL 4 S.F.E. = 756' -10 1/8" LEVEL 5 S.F.E. = 767' -6" TRUSS BEARING S.F.E. = 776' -6 5/8" BASEMENT S.F.E. = 711' -0" BR01 LEVEL 1.1 S.F.E. = 724' -9" CMP01CB01CB01CW01RM01 CTS01CW01CW01CW01CW01CW01CB01RM01CB01RM01CB01RM01MP01RM01BR01CTS01BR01CTS01CMP01 LEVEL 1 S.F.E. = 721' -8 5/8" LEVEL 2 S.F.E. = 735' -5 5/8" LEVEL 3 S.F.E. = 746' -2 1/4" LEVEL 4 S.F.E. = 756' -10 1/8" LEVEL 5 S.F.E. = 767' -6" TRUSS BEARING S.F.E. = 776' -6 5/8" BASEMENT S.F.E. = 711' -0" 1 A06.01 2 A06.01 LEVEL 1.1 S.F.E. = 724' -9" MP01CW01CB01CB01RM01BR01CTS01CMP01RM01CB01RM01CW01CB01RM01CW01CB01RM01CW01CB01RM01CW01CB01RM01BR01BR01CW01RM01BR01RM01CTS01CMP01BR01BR01MP01CB01CMP01 LEVEL 1 S.F.E. = 721' -8 5/8" LEVEL 2 S.F.E. = 735' -5 5/8" LEVEL 3 S.F.E. = 746' -2 1/4" LEVEL 4 S.F.E. = 756' -10 1/8" LEVEL 5 S.F.E. = 767' -6" TRUSS BEARING S.F.E. = 776' -6 5/8" BASEMENT S.F.E. = 711' -0" BR01 LEVEL 1.1 S.F.E. = 724' -9" CB01 RM01 BR02 CB01CTS01RM01CTS01CB01RM01CB01RM01CB01RM01CB01RM01CB01RM01CB01RM01BR01CMP01MP01BR01CTS01CTS01CTS01CLS01CLS01CLS01CLS01CLS01 LEVEL 1 S.F.E. = 721' -8 5/8" LEVEL 2 S.F.E. = 735' -5 5/8" LEVEL 3 S.F.E. = 746' -2 1/4" LEVEL 4 S.F.E. = 756' -10 1/8" LEVEL 5 S.F.E. = 767' -6" TRUSS BEARING S.F.E. = 776' -6 5/8" BASEMENT S.F.E. = 711' -0" 1 A06.01 2 A06.01 LEVEL 1.1 S.F.E. = 724' -9" CB01RM01 BR01CMP01MP01CTS01CW01RM01MP01CB01CW01CB01RM01CW01CB01RM01CW01CLS01BR01CLS01CTS01BR01CB01RM01CW01CB01RM01CW01BR01BR02BR01RP01RP01RP01 BR02 LIGHT BRICK BR01 DARK BRICK MP01 METAL PANEL CMP01 CORRUGATED METAL PANEL CB&B01 CEMENTITIOUS BOARD AND BATTEN CLS01 CEMENTITIOUS LAP SIDING RP01 PICKET RAILING RM01 MESH RAILING CWT01 WOODTONE CEMENTITIOUS PANEL CTST01 CORTEN STEEL RETURN ALL MATERIALS AND COLORS TO INSIDE CORNERS. EXTERIOR MATERIAL LEGEND C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:59:41 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A05.01 Author Checker 2234301 OVERALL ELEVATIONS SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 1/16" = 1'-0"1 OVERALL BUILDING ELEVATION 1 1/16" = 1'-0"2 OVERALL BUILDING ELEVATION 2 1/16" = 1'-0"3 OVERALL BUILDING ELEVATION 3 1/16" = 1'-0"4 OVERALL BUILDING ELEVATION 4 LEVEL 1 S.F.E. = 721' -8 5/8" LEVEL 2 S.F.E. = 735' -5 5/8" LEVEL 3 S.F.E. = 746' -2 1/4" LEVEL 4 S.F.E. = 756' -10 1/8" LEVEL 5 S.F.E. = 767' -6" TRUSS BEARING S.F.E. = 776' -6 5/8" BASEMENT S.F.E. = 711' -0" 9' - 0 5 / 8 " 10 ' - 7 7 / 8 " 10 ' - 7 7 / 8 " 10 ' - 8 5 / 8 " 13 ' - 9 " 10 ' - 8 5 / 8 " 65 ' - 6 5 / 8 " UNITS CORRIDOR PARKING GARAGE UNITS CORRIDOR PARKING GARAGE UNITS CORRIDOR PARKING GARAGE UNITS CORRIDOR PARKING GARAGE UNITS CORRIDOR PARKING GARAGE UNITS CORRIDOR CORRIDOR CORRIDOR CORRIDOR CORRIDOR CO-WORKING SPACE UNITS UNITS UNITS UNITS LEVEL 1 S.F.E. = 721' -8 5/8" LEVEL 2 S.F.E. = 735' -5 5/8" LEVEL 3 S.F.E. = 746' -2 1/4" LEVEL 4 S.F.E. = 756' -10 1/8" LEVEL 5 S.F.E. = 767' -6" TRUSS BEARING S.F.E. = 776' -6 5/8" BASEMENT S.F.E. = 711' -0" 9' - 0 5 / 8 " 10 ' - 7 7 / 8 " 10 ' - 7 7 / 8 " 10 ' - 8 5 / 8 " 13 ' - 9 " 10 ' - 8 5 / 8 " 65 ' - 6 5 / 8 " CORRIDOR CORRIDOR CORRIDOR 2 -STORY PASS THROUGH UNITS UNITS UNITS UNITS UNITS UNITS LEVEL 1 S.F.E. = 721' -8 5/8" LEVEL 2 S.F.E. = 735' -5 5/8" LEVEL 3 S.F.E. = 746' -2 1/4" LEVEL 4 S.F.E. = 756' -10 1/8" LEVEL 5 S.F.E. = 767' -6" TRUSS BEARING S.F.E. = 776' -6 5/8" BASEMENT S.F.E. = 711' -0" 9' - 0 5 / 8 " 10 ' - 7 7 / 8 " 10 ' - 7 7 / 8 " 10 ' - 8 5 / 8 " 10 ' - 8 5 / 8 " 3' - 0 3 / 8 " 10 ' - 8 5 / 8 " 65 ' - 6 5 / 8 " CORRIDOR CORRIDOR CORRIDOR RETAIL SPACE UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS CORRIDOR CORRIDOR CORRIDOR UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS UNITS CORRIDOR CORRIDOR LEASING / AMENITY LEVEL 1.1 S.F.E. = 724' -9" C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:59:47 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A06.01 Author Checker 2234301 OVERALL BUILDING SECTIONS SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 1/16" = 1'-0"1 OVERALL BUILDING SECTION 1 1/16" = 1'-0"2 OVERALL BUILDING SECTION 2 1/16" = 1'-0"3 OVERALL BUILDING SECTION 3 PARKING DECK PARKING DECK CORRIDOR CORRIDOR 10 ' - 8 5 / 8 " . 10 ' - 7 7 / 8 " . 10 ' - 7 7 / 8 " . 9' - 0 1 / 8 " . SE E P L A N S F O R F . F . E . 13 ' - 9 " . CONCRETE SLAB ON GRADE CONCRETE SLAB ON GRADE FCA 6 PO3 001 ROOF SYSTEM PRECAST CONCRETE WALL FCA 2 FCA 2 FCA 2 PARKING DECK PARKING DECK PARKING DECK CORRIDOR CORRIDOR PO3 001 FB1 020 FB1 020 LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 LEVEL -5 TRUSS BEARING 721' -8 5/8" 735' -5 5/8" 746' -2 1/4" 756' -10 1/8" 767' -5 1/2" 776' -5 3/8" PT CONCRETE SLAB, SEE STRUCTURAL DWGS. FCA 7 PO3 001 FB1 020 CORRIDOR TYPE IA CONSTRUCTION TYPE IIIA CONSTRUCTION LEVEL 1 LEVEL 3 UNITS / AMENITY CONCRETE SLAB ON GRADE -REFER TO STRUCTURAL LEVEL 5 9' - 0 1 / 8 " 10 ' - 7 7 / 8 " 10 ' - 7 7 / 8 " 10 ' - 8 5 / 8 " SE E P L A N S F O R F F E 13 ' - 9 " . LEVEL 4 FCA 7 TRUSS BEARING FCA 6 FCA 6 UNITUNIT UNITUNIT UNITUNIT WB1 070 721' -8 5/8" FCA 1FCA 1 LEVEL 2 UNITUNIT PT CONCRETE SLAB, SEE STRUCTURAL DWGS. UNIT 735' -8 1/4" 746' -2 1/4" 756' -10 1/8" 767' -5 1/4" 776' -5 3/8" WB1 021 F.F.E. -BASEMENT F.F E. -LEVEL 1 F.FE. -LEVEL 2 F.F.E. -LEVEL 3 TRUSS BEARING CORRIDOR F.FE. -LEVEL 4 FCA 2 CORRIDOR UNIT UNIT CORRIDOR UNIT CORRIDOR UNIT CORRIDOR FCA 5FCA 5 WB1 021 FCA 2FCA 1 UNIT CORRIDOR FCA 2FCA 1 FCA 2FCA 1 WB1 021 UNITCORRIDOR UNITCORRIDOR UNITCORRIDOR FCA 5 FCA 5 WB1 021 FCA 2 FCA 1 UNITCORRIDOR FCA 2 FCA 1 FCA 2 FCA 1 FCA 2 FCA 1 SEE PLANS 5' - 6" SEE PLANS 6' - 0". TRUSS HANGER/TIE DOWN COMPONENT - REFER TO STRUCTURAL TRUSS HANGER/TIE DOWN COMPONENT - REFER TO STRUCTURAL F.FE. -LEVEL 5 UNIT CORRIDOR FCA 2FCA 1 UNITCORRIDOR FCA 2 FCA 1 721' -8 5/8" 735' -5 5/8" 746' -2 1/4" 756' -10 1/8" 767' -5 1/4" 776' -5 3/8" 711' -0" SEE PLANS FOR F.F.E. 10 ' - 8 5 / 8 " . SEE PLANS FOR F.F.E. 13 ' - 9 " . 10 ' - 8 5 / 8 " . 10 ' - 7 7 / 8 " . 10 ' - 7 7 / 8 " . 9' - 0 1 / 8 " . 3" AERATED AUTOCLAVED CONCRETE FIREWALL (3 HR.) PLACE TRUSS ON TOP OF STUD WALL 60 MIL TPO SINGLE PLY ROOF MEMBRANE UNITUNIT UNITUNIT UNITUNIT UNITUNIT UNIT FCA 1FCA 1 PB3 070 2" AIRSPACE 2" AIRSPACE PER 2018 NCBC, SECTION 706.6, EXCEPTION 4, THE FIREWALL IS PERMITTED TO TERMINATE AT THE UNDERSIDE OF COMBUSTIBLE ROOF SHEATHING OR DECKS. PB3 070 FILL CAVITY BETWEEN FLOORS AND AND ATTIC WITH INSULATION. FILL ALL VOIDS. PROVIDE NETTING @ EVERY OTHER TRUSS FOR INSTALLATION NOTE 1 FCA 15 INSTALL FIRE RETARDANT TREATED ROOF SHEATHING OVER FIREWALL, EXTEND FRT ROOF SHEATHING 4'-0" ON EACH SIDE OF FIREWALL, NO PENETRATIONS PERMITTED IN FRT SHEATHING. CLASS 'B' ROOFING REQUIRED, REFER TO DETAIL 2/A6-31 FCA 1FCA 1 FCA 1FCA 1 721' -8 5/8" LEVEL 1 LEVEL 2 735' -5 5/8" LEVEL 3 746' -2 1/4" LEVEL 4 756' -10 1/8" LEVEL 5 767' -5 1/4" TRUSS BEARING 776' -5 3/8" SEE PLANS FOR F.F.E. 13 ' - 9 " . 10 ' - 8 5 / 8 " . 10 ' - 7 7 / 8 " . 10 ' - 7 7 / 8 " . 9' - 0 1 / 8 " . C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12 / 1 9 / 2 0 2 2 4 : 0 9 : 1 5 P M C : \ U s e r s \ e l y t t l e \ D o c u m e n t s \ R e v i t \ C a m p N o r t h E n d _ B L D G 4 0 0 0 _ 2 0 2 2 _ e l y t t l e 3 C Q M P . r v t A06.10 Author Checker 2234301 TYPICAL WALL SECTIONS SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 1" = 1'-0"2 TYPICAL PARKING DECK BLDG SECTION 1" = 1'-0"1 TENANT SEPARATION WALL OVER PODIUM 1" = 1'-0"3 1 HOUR CORRIDOR / TENANT - PARALLEL TRUSS (UL # U305) THROUGH FOUNDATION WALL 1" = 1'-0"4 TYPICAL 3-HOUR RATED AAC FIRE WALL - TYP LEVEL 1 LEVEL 3 CONCRETE SLAB ON GRADE -REFER TO STRUCTURAL LEVEL 5 9' - 0 1 / 8 " 10 ' - 7 7 / 8 " 10 ' - 7 7 / 8 " 10 ' - 8 5 / 8 " SE E P L A N S F O R F . F . E . 13 ' - 9 " . LEVEL 4 TRUSS BEARING FCA 6 FCA 6 FCA 1FCA 1 UNITUNIT WB1 070 FCA 1FCA 1 LEVEL 2 UNITUNIT UNITUNIT UNITUNIT UNITUNIT 721' -8 5/8" 735' -8 1/4" 746' -2 1/4" 756' -10 1/8" 767' -5 1/4" 776' -5 3/8" UNITCORRIDOR FCA 2 FCA 1 LEVEL 2 LEVEL 4 LEVEL 5 TRUSS BEARING LEVEL 1 UNITCORRIDOR UNITCORRIDOR UNITCORRIDOR SEE PLANS FOR F.F.E. 13' - 9". 10' - 8 5/8" 10' - 7 7/8" 10' - 7 7/8" 9' - 0 1/8". CONCRETE SLAB ON GRADE -REFER TO STRUCTURAL FCA 6 WB1 021 LEVEL 3 TYPE IIIA CONSTRUCTION UNITCORRIDOR 721' -8 5/8" 735' -8 1/4" 746' -2 1/4" 756' -10 1/8" 767' -5 1/4" 776' -5 3/8" UNIT STAIR UNIT STAIR UNIT STAIR UNIT STAIR ROOF SYSTEM SEE PLANS FOR F.F.E. 13' - 9". 10' - 8 5/8". 10' - 7 7/8". 10' - 7 7/8". 9' - 0 1/8". LEVEL 1 LEVEL 2 LEVEL 3 LEVEL 4 LEVEL 5 UNIT STAIR CONCRETE SLAB ON GRADE 8" CMU MB2 002 FCA 1 MB2 002 FCA 1 FCA 6 FCA 1 FCA 1 FCA 6 FCA 3 FCA 3 FCA 3 FCA 3 TRUSS BEARING 721' -8 5/8" 735' -8 1/4" 746' -2 1/4" 756' -10 1/8" 767' -5 1/4" 776' -5 3/8" 3" AERATED AUTOCLAVED CONCRETE FIREWALL (3 HR.) PLACE TRUSS ON TOP OF STUD WALL 60 MIL TPO SINGLE PLY ROOF MEMBRANE UNITUNIT UNITUNIT UNITUNIT UNITUNIT UNIT FCA 1FCA 1 PB3 070 2" AIRSPACE 2" AIRSPACE PER 2018 NCBC, SECTION 706.6, EXCEPTION 4, THE FIREWALL IS PERMITTED TO TERMINATE AT THE UNDERSIDE OF COMBUSTIBLE ROOF SHEATHING OR DECKS. PB3 070 FILL CAVITY BETWEEN FLOORS AND AND ATTIC WITH INSULATION. FILL ALL VOIDS. PROVIDE NETTING @ EVERY OTHER TRUSS FOR INSTALLATION NOTE 1 FCA 15 INSTALL FIRE RETARDANT TREATED ROOF SHEATHING OVER FIREWALL, EXTEND FRT ROOF SHEATHING 4'-0" ON EACH SIDE OF FIREWALL, NO PENETRATIONS PERMITTED IN FRT SHEATHING. CLASS 'B' ROOFING REQUIRED, REFER TO DETAIL 2/A6-31 FCA 1FCA 1 FCA 1FCA 1 CORRIDOR FCA 2 721' -8 5/8" 711' -0" LEVEL 1 BASEMENT LEVEL 2 735' -5 5/8" LEVEL 3 746' -2 1/4" LEVEL 4 756' -10 1/8" LEVEL 5 767' -5 1/4" TRUSS BEARING 776' -5 3/8" SEE PLANS FOR F.F.E. 10 ' - 8 5 / 8 " . SEE PLANS FOR F.F.E. 13 ' - 9 " . 10 ' - 8 5 / 8 " . 10 ' - 7 7 / 8 " . 10 ' - 7 7 / 8 " . 9' - 0 1 / 8 " . C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 4:09:17 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A06.11 Author Checker 2234301 TYPICAL WALL SECTIONS SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 1" = 1'-0"1 TENANT SEPARATION WALL 1" = 1'-0"2 CORRIDOR & UNIT SEPARATION 1" = 1'-0"3 TYPICAL 2 HOUR STAIR & LANDING 1" = 1'-0"4 TYPICAL 3-HOUR RATED AAC FIRE WALL 9 21 MAINT. PARKING COUNT LEVEL B 45 LEVEL 1 98 LEVEL 2 106 LEVEL 3 106 LEVEL 4 106 LEVEL 5 103 TOTAL 564 PARKING REQUIRED MF ZONING -1/ UNIT = 324 SPACES MF OWNER -1/BEDROOM = 435 RETAIL 1/250 SF = 42 SPACES CO WORKIN 1/500 SF = 10 SPACES TOTAL REQUIRED = 487 SPACES 15 UP 714'-3" ELEV 1 STAIR B ELEV 2ELEV LOBBY 45 PARKS 1 A06.01 42 ' - 8 " 36 ' - 1 0 " 42 ' - 8 " 9' - 2 " 9' - 1 0 1 / 2 " 79 ' - 6 " 42 ' - 8 " 10' - 4"8' - 0"8' - 3"73' - 6 51/64" 10 4 ' - 2 1 / 2 " 27 ' - 1 0 " 13 2 ' - 0 1 / 2 " 42' - 8"177' - 0" 254' - 2 1/8" 235' - 5"8' - 3"10' - 6 1/8" 100' - 1 3/4" 12 2 ' - 2 " C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:59:55 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A13.00 Author Checker 2234301 OVERALL PARKING DECK PLAN - BASEMENT LEVEL SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/32" = 1'-0"1 OVERALL PARKING DECK PLAN - BASEMENT LEVEL 9 19 19 4 25 22 DNUP TRASH STAIR C ELEV 1 STAIR B ELEV 2ELEV LOBBY 98 PARKS 1 A06.01 3/4" / 12" 3/4" / 12" 27 ' - 1 0 " 88 ' - 2 " 16 ' - 2 1 / 4 " 9' - 0 1 / 4 " 9' - 1 0 1 / 2 " 42 ' - 8 " 36 ' - 1 0 " 42 ' - 8 " 9' - 1 0 1 / 2 " 79 ' - 6 " 42 ' - 8 " 10' - 4"8' - 0"8' - 3"225' - 5"10' - 4" 235' - 5"8' - 3" 262' - 4" 13 2 ' - 2 1 / 4 " 10 4 ' - 2 1 / 2 " 27 ' - 1 0 " 13 2 ' - 0 1 / 2 " 262' - 4 1/256" 42' - 8"177' - 0"42' - 8" C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:59:57 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A13.01 Author Checker 2234301 OVERALL PARKING DECK PLAN -LEVEL 1 SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/32" = 1'-0"1 OVERALL PARKING DECK PLAN - LEVEL 1 99 19 19 25 25 TRASH STAIR C ELEV 1 STAIR B ELEV 2ELEV LOBBY 106 PARKS 177' - 0" 79 ' - 6 " 42 ' - 8 " 1 A06.01 DNUP 3/4" / 12" 3/4" / 12" 27 ' - 1 0 " 91 ' - 0 " 13 ' - 2 1 / 2 " 9' - 2 " 9' - 1 0 1 / 2 " 42 ' - 8 " 36 ' - 1 0 " 42 ' - 8 " 9' - 1 0 1 / 2 " 79 ' - 6 " 42 ' - 8 " 10' - 4"8' - 0"8' - 3"225' - 5"10' - 4" 235' - 5"8' - 3"9' - 0 7/8"9' - 7 1/8" 262' - 4" 13 2 ' - 0 1 / 2 " 10 4 ' - 2 1 / 2 " 27 ' - 1 0 " 13 2 ' - 0 1 / 2 " 262' - 4 1/256" 42' - 8"177' - 0"42' - 8" C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:59:58 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A13.02 Author Checker 2234301 OVERALL PARKING DECK PLAN -LEVEL 2 SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/32" = 1'-0"1 OVERALL PARKING DECK PLAN - LEVEL 2 99 19 19 25 25 TRASH STAIR C ELEV 1 STAIR B ELEV 2ELEV LOBBY 106 PARKS 10' - 4" 27 ' - 1 0 " 91 ' - 0 " 177' - 0" 79 ' - 6 " 42 ' - 8 " 1 A06.01 DNUP 3/4" / 12" 3/4" / 12" 27 ' - 1 0 " 91 ' - 0 " 13 ' - 2 1 / 2 " 9' - 2 " 9' - 1 0 1 / 2 " 42 ' - 8 " 36 ' - 1 0 " 42 ' - 8 " 9' - 1 0 1 / 2 " 79 ' - 6 " 42 ' - 8 " 10' - 4"8' - 0"8' - 3" 235' - 5"8' - 3"9' - 0 7/8"9' - 7 1/8" 262' - 4" 13 2 ' - 0 1 / 2 " 10 4 ' - 2 1 / 2 " 27 ' - 1 0 " 13 2 ' - 0 1 / 2 " 262' - 4 1/256" 42' - 8"177' - 0"42' - 8" C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 3:59:59 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A13.03 Author Checker 2234301 OVERALL PARKING DECK PLAN -LEVEL 3 SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/32" = 1'-0"1 OVERALL PARKING DECK PLAN - LEVEL 3 99 19 19 25 25 TRASH STAIR C ELEV 1 STAIR B ELEV 2ELEV LOBBY 106 PARKS 1 A06.01 DNUP 3/4" / 12" 3/4" / 12" 27 ' - 1 0 " 91 ' - 0 " 13 ' - 2 1 / 2 " 9' - 2 " 9' - 1 0 1 / 2 " 42 ' - 8 " 36 ' - 1 0 " 42 ' - 8 " 9' - 1 0 1 / 2 " 79 ' - 6 " 42 ' - 8 " 10' - 4"8' - 0"8' - 3"225' - 5"10' - 4" 235' - 5"8' - 3"9' - 0 7/8"9' - 7 1/8" 262' - 4" 13 2 ' - 0 1 / 2 " 10 4 ' - 2 1 / 2 " 27 ' - 1 0 " 13 2 ' - 0 1 / 2 " 262' - 4 1/256" 42' - 8"177' - 0"42' - 8" C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 4:00:01 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A13.04 Author Checker 2234301 OVERALL PARKING DECK PLAN -LEVEL 4 SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/32" = 1'-0"1 OVERALL PARKING DECK PLAN - LEVEL 4 TRASH 99 19 19 25 25 STAIR C ELEV 1 STAIR B ELEV 2 ELEV LOBBY ELEV LOBBY 27 ' - 1 0 " 91 ' - 0 " 13 ' - 2 1 / 2 " 9' - 2 " 9' - 1 0 1 / 2 " 42 ' - 8 " 36 ' - 1 0 " 42 ' - 8 " 106 PARKS 9' - 1 0 1 / 2 " 79 ' - 6 " 42 ' - 8 " 1 A06.01 3/4" / 12" DN 10' - 4"8' - 0"8' - 3"225' - 5"10' - 4" 235' - 5"8' - 3"9' - 0 7/8"9' - 7 1/8" 262' - 4" 13 2 ' - 0 1 / 2 " 10 4 ' - 2 1 / 2 " 27 ' - 1 0 " 13 2 ' - 0 1 / 2 " 262' - 4 1/256" 42' - 8"177' - 0"42' - 8" C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 12/19/2022 4:00:02 PM C:\Users\elyttle\Documents\Revit\Camp North End_BLDG 4000_2022_elyttle3CQMP.rvt A13.05 Author Checker 2234301 OVERALL PARKING DECK PLAN -LEVEL 5 SCHEMATIC DESIGN 2022 12-19 SCHEMATIC DESIGN X CA M P N O R T H E N D BU I L D I N G 2 7 / 2 8 CH A R L O T T E , N C 2 8 2 0 6 DATE DESCRIPTION REV 3/32" = 1'-0"1 OVERALL PARKING DECK PLAN - LEVEL 5 E7-01 QC WLP ELECTRICAL RISER DIAGRAM NONE1ELECTRICAL RISER DIAGRAM 1 OF 5 - BUILDING 1000 C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVEPROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BEREPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT ASREQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USEDFOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN ANDARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTENCONSENT OF DWELL DESIGN STUDIO.SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINALDRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAILATLANTA, GA 30350PHONE: 770.864.1035dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 8/ 2 7 / 2 0 2 0 1 0 : 1 6 : 2 5 A M C a m p N o r t h E n d _ S D _ 2 0 2 0 _ 0 8 - 2 6 b a c k g r o u n d _ d e t a c h e d . r v t 2034301 2022-12-19 SCHEMATIC DESIGN PACKAGE X CA M P N O R T H E N D DATE DESCRIPTION REV 500 Sugar Mill RoadBuilding A, Suite 105Atlanta, GA 30350Telephone: 770.650.9061Fax: 770.642.2410PGE # 220044NC CERTIFICATION # C-2592 Phillips Gradick Engineering, P.C. MU L T I - F A M I L Y B U I L D I N G S E7-02 QC WLP ELECTRICAL RISER DIAGRAM NONE1ELECTRICAL RISER DIAGRAM 1 OF 3 - BUILDING 2000 C d w e l l d e s i g n s t u d i o - A L L R I G H T S R E S E R V E D DRAWN BY CHECKED BY JOB NUMBER: SHEET NAME: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVEPROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BEREPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT ASREQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USEDFOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN ANDARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTENCONSENT OF DWELL DESIGN STUDIO.SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINALDRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x 42 INCHES. DISCLAIMER: SEAL: ISSUE 1280 HIGHTOWER TRAILATLANTA, GA 30350PHONE: 770.864.1035dwelldesignstudio.com A DEVELOPMENT FOR: REVISION DATE DESCRIPTION INCLUDED 8/ 2 7 / 2 0 2 0 1 0 : 1 6 : 2 5 A M C a m p N o r t h E n d _ S D _ 2 0 2 0 _ 0 8 - 2 6 b a c k g r o u n d _ d e t a c h e d . r v t 2034301 2022-12-19 SCHEMATIC DESIGN PACKAGE X CA M P N O R T H E N D DATE DESCRIPTION REV 500 Sugar Mill RoadBuilding A, Suite 105Atlanta, GA 30350Telephone: 770.650.9061Fax: 770.642.2410PGE # 220044NC CERTIFICATION # C-2592 Phillips Gradick Engineering, P.C. MU L T I - F A M I L Y B U I L D I N G S Appendix B Preliminary Construction Schedule ID Task Name Start Finish 1 Camp North Moniker One Level Podium (31 Month Total Duration) Mon 2/12/24 Thu 3/25/27 2 Dwell MF Design & Permitting Mon 2/12/24 Fri 10/25/24 3 Redesign to Add Podium Level Mon 2/12/24 Fri 5/24/24 4 First Round Plan Review Meck County Mon 6/3/24 Thu 8/1/24 5 Design Team Addressed Comments for 2nd Round Submission Fri 8/2/24 Wed 8/14/24 6 Second Round Plan Review Meck County Mon 9/2/24 Wed 10/16/24 7 Building Permit Issued Wed 10/16/24 Wed 10/16/24 8 GMP Drawings Complete Mon 6/10/24 Mon 6/10/24 9 Final IFC Drawings Issued Fri 10/25/24 Fri 10/25/24 10 Preconstruction Mon 6/10/24 Thu 9/19/24 11 GMP Pricing Mon 6/10/24 Fri 7/19/24 12 Award & Execute GMP Fri 7/26/24 Fri 7/26/24 13 Buyout & Submittals Fri 7/26/24 Thu 9/19/24 14 Demolition Wed 5/1/24 Tue 10/1/24 15 Start Demo & Sitework Wed 5/1/24 Wed 5/1/24 16 Disconnect Utilities & Temp Walls Wed 5/1/24 Tue 6/11/24 17 Hercules N Abatement Wed 5/15/24 Tue 6/18/24 18 Hercules S Abatement Wed 6/19/24 Tue 7/23/24 19 Demo Storage Building Wed 5/29/24 Tue 6/18/24 20 Demo Hercules N Above SOG Wed 6/19/24 Tue 7/23/24 21 Demo Hercules S Above SOG Wed 7/24/24 Tue 8/27/24 22 Demo Hercules N SOG Wed 7/24/24 Tue 8/27/24 23 Demo Hercules S SOG Wed 8/28/24 Tue 10/1/24 24 Demo Complete Tue 10/1/24 Tue 10/1/24 25 Sitework Wed 5/1/24 Tue 1/21/25 26 Mobilization Wed 5/1/24 Tue 5/14/24 27 Phase I Erosion Control & Storm Drain Wed 5/15/24 Tue 6/4/24 28 Site Demo Moniker Pad Wed 6/5/24 Tue 6/25/24 29 Site Demo & Erosion Control Storage Building Wed 6/26/24 Tue 7/16/24 30 Relocate Fire & Domestic Water Lines for Demo Wed 6/5/24 Tue 7/2/24 31 Mass Grading Basement Excavation Building A Wed 8/28/24 Tue 9/10/24 32 Aggregate Piers Building A Basement Wed 9/11/24 Tue 9/17/24 33 Mass Grading Parking Deck & Remaining Pad Building A Wed 9/11/24 Tue 9/24/24 34 Aggregate Piers Parking Deck Wed 9/25/24 Tue 10/1/24 35 Mass Grading Building Pad B Wed 9/25/24 Tue 10/8/24 36 Aggregate Piers Building B Wed 10/9/24 Fri 10/18/24 37 Storm Drain Install Along Woodward Ave Wed 9/25/24 Tue 10/22/24 38 Install Remaining Site Utilities Wed 10/16/24 Tue 11/26/24 39 Install Remaining Storm Drain Wed 10/23/24 Tue 11/19/24 40 Grading for Parados Way Wed 11/27/24 Tue 12/10/24 41 Site Conduit Rough In Parados Way Wed 12/11/24 Tue 12/24/24 42 Perimeter C&G, Stone/Binder Parados Way Wed 12/25/24 Tue 1/21/25 43 Building Pads & Road Bed Complete Tue 1/21/25 Tue 1/21/25 44 Roof Drain Piping, Fine Grading, Sidewalks & Landscaping Wed 8/12/26 Tue 2/16/27 45 Install Roof Drain Piping Wed 8/12/26 Tue 9/8/26 46 Fine Grade for Sidewalks Wed 9/2/26 Tue 9/22/26 47 Form & Pour Sidewalks Wed 9/16/26 Tue 10/20/26 48 Backfill Sidewalks & Fine Grading Wed 10/14/26 Tue 10/27/26 49 Irrigation Install Wed 10/28/26 Tue 11/17/26 50 Landscaping Starts Tue 11/17/26 Tue 11/17/26 51 Landscaping/Hardscapes (Trees & Bushes Only Perennials Planted Spring/Summer 2027)Wed 11/18/26 Tue 12/22/26 52 Final Setup, Paving and Striping Wed 12/23/26 Tue 1/5/27 53 Fix Damaged Curb & Asphalt (CNE Allowance) Wed 1/6/27 Tue 1/12/27 54 Pressure Washing Site Wed 1/13/27 Tue 1/26/27 55 Zoning, Utility, & Urban Forestry Final Inspections Wed 1/27/27 Tue 2/16/27 56 Courtyard Mon 3/9/26 Wed 1/13/27 57 Rough Grading & Storm Drain Mon 3/9/26 Fri 3/27/26 58 Amenity/Pool House Building Construction Mon 3/30/26 Fri 7/3/26 59 Pool Installation Mon 5/18/26 Fri 7/17/26 60 Final Pool Connections Mon 7/20/26 Fri 7/24/26 61 Grading for Site Concrete Wed 7/22/26 Tue 8/11/26 62 Courtyard Site Concrete & Underdrainage Wed 8/12/26 Tue 10/13/26 63 Misc. Steel Installation Wed 10/7/26 Tue 10/27/26 64 Fine Grading Wed 10/28/26 Tue 11/10/26 65 Irrigation Installation & Lighting Wed 11/11/26 Tue 11/24/26 66 Landscaping (Trees & Bushes Only Perennials Planted Spring/Summer 2027)Wed 11/25/26 Tue 12/22/26 67 Final Cleaning Wed 12/23/26 Thu 12/31/26 68 Installation of Site Furnishings Fri 1/1/27 Mon 1/11/27 69 Installation of Owner FF&E Thu 1/7/27 Wed 1/13/27 70 Foundation, CIP Walls, Slab On Grade, & Podium Fri 9/13/24 Tue 9/17/24 71 Mobilization, Rebar Delivery & Layout Fri 9/13/24 Tue 9/17/24 72 Building Foundations, CIP Walls, & SOG Building A Basement Wed 9/18/24 Fri 11/29/24 73 Building Foundations Building A Basement Wed 9/18/24 Tue 10/8/24 74 CIP Walls Building A Basement Wed 9/25/24 Tue 11/5/24 75 Waterproofing and Backfill CIP Walls Wed 11/6/24 Fri 11/15/24 76 Under slab Plumbing & Electrical Rough In Thu 11/7/24 Fri 11/15/24 77 SOG Prep & Pour Mon 11/18/24 Fri 11/29/24 78 Basement Podium Mon 12/2/24 Mon 1/6/25 79 Shoring Mon 12/2/24 Tue 12/10/24 80 Framer Pop Out Walls Wed 12/11/24 Wed 12/11/24 81 MEP Sleeves Thu 12/12/24 Fri 12/13/24 82 Reinforcing, Sleeves, & Inspections Mon 12/16/24 Mon 12/23/24 83 Pour Tue 12/24/24 Tue 12/24/24 84 Cure & Stress & Reports Wed 12/25/24 Tue 12/31/24 85 Strip Forms Wed 1/1/25 Mon 1/6/25 86 Parking Deck Foundations, CIP Walls & SOG Tue 10/29/24 Thu 1/9/25 Dwell Meck County Dwell Meck County 10/16 6/10 10/25 Delco 7/26 Delco/Dwell 5/1 10/1 1/21 11/17 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Critical Critical Split Progress Manual Progress Camp North End Moniker One Level Podium Page 1 Project: Original Schedule Date: Fri 4/19/24 ID Task Name Start Finish 87 Parking Deck Foundations Tue 10/29/24 Mon 12/2/24 88 Parking Deck CIP Walls Tue 11/12/24 Mon 12/30/24 89 Waterproofing and Backfill CIP Walls Tue 12/31/24 Thu 1/9/25 90 Foundations, CIP Walls, & Columns (7) Areas Mon 10/21/24 Fri 3/14/25 91 Area 1 Foundations, CIP Walls, & Columns Mon 10/21/24 Fri 11/8/24 92 Area 2 Foundations, CIP Walls, & Columns Mon 11/11/24 Fri 11/29/24 93 Area 3 Foundations, CIP Walls, & Columns Mon 12/2/24 Fri 12/20/24 94 Area 4 Foundations, CIP Walls, & Columns Mon 12/23/24 Fri 1/10/25 95 Area 5 Foundations, CIP Walls, & Columns Mon 1/13/25 Fri 1/31/25 96 Area 6 Foundations, CIP Walls, & Columns Mon 2/3/25 Fri 2/21/25 97 Area 7 Foundations, CIP Walls, & Columns Mon 2/24/25 Fri 3/14/25 98 SOG (7) Areas Mon 11/11/24 Mon 3/31/25 99 Area 1 Under slab Rough In SOG Prep & Pour Mon 11/11/24 Mon 11/25/24 100 Area 2 Under slab Rough In SOG Prep & Pour Mon 12/2/24 Mon 12/16/24 101 Area 3 Under slab Rough In SOG Prep & Pour Mon 12/23/24 Mon 1/6/25 102 Area 4 Under slab Rough In SOG Prep & Pour Mon 1/13/25 Mon 1/27/25 103 Area 5 Under slab Rough In SOG Prep & Pour Mon 2/3/25 Mon 2/17/25 104 Area 6 Under slab Rough In SOG Prep & Pour Mon 2/24/25 Mon 3/10/25 105 Area 7 Under slab Rough In SOG Prep & Pour Mon 3/17/25 Mon 3/31/25 106 Podium Prep & Pour Seven (7) Areas Tue 11/26/24 Tue 5/13/25 107 Podium Pour #1 Tue 11/26/24 Tue 5/13/25 108 Shoring Tue 11/26/24 Mon 12/9/24 109 Framer Pop Out Walls Tue 12/10/24 Wed 12/11/24 110 MEP Sleeves Thu 12/12/24 Mon 12/16/24 111 Reinforcing, Sleeves, & Inspections Tue 12/17/24 Tue 12/24/24 112 Pour Wed 12/25/24 Wed 12/25/24 113 Cure & Stress & Reports Thu 12/26/24 Wed 1/1/25 114 Strip Forms Thu 1/2/25 Tue 1/7/25 115 Podium Pour #2 Tue 12/17/24 Tue 1/28/25 116 Shoring Tue 12/17/24 Mon 12/30/24 117 Framer Pop Out Walls Tue 12/31/24 Wed 1/1/25 118 MEP Sleeves Thu 1/2/25 Mon 1/6/25 119 Reinforcing, Embeds, & Inspections Tue 1/7/25 Tue 1/14/25 120 Pour Wed 1/15/25 Wed 1/15/25 121 Cure & Stress Thu 1/16/25 Wed 1/22/25 122 Strip Forms Thu 1/23/25 Tue 1/28/25 123 Podium Pour #3 Tue 1/7/25 Tue 2/18/25 124 Shoring Tue 1/7/25 Mon 1/20/25 125 Framer Pop Out Walls Tue 1/21/25 Wed 1/22/25 126 MEP Sleeves Thu 1/23/25 Mon 1/27/25 127 Reinforcing, Sleeves, & Inspections Tue 1/28/25 Tue 2/4/25 128 Pour Wed 2/5/25 Wed 2/5/25 129 Cure & Stress & Reports Thu 2/6/25 Wed 2/12/25 130 Strip Forms Thu 2/13/25 Tue 2/18/25 131 Podium Pour 4 Tue 1/28/25 Tue 3/11/25 132 Shoring Tue 1/28/25 Mon 2/10/25 133 Framer Pop Out Walls Tue 2/11/25 Wed 2/12/25 134 MEP Sleeves Thu 2/13/25 Mon 2/17/25 135 Reinforcing, Sleeves, & Inspections Tue 2/18/25 Tue 2/25/25 136 Pour Wed 2/26/25 Wed 2/26/25 137 Cure & Stress & Reports Thu 2/27/25 Wed 3/5/25 138 Strip Forms Thu 3/6/25 Tue 3/11/25 139 Podium Pour #5 Tue 2/18/25 Tue 4/1/25 140 Shoring Tue 2/18/25 Mon 3/3/25 141 Framer Pop Out Walls Tue 3/4/25 Wed 3/5/25 142 MEP Sleeves Thu 3/6/25 Mon 3/10/25 143 Reinforcing, Sleeves, & Inspections Tue 3/11/25 Tue 3/18/25 144 Pour Wed 3/19/25 Wed 3/19/25 145 Cure & Stress & Reports Thu 3/20/25 Wed 3/26/25 146 Strip Forms Thu 3/27/25 Tue 4/1/25 147 Podium Pour #6 Tue 3/11/25 Tue 4/22/25 148 Shoring Tue 3/11/25 Mon 3/24/25 149 Framer Pop Out Walls Tue 3/25/25 Wed 3/26/25 150 MEP Sleeves Thu 3/27/25 Mon 3/31/25 151 Reinforcing, Sleeves, & Inspections Tue 4/1/25 Tue 4/8/25 152 Pour Wed 4/9/25 Wed 4/9/25 153 Cure & Stress & Reports Thu 4/10/25 Wed 4/16/25 154 Strip Forms Thu 4/17/25 Tue 4/22/25 155 Podium Pour #7 Tue 4/1/25 Tue 5/13/25 156 Shoring Tue 4/1/25 Mon 4/14/25 157 Framer Pop Out Walls Tue 4/15/25 Wed 4/16/25 158 MEP Sleeves Thu 4/17/25 Mon 4/21/25 159 Reinforcing, Sleeves, & Inspections Tue 4/22/25 Tue 4/29/25 160 Pour Wed 4/30/25 Wed 4/30/25 161 Cure & Stress & Reports Thu 5/1/25 Wed 5/7/25 162 Strip Forms Thu 5/8/25 Tue 5/13/25 163 Parking Deck Erection Fri 1/10/25 Mon 7/21/25 164 Erect Parking Deck Fri 1/10/25 Thu 4/10/25 165 Under Slab Rough In Basement Level Fri 4/11/25 Mon 4/21/25 166 SOG Prep & Pour Basement Level Tue 4/22/25 Mon 5/12/25 167 Pour Backs Tue 5/13/25 Mon 6/2/25 168 Parking Deck Rough In, Fixtures, & Standpipes Tue 6/3/25 Mon 7/21/25 169 TPO Roofing at Stair & Elevator Towers Tue 6/3/25 Thu 6/12/25 170 Misc., Steel & Rails Tue 6/3/25 Mon 6/30/25 171 Frames, Doors, & Hardware Tue 7/1/25 Mon 7/14/25 172 CMU Towers & Shafts Wed 1/1/25 Tue 3/11/25 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Critical Critical Split Progress Manual Progress Camp North End Moniker One Level Podium Page 2 Project: Original Schedule Date: Fri 4/19/24 ID Task Name Start Finish 173 Lay Stair Tower A Building A Basement Wed 1/1/25 Tue 1/21/25 174 Lay Stair Tower E & Elevator Shaft 3 Building B Wed 1/29/25 Tue 2/25/25 175 Lay Stair Tower D Building B Wed 2/19/25 Tue 3/11/25 176 Structural Steel Wed 4/30/25 Thu 5/22/25 177 Erect Structural Steel Buildings A & B Under Podium Wed 4/30/25 Tue 5/20/25 178 Fire Proofing Steel Buildings A & B Under Podium Wed 5/14/25 Thu 5/22/25 179 Metal Stud Framing Under Podium First Floor Fri 5/23/25 Thu 6/26/25 180 Metal Stud Framing Under Podium Areas Fri 5/23/25 Thu 6/26/25 181 Wood Framing Wed 4/23/25 Thu 3/25/27 182 Second Floor Framing Wed 4/23/25 Tue 6/10/25 183 Pop-out Walls Wed 4/23/25 Fri 4/25/25 184 Second Floor Walls Mon 4/28/25 Wed 5/21/25 185 2nd Floor Trusses & Decking Fri 5/9/25 Tue 6/3/25 186 2nd Floor CLP & Simpson Ties Wed 6/4/25 Tue 6/10/25 187 Third Floor Framing Tue 5/27/25 Wed 7/9/25 188 Pop-out Walls Tue 5/27/25 Thu 5/29/25 189 Third Floor Walls Tue 5/27/25 Thu 6/19/25 190 3rd Floor Trusses & Decking Mon 6/9/25 Wed 7/2/25 191 3rd Floor CLP & Simpson Ties Thu 7/3/25 Wed 7/9/25 192 Fourth Floor Framing Tue 6/24/25 Wed 8/6/25 193 Pop-out Walls Tue 6/24/25 Thu 6/26/25 194 Fourth Floor Walls Tue 6/24/25 Thu 7/17/25 195 4th Floor Trusses & Decking Mon 7/7/25 Wed 7/30/25 196 4th Floor CLP & Simpson Ties Thu 7/31/25 Wed 8/6/25 197 Fifth Floor Framing Tue 7/22/25 Wed 9/3/25 198 Pop-out Walls Tue 7/22/25 Thu 7/24/25 199 Fifth Floor Walls Tue 7/22/25 Thu 8/14/25 200 5th Floor Trusses & Decking Mon 8/4/25 Wed 8/27/25 201 5th Floor CLP & Simpson Ties Thu 8/28/25 Wed 9/3/25 202 Sixth Floor Framing Tue 8/19/25 Wed 11/5/25 203 Pop-out Walls Tue 8/19/25 Thu 8/21/25 204 Sixth Floor Walls Tue 8/19/25 Thu 9/11/25 205 6th Floor Roof Trusses Mon 9/1/25 Mon 9/15/25 206 Roof Sheathing Tue 9/9/25 Mon 9/22/25 207 Install HVAC Dog Houses Tue 9/16/25 Mon 9/22/25 208 5th Floor CLP & Simpson Ties & Third Party Testing Tue 9/23/25 Wed 10/1/25 209 Punch Out Thu 10/2/25 Wed 11/5/25 210 Wet Rough In Fri 6/20/25 Thu 11/6/25 211 MEP & Sprinkler Trades Wet Rough In Fri 6/20/25 Thu 11/6/25 212 Roofing, Trim/Downspouts & Awnings Wed 9/17/25 Thu 12/10/26 213 Install TPO Roof System Wed 9/17/25 Tue 10/14/25 214 Roof Detail Work Wed 10/15/25 Tue 10/28/25 215 Coping Trim & Downspouts Fri 11/6/26 Thu 12/10/26 216 WRB, Window Install, Balcony Topping, & Patio Door Install Wed 9/17/25 Fri 11/21/25 217 Install WRB Wed 9/17/25 Tue 10/7/25 218 Install Windows Mon 9/22/25 Fri 10/10/25 219 Building Dry In Fri 10/10/25 Fri 10/10/25 220 Waterproof, Prep, & Pour Balconies Mon 10/6/25 Fri 11/7/25 221 Install Patio Dors Mon 11/3/25 Fri 11/21/25 222 Windows, Patio Doors, Patio Topping, & Fiber Cement Siding Mon 11/10/25 Thu 12/17/26 223 Courtyard Elevation Mon 11/10/25 Fri 3/6/26 224 Fiber Cement Siding Mon 11/10/25 Fri 1/9/26 225 Exterior Painting Mon 12/29/25 Fri 1/16/26 226 Storefront Install & Overhead Doors Mon 1/19/26 Fri 2/6/26 227 Balcony Railing Install Mon 2/9/26 Fri 3/6/26 228 East Elevation Mon 1/5/26 Fri 5/1/26 229 Fiber Cement Siding Mon 1/5/26 Fri 2/27/26 230 Exterior Painting Mon 2/23/26 Fri 3/13/26 231 Storefront Install Mon 3/16/26 Fri 4/3/26 232 Balcony Railing Install Mon 4/6/26 Fri 5/1/26 233 North Elevation Mon 4/27/26 Fri 8/14/26 234 Fiber Cement Siding Mon 4/27/26 Fri 6/12/26 235 Exterior Painting Mon 6/8/26 Fri 6/26/26 236 Storefront Install & Overhead Doors Mon 6/29/26 Fri 7/17/26 237 Balcony Railing Install Mon 7/20/26 Fri 8/14/26 238 West Elevation Mon 6/8/26 Thu 10/29/26 239 Fiber Cement Siding Mon 6/8/26 Fri 8/14/26 240 Exterior Painting Fri 8/14/26 Thu 9/10/26 241 Storefront Install Fri 9/11/26 Thu 10/1/26 242 Balcony Railing Install Fri 10/2/26 Thu 10/29/26 243 South Elevation Mon 8/10/26 Thu 12/17/26 244 Fiber Cement Siding Mon 8/10/26 Fri 10/9/26 245 Exterior Painting Fri 10/9/26 Thu 11/5/26 246 Storefront Install Fri 11/6/26 Thu 11/26/26 247 Balcony Railing Install Fri 11/27/26 Thu 12/17/26 248 MEP & SPRINKLER ROUGH-INS Mon 10/13/25 Fri 1/29/27 249 Sixth Floor MEP Rough In Mon 10/13/25 Wed 12/17/25 250 MEP Rough-In 6th Floor Mon 10/13/25 Fri 11/14/25 251 Fire Caulking Mon 11/17/25 Fri 11/21/25 252 Owner Venders Low Voltage Rough In Thu 11/6/25 Fri 11/14/25 253 Pre-Rock & Tub/Shower Install Thu 11/13/25 Wed 12/3/25 254 Rough-In Inspections All Trades 6th Thu 12/4/25 Wed 12/17/25 255 Fifth Floor MEP Rough In Mon 11/24/25 Wed 1/28/26 256 MEP Rough-In 5th Floor Mon 11/24/25 Fri 12/26/25 257 Fire Caulking Mon 12/29/25 Fri 1/2/26 258 Owner Venders Low Voltage Rough In Thu 12/18/25 Fri 12/26/25 10/10 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Critical Critical Split Progress Manual Progress Camp North End Moniker One Level Podium Page 3 Project: Original Schedule Date: Fri 4/19/24 ID Task Name Start Finish 259 Pre-Rock & Tub/Shower Install Thu 12/25/25 Wed 1/14/26 260 Rough-In Inspections All Trades 5th Thu 1/15/26 Wed 1/28/26 261 Fourth Floor MEP Rough In Mon 1/5/26 Wed 3/11/26 262 MEP Rough-In 4th Floor Mon 1/5/26 Fri 2/6/26 263 Fire Caulking Mon 2/9/26 Fri 2/13/26 264 Owner Venders Low Voltage Rough In Thu 1/29/26 Fri 2/6/26 265 Pre-Rock & Tub/Shower Install Thu 2/5/26 Wed 2/25/26 266 Rough-In Inspections All Trades 4th Thu 2/26/26 Wed 3/11/26 267 Third Floor MEP Rough In Mon 2/16/26 Wed 4/22/26 268 MEP Rough-In 3rd Floor Mon 2/16/26 Fri 3/20/26 269 Fire Caulking Mon 3/23/26 Fri 3/27/26 270 Owner Venders Low Voltage Rough In Thu 3/12/26 Fri 3/20/26 271 Pre-Rock & Tub/Shower Install Thu 3/19/26 Wed 4/8/26 272 Rough-In Inspections All Trades 3rd Thu 4/9/26 Wed 4/22/26 273 Second Floor MEP Rough In Mon 3/30/26 Wed 6/3/26 274 MEP Rough-In 2nd Floor Mon 3/30/26 Fri 5/1/26 275 Fire Caulking Mon 5/4/26 Fri 5/8/26 276 Owner Venders Low Voltage Rough In Thu 4/23/26 Fri 5/1/26 277 Pre-Rock & Tub/Shower Install Thu 4/30/26 Wed 5/20/26 278 Rough-In Inspections All Trades 2nd Thu 5/21/26 Wed 6/3/26 279 First Floor & Basement MEP Rough In (Below Podium)Mon 5/11/26 Wed 7/22/26 280 MEP Rough-In Below Podium Mon 5/11/26 Fri 6/19/26 281 Fire Caulking Mon 6/22/26 Fri 6/26/26 282 Owner Venders Low Voltage Rough In Thu 6/11/26 Wed 6/24/26 283 Pre-Rock & Tub/Shower Install Thu 6/18/26 Wed 7/8/26 284 Rough-In Inspections All Trades 1st Thu 7/9/26 Wed 7/22/26 285 Rough-In Inspections All Trades Below Podium Thu 7/9/26 Wed 7/22/26 286 Electrical Service Mon 5/18/26 Tue 10/13/26 287 Set Gear & Panels Mon 5/18/26 Fri 6/19/26 288 Set Transformers Mon 6/22/26 Tue 6/23/26 289 Pull Primary & Secondary Feeders Wed 6/24/26 Tue 7/7/26 290 Permanent Power Inspection Wed 7/8/26 Tue 7/14/26 291 Energize Permanent Power Wed 7/15/26 Tue 7/21/26 292 Power to MDP Tue 7/21/26 Tue 7/21/26 293 Distribute Power to 6th Floor Meter Bases Wed 7/22/26 Tue 8/4/26 294 Distribute Power to 5th Floor Meter Bases Wed 8/5/26 Tue 8/18/26 295 Distribute Power to 4th Floor Meter Bases Wed 8/19/26 Tue 9/1/26 296 Distribute Power to 3rd Floor Meter Bases Wed 9/2/26 Tue 9/15/26 297 Distribute Power to 2nd Floor Meter Bases Wed 9/16/26 Tue 9/29/26 298 Distribute Power to 1st Floor Meter Bases Wed 9/30/26 Tue 10/13/26 299 Power to all Floors & Units Tue 10/13/26 Tue 10/13/26 300 HVAC Mon 6/22/26 Fri 7/24/26 301 Set & Tie in Equipment on Roof Mon 6/22/26 Fri 7/10/26 302 Hook Up HVAC Equipment Electrical Mon 7/6/26 Fri 7/24/26 303 Elevators Wed 7/22/26 Fri 1/29/27 304 Power to Elevator Disconnect Wed 7/22/26 Tue 7/28/26 305 Elevator Delivery Wed 7/29/26 Thu 7/30/26 306 Install Rails Fri 7/31/26 Mon 8/17/26 307 Car Components Tue 8/18/26 Mon 10/5/26 308 Door Jambs Tue 10/6/26 Mon 10/26/26 309 Door Infill Tue 10/27/26 Fri 11/6/26 310 Cab, Doors, Controller Mon 11/9/26 Fri 12/18/26 311 Electrical & Plumbing Work Mon 12/21/26 Fri 1/1/27 312 Install Smoke Curtains Mon 1/4/27 Fri 1/8/27 313 Final Adjustments & Pre Inspection Mon 1/11/27 Fri 1/15/27 314 State Elevator Inspection Mon 1/18/27 Fri 1/29/27 315 Elevators Inspected & Operational Fri 1/29/27 Fri 1/29/27 316 Insulation, Drywall, Gypcrete Thu 12/18/25 Mon 10/5/26 317 Sixth Floor Thu 12/18/25 Thu 3/12/26 318 Insulation & Inspection Thu 12/18/25 Wed 1/7/26 319 Hang & Finish Drywall Thu 1/8/26 Wed 3/4/26 320 Gypcrete Prep & Pour Thu 3/5/26 Thu 3/12/26 321 Fifth Floor Thu 1/29/26 Thu 4/23/26 322 Insulation & Inspection Thu 1/29/26 Wed 2/18/26 323 Hang & Finish Drywall Thu 2/19/26 Wed 4/15/26 324 Gypcrete Prep & Pour Thu 4/16/26 Thu 4/23/26 325 Fourth Floor Thu 3/12/26 Thu 6/4/26 326 Insulation & Inspection Thu 3/12/26 Wed 4/1/26 327 Hang & Finish Drywall Thu 4/2/26 Wed 5/27/26 328 Gypcrete Prep & Pour Thu 5/28/26 Thu 6/4/26 329 Third Floor Thu 4/23/26 Thu 7/16/26 330 Insulation & Inspection Thu 4/23/26 Wed 5/13/26 331 Hang & Finish Drywall Thu 5/14/26 Wed 7/8/26 332 Gypcrete Prep & Pour Thu 7/9/26 Thu 7/16/26 333 Second Floor Thu 6/4/26 Thu 8/20/26 334 Insulation & Inspection Thu 6/4/26 Wed 6/17/26 335 Hang & Finish Drywall Thu 6/18/26 Wed 8/12/26 336 Gypcrete Prep & Pour Thu 8/13/26 Thu 8/20/26 337 First Floor & Basement Thu 7/23/26 Mon 10/5/26 338 Batt Insulation & Spray foam Thu 7/23/26 Wed 8/5/26 339 Hang & Finish Drywall Thu 8/6/26 Wed 9/30/26 340 Basement Area Gypcrete Prep & Pour Thu 10/1/26 Mon 10/5/26 341 Finishes Fri 3/13/26 Thu 3/25/27 342 Cold Dark Shell Thu 10/1/26 Wed 11/4/26 343 Electrical, Unit Heater, & Sprinkler Trim Out Cold Dark Shell Thu 10/1/26 Wed 10/21/26 344 Final Clean & Punch Out Thu 10/22/26 Wed 10/28/26 7/21 10/13 1/29 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Critical Critical Split Progress Manual Progress Camp North End Moniker One Level Podium Page 4 Project: Original Schedule Date: Fri 4/19/24 ID Task Name Start Finish 345 Final Inspections Thu 10/29/26 Wed 11/4/26 346 Turn Over Cold Dark Shell Wed 11/4/26 Wed 11/4/26 347 Amenities Finishes Thu 9/17/26 Wed 2/17/27 348 Prime Walls & Finish Ceilings Thu 9/17/26 Fri 10/2/26 349 First Trim Tue 9/29/26 Mon 10/19/26 350 Cabinets & Countertops Thu 10/15/26 Fri 10/30/26 351 Ceramic Tile Mon 10/19/26 Fri 11/13/26 352 Electrical Trim & Fixture Install Mon 11/9/26 Fri 12/4/26 353 Low Voltage Trim Out & Programing Mon 11/23/26 Fri 12/4/26 354 Plumbing & HVAC Trim Out Mon 11/23/26 Fri 12/11/26 355 Sprinkler Trim Out Wed 12/9/26 Tue 12/15/26 356 Flooring Mon 12/7/26 Fri 12/25/26 357 Second Trim (Bath Accessories & Shower Doors) Mon 12/28/26 Tue 1/12/27 358 Final Paint Wed 1/13/27 Thu 1/21/27 359 Rough Clean Wed 1/20/27 Tue 1/26/27 360 Blind Installation Wed 1/27/27 Wed 1/27/27 361 Signage Installation Tue 1/26/27 Wed 1/27/27 362 Punch List Mon 1/18/27 Fri 1/29/27 363 Final Clean Thu 1/28/27 Wed 2/3/27 364 Final Inspections Thu 1/28/27 Wed 2/3/27 365 Owners FF&E Thu 2/4/27 Wed 2/17/27 366 Installation of Workout Equipment Thu 2/11/27 Wed 2/17/27 367 Early Turn Over of Amenity Spaces Wed 2/3/27 Wed 2/3/27 368 Six Floor Finishes Fri 3/13/26 Mon 10/5/26 369 6th Prime Walls & Finish Ceilings Fri 3/13/26 Mon 3/30/26 370 6th First Trim Thu 3/26/26 Fri 4/10/26 371 6th Cabinets & Countertops Wed 4/8/26 Tue 4/21/26 372 6th Ceramic Tile Wed 4/8/26 Tue 5/5/26 373 6th Electrical Trim & Fixture Install Wed 4/29/26 Tue 5/19/26 374 6th Floor Low Voltage Trim Out Wed 5/6/26 Thu 5/14/26 375 6th Plumbing & HVAC Trim Out Fri 5/15/26 Thu 6/4/26 376 6th Sprinkler Trim Out Tue 6/2/26 Mon 6/8/26 377 6th Flooring Tue 6/2/26 Mon 6/22/26 378 6th Second Trim (Bath Accessories & Shower Doors) Tue 6/23/26 Wed 7/8/26 379 6th Final Paint Thu 7/9/26 Wed 7/29/26 380 6th Rough Clean Tue 7/28/26 Mon 8/10/26 381 6th Blind Installation Fri 8/7/26 Thu 8/13/26 382 6th Floor Signage Installation Fri 8/14/26 Mon 8/17/26 383 6th Punch List Tue 8/11/26 Mon 8/24/26 384 6th Final Clean Tue 8/18/26 Mon 8/31/26 385 Owners FF&E Tue 9/29/26 Mon 10/5/26 386 Fifth Floor Finishes Fri 4/24/26 Fri 10/16/26 387 5th Prime Walls & Finish Ceilings Fri 4/24/26 Mon 5/11/26 388 5th First Trim Thu 5/7/26 Fri 5/22/26 389 5th Cabinets & Countertops Wed 5/20/26 Tue 6/2/26 390 5th Ceramic Tile Wed 5/20/26 Tue 6/16/26 391 5th Electrical Trim & Fixture Install Wed 6/3/26 Tue 6/23/26 392 5th Floor Low Voltage Trim Out Mon 6/15/26 Tue 6/23/26 393 5th Plumbing & HVAC Trim Out Wed 6/10/26 Tue 6/30/26 394 5th Sprinkler Trim Out Fri 6/26/26 Thu 7/2/26 395 5th Flooring Wed 6/24/26 Tue 7/14/26 396 5th Second Trim (Bath Accessories & Shower Doors) Wed 7/15/26 Thu 7/30/26 397 5th Final Paint Fri 7/31/26 Thu 8/20/26 398 5th Rough Clean Wed 8/19/26 Tue 9/1/26 399 5th Blind Installation Wed 8/26/26 Tue 9/1/26 400 5th Floor Signage Installation Mon 8/31/26 Tue 9/1/26 401 5th Punch List Mon 8/24/26 Fri 9/4/26 402 5th Final Clean Mon 8/31/26 Fri 9/11/26 403 Owners FF&E Mon 10/12/26 Fri 10/16/26 404 Fourth Floor Finishes Fri 6/5/26 Fri 11/27/26 405 4th Prime Walls & Finish Ceilings Fri 6/5/26 Mon 6/22/26 406 4th First Trim Thu 6/18/26 Fri 7/3/26 407 4th Cabinets & Countertops Wed 7/1/26 Tue 7/14/26 408 4th Ceramic Tile Wed 7/1/26 Tue 7/28/26 409 4th Electrical Trim & Fixture Install Wed 7/15/26 Tue 8/4/26 410 4th Floor Low Voltage Trim Out Mon 7/27/26 Tue 8/4/26 411 4th Plumbing & HVAC Trim Out Wed 7/22/26 Tue 8/11/26 412 4th Sprinkler Trim Out Fri 8/7/26 Thu 8/13/26 413 4th Flooring Wed 8/5/26 Tue 8/25/26 414 4th Second Trim (Bath Accessories & Shower Doors) Wed 8/26/26 Thu 9/10/26 415 4th Final Paint Fri 9/11/26 Thu 10/1/26 416 4th Rough Clean Wed 9/30/26 Tue 10/13/26 417 4th Blind Installation Wed 10/7/26 Tue 10/13/26 418 4th Floor Signage Installation Mon 10/12/26 Tue 10/13/26 419 4th Punch List Mon 10/5/26 Fri 10/16/26 420 4th Final Clean Mon 10/12/26 Fri 10/23/26 421 4th Owners FF&E Mon 11/23/26 Fri 11/27/26 422 Third Floor Finishes Fri 7/17/26 Fri 1/1/27 423 3rd Prime Walls & Finish Ceilings Fri 7/17/26 Mon 8/3/26 424 3rd First Trim Thu 7/30/26 Fri 8/14/26 425 3rd Cabinets & Countertops Wed 8/12/26 Tue 8/25/26 426 3rd Ceramic Tile Wed 8/12/26 Tue 9/8/26 427 3rd Electrical Trim & Fixture Install Wed 8/19/26 Tue 9/8/26 428 3rd Floor Low Voltage Trim Out Mon 8/31/26 Tue 9/8/26 429 3rd Plumbing & HVAC Trim Out Wed 8/26/26 Tue 9/15/26 430 3rd Sprinkler Trim Out Fri 9/11/26 Thu 9/17/26 11/4 2/3 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Critical Critical Split Progress Manual Progress Camp North End Moniker One Level Podium Page 5 Project: Original Schedule Date: Fri 4/19/24 ID Task Name Start Finish 431 3rd Flooring Wed 9/9/26 Tue 9/29/26 432 3rdSecond Trim (Bath Accessories & Shower Doors) Wed 9/30/26 Thu 10/15/26 433 3rd Final Paint Fri 10/16/26 Thu 11/5/26 434 3rdRough Clean Wed 11/4/26 Tue 11/17/26 435 3rd Punch List Mon 11/9/26 Fri 11/20/26 436 3rd Signage Installation Thu 11/19/26 Fri 11/20/26 437 3rd Blind Installation Mon 11/16/26 Fri 11/20/26 438 3rd Final Clean Wed 11/18/26 Tue 12/1/26 439 3rd Owner FF&E Mon 12/28/26 Fri 1/1/27 440 Second Floor Finishes Fri 8/21/26 Fri 2/12/27 441 2nd Prime Walls & Finish Ceilings Fri 8/21/26 Mon 9/7/26 442 2nd First Trim Thu 9/3/26 Fri 9/18/26 443 2nd Cabinets & Countertops Wed 9/16/26 Tue 9/29/26 444 2nd Ceramic Tile Wed 9/16/26 Tue 10/13/26 445 2nd Electrical Trim & Fixture Install Wed 9/30/26 Tue 10/20/26 446 2nd Low Voltage Trim Out Mon 10/12/26 Tue 10/20/26 447 2nd Plumbing & HVAC Trim Out Wed 10/7/26 Tue 10/27/26 448 2nd Sprinkler Trim Out Fri 10/23/26 Thu 10/29/26 449 2nd Flooring Wed 10/21/26 Tue 11/10/26 450 2nd Floor Second Trim (Bath Accessories & Shower Doors) Wed 11/11/26 Thu 11/26/26 451 2nd Final Paint Fri 11/27/26 Thu 12/17/26 452 2nd Rough Clean Wed 12/16/26 Tue 12/29/26 453 2nd Blind Installation Wed 12/23/26 Tue 12/29/26 454 2nd Signage Installation Mon 12/28/26 Tue 12/29/26 455 2nd Punch List Mon 12/21/26 Fri 1/1/27 456 2nd Final Clean Thu 12/31/26 Wed 1/13/27 457 2nd Owners FF&E Mon 2/8/27 Fri 2/12/27 458 Unit Turn Over 2-6 Fri 2/12/27 Fri 2/12/27 459 First Floor Below Podium level Finishes Thu 10/1/26 Thu 3/25/27 460 1st Prime Walls & Finish Ceilings Thu 10/1/26 Fri 10/16/26 461 1st First Trim Wed 10/14/26 Thu 10/29/26 462 1st Cabinets & Countertops Tue 10/27/26 Mon 11/9/26 463 1st Ceramic Tile Tue 10/27/26 Mon 11/23/26 464 1st Electrical Trim & Fixture Install Tue 11/17/26 Mon 12/7/26 465 1st Low Voltage Trim Out Tue 11/24/26 Wed 12/2/26 466 1st Plumbing & HVAC Trim Out Tue 11/24/26 Mon 12/14/26 467 1st Sprinkler Trim Out Thu 12/10/26 Wed 12/16/26 468 1st Flooring Tue 12/8/26 Mon 12/28/26 469 1st Second Trim (Bath Accessories & Shower Doors) Tue 12/29/26 Wed 1/13/27 470 1st Final Paint Thu 1/14/27 Wed 2/3/27 471 1st Rough Clean Tue 2/2/27 Mon 2/15/27 472 1st Blind Installation Tue 2/16/27 Mon 2/22/27 473 1st Signage Installation Fri 2/19/27 Mon 2/22/27 474 1st Punch List Fri 2/5/27 Thu 2/18/27 475 1st Final Clean Wed 2/17/27 Tue 3/2/27 476 1st Owners FF&E Fri 3/19/27 Thu 3/25/27 477 Final Inspections Tue 8/25/26 Thu 3/25/27 478 6th Floor Final Inspections Tue 8/25/26 Mon 9/28/26 479 Electrical Final Tue 8/25/26 Mon 8/31/26 480 Plumbing Final Tue 9/1/26 Mon 9/7/26 481 HVAC Final Tue 9/8/26 Mon 9/14/26 482 Fire Protection, Fire Alarm, Fire Marshal Tue 9/15/26 Mon 9/21/26 483 Building Final Tue 9/22/26 Mon 9/28/26 484 5th Floor Final Inspections Mon 9/7/26 Fri 10/9/26 485 Electrical Final Mon 9/7/26 Fri 9/11/26 486 Plumbing Final Mon 9/14/26 Fri 9/18/26 487 HVAC Final Mon 9/21/26 Fri 9/25/26 488 Fire Protection, Fire Alarm, Fire Marshal Mon 9/28/26 Fri 10/2/26 489 Building Final Mon 10/5/26 Fri 10/9/26 490 4th Floor Final Inspections Mon 10/19/26 Fri 11/20/26 491 Electrical Final Mon 10/19/26 Fri 10/23/26 492 Plumbing Final Mon 10/26/26 Fri 10/30/26 493 HVAC Final Mon 11/2/26 Fri 11/6/26 494 Fire Protection, Fire Alarm, Fire Marshal Mon 11/9/26 Fri 11/13/26 495 Building Final Mon 11/16/26 Fri 11/20/26 496 3rd Floor Final Inspections Mon 11/23/26 Fri 12/25/26 497 Electrical Final Mon 11/23/26 Fri 11/27/26 498 Plumbing Final Mon 11/30/26 Fri 12/4/26 499 HVAC Final Mon 12/7/26 Fri 12/11/26 500 Fire Protection, Fire Alarm, Fire Marshal Mon 12/14/26 Fri 12/18/26 501 Building Final Mon 12/21/26 Fri 12/25/26 502 2nd Floor Final Inspections Mon 1/4/27 Fri 2/5/27 503 Electrical Final Mon 1/4/27 Fri 1/8/27 504 Plumbing Final Mon 1/11/27 Fri 1/15/27 505 HVAC Final Mon 1/18/27 Fri 1/22/27 506 Fire Protection, Fire Alarm, Fire Marshal Mon 1/25/27 Fri 1/29/27 507 Building Final Mon 2/1/27 Fri 2/5/27 508 1st Floor Below Podium Final Inspections Fri 2/19/27 Wed 3/24/27 509 Electrical Final Fri 2/19/27 Wed 2/24/27 510 Plumbing Final Thu 2/25/27 Tue 3/2/27 511 HVAC Final Wed 3/3/27 Mon 3/8/27 512 Fire Protection, Fire Alarm, Fire Marshal Tue 3/9/27 Fri 3/12/27 513 Building Final Mon 3/15/27 Thu 3/18/27 514 Final Exterior Building & Zoning Final Fri 3/19/27 Wed 3/24/27 515 Building Turn Over to CNE Thu 3/25/27 Thu 3/25/27 2/12 CNE Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter 1st Quarter 2nd Quarter Task Split Milestone Summary Project Summary Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only External Tasks External Milestone Deadline Critical Critical Split Progress Manual Progress Camp North End Moniker One Level Podium Page 6 Project: Original Schedule Date: Fri 4/19/24 Appendix C Previous Environmental Assessment Data Tables Table 1 Summary of Soil Analytical Data CAMP Brownfields Site Statesville Avenue and Woodward Avenue Charlotte, North Carolina Brownfields Project No. 11044-07-060 H&H Job No. ATL.008 Sample Location Building C Sample ID SB-01 SB-02 SB-04 SB-05 SB-06 SB-07 SB-08 SB-09 SB-10 SB-11 Date Collected 3/16/23 3/16/23 3/16/23 3/16/23 3/17/23 3/16/23 3/16/23 3/17/23 3/16/23 3/17/23 Depth (ft bgs)0-2 0-2 0-2 3-5 0-2 0-2 0-2 0-2 0-2 0-2 Range Mean VOCs (8260D) Acetone 0.032 0.017 J 0.016 J 0.018 J 0.015 0.016 J 0.051 0.087 0.055 0.065 0.016 J 0.010 J 25 14,000 210,000 ---- Carbon Disulfide <0.0008 <0.0009 <0.0008 <0.0008 0.001 J <0.0009 <0.0008 <0.0008 <0.0008 <0.0008 <0.0008 <0.0009 4.1 160 740 ---- Methylene Chloride <0.001 <0.002 <0.001 0.001 J,B <0.001 <0.002 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 0.025 58 650 ---- Methyl Ethyl Ketone <0.0008 <0.0009 <0.0008 <0.0008 <0.0008 <0.0009 <0.0008 0.008 J 0.004 J 0.005 J <0.0009 <0.0009 17 5,500 40,000 ---- Toluene <0.0008 <0.0009 <0.0008 <0.0008 <0.0009 <0.0009 0.002 J <0.0009 <0.0009 <0.0009 <0.0009 <0.0009 8.3 990 9,700 ---- SVOCs (8270E) ALL BDL BDL BDL BDL BDL BDL BDL BDL BDL BDL BDL BDL BDL ---------- RCRA Metals (6020B/7470A) Arsenic 1.65 0.819 0.700 1.01 0.853 0.841 1.73 0.911 1.43 1.75 1.61 2.03 5.8 0.68 3 <2.35 - 5.25 1.0-18 4.8 Barium 29.3 39.8 173 48.8 33.6 38.7 25.2 32.5 43.0 37.7 18.4 48.8 580 3,100 47,000 --50-1,000 356 Cadmium <0.0324 <0.0354 0.0344 J <0.0312 <0.0334 <0.0357 <0.0331 <0.0335 0.0431 J <0.0335 <0.0341 <0.0350 3 1.4 20 <1.12 - 1.64 1.0-10 4.3 Chromium 48.6 12.9 5.97 15.1 21.6 47.2 41.4 24.8 67.9 39.7 91.7 74.4 NE NE NE 23.4 - 70.7 7.0-300 65 Hexavalent Chromium <0.177 <0.192 <0.176 <0.174 <0.182 <0.194 <0.185 <0.182 0.504 <0.182 0.354 0.342 3.8 0.31 6.5 <2.35 - 2.18J NE NE Trivalent Chromium 48.6 12.9 5.97 15.1 21.6 47.2 41.4 24.8 67.396 39.7 91.346 74.058 360,000 23,000 350,000 23.4 - 70.7 NE NE Lead 9.85 6.65 4.53 6.94 5.88 9.39 11.4 7.57 11.4 11.0 5.69 19.5 NE 400 800 13.3 - 53.4 ND-50 16 Mercury 0.0358 J <0.0283 <0.0278 <0.0263 <0.0282 <0.0293 0.0641 J 0.0464 J 0.0468 J 0.0577 J 0.0302 J 0.0482 J NE 4.7 70 <0.108 - 0.303 0.03-0.52 0.121 Selenium 0.703 0.448 1.31 0.925 0.582 0.574 0.548 0.432 0.794 0.863 0.749 1.07 2.1 78 1,200 <2.41 - 7.77 <0.1-0.8 0.42 Silver 0.0251 J 0.0139 J 0.0135 J 0.0131 J 0.0347 J 0.0130 J 0.0154 J 0.0109 J 0.0255 J 0.0274 J 0.0119 J 0.0257 J 3.4 78 1,200 --ND-5.0 NE Notes: 1) NC Department of Environmental Quality (DEQ) Preliminary Soil Remediation Goals (PSRGs) dated January 2023 and based upon TCR = 1 x 10-6 and THQ = 0.2. 2) Range of site-specific metal background concentrations collected by H&H at the Rite Aid Brownfields site on November 16, 2016 (excluding soil sample (SSB-10) 3) Range and mean values of background metals for North Carolina soils taken from Elements in North American Soils by Dragun and Chekiri, 2005. Background Cd and Ag concentrations were taken from Southeastern and Conterminous US soils. Compound concentrations are reported in milligrams per kilograms (mg/kg). Compound concentrations are reported to the laboratory method detection limits. With the exception of metals, only constituents detected in at least one sample are shown in the table above. Bold values exceed Protection of Groundwater PSRGs. Underlined values exceed the Residential PSRGs. VOCs = volatile organic compounds; SVOCs = semi-volatile organic compounds; RCRA = Resource Conservation Recovery Act -- = Not Applicable; NE = Not Established; < = below laboratory method detection limit; ft bgs = feet below ground surface. TCR = Target Cancer Risk; THQ = Target Hazard Quotient; J = Compound was detected above the laboratory method detection limit, but below the laboratory reporting limit resulting in a laboratory estimated concentration. B = analyte detected in laboratory method blank. Industrial/ Commercial PSRGs (1) Regional Background Metals in Soil (3)Protection of Groundwater PSRGs (1) Residential PSRGs (1) Site-Specific Background Metal Concentrations (2) SB-03 / SB-DUP 3/16/23 0-2 Building A Building B https://harthick.sharepoint.com/sites/MasterFiles-1/Shared Documents/AAA-Master Projects/ATCO LLC - ATC/ATL-008 Woodward Ave Multi-Family/Tables/Data Tables 4/24/2023 Table 1 Hart & Hickman, PC Table 2 Temporary Monitoring Well Construction Data CAMP Brownfields Site Statesville Avenue and Woodward Avenue Charlotte, North Carolina Brownfields Project No. 11044-07-060 H&H Job No. ATL.008 Total Well Depth Screened Interval Depth to Groundwater (ft bgs)(ft bgs)(ft bTOC) TMW-1 3/16/2023 1.0 21.7 6.7 - 21.7 9.50 Notes: TMW = temporary monitoring well; bgs = below ground surface; bTOC = below top of casing; ft = feet Depth to groundwater measurement for TMW-1 collected on March 17, 2023. Well ID Well Diameter (inches)Date Installed Hart & Hickman, PC Table 3 Summary of Groundwater Analytical Data CAMP Brownfields Site Statesville Avenue and Woodward Avenue Charlotte, North Carolina Brownfields Project No. 11044-07-060 H&H Job No. ATL.008 Sample Location Sample ID Date Collected VOCs (8260) Acetone 5.41 5.09 6,000 NE NE SVOCs (8270) RCRA Metals (6020/7471) Arsenic 1.38 1.54 10 NE NE Barium 28.0 27.6 700 NE NE Cadmium <0.350 <0.350 2 NE NE Chromium (Total)1.46 1.56 10 NE NE Lead 3.16 3.17 15 NE NE Mercury <0.00013 <0.00013 1 0.18 0.75 Selenium <0.703 <0.703 20 NE NE Silver <0.0570 <0.0570 20 NE NE Notes: 1) North Carolina Department of Environmental Quality (DEQ) 15A NCAC 02L.0202 Groundwater Standards (2L Standards) (April 2022). 2) DEQ Division of Waste Management (DWM) Residential Vapor Intrusion Groundwater Screening Levels (GWSLs) (January 2023). 3) DEQ DWM Non-Residential Vapor Intrusion Groundwater Screening Levels (GWSLs) (January 2023). With the exception of metals, only constituents detected in at least one sample are shown. Compound concentrations are reported to the laboratory method detection limits. Laboratory analytical methods are shown in parentheses. VOCs = volatile organic compounds; SVOCs = semi-volatile organic compounds, RCRA = Resource Conservation and Recovery Act NE = Not Established; NA = Not Analyzed; NTU = Nephelometric Turbidity Unit; -- = Not Applicable. BDL = below laboratory method detection limtis. J = Compound was detected above the laboratory method detection limit, but below the laboratory reporting limit resulting in a laboratory estimated concentration. Non-Residential GWSLs (3) NC 2L Groundwater Standards (1) Residential GWSLs (2) Central Portion of Site 3/17/23 TMW-1 / GW-DUP https://harthick.sharepoint.com/sites/MasterFiles-1/Shared Documents/AAA-Master Projects/ATCO LLC - ATC/ATL-008 Woodward Ave Multi-Family/Tables/Data Tables 4/3/2023 Hart & Hickman, PC Table 4 Summary of Soil Gas Analytical Results CAMP Brownfields Site Statesville Avenue and Woodward Avenue Charlotte, North Carolina Brownfields Project No. 11044-07-060 H&H Job No. ATL.008 Sample Location Sample ID SGV-2 SSV-1 SSV-2 SSV-3 SSV-4 SSV-5 SSV-6 SSV-7 SSV-8 Date Collected 3/16/23 3/16/23 3/16/23 3/16/23 3/16/23 3/17/23 3/16/23 3/17/23 3/16/23 Vapor Screen Installation Depth (ft bgs)5.0 - 5.5 ---------------- VOCs (TO-15) (µg/m3) Acetone 10.2 13.0 25.2 615 408 8.62 69.2 120 82.3 1,090 279 NE NE Benzene 2.14 2.19 5.01 0.392 J 0.690 J 0.338 J 0.306 J 0.364 J 0.590 J 0.287 J 0.265 J 12 160 1,3-Butadiene 0.789 J 0.800 J 20.3 <0.328 <0.328 <0.328 <0.328 <0.328 <0.328 <0.328 <0.328 3.1 41 Carbon Disulfide 5.63 J 5.57 J 36.0 2.13 J,B 3.18 J 0.348 J,B 3.87 J,B 6.02 J 2.26 J <0.060 2.14 J 4,900 61,000 Chloroform 0.522 J 0.478 J 0.478 J <0.086 <0.086 <0.086 <0.086 <0.086 <0.086 <0.086 <0.086 4.1 53 Cyclohexane <0.161 <0.161 8.71 54.3 153 <0.161 <0.161 5.63 14.1 7.10 21.3 42,000 530,000 1,4-Dichlorobenzene <0.186 <0.186 <0.186 0.865 J 0.685 J 1.06 J 0.685 J <0.186 0.853 J 0.775 J 0.763 J 8.5 110 Dichlorodifluoromethane 2.64 2.73 4.15 2.40 J 2.34 J 2.55 2.53 2.45 J 2.47 2.40 J 2.38 J 700 8,800 1,2-Dichloroethane <0.129 <0.129 <0.129 <0.129 <0.129 <0.129 <0.129 <0.129 <0.129 <0.129 <0.129 3.6 47 trans-1,2-Dichloroethene <0.108 <0.108 <0.108 <0.108 <0.108 <0.108 <0.108 <0.108 <0.108 <0.108 <0.108 280 3,500 1,4-Dioxane <0.435 <0.435 <0.435 <0.435 <0.435 <0.435 <0.435 <0.435 <0.435 <0.435 <0.435 19 250 Ethyl Acetate <0.136 <0.136 <0.136 <0.136 <0.136 <0.136 <0.136 <0.136 <0.136 <0.136 2.03 490 6,100 Ethylbenzene 4.26 4.23 19.7 0.616 J 0.907 J 0.642 J 0.877 J 0.434 J 0.538 J 0.529 J 0.603 J 37 490 4-Ethyltoluene 1.66 J 1.58 J 2.88 <0.128 <0.128 <0.128 <0.128 <0.128 <0.128 <0.128 <0.128 NE NE 1,1,2-Trichloro-1,2,2-trifluoroethane <0.561 <0.561 0.957 J 0.712 J <0.561 47.6 <0.561 0.605 J 0.574 J 1.07 J 1.23 J 35,000 280 Heptane 18.0 17.9 57.4 1.07 J 2.80 <0.143 0.331 J <0.143 0.389 J 0.377 J 0.627 J 2,800 8,800 n-Hexane 1.64 J 1.85 29.8 3.75 15.9 0.606 J 1.66 J 0.905 J 1.43 J 0.454 J 3.87 4,900 440,000 2-Hexanone 1.49 J 1.61 J <0.285 0.487 J <0.285 <0.285 <0.285 <0.285 <0.285 <0.285 <0.285 210 2,600 Isopropyl Alcohol 1.57 J 1.99 J 12.8 14.1 9.92 4.13 J,B 7.62 8.62 6.01 9.22 7.48 1,400 18,000 Methyl Ethyl Ketone (MEK)1.49 1.78 5.63 1.97 B 2.90 1.05 J,B 1.12 J,B 2.07 4.46 2.54 1.77 35,000 440,000 4-Methyl-2-Pentanone 0.938 J 0.950 J 1.96 J 1.51 J 0.520 J <0.121 <0.121 <0.121 0.729 J 1.00 J 0.540 J 21,000 260,000 Methylene Chloride <0.488 1.25 J 30.4 11.1 5.52 9.35 11.1 1.36 J 3.37 0.823 J 5.60 3,400 53,000 Naphthalene 1.89 J 1.87 J 1.32 J 0.660 J <0.183 <0.183 11.5 3.07 0.435 J 0.791 J 0.912 J 2.8 36 Propene 12.6 12.6 290 <0.242 15.2 <0.242 <0.242 <0.242 <0.242 <0.242 <0.242 21,000 260,000 Styrene 0.319 J 0.315 J 0.655 J 0.519 J 0.553 J 0.702 J 0.408 J <0.124 0.596 J 0.460 J 0.511 J 7,000 88,000 Tetrachloroethene 0.630 J 0.718 J 0.963 J 6.12 1.49 J 1.74 J 3.32 J <0.181 4.18 6.55 1.55 J 280 3,500 Tetrahydrofuran 0.250 J 0.345 J <0.107 <0.107 1.07 J 0.781 J 0.380 J 0.867 J 0.875 J 2.08 0.232 J 14,000 180,000 Toluene 21.6 21.3 28.8 69.5 96.2 2.86 B 17.8 7.52 23.3 17.4 36.0 35,000 440,000 1,1,1-Trichloroethane <0.144 <0.144 <0.144 1.76 J <0.144 <0.144 <0.144 <0.144 0.436 J <0.144 <0.144 35,000 440,000 1,1,2-Trichloroethane <0.087 <0.087 <0.087 <0.087 <0.087 <0.087 <0.087 <0.087 <0.087 <0.087 <0.087 1.4 18 Trichloroethene <0.199 <0.199 <0.199 <0.199 <0.199 <0.199 <0.199 <0.199 <0.199 <0.199 <0.199 14 180 Trichlorofluoromethane 1.56 J 1.61 J 30.6 1.80 J 1.50 J 1.55 J 1.71 J 2.19 J 1.60 J 3.11 3.16 NE NE 1,2,4-Trimethylbenzene 4.84 4.91 8.54 0.776 J 0.820 J 0.983 J 0.963 J 0.693 J 0.875 J 0.909 J 0.988 J 420 5,300 1,3,5-Trimethylbenzene 1.40 J 1.45 J 2.35 J <0.236 <0.236 <0.236 <0.236 <0.236 <0.236 <0.236 <0.236 420 5,300 Vinyl Chloride <0.127 <0.127 <0.127 <0.127 <0.127 <0.127 <0.127 <0.127 <0.127 <0.127 <0.127 5.6 280 o-Xylene 5.08 5.17 21.2 0.950 J 1.16 J 1.13 J 1.21 J 0.651 J 0.859 J 0.924 J 0.968 J 700 8,800 mp-Xylene 12.7 12.7 69.4 <0.217 1.03 J <0.217 0.694 J <0.217 <0.217 <0.217 <0.217 700 8,800 Xylene (Total)17.8 17.9 90.6 0.950 J 2.19 J 1.13 J 1.90 J 0.651 J 0.859 J 0.924 J 0.968 J 700 8,800 Notes: 1) North Carolina Department of Environment Quality (DEQ) Division of Waste Management (DWM) Residential Sub-Slab and Exterior Soil Gas Screening Levels (SGSLs) (January 2023). 2) North Carolina Department of Environment Quality (DEQ) Division of Waste Management (DWM) Non-Residential Sub-Slab and Exterior Soil Gas Screening Levels (SGSLs) (January 2023). Only constituents detected in at least one sample are shown. Compound concentrations are reported to the laboratory method detection limits. Bold values exceed the Residential SGSL. NE = Not Established; ft bgs = feet below ground surface. J = estimated value between the laboratory method detection limit and the laboratory reporting limit. B = analyte detected in laboratory method blank Building A Residential SGSLs (1) Non-Residential SGSLs (2)3/17/23 SGV-1 / SGV-DUP 5.0 - 5.5 Hart & Hickman, PC Table 4 Summary of Soil Gas Analytical Results CAMP Brownfields Site Statesville Avenue and Woodward Avenue Charlotte, North Carolina Brownfields Project No. 11044-07-060 H&H Job No. ATL.008 Sample Location Building C Sample ID SGV-3 SSV-9 SSV-10 SSV-11 SSV-12 SSV-13 SSV-14 SSV-15 SSV-16 SSV-17 Date Collected 3/17/23 3/17/23 3/17/23 3/17/23 3/17/23 3/17/23 3/17/23 3/17/23 3/16/23 3/17/23 Vapor Screen Installation Depth (ft bgs)5.0 - 5.5 ------------------ VOCs (TO-15) (µg/m3) Acetone 65.1 464 7.75 24.1 178 65.3 20.7 16.1 17.2 319 NE NE Benzene 23.8 0.370 J 0.265 J 0.511 J 0.303 J <0.073 0.386 J 0.303 J <0.073 0.594 J 12 160 1,3-Butadiene <0.328 <0.328 <0.328 <0.328 <0.328 <0.328 <0.328 <0.328 <0.328 <0.328 3.1 41 Carbon Disulfide 78.9 0.622 J,B 0.274 J 0.345 J 0.242 J <0.060 2.92 J 2.78 J,B 0.289 J 2.54 J,B 4,900 61,000 Chloroform 0.786 J <0.086 <0.086 <0.086 2.75 <0.086 <0.086 <0.086 <0.086 <0.086 4.1 53 Cyclohexane 19.8 16.9 <0.161 <0.161 2.11 J <0.161 <0.161 <0.161 <0.161 <0.161 42,000 530,000 1,4-Dichlorobenzene 0.679 J 0.559 J 0.517 J 1.00 J <0.186 <0.186 0.547 J 0.685 J 0.432 J 0.709 J 8.5 110 Dichlorodifluoromethane 1.18 J 2.41 J 2.42 J 2.49 2.34 J 2.57 2.57 2.68 2.37 J 2.81 700 8,800 1,2-Dichloroethane 0.348 J <0.129 <0.129 <0.129 <0.129 <0.129 <0.129 <0.129 <0.129 <0.129 3.6 47 trans-1,2-Dichloroethene <0.108 <0.108 <0.108 <0.108 <0.108 <0.108 <0.108 <0.108 <0.108 3.51 280 3,500 1,4-Dioxane <0.435 <0.435 <0.435 <0.435 <0.435 <0.435 <0.435 <0.435 <0.435 5.40 19 250 Ethyl Acetate 1.74 J <0.136 <0.136 <0.136 <0.136 <0.136 <0.136 <0.136 <0.136 <0.136 490 6,100 Ethylbenzene 61.5 0.451 J <0.106 0.816 J 1.79 J <0.106 0.490 J 0.481 J 0.329 J 0.395 J 37 490 4-Ethyltoluene 24.7 <0.128 <0.128 0.363 J <0.128 <0.128 <0.128 <0.128 <0.128 <0.128 NE NE 1,1,2-Trichloro-1,2,2-trifluoroethane <0.561 0.605 J 185 165 612 66.1 15.9 4.40 17.5 8.50 35,000 280 Heptane 364 0.467 J <0.143 <0.143 <0.143 <0.143 <0.143 <0.143 <0.143 <0.143 2,800 8,800 n-Hexane 27.4 1.47 J <0.047 0.278 J 0.296 J 0.458 J 0.303 J <0.047 2.14 0.370 J 4,900 440,000 2-Hexanone <0.285 <0.285 <0.285 0.348 J <0.285 <0.285 <0.285 <0.285 <0.285 <0.285 210 2,600 Isopropyl Alcohol 11.4 8.66 3.35 J 5.08 14.3 7.74 3.50 J 3.06 J,B 6.84 17.8 1,400 18,000 Methyl Ethyl Ketone (MEK)16.3 2.32 B 0.737 J 1.89 1.38 J 1.13 J,B 1.33 J 1.32 J,B 0.970 J 2.22 B 35,000 440,000 4-Methyl-2-Pentanone 5.13 0.364 J <0.121 <0.121 <0.121 <0.121 <0.121 0.290 J <0.121 0.856 J 21,000 260,000 Methylene Chloride 7.62 5.96 <0.488 1.91 <0.488 2.86 2.33 8.26 3.73 12.5 3,400 53,000 Naphthalene 1.04 J 0.497 J 0.608 J <0.183 2.34 J <0.183 <0.183 <0.183 0.429 J 0.665 J 2.8 36 Propene 159 <0.242 <0.242 <0.242 <0.242 <0.242 <0.242 <0.242 <0.242 <0.242 21,000 260,000 Styrene 1.04 J 0.366 J <0.124 0.664 J <0.124 <0.124 0.366 J 0.406 J <0.124 0.408 J 7,000 88,000 Tetrachloroethene 1.93 J 0.847 J 2.27 J 2.90 J 1.80 J 2.96 J 2.44 J 0.651 J 0.969 J 1.99 J 280 3,500 Tetrahydrofuran 8.58 0.946 J <0.107 0.595 J <0.107 <0.107 <0.107 0.569 J <0.107 <0.107 14,000 180,000 Toluene 270 27.0 1.62 J,B 3.80 B 4.52 B 2.96 B 3.46 B 3.19 B 3.12 B 3.99 35,000 440,000 1,1,1-Trichloroethane <0.144 <0.144 <0.144 <0.144 1.75 J <0.144 5.65 1.22 J <0.144 <0.144 35,000 440,000 1,1,2-Trichloroethane 0.605 J <0.087 <0.087 <0.087 <0.087 <0.087 <0.087 <0.087 <0.087 <0.087 1.4 18 Trichloroethene <0.199 <0.199 <0.199 <0.199 <0.199 <0.199 0.612 J <0.199 <0.199 <0.199 14 180 Trichlorofluoromethane 0.629 J 1.58 J 1.54 J 1.66 J 3.06 3.14 3.75 2.93 1.53 J 2.25 J NE NE 1,2,4-Trimethylbenzene 86.3 0.560 J 0.525 J 1.82 J 2.05 J <0.110 0.835 J 0.717 J 0.594 J 0.673 J 420 5,300 1,3,5-Trimethylbenzene 26.3 <0.236 <0.236 0.452 J 1.05 J <0.236 <0.236 <0.236 <0.236 <0.236 420 5,300 Vinyl Chloride 125 <0.127 <0.127 <0.127 <0.127 <0.127 <0.127 <0.127 <0.127 <0.127 5.6 280 o-Xylene 73.8 0.673 J 0.499 J 1.55 J 7.49 <0.157 0.733 J 0.903 J 0.577 J 0.690 J 700 8,800 mp-Xylene 207 <0.217 <0.217 1.12 J 16.3 <0.217 <0.217 <0.217 <0.217 <0.217 700 8,800 Xylene (Total)281 0.673 J 0.499 J 2.67 J 23.8 <0.157 0.733 J 0.903 J 0.577 J 0.690 J 700 8,800 Notes: 1) North Carolina Department of Environment Quality (DEQ) Division of Waste Management (DWM) Residential Sub-Slab and Exterior Soil Gas Screening Levels (SGSLs) (January 2023). 2) North Carolina Department of Environment Quality (DEQ) Division of Waste Management (DWM) Non-Residential Sub-Slab and Exterior Soil Gas Screening Levels (SGSLs) (January 2023). Only constituents detected in at least one sample are shown. Compound concentrations are reported to the laboratory method detection limits. Bold values exceed the Residential SGSL. NE = Not Established; ft bgs = feet below ground surface. J = estimated value between the laboratory method detection limit and the laboratory reporting limit. B = analyte detected in laboratory method blank. Non-Residential SGSLs (2) Residential SGSLs (1) Building B Hart & Hickman, PC Appendix D Preliminary Site Grading Plan and Cut/Fill Analysis Job: 1020143-Agtek- Interim Units: Ft-CY Fri Sep 1, 2023 14:35:11 Page 1 Volume Report Subgrade vs Stripped Area Volume Comp/Ratio Compact Export Change Total Cut Fill OnGrade Cut Fill Cut Fill Cut Fill -Import Per 0.1 ft -REPORT REGION 226,784 192,614 30,644 3,526 24,160 1,800 1.00 1.15 24,160 2,070 22,090 966 -REPORT REGION 82,550 4,370 77,044 1,136 104 18,109 1.00 1.15 104 20,825 -20,721 352 Regions Total 309,334 196,984 107,688 4,662 24,264 19,909 24,264 22,895 1,369 1,318 Plane Slope Stripping Qtys Area Area Depth Volume -STRIPPING 82,549 84,094 0.500 1,557 -STRIPPING 226,782 227,924 0.500 4,221 Stripping Total 309,331 312,018 5,778 Plane Slope Sectional Qtys Area Area Depth Volume -BUILDING 141,844 142,018 1.000 5,260 -ROADWAY 4,327 4,347 1.000 161 -ROADWAY 27,839 27,913 1.000 1,034 -ROADWAY 29,807 29,957 1.000 1,110 Sectional Total 203,817 204,235 7,565 1.50 1.40 1.30 1.20 1.10 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 ± .050 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.10 1.20 1.30 1.40 1.50 5,500 SF LEASING/ AMENITY 11,132 SFRETAIL 5,003 SFCO-WORKING UP U 724 724 724 724 724 724 72 472 3 72 2 72 1 71 9 71 8 71 7 71 6 71 4 724 723 722 721 719 718 721 722 723 713712711 724723 722 72 5 72 6 72 7 727 727 72 8 72 9 73 0 73 1 73 2 73 3 734 73 5 73 6 73 7 73 8 739 72 8 729 730 731 732 733 734 735 736 737 738 73 8 738 73 9 74 0 74 0 741 73 9 72 5 72 6 72 7 728 9/1/2023 2:52 PM CFRANKLIN \\CORP.LANDDESIGN.COM\LDCORPDATA\PROJECTS\CLT\_2020\1020143\CAD\EXHIBITS\2023-08-23-CNE PH II INTRIM GRADING EXHIBIT.DWG PN1020143 | 09.01.2023 | ATCO CAMP NORTH END ▪ CHARLOTTE, NC ▪ PH II MASTERPLAN - GRADING EXHIBIT SCALE:1"=60' 30'60'90'150'0 25,0000 CUBIC YARDS TO CUT CAMP ROADEX. BUILDING 7 TO REMAIN CO N N E C T I O N D EX. B U I L D I N G 1 2 TO R E M A I N EX. BUILDING 9 TO REMAIN ST A T E S V I L L E A V E . (N C D O T M A I N T A I N E D - SD R U - 2 0 1 8 - 0 0 0 0 6 ) WOODWARD AVENUE (CDOT MAINTAINED-EXCOLLMJ) PARCEL 27 & 28 MF WATER TOWER D R I V E(PRIVATE ROAD - 5 4 ' P U B L I C A C C E S S E A S E M E N T ) PA R A D O S W A Y (P R I V A T E R O A D - 5 4 ' P U B L I C A C C E S S E A S E M E N T ) EX. BUILDING 10 TO REMAIN EX. BUILDING 11 TO REMAIN THE RACEWAY (PRIVATE ROAD) EX. BOILER & CHIMNEY TIE TO EX. ASPHALT CONNECTION EX. WOODWARD PARKING LOT TO REMAIN EX. STAIR TO BE REMOVED EX. 39 GRANITE TO REMAIN PORTION OF LOADING DOCK RAMP TO BE REMOVED ACCESS TO BUILDING 10 PARKING LOT TO BE REMOVED WITH INTERIM FILL CONDITION PROP. SAW CUT EX. BUILDING 10 PARKING LOT TO BE SAWCUT AND REMOVED EX. RETAINING WALL TO BE REMOVED BUILDING 15 TO BE REMOVED 25,000 CUBIC YARDS TO FILL N. G R A H A M S T . (N C D O T M A I N T A I N E D ) EX. BUILDING 10 PARKING LOT TO REMAIN EX. RAILROAD TRACKS TO BE REMOVED