HomeMy WebLinkAbout9231_WakeRec_BrownfieldRdCDLF_FAAnnualNotice_FID_20240122DocuSign Envelope ID: 80FEC036-B352-4C6B-BB7E-33FA037B24BA
SMITH{ GARDNER
ENGINEERS
January 22, 2024
Ms. Sarah Moutos
ABBRESS TEL WEB
14 N. Boylan Avenue, Raleigh NC 27603 919.828.0577 www.smithgardnerinc.com
Environmental Program Consultant
Division of Waste Management - Solid Waste Section
North Carolina Department of Environmental Quality
217 W. Jones Street
Raleigh, NC 27603
RE: Financial Assurance Notification
Wake Reclamation, LLC
Solid Was Section Permit No.92-31
Dear Sarah:
On behalf of Wake Reclamation, LLC (Brownfield Road C&D Landfill), Smith Gardner, Inc.
(S+G) has prepared this notification of the financial assurance mechanism, in accordance
with 15A NCAC 13B .1801 H. This notification is being submitted within 180 days of the
financial assurance renewal date, August 18th. Revisions to the previous financial assurance
calculations' are proposed for the financial assurance renewal with the construction of
Phase 3, which is planned to be completed before the end of 2024. An updated financial
assurance estimate is attached.
Brownfield Road C&D Landfill currently operates Phases 1, 2A and 2B of the C&D landfill.
These areas will remain active through the upcoming financial assurance renewal.
Additionally, no area has been closed since the previous financial assurance mechanism
renewal. A summary of the total landfill footprint, current operating area, and closed area
are summarized in Table 1, below.
Permitted C&D
Area (acres)
Active C&D
Area (acres)
Closed C&D
Area (acres)
Phase 1
19.2
12.7
6.5
Phase 2A
17
17
---
Phase 2B
8.9
8.9
---
Phase 3
23.5
---
---
Total
68.6
38.6
6.5
' Stacey Smith to Ethan Caldwell, July 31, 2018. Phase 2B Construction Quality Assurance Report,
Brownfield Road C&D Landfill (Solid Waste Permit No. 92-31)
DocuSign Envelope ID: 80FEC036-B352-4C6B-BB7E-33FA037B24BA
Ms. Sarah Moutos
January 22, 2024
Page 2of2
If you have any questions or require any additional information, please contact us at (919)
828-0577 or by email below.
Sincerely,
SMITH GARDNER, INC.
DocuSigneld .b�y:
4FFAB9B6926A4DE...
Lou J. Krasuski
Project Manager, ext. 154
louCdsmithgardnerinc.com
Attachment
CC: Don Plessinger, Wake Reclamation, LLC
Bryan Wuester, GFL Environmental, Inc.
John Pfleger, GFL Environmental, Inc.
Jim Poole, INSURE
CAf� �Ilri
4 SEAL l22
E(�
DocuSigned by: � �❑28425
358C21 E64007440... �IIi,'4 �,_. •',
W. Michael Brinchek, P.E.
Senior Project Manager, ext. 128
mike(asmithgardnerinc.com
024
SMITH GARDNER
14 N. Boylan Awe, Raleigh NC 2i603 1 919.626.0577
Red Rock Disposal, LLC (NC Solid Waste Permit No. 92-28)
Engineer's Financial Assurance Summary
Notes:
DATE: 22-Jan-24
PERFORMED BY: LJK
CHECKED BY: WMB
1. Costs are presented in current dollars and should be increased at an inflation rate prescribed by the NCDEQ Division of Waste Management per http://deq.nc.gov/about/divisions/waste-managem ent/solid-
waste-section/financial-assuran ce-for-solid-waste-management-facilities if additional review is not performed annually.
2. This ESTIMATE has been prepared for financial assurance purposes only and shall not be considered a replacement for an actual bid from a licensed contractor. The ESTIMATE is intended to be accurate to
within +/-10% of the Total Estimated Cost.
SMITH GARDNER
Brownfield Road COD Lan dfiU.(NC Solid Waste Permit No.92-31)
Engineer's Closure Construction Cost Estimate
BATE: 22-Jan-24
PERFORMED BY: WK
CHECKED BY: WMB
to ru
nos cription®�
Contractor
Constructed Area (Horizontal Plan) AC 68.6
Previously Closed Area (Horizontal Plan) > AD 6.5
AC
L: Financial Assurance Area (Horizontal Plan) 62.1
®
Construction Documents 6Bidding
S,G Estimate
Construction
I
®Surveys
andLayout'�
1111
I 111
Historical
Based on 2016 Closure Event No I Costs
®Site
Preparation (repairs 1 intermediate cover��
I111
111
Based on 1 . Closure Event No I Costs
®Drainage
Geocomposite11slopes)
®
•1 II
.I I11Historical
®'
' Vegetative Suppoq11slopes):III
:II
�� III IIHistorical
24" Vegetative Support Laver (side slopes)
S-G Historical Estimate
landfill
'�
11111
�1111
Based on 1 . Closure
®'
Cap Drainage piping,��
11111
II II
Based on 1 . Closure
Erosion 6 SedimentControl • .1
'�
I I 1 1
IIIHistorical
Historical
'
®Field
MonitoringS+G
Estimate
As -Build
'�
II111
. I111S+G
Estimate
®
.11 . 1
'�
I111
' 111S+G
Estimate
Engineering Certification
S+G Estimate
®'Surveying.
d Deed Notation
'�
III
' 11Historical
'Co 1
1 si 1 n a nd' 1 ranwater1 1 1' 1 11 1
®®
I I I I I
. 11 I I
1
'®Engineeringand
'•11
®®
I11
IIHistorical
Total Closure Costs
Construction Esthnuate� 1
Total Estimate $3,955,075 INotes
Notes:
1. All costs are presented in current dollars and should be increased at an inflation rate prescribed by the NCBENR Division of Waste Management per http://portal.ncdencorg/web/wm/sw/financialassura Fee
if additional review is not performed annually.
2. This ESTIMATE has been prepared for financial assurance purposes only and shall not be considered a replacement for an actual bid from a licensed contractor and is considered acceptable
within a +/-10% of the Total Estimate value.
;LOff . - I
1.Wake Reclamation, LLC., Brownfield Road CBD Landfill, Phase 3 Permitto Construction, November 2023, prepared by Smith Gardner, Inc.
2. Construction Quality Assurance Report, Brownfield Road CSD Landfill - Closure Event No.1. July 2016, prepared by Smith Gardner, Inc.
_ nenmesvalues calculated in spreadsheet.
SMITH GARDNER
Brownfield Road C&B Landfill (NC Solid Waste Permit No. 92.31)
Engineer's Post Closure Cost Estimate
ngwells
...................................................................................................................................................................................................................................................................................................................
9
:wells
Reference
water Dint
P.............................................................................................................................................................................................................-P....................................................................................
3
Dints
ReferenceI
gfrequency........................................................................................................................................................................_2.
......................
........................................................S..+.Ga...s..t..i.m...a.
Re.f.erenc.e.I
.t.0nplig
nndshiPpinQ:...........................................................n
....
3................Per
.eevents
event.................................
uyAnalysls.....................
$350..................sPerwell....................................
S+Gestimate
ow. statistics. and reoortind
52.000
:oer event
S+G estimate
maintenanceandre air $1,000 ervent er ear S+Gestimate
P................................................................................................................................., P................. P...... Y.......................................................
ritorind 8350 :oer orohe oer vear S+G estimate
BATE: 22-Jan-24
PERFORMED BY: LIK
CHECKED BY: WMB
Final Cover Management
.................................................................................................................................................................................................................................................
Area of maintenance
..............................................................................................................................................................................................................................................................................................................................................`/...............................................................................
i.......................................................
fit :acres
................................................................................................................................................
Extends to area immediate) around landfill.
Mowin
...Q................................................................................................................................................................................................................................P....................................................................................................................................................................................................
$250 ;eracre
S+Gestimate
Erosion and sediment control maintenance
$200 ;eracre
.........................P....................................................................................................................................................................................................
S+G estimate
To dressin (seed &fertilizer)............................................................................................................................................._$125...................UP.eracre....................................
P.. Q ............
S+Gestimate ................................................................................................................
Vector and rodent control
820 :oer acre
S+Gestimate
S+G estimate
Subtotal
.........................................................................................................................................................................................
EstimatedAverageAnnualCosts
$11Q250
. year(20-18$)
Number of Years for Post -Closure
30
years
Cost per Acre
$1,871.97
per year
Subtotal Past Closure Costs
$3,487,485
(2024$) (See Notes 19 2)
Potential Assessment and Corrective (Remedial) Action
................................................................................................................................................................................................................................................:.......................................................................................................................................................................................................
Minimum amount re uiredb NCDEQDivisionofWasteMana ement $1,236,224 lum sum Re ulator re uirement(SessionLaw2o11-2fi2)
4............... Y....................................................................... g......................................................................................................... P................................................. g............ Y.......9..............................................................................................................
SubtotalRemedial Cost $1,2...rwl............ lump sumI..............................................................................................................................................................................
Total Post Closure and Remedial Costs $4,723,709 (2D24$) (See Notes 1 & 2)
Total Closure, Post Closure, and Remedial Costs $8,678,784 (2D24$) (See Notes 1 & 2)
Notes:
1. All casts are presented in current dollars and should be increased at an inflation rate prescribed by the NCDEQ Division of Waste Management per
http:///portalTncdenr.org/web/wm/sw/financialassurance if additional review is not performed annually.
2. This ESTIMATE has been prepared for financial assurance purposes only and shall not be considered a replacement for an actual bid from a licensed contractor and is considered acceptable
within a +/-10% ofthe Total Estimate value.
References:
1. Wake Reclamation, LLC., Brownfield Road CSD Landfill, Phase 3 Permit to Construction, November 2023, prepared by Smith Gardner, Inc.
_ Denotes values calculated in spreadsheet.
3 of 3 Closure -Post Closure 2024 01