MULTI -MEDIA SAMPLE LOCATIONS
CCP LANDFILL NO. 8106-INDUS
WATER QUALITY MONITORING PLAN
ROGERS ENERGY COMPLEX - CLIFFSIDE STEAM STATION
DUKE ENERGY PROGRESS OR CAROLINAS, L-C., MOORESBORO, NC
Sample ID
Media
Description
Reason for Change
CCR-CCPBG-1BR was installed to monitor background groundwater and is
CCR-CCPBG-1BR
located southwest and upgradient of the landfill.
CCR-CCPBG-1D was installed to monitor background groundwater and is
CCR-CCPBG-1D
located southwest and upgradient of the landfill.
CCR-CCP-18S was installed as a part of a separate program for assessment
ADDED TO NETWORK: Well added to address gaps in
CCR-CCP-18S
and is located east and downgradient of the landfill.
sampling network east of the landfill
CCR-CCP-19S was installed as a part of a separate program for assessment
ADDED TO NETWORK: Well added to address gaps in
CCR-CCP-19S
and is located east and downgradient of the landfill.
sampling network east of the landfill
CCR-CCP-20D was installed as a part of a separate program for assessment
ADDED TO NETWORK: Well added to address gaps in
CCR-CCP-20D
and is located east and downgradient of the landfill.
sampling network east of the landfill
CCR-CCPMW-8D was installed as a part of a separate program for
ADDED TO NETWORK: Well added to network to replace
CCR-CCPMW-8D
assessment and is located south and downgradient of the landfill.
CCPMW-8 (effectively dry) with a deeper well
CCPMW-1S was installed to monitor background groundwater and is located
CCPMW-1S
west and upgradient of the landfill.
CCPMW-1D was installed to monitor background groundwater and is located
CCPMW-1D
west and upgradient of the landfill.
CCPMW-2S was installed for assessment, is located south and downgradient
CCPMW-2S
of the landfill.
CCPMW-2D was installed for assessment, is located south and downgradient
REMOVED FROM NETWORK - 25 is sufficient coverage for
CCPMW-2D
of the landfill.
uppermost aquifer. Keep as water level only
REMOVED FROM NETWORK: Well is effectively ry. No
CCPMW-35 was installed for assessment, is located south and downgradient
replacement required as deeper well CCPMW-3D is
CCPMW-3S
of the landfill.
already in the monitoring network. Keep as water level
Groundwater
only
CCPMW-3D was installed for assessment, is located south and downgradient
CCPMW-3D
of the landfill.
CCPMW-4 was installed for assessment, is located northwest and
CCPMW 4
downgradient of the landfill.
CCPMW-5 was installed for assessment, is located north and downgradient
CCPMW-5
of the landfill.
CCPMW-6S was installed for assessment, is located north and downgradient
CCPMW-6S
of the landfill.
CCPMW-6D was installed for assessment, is located north and downgradient
REMOVED FROM NETWORK - 65 is sufficient coverage for
CCPMW-6D
of the landfill.
uppermost aquifer. Keep as water level only
CCPMW-7 was installed for assessment, is located north and downgradient
CCPMW-7
of the landfill.
REMOVED FROM NETWORK: Well is effectively dry.
CCPMW-8 was installed for assessment, is located south and downgradient
CCPMW-8
Replaced with existing deeper well CCR-CCPMW-8D. Keep
of the landfill.
as water level only
CCPMW-10 was installed for assessment, is located south and downgradient
CCPMW-10
of the landfill.
CCPMW-11 was installed for assessment, is located southeast and
CCPMW-11
downgradient of the landfill.
CCPTW-2 was installed for assessment, is located south and downgradient
REMOVED FROM NETWORK: Well is dry. Replaced with
CCPTW 2
of the landfill.
deeper well CCR-CCPTW-2D. Keep as water level only
CCR-CCPTW-2D was installed as a part of a separate program for assessment
ADDED TO NETWORK: Well added to network to replace
CCR-CCPTW-2D
and is located south and downgradient of the landfill.
CCPTW-2 (dry) with a deeper well
CCPSW-1 surface water monitoring location is south and upgradient of the
SW-1
Surface Watei
landfill.
SW-2
CCPSW-2 surface water monitoring location is east and downgradient of the
landfill.
CCPSW-3 surface water monitoring location is west and downgradient of the
SW-3
landfill.
Leachate sample, representing leachate from Phases 1 and 2 of the landfill,
CCP-LEACHATE
collected from an in -line sampling point south and downgradient of the
Leachate
landfill.
Leachate sample, representing leachate from Phases 3 and 4 of the landfill,
CCP-LEACHATE-31
collected from an in -line sampling point south and downgradient of the
landfill.
•
CCPMW-5 `•
•
;PMW-4 •` ••
J ® CCPMW-6S/D
'.
AL
ii p CCPM\
CCPMW-1S/D
,
.CAI yry,L.,P
0 lope
I •
- , 1
■
1
1
DUKE POWER
414,
Now
•
•
I
�
1
1
■
LEGEND
1
JII!!I GROUNDWATER MONITORING WELL
1
LEACHATE SAMPLE LOCATION
LANDFILL LIMIT OF WASTE
•
LANDFILL REVIEW BOUNDARY
1
■
— - — • LANDFILL COMPLIANCE BOUNDARY
— - DUKE ENERGY CAROLINAS PROPERTY LINE
STREAM (AMEC NRTR)
® WETLANDS (AMEC NRTR)
r
•
NOTES:
I 1 '
• . 1. THE WATERS OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE
F I - US ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS MAP
- - - IS NOT TO BE USED FOR JURISDICTIONAL DETERMINATION PURPOSES. THE
CCR-CCPBG 1 D/BR ®_ "• WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM STREAM AND
CCPTW-2 CCPMW-11 P
1
CCPMW-2S/D - — CCPMW-8
• • I CCPMW-3S/D .
• ♦ ♦ � •�
/.
' A♦
00,0000
BALEEN GER RD. -'
` GRAPHIC SCALE
■> DUKE 150 0 150 300
4' ENERGY N FEET)
CAROLINAS
DRAWN BY: C. WYATT DATE: 02/09/2022
REVISED BY: C. WYATT DATE: 03/11/2022
CHECKED BY: D. AVARD DATE: 03/11/2022
APPROVED BY: T. GRANT DATE: 03/11/2022
synTerm PROJECT MANAGER: S. SPINNER
www.synterracorp.com
WETLAND DELINEATION CONDUCTED BY AMEC FOSTER WHEELER
ENVIRONMENTAL AND INFRASTRUCTURE, INC. JUNE 2015.
2. ALL BOUNDARIES ARE APPROXIMATE.
3. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS.
4. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO. AERIAL DATED
SEPTEMBER 4, 2021.
5. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE
PLANE COORDINATE SYSTEM RIPS 3200 (NAD83).
DRAWING 2
CCP LANDFILL GROUNDWATER MONITORING SYSTEM
CCP LANDFILL PHASES I THROUGH IV
WATER QUALITY MONITORING PLAN
ROGERS ENERGY COMPLEX - CLIFFSIDE STEAM STATION
MOORESBORO, NORTH CAROLINA