HomeMy WebLinkAbout0403_AnsonLF_7cvrltr_20240528ROY COOPER
Gawffnor
ELIZABETH S. BISER
Serretary
MICHAEL SCOTT
Director
Via email
Mr. Brady Stewart,
Eastern Regional Engineer
Waste Connections, Inc.
NORTH CAROLINA
Eavimmmeantu! Q"Ji i y
May 28, 2024
Re: Permit to Construct, Approved Phases 4 and 5 Expansion
Anson Waste Management Facility (Anson Landfill), Permit 0403-MSWLF-2010
Dear Mr. Stewart:
Please find with this email, the Permit to Construct and Operate for the Anson Landfill. This permit
approves the lateral and vertical expansion of the landfill, adding Phase 5.
In general, the new facility permit does not reiterate permit conditions which are included in the
Solid Waste Management Rules, 15A NCAC 13B, nor does it restate specific conditions which are
included within the approved plans, such as site -specific operations. Please review the conditions
of the permit carefully.
Approved site documents can be viewed and downloaded from our online document database:
https://edocs.deg.nc.gov/WasteManagement/Browse.aspx?id=122&dbid=0&repo=WasteManagem
ent
Also included is a cell activation form to be completed when an upgradient subcell is to be opened
for use.
If you have any questions, please contact me at 919-707-8255 or donna.wilson@deg.nc.gov. The
Waste Management Specialist for the facility is Teresa Bradford. She can be reached at (704) 235-
2160.
Sincerely,
Donna J. Wilson
Environmental Engineer
Solid Waste Section
cc: Tyler Fitzgerald, Waste Connections
Nathan Bivins
Teresa Bradford
Deb Aja
North Carolina Department of Environmental Quality I Division of Waste Management
217 West Jones Street 1 1646 Mail Service Center I Raleigh, North Carolina 27699-1646
NORTH CAROUNA
oejnm ,d M Emimi Ul u�ai� /� 919.707.8200