HomeMy WebLinkAboutWS-3891_12913_CA_CAI_20170706_System-Status
P.O. Box 16265 • Greensboro, NC 27416 503 Industrial Ave • Greensboro, NC 27406 Phone (336)335-3174 • Fax (336)691-0648 • Toll Free (866)545-9507 Email: Info@pyramidenvironmental.com www.pyramidenvironmental.com
July 6, 2017
Ms. Mindy Lepard NCDEQ – Winston-Salem Regional Office UST Section
450 W. Hanes Mill Rd., Suite 300
Winston-Salem, NC 27105
RE: Remediation System Status Update - 2nd Quarter 2017
Harold Smith, Graham, Alamance County, North Carolina
Pyramid Project# 2017-094
Incident # 12913 Dear Ms. Lepard: Pyramid Environmental & Engineering, P.C. has completed all operation and maintenance
activities associated with the Harold Smith remediation system. The system was operational most of the time during the April-June 2017 period. During this period, the soil vapor extraction (SVE) system extracted a calculated total of approximately 37.2 equivalent pounds of total hydrocarbon vapors. The Calculation of Hydrocarbon Mass Removal spreadsheet is enclosed. At the time of this report, the system was operational.
If you have any questions or comments concerning this report, please contact me at your convenience. Respectfully,
Brett Higgins
Project Manager
Enclosure: Hydrocarbon Mass Removal Calculation
Calculation of Hydrocarbon Mass Removal as Gasoline from SVE System page 1 of 2
SITE: Harold Smith DATE:
Total Removed to Date from last Spreadsheet:0.0 gallons Date of last Spreadsheet:
Step #2 - Calculate Mass Removal Rate for Hydrocarbons as Gasoline
Flow Relative Humidity OVA/OVM
Date Rate Temp Temp Temp Humidity Bws *PPMw Qstd K PPMc Cc PMRc PMRg
(cfm) (deg. F) (deg. C) (deg. R)%(mass ratio)(ppm) (dscfm)**(ppm)(lb/hr) (lb/hr)
4/18/2017 50.0 70 21.11 530 90.000 0.0147 30 49.08 6 177 0.0000055 0.0163 0.0188
5/5/2017 50.0 75 23.89 535 55.000 0.0106 30 48.82 6 178.092 0.0000055 0.0163 0.0188
6/14/2017 50.0 90 32.22 550 55.000 0.0174 30 47.16 6 176.868 0.0000055 0.0156 0.0180
Step #1 - Calculate Vapor Flow Rate Step #3 - Calculate Total Hydrocarbons Removed
Exhaust Exhaust Exhaust Flow System System Total Total
Date Diam. Area Velocity Rate Date PMRg Operation Operation Removed Removed
(inches)(ft )(ft/sec) (cfm) (lb/hr) (days) (hours) (lbs) (gallons)
4/18/2017 0.0188 22 528.0 9.9 1.6
5/5/2017 0.0188 23 552.0 10.4 1.7
6/14/2017 0.0180 39 936.0 16.9 2.7
KEY
Field Data
From Web
Int. Calc.
Transferred
Results
Set Current
Total hydrocarbons removed as gasoline (previous spreadsheet): 0.0 gallons * See Psychrometric Calculators at:
Total hydrocarbons removed as gasoline (to date): 37.2 lbs http://www.learninghelper.com/psyc/psyc_cal.cgi or
Total hydrocarbons removed as gasoline (to date): 6.0 gallons http://www.monachos.gr/en/calculators/psychrometrics.asp
** For OVA (FID) calibrated with Methane, K=1;
Calculations based on NCDENR - UST Section Guidelines - Appendix B, Pages B-74 to B-75 For OVM (PID) calibrated with Hexane, K=6.
5-Jul-2017
NA