Loading...
HomeMy WebLinkAboutMO-8954_40451_CA_FPR_202308142725 E. Millbrook Road, Suite 121 Raleigh, NC 27604 Telephone 919-871-0999 www.atcgroupservices.com ATC Project No. STL4045101 NCDEQ State Lead Program August 14, 2023 Mr. Scott Ryals, P.E. North Carolina Department of Environmental Quality Division of Waste Management – Underground Storage Tank Section 1646 Mail Service Center Raleigh, North Carolina 27699-1646 Subject: Free Product Recovery Letter Report A-1 Express 603 East Main Street Lincolnton, Lincoln County, North Carolina NCDEQ Incident No. 40451 Dear Mr. Ryals: ATC Associates of North Carolina, P.C. (ATC) is pleased to submit the results of a mobile multi-phase extraction (MMPE) event and subsequent groundwater gauging event at the A-1 Express site located at 603 East Main Street in Lincolnton, Lincoln County, North Carolina. The activities were performed based on a April 6, 2023, Task Authorization (TA-01) by the Trust Fund Branch of the Underground Storage Tank (UST) Section, Division of Waste Management, North Carolina Department of Environmental Quality (NCDEQ). The work is being performed as part of the State Lead Contract #N70522-B between NCDEQ and ATC. The A-1 Express site historically operated three 4,000-gallon gasoline USTs and one 2,000-gallon gasoline UST that were installed between 1964 and 1976 and removed in June 1989. Concurrent with UST removal, three 7,829-gallon gasoline USTs were installed and are still in use to, although they were temporarily closed between April 2014 and July 2016. Figure 1 depicts the site on a topographic map and Figure 2 is a site map with pertinent site features. There are no receptors located within the site vicinity. Advanced Environmental Services, Inc. (Advanced) was subcontracted to perform an MMPE event from June 26, 2023, to June 30, 2023. On June 26, 2023, ATC used an oil/water interface probe to measure light non-aqueous phase liquid (LNAPL) thicknesses at the site. LNAPL was present in monitoring wells MW-1 (6.80 feet), MW-2 (0.01 feet), MW-3 (0.21 feet), and MW-8 (3.91 feet). Only wells that historically indicated LNAPL were gauged. Due to the limited size of the site property, the MMPE equipment was staged on the eastern adjacent property. Due to the location of the MMPE equipment and the vehicular traffic associated with the onsite store, only well MW-1 was used as an extraction point for the entirety of the event. However, in an attempt to abate LNAPL levels in wells MW-2, MW-3, and MW-8, it was determined these wells would be used as extraction points from 10:30 p.m. to 8:00 a.m., while the onsite store was closed. Monitoring well construction details and LNAPL thicknesses are included as Table 1. The stinger depth was initially placed around 30 feet below ground surface and adjusted as needed throughout the event. During MMPE activities, a liquid ring vacuum pump unit is plumbed to the designated extraction point, and a drop pipe is extended into the well through an airtight seal at the top of the well casing and into the water column. Throughout the MMPE process, a cone of depression forms around the designated recovery point by drawing down the groundwater surface levels, thus causing impacted water surrounding the recovery points to be extracted. Petroleum-impacted soil vapor within the cone of depression and the overlying vadose zone is removed as part of the MMPE extraction process. The MMPE event began at 11:55 am on June 26, 2023, was concluded at 11:55 am on June 30, 2023, and was active for 96.0 hours. During the event, vacuum at the recovery pump ranged from 24.0 to 27.0 inches of mercury. Airflow rates ranged from 900 to 1,050 feet per minute and stabilized at 900 feet per minute. System temperature ranged from 118.0 – 134.0 °F, and humidity ranged from 46.0 to 62.0 percent. Field gauged volatile organic compounds (VOCs) reduced from 50,000 parts per million (ppm) throughout the event. Approximately 4,170 gallons of total fluid and 58 gallons of LNAPL were recovered during the MMPE event. In addition, approximately A-1 Express August 10, 2023 ATC Project No. STL4045101 NCDEQ State Lead Program TABLE TABLE 1 WELL CONSTRUCTION AND GROUNDWATER ELEVATION DATA A-1 EXPRESS 603 EAST MAIN STREET LINCOLNTON, LINCOLN COUNTY, NORTH CAROLINA INCIDENT #40451 Well ID Date Installed Screened Interval (ft.) Depth of Well (ft.)TOC Elev. (ft.)Date Measured Depth to LNAPL (ft.) Depth to Water (ft.) LNAPL Thickness (ft.) Groundwater Elevation (ft.) 12/17/2016 29.90 39.67 9.77 61.74 1/18/2021 (Pre-AFVR)23.67 36.31 12.64 67.57 1/18/2021 (Post-AFVR)--36.81 --56.22 3/26/2021 22.86 34.81 11.95 68.47 2/17/2022 28.99 37.64 8.65 62.81 7/11/22 (Pre-MMPE)28.55 37.61 9.06 63.19 7/15/22 (Post-MMPE)41.10 41.14 0.04 51.92 8/12/2022 29.46 36.60 7.14 62.56 12/19/22 (Pre-MMPE)29.88 37.13 7.25 62.12 12/23/22 (Post-MMPE)--42.58 --50.45 1/24/2023 29.66 35.39 5.73 62.56 6/26/2023 (Pre-MMPE)27.61 34.41 6.80 64.46 6/30/23 (Post-MMPE)--40.90 --52.13 7/28/2023 26.94 34.29 7.35 65.05 12/17/2016 35.39 35.50 0.11 58.82 1/18/2021 (Pre-AFVR)--27.93 --66.30 2/17/2022 31.30 34.21 2.91 62.52 7/11/22 (Pre-MMPE)31.15 33.93 2.78 62.69 7/15/22 (Post-MMPE)31.49 34.47 2.98 62.32 8/12/2022 31.59 31.60 0.01 62.64 12/19/22 (Pre-MMPE)32.07 35.11 3.04 61.73 12/23/22 (Post-MMPE)32.78 32.98 0.20 61.42 1/24/2023 31.94 32.16 0.22 62.26 6/26/2023 (Pre-MMPE)29.33 29.34 0.01 64.90 6/30/23 (Post-MMPE)--29.81 --64.42 7/28/2023 --29.66 --64.57 12/17/2016 29.21 36.58 7.37 64.77 1/18/2021 (Pre-AFVR)27.87 29.43 1.56 66.94 2/17/2022 31.51 32.94 1.43 63.32 7/11/22 (Pre-MMPE)31.49 34.00 2.51 63.18 7/15/22 (Post-MMPE)31.79 34.58 2.79 62.84 8/12/2022 31.88 34.79 2.91 62.74 12/19/22 (Pre-MMPE)32.00 36.61 4.61 62.38 12/23/22 (Post-MMPE)33.21 33.60 0.39 61.76 1/24/2023 31.83 34.08 2.25 62.88 6/26/2023 (Pre-MMPE)29.34 29.55 0.21 65.66 6/30/23 (Post-MMPE)30.71 30.81 0.10 64.31 7/28/2023 29.95 30.06 0.11 65.06 MW-4 2/1/2022 20-40 40 91.66 2/17/2022 --30.21 --61.45 MW-5 2/1/2022 20-40 40 92.67 2/17/2022 --30.55 --62.12 MW-6 2/1/2022 20-40 40 95.35 2/17/2022 --29.28 --66.07 MW-7 2/1/2022 20-40 40 95.30 2/17/2022 --30.54 --64.76 2/17/2022 32.14 32.42 0.28 62.80 7/11/22 (Pre-MMPE)31.05 35.22 4.17 63.34 7/15/22 (Post-MMPE)31.29 35.48 4.19 63.10 8/12/2022 31.51 35.81 4.30 62.86 12/19/22 (Pre-MMPE)32.05 36.48 4.43 62.30 12/23/22 (Post-MMPE)33.10 33.30 0.20 61.85 1/24/2023 32.18 32.92 0.74 62.69 6/26/2023 (Pre-MMPE)28.64 32.55 3.91 65.79 6/30/23 (Post-MMPE)30.76 30.87 0.11 64.20 7/28/2023 29.33 31.95 2.62 65.28 Notes: MW-2 12/13/2016 30-50 50 94.23 MW-8 2/1/2022 20-40 40 94.98 MW-1 12/13/2016 30-50 50 93.03 MW-3 12/13/2016 30-50 50 95.03 4. Groundwater elevation calculated using the following formula: TOC Elevation - Depth to GW + (0.8581*LNAPL Thickness). 3. TOC = Top of casing. 2. -- = LNAPL not detected. 1. LNAPL = Light non-aqueous phase liquid. A-1 Express August 10, 2023 ATC Project No. STL4045101 NCDEQ State Lead Program FIGURES 2725 E. Millbrook Road, Suite 121 Raleigh, NC 27604 (919) 871-0999 FIGURE 1 SITE TOPOGRAPHIC MAP PROJECT NO: SLC4045104 REVIEWED BY: AW SCALE: 1” = 1,400’ DATE: 08/2022 A-1 EXPRESS –INCIDENT #40451 603 EAST MAIN STREET LINCOLNTON, NORTH CAROLINA Source: NC One Map N Site EAST MA IN STREETNORTH OAK STREETUSTBASINLEGEND:SITE PROPERTY LINENOTE: ALL LOCATIONS ARE APPROXIMATEPARCEL LINEMONITORING WELLWell Identification10SCALE: 1" = 30'02030NMW-4MW-5MW-8MW-7MW-1MW-2MW-3MW-6MW-1SITEBUILDINGCANOPYFigure:Drawing File: Project Number: Ckd. By: Drn. By: App'd By: Ckd. Date:Scale:Date:H:\2022\1 OTHER OFFICES\NORTH CAROLINA\NCDEQ-STATE LEAD\A-1 EXPRESS\SLC4045103-SITE.DWG, FIG2 SITE MAP03/08/2022SEE LOWER LEFTA-1 EXPRESS 603 EAST MAIN STREET LINCOLNTON, LINCOLN COUNTY, NORTH CAROLINA NCDEQ INCIDENT #40451 SLC4045103AS SHOWNDH AW2NOTES: 1.Features shown are not an authoritative location, nor are they presented to a stated accuracy. COORDINATE SYSTEM: NAD 1983 NORTH CAROLINA STATE PLANE FIPS 3200, US SURVEY FEET A-1 Express August 10, 2023 ATC Project No. STL4045101 NCDEQ State Lead Program APPENDIX A FIELD NOTES A-1 Express August 10, 2023 ATC Project No. STL4045101 NCDEQ State Lead Program APPENDIX B PHOTOGRAPH LOG Photo 1: A-1 Express site. Photo 2: MMPE equipment setup. Site Photographs A-1 Express – Incident #40451 603 East Main Street Lincolnton, Lincoln County, North Carolina 2725 E. Millbrook Road, Suite 121 Raleigh, North Carolina Tel: (919) 871-0999 Fax: (737) 207-8261 Photos Taken By: JA Cooper Site ID: Incident #40451 ATC Project No.: STL4045101 Photo 3: MMPE equipment setup. Photo 4: MMPE connected to monitoring well MW-1. Site Photographs A-1 Express – Incident #40451 603 East Main Street Lincolnton, Lincoln County, North Carolina 2725 E. Millbrook Road, Suite 121 Raleigh, North Carolina Tel: (919) 871-0999 Fax: (737) 207-8261 Photos Taken By: JA Cooper Site ID: Incident #40451 ATC Project No.: STL4045101 Photo 5: Monitoring well MW-1. Photo 6: Monitoring well MW-2. Site Photographs A-1 Express – Incident #40451 603 East Main Street Lincolnton, Lincoln County, North Carolina 2725 E. Millbrook Road, Suite 121 Raleigh, North Carolina Tel: (919) 871-0999 Fax: (737) 207-8261 Photos Taken By: Brooke Boltz Site ID: Incident #40451 ATC Project No.: STL4045101 Photo 7: Monitoring well MW-3. Photo 8: Monitoring well MW-8. Site Photographs A-1 Express – Incident #40451 603 East Main Street Lincolnton, Lincoln County, North Carolina 2725 E. Millbrook Road, Suite 121 Raleigh, North Carolina Tel: (919) 871-0999 Fax: (737) 207-8261 Photos Taken By: Brooke Boltz Site ID: Incident #40451 ATC Project No.: STL4045101 A-1 Express August 10, 2023 ATC Project No. STL4045101 NCDEQ State Lead Program APPENDIX C MOBILE-MULTI PHASE EXTRACTION REPORT ADVANCED ENVIRONMENTAL SERVICES, INC. “Your Environmental Solutions Partner” MOBILE MULTI-PHASE EXTRACTION REPORT Site Location: A-1 Express 603 East Main Street Lincolnton, NC Prepared for: ATC Group Services 2725 E. Millbrook Road, Suite 121 Raleigh, NC 27604 PM – Aaron D. Springer, Staff Scientist August 2, 2023 TABLE OF CONTENTS EVENT SUMMARY MMPE FIELD LOG MASS-REMOVAL CALCULATION FIELD NOTES DISPOSAL MANIFESTS MOBILE MULTI-PHASE EXTRACTION EVENT SUMMARY August 2, 2023 Location: A-1 Express 603 East Main Street Lincolnton, NC Client: ATC Group Services 2725 East Millbrook Rd., Suite 121 Raleigh, NC 27604 Event Dates: June 26 - 30, 2022 Advanced Job # 22 - 2339 Advanced Personnel: Scott Crook and Gary McDaniel MMPE System: MMPE system rated 25”hg at 280 CFM 6’ discharge stack - 6” diameter 6,000 - gallon tanker 300’ of 1.5” and 1.0” hose to 4 wells Extraction Well: MW-1, MW-2, MW-3 and MW-8 Well Initial FP / WL(ft) Final FP / WL(ft) Stinger depth(ft) Run Time /Changed to MW-1 27.61/34.41 40.90 30/32/34 96.0 hours MW-2 29.33/29.34 31.74 30 11.0 hours MW-3 29.34/29.55 31.81 30 33.0 hours MW-8 28.64/32.55 31.46 30 44.0 hours Description of Event: The MMPE event ran from 11:55 June 26, 2023 to 11:55 June 30, 2023. The MMPE system was active for 96.0 hours. During the event vacuum at the recovery pump ranged from 24.0 to 27.0 inches of mercury (hg) and stabilized at approximately 27.0 inches of mercury. Airflow rates ranged from 900 to 1050 feet per minute and stabilized at approximately 900 feet per minute. System temperature ranged from 118.0 – 134.0 degrees F and humidity ranged from 46.0 to 62.0 percent. Field gauged volatile organic compounds (VOC’s) maintained 50,000 parts per-million (PPM) throughout the event. Groundwater / Product Mix Recovered: During the event a total of 4,170 gallons of product/water mix were removed from the site and properly disposed at a certified North Carolina disposal facility. Approximately 58 gallons of measurable free product was identified in the tanker following the event. Total fluids recovered, was measured based on stick readings conducted during and following the event. Based on 96.0 hours of operation and a total of 4,170 gallons recovered, the average groundwater recovery rate was calculated to be approximately 43.43 gallons per hour. Events Results: Based on mass-removal calculations 1,593.10 pounds or 258.96 gallons of VOC’s were removed as vapor. Following the event, no product was identified in any well. MMPE FIELD LOG: 1 CLIENT: ATC JOB NAME: A-1 Express LOCATION: Lincolnton, NC MMPE EVENT DATES: June 26 -30, 2023 EXTRACTION POINTS: MW-1, MW-2, MW-3 and MW-8 AES JOB NUMBER: 06 - 2339 DATE TIME FLOW (f/m) HUM.(%) TEMP. (F)VOC'S PRE VAC. (hg")GALLONS STINGER/WL's EXTRACTION POINTS (hg") MW-1 MW-2 MW-3 Start 11:55 Stinger(ft)30/32/34 30 30 Initial WL's 27.61/34.41 29.33/29.34 29.34/29.55 06/26/23 12:30 900 62 118 50,000 27.0 25.0 off-line off-line 13:30 900 56 124 50,000 27.0 25.0 off-line off-line 20:20 900 52 128 50,000 27.0 25.0 off-line off-line 21:20 1,000 52 128 50,000 25.0 20.0 off-line off-line 06/27/23 8:10 1,000 52 128 50,000 25.0 990 gal.20.0 off-line off-line 10:10 900 48 132 50,000 27.0 25.0 off-line off-line 15:00 900 46 134 50,000 27.0 25.0 off-line off-line 20:40 900 50 130 50,000 27.0 25.0 off-line off-line 06/28/23 8:30 1,000 52 128 50,000 25.0 2,085 gal.22.0 off-line 10.0 10:30 900 50 130 50,000 27.0 25.0 off-line off-line 14:00 900 46 134 50,000 27.0 25.0 off-line off-line 21:00 900 50 130 50,000 27.0 25.0 off-line off-line 06/29/23 8:10 1,000 50 130 50,000 25.0 3,060 gal.21.0 off-line 10.0 10:10 900 48 132 50,000 27.0 25.0 off-line off-line 16:00 900 46 134 50,000 27.0 25.0 off-line off-line 21:00 900 50 130 50,000 27.0 25.0 off-line off-line 06/30/23 8:00 1,050 52 128 50,000 24.0 4,020 gal.25.0 6.0 6.0 11:40 900 48 132 50,000 27.0 25.0 off-line off-line Final 11:55 Final WL's 40.90 31.74 31.81 Total Fluids 4,170 gal. Tot Product 58 gal. DATE TIME EXTRACTION POINTS (hg") VACUUM INFLUENCE H2O" WELL GAUGING (FEET) MW-8 Stinger(ft) 30 Initial WL's 28.64/32.55 Start 11:55 06/26/23 12:30 off-line 13:30 off-line 20:20 off-line 21:20 13.0 06/27/23 8:10 13.0 10:10 off-line 15:00 off-line 20:40 off-line 06/28/23 8:30 10.0 10:30 off-line 14:00 off-line 21:00 off-line 06/29/23 8:10 10.0 10:10 off-line 16:00 off-line 21:00 off-line 06/30/23 8:00 6.0 11:40 off-line End 11:55 Final w/l 31.46 Page 1 of 1 MOBILE MULTI-PHASE EXTRACTION EVENT SITE NAME: A-1 Express CLIENT: ATC INCIDENT NUMBER: AVERAGE DEPTH TO GROUNDWATER: 27 - 30 feet DESCRIBE SOIL IN THE SATURATED ZONE:AVERAGE HYDRAULIC CONDUCTIVITY (if known):EXTRACTION WELLS USED FOR MMPE: MW-1, MW-2, MW-3 and MW-8 SPECIFICATIONS OF THE MMPE SYSTEM (cfm @ in Hg): 280 cfm @ 25.0"Hg DRY STANDARD CUBIC FEET PER MINUTE (DSCFM) AIR FLOW CALCULATIONS (Qstd) Date Hours Vacuum Velocity Pipe ID Temp Rel Humid Water Water Qstd(inches of Hg)(ft/min)(in)(°F)(%)Vapor (Wt%)Vapor (Vol%)(flow) 6/26/23 24.00 26.50 925.00 6 125 55.5 0.046 0.069 153 6/27/23 48.00 26.50 925.00 6 131 49.0 0.051 0.076 150 6/28/23 72.00 26.50 925.00 6 131 49.5 0.049 0.073 151 6/29/23 96.00 26.00 950.00 6 131 49.3 0.050 0.074 154 6/30/23 NOTES Qstd = Flow at DSCFM Vacuum = The level of vacuum being applied should be recorded from the MMPE system (inches of Hg) Velocity = The rate at which air flows is measured at the blower discharge piping (anemometer or pitot tube) Pipe ID = The inside diameter of the blower discharge piping (from the MMPE system) Temperature = The temperature of the air stream exiting the blower discharge piping (dry bulb temp., in deg.°F) Relative humidity = The % relative humidity of the air stream exiting the blower discharge pipingBwsw = water vapor % by weight, i.e., pounds of water per pound of dry air, derived from the Psychrometric chart (temp Vs relative humidity) Bws = water vapor % by volume EQUATIONS Bws = (Bwsw/18 lb-mole H20)/[(1/28.84 lb-mole dry air) + (Bwsw/18 lb-mole H2O)] Qstd = (1-Water Vapor) * velocity * (PI * (diameter/24)2) * (528°R/(Temp + 460)) EMISSION CALCULATIONS Elapsed Time Flow PPMmeasured PPMwet PPMdry K PPMconc Cc:m Cc PMRc PMRg PMR(hour)(DSCFM)(ppm)(#C - gas)(mg/dsm3)(lb/dscf)(lb/hour)(lb/hour)(lb) 24 153 50000 50000 53685 1 53685 26787 0.0016723 15.33 17.74 425.85 48 150 50000 50000 54086 1 54086 26987 0.001684777 15.16 17.55 421.17 72 151 50000 50000 53925 1 53925 26907 0.001679786 15.18 17.56 421.53 90 154 50000 50000 54006 1 54006 26947 0.001682282 15.58 18.03 324.55 Total emissions in pounds 1593.10 Total emissions as gallons (pounds / 6.152)258.96 NOTES PPMmeasured = Actual measurements (ppm) taken with a OVA or TVA at the blower discharge piping PPMwet = "wet" concentration PPMdry = "dry" concentration K = Number of carbons in calibration gas: (Methane K = 1, or Propane K = 3, or Hexane K = 6) PPMc= PPMv, Volumetric concentration of VOC emissions as carbon, dry basis at STP Cc:m = mg/dsm3, mass concentration of VOC emissions as carbon Mc = 12.01 mg/mg-mole, molecular weight of carbon K3 = 24.07 dsm3/106 mg-mole, mass to volume conversion factor at STP Cc = lb/dcsf, mass concentration of VOC emissions as carbon, dry basis at STP PMRc = lb/hr, pollutant mass removal rate of VOC's as carbonPMRg = lb/hr, pollutant mass removal rate of of VOC's as gasoline PMR = lb, pollutant mass removal of VOC's as gasoline EQUATIONS PPMwet = PPMmeasuredPPMdry = (PPMwet)/(1-Bws) PPMc = (PPMd)(K) Cc:m = (PPMc)(Mc / K3) Cc = (Cc:m)(62.43x10-9 lb-m3/mg-ft3) PMRc = (Cc)(Qstd)(60 minute/hour) PMRg = (PMRc)(Mg/Mcg) PMR = (PMRg)(#hours) MMPR Field Log Oient: A·TC.. SiteName: Extraction Wells: G.-2.<'.o-2 '3:C)D I I : c,o JobNamber. C> &. -2-s 39 Event 0ates: Cs. /24> -(p/ .7 c. I Z3