Date of Site Inspection: April 1, 2024
FACILITY NAME AND ADDRESS:
West Farms Wood Products
1683 Barefoot Road
Newton Grove, NC 28366
GPS COORDINATES: Lat.: 35.300748'
Date of Last Inspection: October 9, 2023
Long.:-78.397089'
FACILITY CONTACT NAME AND PHONE NUMBER:
Name: Ryan Conrad
Phone: (812) 320-2373
Email address: ryan@bwoodsolutions.com
FACILITY CONTACT ADDRESS:
Blackwood Associates, LLC
Mr. Ryan Conrad
699 West Dillman Road
Bloomington, IN 47401
PARTICIPANTS:
Amanda Thompson, NCDEQ, Solid Waste Section
Amber Pernell, West Farms Wood Products
STATUS OF PERMIT:
Permit to Operate (PTO) issued August 2, 2019. Permit to Operate shall expire on August 2, 2024. Please submit the
permit renewal to the Section as soon as possible.
A revised Permit to Operate Application was submitted to the Section on February 5, 2021.
PURPOSE OF SITE VISIT:
Comprehensive Inspection
STATUS OF PAST NOTED VIOLATIONS:
A. March 11, 2019 Permit to Operate Application, Site Design (Page 4, Paragraph 1), "The West Farms Wood
Produces wood material treatment and processing facility is in the east central portion of the site and occupies
about 6.0 acres (see Total Property Layout & Staging Area — Drawing 2)."
PARTIALLY RESOLVED: A new permit application has been submitted to Donna Wilson, Permitting Engineer,
for review. This violation will be resolved once the new permit application with site plan has been reviewed and
approved.
OBSERVED VIOLATIONS:
None.
Page 1 of 3
NORTH CARnLINAD_E Q��
o.n.mm.m m c.w.mmen.i a.i�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
ADDITIONAL COMMENTS
1. The facility is fenced and is secured by a locking gate when it is not open for operations.
2. The correct signage is located at the entrance of the facility.
3. Operating hours are 7:OOAM to 5:OOPM, Monday through Friday and 7:OOAM to 12:OOPM, Saturday.
4. The facility is permitted to store up to 200,000 tons of treated wood on -site at any one time based on a demonstrated
financial responsibility of $229,065.60.
5. Several pieces of painted pallets were identified within the waste stream. Ms. Pernell stated that the unacceptable
wastes are removed as they are encountered and properly disposed of. Ensure that the unacceptable wastes are
removed and properly disposed of as they are observed.
6. The area had been graded to shed water away from the wood stockpiles.
7. Grinding was taking place during this inspection. The incinerator is still located at the facility; however, the
incinerator has not been utilized on -site since July 2022. Ms. Pernell stated that the stated that the white wood is
ground and sent to McGill for mulching and composting. The electrical poles are ground and sent to the Virginia.
8. Ms. Pernell stated that the eastern portion of the facility is used by Duke Energy as a laydown yard for new metal
electrical poles. The wood grinding operations would be taking place in the western portion of the facility. Please
notify Permitting of possible layout changes at the facility.
9. Digital photographs were taken during the inspection.
Please contact me if you have any questions or concerns regarding this inspection report.
Amanda Digitally signed by Amanda
Thompson
024.04.04 07:48:29
Thompson 04'00'
Amanda Thompson
Environmental Senior Specialist
Regional Representative
Phone: (910) 433-3352
Sent on: April 4, 2024 X Email Hand delivery US Mail Certified No.
Copies: Drew Hammonds, Eastern District Supervisor — Solid Waste Section
Donna Wilson, Permitting Engineer — Solid Waste Section
Page 2 of 3
Oepartmenl o� Environmantal0uali�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Photogra hs taken b Amanda Thom son on A ril 1, 2024.
General view of the site.
7.
View of the grinding location.
t
View oin f the treated tele hone ole stockpile.a
View of the white wood stockpile.
Page 3 of 3