HomeMy WebLinkAbout25009_East Side Truck Svc_Utility Trench Dam Install Rpt_20230718AO
Atlantic Shores
Environmental Services, Ltd.
July 18, 2023
Ms. Stephanie Graham
NCDEQ
217 West Jones Street
Raleigh, North Carolina 27603
Reference: Documentation of Stormwater Vapor Dam Installation
Eastside Trucking
Fayetteville, North Carolina
Brownfield Project No. 25009-21-026
Dear Ms. Graham,
The purpose of this letter is to document the installation of two vapor dams for the stormwater
conduits east of catch basin DI-(B3). This mitigation system was mixed and installed in accordance
with the attached drawing prepared by ECS dated June 28, 2023. Cheryl Moody, PE of Atlantic
Shores Environmental (ASE) observed the installation of the two barriers on June 29, 2023 (See
attached photographs).
South Atlantic Environmental Drilling and Construction Company preformed the work. The
concrete slurry was placed into the forms that were constructed around the pipes. The slurry was
placed in lifts and agitated manually to ensure all voids were filled before placing another lift.
If there are questions regarding this submittal, or there is a need for further information, please
contact us at 910-371-5980.
Respectfully submitted,
ATLANTIC SHORES ENVIRONMENTAL SERVICES, LTD.
iCARo�%',
Q'•''ES•Sj'••�i
Cheryl J. Moody, PE ; =:'oF 0 9 ; Ryan Kramer
Principal Engineer - oSEoos r = Sr. Project Manager
Enclosures: Photographs
Drawing
175-1 Venture Drive, Belville NC 28451 P:(910)371-5980
-A Woman Owned Business - License No. C-4762
Documentation of Stormwater Vapor Dam Installation
Eastside Trucking
Fayetteville, North Carolina
Brownfield Project No. 25009-21-026
Photograph 1 — View of southern vapor dam form
Photograph 2 — View of southern vapor dam installation
July 18, 2023
Documentation of Stormwater Vapor Dam Installation
Eastside Trucking
Fayetteville, North Carolina
Brownfield Project No. 25009-21-026
July 18, 2023
Photograph 3 — View of southern vapor dam installation
Photograph 4 — View of northern vapor dam form
V
2
Documentation of Stormwater Vapor Dam Installation
Eastside Trucking
Fayetteville, North Carolina
Brownfield Project No. 25009-21-026
Photograph 5 — View of northern vapor dam installation
Photograph 6 — View of northern vapor dam installation
July 18, 2023
Utility Trench Vapor Mitigation Design
Spring Hill Suites
520 Judson Church Road
Fayetteville, Cumberland County, NC 28312
=:a� SEAL
,' q� G I N g; •'
r��trnS C j I s �ss�
DATE: June 28, 2023
PREPARED 9Y-
ECS Southeast, LLP
5260 Greens Dairy Road -
Raleigh, NC 27616
Phone: 919-861-9910 ecs southeast
6260 Greens Dairy Rd.
Raleigh, NC 27616
NC Registered Engineering Firm F-1078
DRAWING LIST
PAGE(S)
DESCRIPTION
0
COVER
1
NOTES AND DETAIL
2
SITE PLAN
1. APPLICABILITY
1.1.GENERAL
1.1.1. The purpose of this Utility Trench Vapor Mitigation Design at the proposed development is
to manage vapor gas migrating through the utility trench.
1.1.2. All wall and building systems shown are for clarification purposes only. These plans are
only for layout and construction of the Utility Trench Vapor Mitigation Design. Civil
layouts, structural details, and other information pertaining to the design was referenced
from the available plans supplied to ECS Southeast. The design may be modified by ECS, as pCE IMPACTED AREA - SPRINGHILL SUITES
necessary, to accommodate construction restraints.
1.2. SYSTEM COMPONENTS
1.2.1. The Utility Trench Vapor Mitigation Design construction shall consist of, but not be limited
to, the following:
1.2.1.1. A trench dam consisting of a bentonite cement slurry shall be poured in place in the utility
trench dam. The trench dam shall have a minimum length of 36 inches or twice the width
of the trench. The cross section of the utility trench shall be backfilled to provide a minimum
of 12 inches of trench dam material around the utility pipe.
1.2.1.2. The bentonite cement slurry shall consist of a minimum 4% Type II Portland cement and a
minimum 2% powdered bentonite. The remaining mixture shall consist of soil, sand, and/or
aggregate. The mixture shall include enough water to turn this mixture into a pourable slurry.
The mixture shall include a water -reducing admixture which meets ASTM C494
(MasterPozzolith® 700) and an air -entraining admixture which meets ASTM C260
(MasterAir®AE 200).
1.2.1.3. The bentonite shall me mixed with water to fully hydrate prior to mixing with the cement.
1.3. SUBMITTALS
1.3.1. Information about the products shall be submitted to ECS for approval before they are
installed.
1 A.INSPECTIONS AND TESTING
1.4.1. Construction Phase
1.4.0.1. Inspections shall be conducted under the direct supervision of a North Carolina
licensed Professional Engineer to verify compliance with this design and to determine
if the sealed utility barrier has been constructed between soil gas from the VOC
impacted side of the utility trench to the Springhill Suites side of the utility trench.
Inspections shall be conducted during the following:
1.4.0.1.1. During placement of trench dam material.
1.4.0.1.2. During placement of backfill material on either side and over the top of the
trench dam.
1.5. STANDARD OF CARE AND LIMITATIONS
1.5.1 ECS's services will be performed in a manner consistent with generally accepted practices
of the profession undertaken in similar designs in the same geographical area during the
same time period. Please note that ECS does not warrant the work of third parties
supplying information used in the preparation of the vapor mitigation system. These
services were performed in accordance with the scope of work agreed with you, our client,
as reflected in our proposal.
ECS Southeast, LLP
'`�• °
gx�3
5260 Greens Dairy Road
Raleigh, NC 27616
Phone:919-861-9910
NC Registered Engineering Firm F-1078
)NC RETE STORM SEWER Plf
ASPHALT
GRAVEL
SOIL BACKFILL
ZONE OF BENTONITE
CEMENT SLURRY
(4%TYPE II PORTLAND CEMENT
& 2% POWDERED BENTONITE)
SEAL AROUND
PENETRATION
PIPE BEDDING
MATERIAL BY
OTHERS
NOTES:
1. TRENCH DAM SHALL HAVE A MINIMUM LENGTH OF 36 INCHES OR
TWICE THE WIDTH OF THE UTILITY TRENCH.
2. A MINIMUM OF 12 INCHES OF TRENCH DAM MATERIAL SHALL
SURROUND THE UTILITY PIPE.
AA SECTION ALONG STORM WATER
1 PIPING TRENCH
"Vim
Legend ICAN
LLC.
■ Soil Gas Sample Point T,
-Groundwater Monitoring Well
• - Soil Sample Location
Red Text Indicates Exceedance for Groundwater
Green Text indicates Exceedance for Soil Vapor
, "'II I f,,""
.��•`t-SH cn F?0(r
. p •Qgssro-�L
_ SEAL ry=
3
Y
x$ ❑ 1G
II
• � - DROP INLET
I
$� • •- , •—STORM SEWER PIPE
ND
DROP INLET
`STORM SEWER PIPE----- 10
- BENTONI I L CEMLNT SLURRY I RENC� f
A BENTONITE CEMENTSLURRY TRENCH DAM
PCE 5 3 /L� v 1
ND A DROP INLET
PCE 21.7 µg/L
PCE14.6 µg/ w 1 02
Ji STORM SEWER PIPE
15'
$ P 19µg/L
NDI. pPPROX' irrs�
DROP INLET
SG-51T1-55 (3.5') ND
.70 µg/m3
�PC .4µg&�'❑ 7Q
PWC 2Q
- main eaE
STORM SEWER PIPE
Stormwaler maintenance
y access easement f
;1
`20' WAT° R. 5 �. _
.,. 4EE❑aapOK 2�9ls' ORf DRABASIN.
InrpGgSEM EA --.-._...- ., .
1rf�.� r -- f 287.2a371,5-4 n N ^- .. { .... ..
ECS Southeast, LLP
5260 Greens Dairy Road
Raleigh, NC 27616
Phone:919-861-9910
INC Registered Engineering Firm F-1078
Scale
o�s� 3O
1 inch =30 R.