Date of Site Inspection: January 30, 2024
FACILITY NAME AND ADDRESS:
Barnhill/McArtan Mine Site LCID Landfill
Josey Williams Road (NCSR 2027)
Bunnlevel, North Carolina
GPS COORDINATES: Lat.: 35.2670 Long.:-78.7839
Date of Last Inspection: July 19, 2023
FACILITY CONTACT NAME AND PHONE NUMBER:
Name: Steve Waters, Environmental Manager, Barnhill contracting Company
Telephone: 910.978.2412 (Cell) 910.829.6261 (0)
Email address: swaterskbarnhillcontracting com
FACILITY CONTACT ADDRESS:
Barnhill Contracting Company
PO Box 35376
Fayetteville, North Carolina 28303
PARTICIPANTS:
Amanda Thompson — NCDEQ, Solid Waste Section
STATUS OF PERMIT:
LCID Landfill Notification Approval August 29, 2001
Permit to Construct April 17, 2002
Permit Amendment February 19, 2010
Construction Certification May 4, 2012
Permit Amendment March 23, 2015
Permit to Operate was renewed on December 1, 2021.
PURPOSE OF SITE VISIT:
Comprehensive Inspection
STATUS OF PAST NOTED VIOLATIONS:
None.
OBSERVED VIOLATIONS:
None.
The PTO will expire on December 1, 2026.
Page 1 of 3
NORTH CARnLINAD_E Q��
OepaNnent W Environnnnbl puel�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
ADDITIONAL COMMENTS
1. The facility is a land clearing and inert debris (LCID) landfill.
2. The facility has proper signage.
3. Hours of operation are Monday through Saturday from 7:00am to 5:00pm.
4. The facility is properly secured with a locked gate.
5. The facility is permitted to receive land clearing waste, yard trash, untreated and unpainted wood, uncontaminated
soil, inert debris, and asphalt.
6. The facility site plan, operations plan, and permit and were not reviewed with the site operator at this inspection.
7. An access road had been established and cleared around the LCID to provide emergency access.
8. Edge of waste markers were observed around the perimeter of the LCID.
9. No areas of standing water were observed. Continue to ensure that the LCID has been graded to shed water.
10. No woody vegetation was observed along the side slopes. The LCID has been mown since the last inspection.
Continue to ensure that the LCID is mown a minimum of twice per year to allow for proper inspection.
11. Digital pictures were taken during the inspection.
Please contact me if you have any questions or concerns regarding this inspection report.
Digitally signed by Amanda
Amanda Thompson Thompson
Date: 2024.02.01 08:41:49-05'00' Phone: 910-433-3352
Amanda Thompson
Environmental Senior Specialist
Regional Representative
Sent on: February 1, 2024 X Email Hand delivery US Mail Certified No. L,_1
Copies: Drew Hammonds, Eastern District Supervisor — Solid Waste Section
Page 2 of 3
NORTH CARnLINAD_E Q��
o.n.mm.m m c.w.mmen.i a.i�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Digital Photos taken by Amanda Thompson on January 30, 2024.
General view of the LCID.
View of the southwestern side slope.
View of the facility signage.
Page 3 of 3