Loading...
HomeMy WebLinkAboutCCB0031_DukeMarshall_NorthSF_Notification_WellSOW-2A_Reloc_FID_20240228Moutos, Sarah From: Sent: To: Cc: Subject: Attachments: Importance: Follow Up Flag: Flag Status: Healy, Ashley Lisbeth <Ashley.Healy@duke-energy.com> Wednesday, February 28, 2024 3:44 PM Moutos, Sarah Russ, Jordan A; Stanley, Sherri; Saunders, Scott Allen; Varner, Chris; Zakary, Daniel T.; Hardin, Tyler; Witt, Kimberlee [External] Marshall - NCDEQ Notification for Structural Fill (CCB0031) N. Stability Feature Dewatering Well Relocation CCB0031_North Stability Feature -Phase I_SOW-2A Relocation -For Information Only_ 02-28-2024.pdf High Follow up Flagged CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Sarah - As discussed, this is a notification to NCDEQ Solid Waste that Duke Energy intends to replace and relocate one shallow observation well (SOW-2) part of the Structural Fill north stability feature dewatering system. SOW-2 has become dry, and therefore is not a viable observation location for monitoring the dewatering system operations during the stability feature construction. Replacement observation well SOW-2A will be located further within the Ash Basin finger. The well construction details, including that the well will be screened in ash, will be similar to the shallow observation well details provided in the July 7, 2023 submittal (FID 1810470). The attached figure shows the approximate location for SOW-2A; SOW-2 will be abandoned. Please let me know if you have any questions with this notification. Regards, Ashley Healy Ashley L. Healy, P.G. Waste and Groundwater Programs Mobile: 717-982-0986 REV. 0 E F I 1 I 1 1 � � � � � 1 � I I � � I I• 11 � I � �� � 1 � l— 11 � S /" \' \ \\� ,� /' /// � � 1 \ 1 � � � � / � � \\= —\\� ///�\� \\ \ \ IIII \> (} \\ \ ,�� J\ // ���� \\ \\\ \� // % I I I 1 1 1 1 1 1 � 1 1 I.I I I I I � I I • 11 / � �\\`__ \�°� //� � � /—f\\/�� I 03 \ o \ I \ I I \ \ \� \ 1111�11IIoIIIII}I11:IIIII I \ 11�1 I I ICI 1 I ICI I II' I 1 I I I I \\ I \ 1 1 I 11 I I I 1 1 1 1 1 TRANSMISSION TOWER S�' 0t o>(SEE NOTE 3) //17 1 t \ ? I I i 1 \ \ \ \ \ l STRUCTURAL FILL UNIT / ( o I I /\ \ \ \ (( TRANSMISSION POLES \ , \ \■� ) \ �. v / \ / 1 0 1 1 1 i 1•'t� BOUNDARY 1 \ / \ y ( } ` r (SEE NOTE 3) �I l \ 1A 1 \ \\\\\\\\1\I1}11}'}111 l '! \ \ 1 \ ,,� \\ /moo,//�a��\ /o /�1 \ \■ \ III } I ✓ / / J \ \ } • } MIN. OFFSET 25-FT FROM I II I\l \\ "° /' 'EDGE OF TRANSMISSION 1 JTOWER j--j\ FUTURE E ILLANDFILL 00 / /�/ >I I :I1II / /I I(I(I�� TRANSMISSION POLE I1II (IIIIII S / ( / \ BOUNDARY(SEE NOTE 3) STRUCTURAL FILL O C II l O / PERMIT NO. CCB0031 - t t� IIII I Cb /f�,/�'i//iii/ i/�i/i/�i //f•// - 1\ � \\ \ / \ Cb Od O';;;; I'r/i ii i �ii/i �i, /IIII ♦ \ I \�■� / l I I I ' 1 I ' / / % % % j i 3 i I 1 i l �, i It1 7 L /ice 7 1 I r/ I I I I I I I ' I' 1 1 1 I I I I I I I I I I I I 1 �■ �� SOW-2CH — (�o\- 1 I CPT-SF-N-2 i l 1 1 1 i i i i '� CPT-SF-N-3 ♦ —__ __ _ ° , �_�/ I I I I I' 1 1' 1 1 I j 1 1 1 1 it j ♦ ,/ / �- ��x j —� J I I 1 1 I, I I I 1 I' I I I I I I I I I / \ I / \� / / I \_—/ �\ I I 1 1 1 1 1 1 1 1 1 - / \ II ❑ 1 1 13; i 1 1 i' l i i i i ' //��\\ \��\ 11 I I I' I I I I/ \ \% I� 1 1 1 1 1 j 1 1 I j I j I I I j 1 1 1 1 1 1 ► . : / I/ \/ I �� �\ \\\ CPT-SF-N-1 S II I I i 1 I 1 i 1 I i' ►,i l i i 1,i SOW-4 I \SOW-2A 0 ih' i' i i i i ' 0N:685135.1 00 DOW-3 I I DOW-6 I E: 1412125.8 LIMIT OF FINAL COVER ■ i/(\ \ J 1 1 II I I j i l i i i I i l i i I i i i I l i i i i i OVER STABILITY FEATURE I / I I f 1 1 1 1 1 1 1 1 1 1 1 I I I 1 1 1 1 1 I I I I► 1 '\ / / \ \ � i 1 1 Iiil,i'►1 11l1l1i1 i1 i I 8 / .•••• S II I} () 1 1 1 1 CPT-SF-N-4 i I I i 1 i 1 i 1 1 1 1 I I i i i i i CPT-SF-N-5 \\ ••4 \ •••• i I! i ! I i 1 1 PP 1' I I i 1 i' I i' 11 1 I I I I I 1 1► I %+ p p •••. / O ? ` II I I S /� I �' i i� i l� i i 1 1 i'� i l i i i� l i i i i i � \ �� I\ •••••�� • / �^ / [/ \\ I I cp 1 . 6 • : �• / // - I I ■ p O '� •� ( I I I I 1 1 1 1 1 1 1 1 1 1 1 I I I I I I I I I 11 O ■ Q +p •• / \ \ I I , I I, I I 1 1 1 1 1 1' 1 1 I I' I I I I I I I ■ SOW-1 1— �% •••1 / I I 1 1 \ ! «I I I I I 1 I I I I I 1 1 1 1 I I 1 1 I 1 I 1 I 1 I 1111 4 '•ji•• I \ I o 1 SOW-3 5+p0 �� / '�••• \ S 11 I II I �i l►i1i liii'Ii'�ilii ii _��/ / •'••. 1 I oo I , l i i 1 i l i i i' l i'� i l i i'� l i� � / ••y I IiiIi liii'li'�i IIII iliiii ?J / I••••••4 \> 1 ! A I I I ll 1 1 1 1 1 1 1 1 1, 1 1 1 1 1 1 1 1 1 1 1 1 I I I DOW-51 °: /\\� JIB — -, } 1 �'••••• / } Z� II I �I�� 1�1�11{llli �k0 } I \ �••• 11 ! 1� (� I l I l I j 1 1 1 j l j 1 1 1' I I I I' 1 1 1 1 1 J/— — •• \ 1 DOW-2 ■ _ � - �� � I �.! II I I 1 1 j 1� I j � 1 1 � I j I � � I I � 1 1 � I I I ■ �1�_ ��� ��` // �• I \ I I ■ / J/i ^��__ �� �� � /} •�•• lot i i CPT-SF-N-6 100111 \� / > —�/� Ill � �l I11 'ii IIII 1�1�11�i�oi11i1i��\\� � \1\00 \ \gyp\`\`\`\ ll I 1�)I 1 DOW-4 \ \ \ \ \\ \ \p\ ® DOW-1 \ S \\\\\\\\\\\\\\\\\\ \\ \\\\\\\\\\\\\\\ \ \ -840 — -\840— Sp �\ \\ \ \ \`\ \ \` \�\��\ \\\\�\\ `\\ \\\`\\` \`\ \` \\ `• `: �•�. / \\ EXISTING TRANSMISSION / \ ,� \ \ \ \ \ \ \ \ I �'�\\ I I \ F, POLE SEE NOTE 3 N \ t \\ \ CA, 86'\�\ Ole \\ o \ \ I \ �/ / / \ \ i \ \ \ \ \ // ! \�\�_� / 000, \\ ! I } ) 1 i / / / // \ // / \ \ \� / \ // \ \ EXISTING ILF LE CHATE BASIN 14 \\ 1 lI}I11 11 ll \ LJr/ / ►� / /�� — / \ EXISTING ILF LEACHATE PIPE 1100*0 \\\ �\� I i � 1 1 1 1 } 1 } l 1 � 1 \ � 1 � lR �I / �' �/� C � /\ / j / � / � � / / � � �,� � \ � � \ \ \ - -- \ 1 I I � •� (/ C:\USERS\MEAGAN.SURANE\AECOM\DUKE ENERGY-MARSHALL - GENERAL (1)\MAR STABILITY FEATURES\900-CAD-GIS\910_CAD\25-FIGURES\O6_STRUCTURAL FILL NORTH PROPOSED CONDITIONS -PHASE III.DWG 2/7/2024 2:09:32 PM 101 0 50 100 150 GRAPHIC SCALE (IN FEET) LEGEND - 800 - — EXISTING MAJOR TOPOGRAPHIC CONTOUR KELLER DRILLED DEEP OBSERVATION WELL - EXISTING MINOR TOPOGRAPHIC CONTOUR KELLER SHALLOW OBSERVATION WELL PROPOSED MAJOR TOPOGRAPHIC CONTOUR CEC VIBRATING WIRE PIEZOMETER PROPOSED MINOR TOPOGRAPHIC CONTOUR CEC INCLINOMETER � . ASH BASIN BOUNDARY (APPROXIMATE) AECOM CONE PENETRATION TEST LOCATIONS """""".. EXISTING SITE FEATURE (APPROXIMATE) (2022) STABILITY FEATURE LIMITS REFERENCES 1. SEE SHEET MAR_C907.015.002 FOR DRAWING REFERENCES. NnTF.q 1. EXISTING TOPOGRAPHIC CONTOURS WITH STABILITY FEATURE LIMITS DEPICT LIMITS OF PREVIOUS EXCAVATION PHASE. IT IS THE INTENT OF THESE DRAWINGS THAT EXCAVATION LIMITS FOR PREVIOUS PHASE BE ACHIEVED PRIOR TO COMMENCEMENT OF EXCAVATION FOR SUBSEQUENT PHASE. 2. MAXIMUM CCR EXCAVATION SLOPE WITHIN THE LIMITS OF EACH EXCAVATION PHASE SHALL BE 11-HORIZONTAL TO 1-VERTICAL, EXCEPT WHERE SHOWN. EXCAVATION SLOPES IN NATURAL SOILS OUTSIDE THE STABILITY FEATURES ARE LIMITED TO 3-HORIZONTAL TO 1-VERTICAL. FIELD FIT EXCAVATION SLOPES TO TIE INTO ACTUAL BASE OF CCR GRADES AS NECESSARY. 3. MAINTAIN A MINIMUM OFFSET OF 25-FT FROM TRANSMISSION TOWERS AND POLES WITHIN THE PROPOSED EXCAVATION AREAS. COORDINATE WITH DUKE ENERGY PRIOR TO EXCAVATION WITHIN 100-FT OF TRANSMISSION TOWERS. 4. CONTRACTOR SHALL MANAGE SURFACE WATER RUNOFF TO MINIMIZE PONDING AT THE TOE OF CCR EXCAVATIONS. ID Northing Easting Ground Surface Estimated Bottom of Elevation (FT) Ash (FT) SOW-2A 685135.14 1412125.8 824.6 799.4 1. GROUND SURFACE ELEVATION BASED ON PROPELLER TOPOGRAPHIC SURVEY 2. ESTIMATED BOTTOM OF ASH BASED ON PRE -DEVELOPMENT TOPOGRAPHIC DATA. A=GOM N.C. ENGINEERING LICENSE NO. F-0342 PROPOSED PHASE III GRADING PLAN MARSHALL STEAM STATION PV STRUCTURAL FILL NORTH STABILITY FEATURE CATAWBA COUNTY, NORTH CAROLINA FOR ISSUED FOR CONSTRUCTION � DUKE SCALE: AS SHOWN DES: MCS DWG TYPE: ,DWG DFTR : RLP JOB NO: ENFI � DATE: 02//0120246 ENGR : RPD FILENAME: SEE FILE TAG AT BOTTOM LEFT IAPPD: JAB I DWG SIZE DRAWING NO. I REVISION ANSI D 22.0"x34.0" 70 m 0 INCHES 1 2 3 TENTHS 10 20 30 1 1 1 I I I I 4 5 6 7 8 9 10