Loading...
HomeMy WebLinkAbout7407_Pitt_C&DLandfillInc_CDLF_Phase1_Phase2_ProjectStatus_FID1827591_20240201� `.�E SOt�TiO W � cZn h OQ ONMFNT & DEVE�' ELM Site Solutions, Inc. P. O. Box 97607 Raleigh, North Carolina 27624 Phone: (919) 792-3733 February 1, 2024 submitted via electronic mail Ms. Jaclynne Drummond Hydrogeologist Solid Waste Section Division of Waste Management North Carolina Department of Environmental Quality 217 West Jones Street Raleigh, North Carolina 27603 RE: Phytocap Project Phase 1 Closure Program C&D Landfill, Inc. Permit #: 7407-CDLF-2001/2009 Dear Ms. Drummond: On behalf of C&D Landfill, Inc., ELM Site Solutions (ELMSS) herein submits requested information for the above -referenced facility. Details contained in this correspondence are based on recent discussions between the department and facility ownership. This information supports the Corrective Plan Addendum (ELMSS, September 2023) prepared for Phase 1 closure which was approved by the Solid Waste Section (SWS) on October 20, 2023. Phytocap Implementation Schedule The following schedule for construction of the phytocap is anticipated: Preparation and Submittal of the Permit to Construct/Operate Application: 2/1/24 - 2/19/24 Soil Cover Placement and Stabilization: 2/5/24 - 2/23/24 Tree Purchase and Shipping: 2/19/24 - 2/23/24 Tree Installation: 2/26/24 - 3/8/24 Deer Deterrent Installation: 2/26/24 — 3/1/24 Phytocap Installation Certification Report: 3/30/24 Performance Monitoring Equipment Procurement and Installation: 2/5/24 — 3/29/24 Irrigation System Installation: 3/11/24 — 3/29/24 Ms. Jaclynne Drummond Phase 1 Corrective Action February 1, 2024 Financial Assurance Estimate A financial assurance estimate will be provided under separate cover by February 29, 2024. Per -and Polyfluoroalkyl substances (PFAS) Sampling PFAS sampling occurred on September 12-13 and December 13-15, 2024. Results will be provided in the December 2023 Semi -Annual Compliance Report with an anticipated delivery date to the SWS in April 2024. Please contact us if you have any questions or if additional information is required. Sincerely, ELM Site Solutions, Inc. s Rusty Norris, PE, PLS, RSM Senior Engineer c Judson Whitehurst