Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout9204_Wake_Sorrell_MSWLF_March24LFG_FID1832176_20240319pENR USE ONLY ❑Paper Report ❑Electronic Data - Email CDAdata loaded: Yes / No) Doc/Event #:
C DENR Environmental Monitoring
Division of Waste Management - Solid Waste Reporting Form
Notice: This form and any information attached to it are "Public Records" as defined in NC General Statute 132-1. As such, these documents are
available for inspection and examination by any person upon request (NC General Statute 132-6).
Instructions:
• Prepare one form for each individually monitored unit.
• Please type or print legibly.
Attach a notification table with values that attain or exceed NC 2L groundwater standards or NC 2B surface water standards. The notification
must include a preliminary analysis of the cause and significance of each value. (e.g. naturally occurring, off -site source, pre-existing
condition, etc.).
• Attach a notification table of any groundwater or surface water values that equal or exceed the reporting limits.
Attach a notification table of any methane gas values that attain or exceed explosive gas levels. This includes any structures on or nearby the
facility (NCAC 13B .1629 (4)(a)(i).
• Send the original signed and sealed form, any tables, and Electronic Data Deliverable to: Compliance Unit, NCDENR-DWM, Solid Waste
Section, 1646 Mail Service Center, Raleigh, NC 27699-1646.
Solid Waste Monitoring Data Submittal Information
Name of entity submitting data (laboratory, consultant, facility owner):
S&ME, Inc. (Environmental Consultant)
Contact for questions about data formatting. Include data preparer's name, telephone number and E-mail address:
Name: Sam Watts
E-mail: swatts@smeinc.com
Phone: (919) 872-2660
NC Landfill Rule: Actual sampling dates (e.g.,
Facility name: Facility Address: Facility Permit # (.0500 or .1600) October 20-24, 2006)
Sorrells Landfill SR 1303 (near 8000 Smith Road) 92-04 1600 March 18, 2024
Apex, NC 27539
Environmental Status: (Check all that apply)
❑ Initial/Background Monitoring ❑ Detection Monitoring ❑x Assessment Monitoring Corrective Action
T e of data submitted: (Check all that apply)
Groundwater monitoring data from monitoring wells X❑
Groundwater monitoring data from private water supply wells ❑
Leachate monitoring data ❑
Surface water monitoring data
Methane gas monitoring data
Corrective action data (specify)
Other(specify)
Notification attached?
e No. No groundwater or surface water standards were exceeded.
Yes, a notification of values exceeding a groundwater or surface water standard is attached. It includes a list of groundwater and surface water
monitoring points, dates, analytical values, NC 2L groundwater standard, NC 2B surface water standard or NC Solid Waste GWPS and
preliminary analysis of the cause and significance of any concentration.
�x Yes, a notification of values exceeding an explosive methane gas limit is attached. It includes the methane monitoring points, dates, sample
values and explosive methane gas limits.
Certification
To the best of my knowledge, the information reported and statements made on this data submittal and attachments are true and correct.
Furthermore, I have attached complete notification of any sampling values meeting or exceeding groundwater standards or explosive gas
levels, and a preliminary analysis of the cause and significance of concentrations exceeding groundwater standards. I am aware that there
are significant penalties for making any false statement, representation, or certification including the possibility of a fine and imprisonment.
Samuel P. Watts, P.G. S&ME Project Manager (919) 872-2660
Facility Representative Name T nnt) Title (Area Code) Telephone Number
C /A / /r-� _ /. _ / Affix NC Licensed/ Professional Geologist Seal
2D2y
Signature ' Date
S&ME, Inc. 3201 Spring Forest Rd, Raleigh, NC 27616
Facility Representative Address
F-0176
NC PE Firm License Number (if applicable effective May 1, 2009)
Revised 6/2009 '0-
March 19, 2024
Solid Waste Section
NCDEQ - Division of Waste Management
217 West Jones Street
Raleigh, North Carolina 27603
Attention: Ms. Jaclynne Drummond via email:iaclynne.drummond@deg.nc.gov
Reference: Methane Monitoring — March 18, 2024
Sorrell Landfill (Permit No. 92-04)
8000 Smith Road, Apex, North Carolina
S&ME Project No. 1054-07-251
Dear Ms. Drummond:
On behalf of Sorrell Grading Company (Sorrell), S&ME, Inc. (S&ME) is submitting methane gas monitoring data
collected on March 18, 2024 at the closed Sorrell Landfill located in Apex, North Carolina. The March 2024
measurements were collected by S&ME personnel in the on -site permanent methane monitoring wells (probes); in
on -site groundwater monitoring wells; in off -site groundwater assessment wells; and from beneath two off -site
residential structures located at 5100 and 5101 Herndon Lane depicted on Figure 1.
Methane measurements were collected using a Landtec GEM 5000 portable gas analyzer, following Solid Waste
Section guidelines and standard operating procedures previously established for Sorrell Landfill. Table 1
summarizes the methane readings collected at the Sorrell Landfill from January 2013 through March 2024. The
methane concentrations recorded during the March 2024 monitoring event exceeded the operational limits,
established for gas control at municipal solid waste landfills by North Carolina Solid Waste Rules [15A NCAC 13B
.1626(4)(a)], i.e. methane concentrations were greater than the lower explosive limit (LEL) for methane (5% CH4), at
two locations (MMW-4 and MW-8).
Of particular note, S&ME observed additional site development on the property to the south of the landfill, west
of Herndon Lane. Photos taken at the site on March 18, 2024 are included on the attached photolog.
Sincerely,
S&ME, Inc.
cl_ WW--
Samuel P. Watts, PG
Senior Project Manager
swatts@smeinc.com
Enclosures: Figure 1 — Site Map with Methane Monitoring Locations
Table 1 — Percent Methane Gas Levels for the Sorrell Landfill
Photolog
cc: Mr. James R. Easthom (ieasthom@kennoncraver.com) — Kennon, Craver, Belo, Craig & McKee, PLLC
Mrs. Teresa Sorrell Atkins (tandgatkins@aol.com)
S&ME, Inc. 13201 Spring Forest Road I Raleigh, NC 27616 1 p 919.872.2660 1 www.smeinc.com
Attachments
Table 1
Percent (%) Methane Gas Levels
March 2016 - March 2024
Sorrell Landfill, Apex, NC
S&ME Project No. 1054-07-251
Permanent Methane Monitoring Wells & Off -Site Structures
On -site Groundwater Monitoring Wells
Off -site Groundwater Monitoring Wells
DATE
5100
Herndon
Lane
5101
Herndon
Lane
MMW-2
MMW-3
MMW-4
MMW-5
MMW-6
MW-1R
MW-4
MW-5
MW-6
MW-7
MW-8
MW-9
DW-1
GP-7
GP-7D
GP-8
GP-9
GP-10
GP-10D
GP-11
GP-12
GP-12D
GP-13
GP-13D
GP-14
GP-15
GP-16
Percent Methane (% CH4)
03/30/16
0.0
0.0
0.0
0.0
27.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
5.2
0.0
12.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
06/30/16
0.0
0.0
0.0
0.0
19.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.2
0.0
1.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
09/12/16
0.0
0.0
0.0
0.0
27.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
5.3
0.0
10.6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
12/07/16
0.0
0.0
0.0
0.0
26.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.6
0.0
10.6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
03/10/17
0.0
0.0
0.0
0.0
39.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1.9
0.0
23.6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
06/20/17
0.0
0.0
0.0
0.0
40.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1 0.0
0.0
0.0
0.0
0.2
0.0
8.5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
10/06/17
0.0
0.0
0.1
0.1
12.1
0.2
0.0
0.0
0.0
0.0
0.0
0.0
0.6
0.0
0.0
0.1
0.1
8.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
12/27/17
0.0
0.0
0.0
0.0
63.4
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2.2
0.0
0.0
0.0
0.0
8.1
0.0
9.5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
03/05/18
0.0
0.0
0.0
0.0
38.4
0.5
0.0
0.0
0.0
0.0
0.0
0.0
7.3
0.0
0.0
0.0
0.0
2.5
0.0
3.6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
06/22/18
0.0
0.0
0.3
0.0
86.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
16.6
0.0
0.0
0.4
0.0
17.1
0.0
5.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
09/10/18
0.0
0.0
0.0
0.0
48.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
18.0
0.0
0.0
0.0
0.0
12.2
0.0
8.4
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1/17/2019
0.0
0.0
0.0
0.0
28.5
2.5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
9.8
0.0
9.4
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3/21/2019
0.0
0.0
0.0
10.0
6.2
1.7
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
6.3
0.0
1.5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
6/4/2019
0.0
0.0
0.0
0.0
8.7
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.6
0.0
1.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
9/19/2019
0.0
0.0
0.0
0.0
53.7
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
12/18/2019
0.0
0.0
0.0
0.1
44.6
0.1
0.0
0.0
0.0
0.1
0.0
0.0
9.7
0.0
0.0
0.0
0.0
10.0
0.0
5.5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3/25/2020
0.0
0.0
0.0
0.0
16.5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2.6
0.0
9.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
6/4/2020
0.0
0.0
2.5
0.0
40.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
2.8
0.0
20.6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
9/8/2020
0.0
0.0
0.0
0.0
46.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
23.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
12/3/2020
0.0
0.0
0.0
0.0
37.2
0.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
20.1
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3/21/2021
0.0
0.0
0.0
0.0
14.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
4.3
0.0
0.0
0.0
1 0.0
0.0
0.0
0.0
0.0
0.0
6/1/2021
0.0
0.0
0.0
0.0
15.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
7.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
9/13/2021
0.0
0.0
0.0
0.0
41.4
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
14.6
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
12/13/2021
0.0
0.0
0.0
0.0
65.5
0.0
0.0
0.0
1 0.0
0.0
0.0
0.0
0.2
0.0
0.0
0.0
1 0.0
8.1
0.0
9.0
0.0
0.0
0.0
0.0
0.0
0.0
1 0.0
0.0
1 0.0
3/28/2022
0.0
0.0
6.5
0.0
12.7
2.5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.5
0.0
18.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
7/7/2022
0.0
0.0
0.0
0.0
31.2
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
9/29/2022
0.0
0.0
0.0
0.0
20.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3.8
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
12/9/2022
0.0
0.0
0.0
0.0
65.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
23.4
0.0
0.0
0.0
0.0
0.0
13.0
0.0
0.0
0.0
0.0
0.0
1 0.0
0.0
0.0
0.0
3/27/2023
0.0
0.0
5.9
0.0
21.9
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3.9
0.0
0.0
0.0
0.0
10.9
1 0.0
8.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
5/23/2023
0.0
0.0
0.0
0.0
10.5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3.9
0.0
0.0
0.0
0.0
0.0
0.0
4.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
8/29/2023
0.0
0.0
0.0
0.0
36.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
11/1/2023
0.0
0.0
0.0
0.0
18.2
0.0
1 0.0
0.0
0.0
0.0
0.0
0.0
12.4
0.0
1 0.0
0.0
0.0
10.3
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
3/18/2024
1 0.0
1 0.0
0.0
1 0.0
1 34.2
1 0.0
1 0.0
0.0
1 0.0
0.0
0.0
0.0
14.6
0.0
1 0.0
0.0
1 0.0
0.0
0.0
1 0.0
1 0.0
0.0
0.0
1 0.0
0.0
1 0.0
1 0.0
0.0
0.0
Notes: NM = Not Measured
Shaded and bolded cells indicate methane concentration exceeding the lower explosive limit (>5% Methane).
T:\Raleigh-1050\Pmjects\2007\07-251 Sorrell Landfill\LFG-Methane Monitodng\2024 March Monitodng\2016_2024 Summary Table.xlsx
© POTABLE WELL
APPROXIMATE LIMITS OF CAP
APPROXIMATE WASTE BOUNDARY
—4PP TOPOGRAPHIC CONTOUR LINES
HYDROLOGIC FEATURE
X X X X FENCE LINE
GRAPHIC SCALE
zoo 0 100 zoo
( IN FEET )
7
W
Ln w
coN m
O 2 r- 7
N Z z
II
ui c w OT z O
rn a ❑
u
T
2
c0 w
r— Q
0
�IIIW
III
=I
w CD
wz
zR
c9 a
z co
w—
Q
z
J J
J O
a C
Q z U
Q
Lu
J =
ILL!0
�
Of O � z
O X
u1
n
Q
FIGURE NO.
1
Methane Monitoring
Sorrell Landfill
Apex, NC
S&ME Project No. 1054-07-251
00
N
O
® 319-NW (T) [f] 35°42'4"N, 78°48'46"W ±16ft • 477ft
00
M
a�
0
S
.M/, • ,�'' 5 ..'r =4 - a�-a..
OF
is
E
g=
ri
7F
_:
O
O
_
Location / Orientation
Residence at 5100 Herndon Lane
1
Remarks
March 19, 2024
Methane Monitoring
Sorrell Landfill
Apex, NC
S&ME Project No. 1054-07-251
March 19, 2024
Methane Monitoring
Sorrell Landfill
Apex, NC
S&ME Project No. 1054-07-251
NE E SE S
N
O
0107°E (T) OO 35°42'6"N, 78°49'6"W ±16ft • 414ft
00
18 Mar
a�
0
v
v
a
o,
0
0
i
.,
Location / Orientation Construction near MMW-6 facing east.
5
Remarks Adjacent property south of the landfill.
March 19, 2024
Methane Monitoring
Sorrell Landfill
Apex, NC
S&ME Project No. 1054-07-251
i
NW
O
0 248°W (T) Q 35°42'6"N, 78°48'55"W ±16ft A 447ft
Co
4 _ r
to
t
Q
Ol
O
d
Location Orientation
Looking south at adjacent property under
/
development. MMW-4 visible in the foreground.
Remarks Shrubbery planted along property boundary.
N
O
0147°SE (T) OO 35°42'6"N, 78°49T'W ±16ft • 447ft
M
iv
F f '
Q
Q
0
d
Location Orientation
Looking southeast at adjacent property under
/
g development. MMW-5 visible in the foreground.
Remarks Shrubbery planted along property boundary.
March 19, 2024
Methane Monitoring
Sorrell Landfill
Apex, NC
S&ME Project No. 1054-07-251
SW W NW N
00
N
0 295°NW (T) QQ 35°42'6"N, 78°48'56"W ±16ft • 444ft
O
00
-
a--r
0
i
N
i>s
r4i F fir.'q�
12
0
Location /
Facing west looking along the southern property
10
Orientation
boundary access road.
Remarks
March 19, 2024
Methane Monitoring
Sorrell Landfill
Apex, NC
S&ME Project No. 1054-07-251
N
O
0 301°NW (T) Q 35°42`9"N, 78°48'40"W ±16ft A 494ft
00
a�
0
v
v
a
o,
0
0
a
Location /
11 Top of landfill facing northwest.
Orientation
Remarks Click here.
March 19, 2024
Methane Monitoring
Sorrell Landfill
Apex, NC
S&ME Project No. 1054-07-251
S SW 1W NW
00 330 1 �
N
O
0 266°W (T) OO 35°42'8"N, 78-48'41"W ±4639ft • 410ft
00
iv
.. _ •t..
y
�a.�.. _ .. O
� t ��� � p,��• �;�A �n�; ��, � i • '�; ids x �_ 0
13 Location / Orientation Interior road near monitoring well MW-6.
Remarks Visible evidence of flooding.
_
'T
:0
N
O
0 239-SW (T)O 35°42'16"N, 78°48'57"W ±32ft • 412ft
00
M
A
o
Y _
. [e '. •' A't i =�
�
' f
1
�,yr9"1,sa.
0
lr
m
0
0
o
'
a
14 Location / Orientation Interior road near monitoring well MW-6.
Remarks Road partially washed out at stream crossing.
March 19, 2024