Loading...
HomeMy WebLinkAbout8106_DukeRogers_WQMPChanges_FID1832171_20240212TABLE 1 MULTI -MEDIA SAMPLE LOCATIONS CCP LANDFILL NO. 8106-INDUS WATER QUALITY MONITORING PLAN ROGERS ENERGY COMPLEX - CLIFFSIDE STEAM STATION DUKE ENERGY PROGRESS OR CAROLINAS, L-C., MOORESBORO, NC Sample ID Media Description Reason for Change CCR-CCPBG-1BR was installed to monitor background groundwater and is CCR-CCPBG-1BR located southwest and upgradient of the landfill. CCR-CCPBG-1D was installed to monitor background groundwater and is CCR-CCPBG-1D located southwest and upgradient of the landfill. CCR-CCP-18S was installed as a part of a separate program for assessment ADDED TO NETWORK: Well added to address gaps in CCR-CCP-18S and is located east and downgradient of the landfill. sampling network east of the landfill CCR-CCP-19S was installed as a part of a separate program for assessment ADDED TO NETWORK: Well added to address gaps in CCR-CCP-19S and is located east and downgradient of the landfill. sampling network east of the landfill CCR-CCP-20D was installed as a part of a separate program for assessment ADDED TO NETWORK: Well added to address gaps in CCR-CCP-20D and is located east and downgradient of the landfill. sampling network east of the landfill CCR-CCPMW-8D was installed as a part of a separate program for ADDED TO NETWORK: Well added to network to replace CCR-CCPMW-8D assessment and is located south and downgradient of the landfill. CCPMW-8 (effectively dry) with a deeper well CCPMW-1S was installed to monitor background groundwater and is located CCPMW-1S west and upgradient of the landfill. CCPMW-1D was installed to monitor background groundwater and is located CCPMW-1D west and upgradient of the landfill. CCPMW-2S was installed for assessment, is located south and downgradient CCPMW-2S of the landfill. CCPMW-2D was installed for assessment, is located south and downgradient REMOVED FROM NETWORK - 25 is sufficient coverage for CCPMW-2D of the landfill. uppermost aquifer. Keep as water level only REMOVED FROM NETWORK: Well is effectively ry. No CCPMW-35 was installed for assessment, is located south and downgradient replacement required as deeper well CCPMW-3D is CCPMW-3S of the landfill. already in the monitoring network. Keep as water level Groundwater only CCPMW-3D was installed for assessment, is located south and downgradient CCPMW-3D of the landfill. CCPMW-4 was installed for assessment, is located northwest and CCPMW 4 downgradient of the landfill. CCPMW-5 was installed for assessment, is located north and downgradient CCPMW-5 of the landfill. CCPMW-6S was installed for assessment, is located north and downgradient CCPMW-6S of the landfill. CCPMW-6D was installed for assessment, is located north and downgradient REMOVED FROM NETWORK - 65 is sufficient coverage for CCPMW-6D of the landfill. uppermost aquifer. Keep as water level only CCPMW-7 was installed for assessment, is located north and downgradient CCPMW-7 of the landfill. REMOVED FROM NETWORK: Well is effectively dry. CCPMW-8 was installed for assessment, is located south and downgradient CCPMW-8 Replaced with existing deeper well CCR-CCPMW-8D. Keep of the landfill. as water level only CCPMW-10 was installed for assessment, is located south and downgradient CCPMW-10 of the landfill. CCPMW-11 was installed for assessment, is located southeast and CCPMW-11 downgradient of the landfill. CCPTW-2 was installed for assessment, is located south and downgradient REMOVED FROM NETWORK: Well is dry. Replaced with CCPTW 2 of the landfill. deeper well CCR-CCPTW-2D. Keep as water level only CCR-CCPTW-2D was installed as a part of a separate program for assessment ADDED TO NETWORK: Well added to network to replace CCR-CCPTW-2D and is located south and downgradient of the landfill. CCPTW-2 (dry) with a deeper well CCPSW-1 surface water monitoring location is south and upgradient of the SW-1 Surface Watei landfill. SW-2 CCPSW-2 surface water monitoring location is east and downgradient of the landfill. CCPSW-3 surface water monitoring location is west and downgradient of the SW-3 landfill. Leachate sample, representing leachate from Phases 1 and 2 of the landfill, CCP-LEACHATE collected from an in -line sampling point south and downgradient of the Leachate landfill. Leachate sample, representing leachate from Phases 3 and 4 of the landfill, CCP-LEACHATE-31 collected from an in -line sampling point south and downgradient of the landfill. • CCPMW-5 `• • ;PMW-4 •` •• J ® CCPMW-6S/D '. AL ii p CCPM\ CCPMW-1S/D , .CAI yry,L.,P 0 lope I • - , 1 ■ 1 1 DUKE POWER 414, Now • • I � 1 1 ■ LEGEND 1 JII!!I GROUNDWATER MONITORING WELL 1 LEACHATE SAMPLE LOCATION LANDFILL LIMIT OF WASTE • LANDFILL REVIEW BOUNDARY 1 ■ — - — • LANDFILL COMPLIANCE BOUNDARY — - DUKE ENERGY CAROLINAS PROPERTY LINE STREAM (AMEC NRTR) ® WETLANDS (AMEC NRTR) r • NOTES: I 1 ' • . 1. THE WATERS OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE F I - US ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP - - - IS NOT TO BE USED FOR JURISDICTIONAL DETERMINATION PURPOSES. THE CCR-CCPBG 1 D/BR ®_ "• WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM STREAM AND CCPTW-2 CCPMW-11 P 1 CCPMW-2S/D - — CCPMW-8 • • I CCPMW-3S/D . • ♦ ♦ � •� /. ' A♦ 00,0000 BALEEN GER RD. -' ` GRAPHIC SCALE ■> DUKE 150 0 150 300 4' ENERGY N FEET) CAROLINAS DRAWN BY: C. WYATT DATE: 02/09/2022 REVISED BY: C. WYATT DATE: 03/11/2022 CHECKED BY: D. AVARD DATE: 03/11/2022 APPROVED BY: T. GRANT DATE: 03/11/2022 synTerm PROJECT MANAGER: S. SPINNER www.synterracorp.com WETLAND DELINEATION CONDUCTED BY AMEC FOSTER WHEELER ENVIRONMENTAL AND INFRASTRUCTURE, INC. JUNE 2015. 2. ALL BOUNDARIES ARE APPROXIMATE. 3. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS. 4. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO. AERIAL DATED SEPTEMBER 4, 2021. 5. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM RIPS 3200 (NAD83). DRAWING 2 CCP LANDFILL GROUNDWATER MONITORING SYSTEM CCP LANDFILL PHASES I THROUGH IV WATER QUALITY MONITORING PLAN ROGERS ENERGY COMPLEX - CLIFFSIDE STEAM STATION MOORESBORO, NORTH CAROLINA