Loading...
HomeMy WebLinkAbout0501_AsheCoLF_Phase3DesignHydroAddendum_Appr1832040_20240318 March 18th, 2024 Sent Via Email: scott.hurley@ashecountygov.com Mr. Scott Hurley Ashe County Department of Environmental Services Director P.O. Box 1327 West Jefferson, North Carolina 28694 Re: Design Hydrogeologic Report Addendum Ashe County Unlined Closed Landfill Permit# 0501-MSWLF-1980 FID 1832040 Dear Mr. Hurley: The Solid Waste Section (Section) has reviewed the Ashe County Design Hydro Report Addendum (FID 1826368) for the facility’s closed unlined MSW landfill submitted on behalf of Ashe County by Municipal Engineering, Inc. (MESCO). The initial Design Hydrogeologic Report was conditionally approved on February 17, 2009, on the basis that it satisfied the rule requirements, but construction of Phase 3 could not begin due to the need to further assess groundwater contamination upgradient and at the southern edge of Phase 3. In the interim, MESCO conducted remedial activities, additional assessment, and continued groundwater monitoring in the area of concern. The Section issued correspondence (FID 1817023) on August 29, 2023 to Ashe County stating that groundwater contamination in the area of concern had been adequately addressed and was no longer an impediment to Phase 3 expansion. During assessment and corrective action activities, additional wells were installed within the Phase 3 footprint and information collected during their installation was used to supplement the findings of the initial design hydrogeologic report. Additional groundwater elevation measurements collected during the remediation and assessment process were used to confirm the minimum required four feet of separation between the proposed Phase 3 base grade and seasonal high groundwater table and top of bedrock. This correspondence serves as final approval of the Design Hydrogeologic Report for Phase 3 and Ashe County may proceed accordingly. Please contact me at (919) 707-8288 or by e-mail at ervin.lane@ncdenr.gov if you have any questions or concerns regarding this letter. Thank you for your cooperation in this matter. Sincerely, Ervin Lane Hydrogeologist Solid Waste Section, Division of Waste Management NCDEQ cc sent via email: Perry Sugg, P.G. – SWS Environmental Compliance Branch Head Sherri Stanley – SWS Permitting Branch Head Allen Gaither, P.E. – SWS Permitting Engineer Charles Gerstell – SWS Environmental Senior Specialist Jay Zimmerman, P.G. – Municipal Engineering, Inc.