Loading...
HomeMy WebLinkAbout5103_INSP_20231130NORTH CARnLINAD_E Q�� o.n.mm.m m c.wm..rem.i a.i� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined X LCID YW X Transfer Compost SLAS COUNTY: JOHNSTON MSWLF PERMIT NO.: 5103-MSWLF Closed X HHW White Incin T&P FIRM MSWLF goods 5103-CDLF 5103-MSWLF-1984 FILE TYPE: COMPLIANCE CDLF X TireT&P Tire Industrial DEMO SDTF Collection Monofill Landfill Date of Site Inspection: November 30, 2023 FACILITY NAME AND ADDRESS: Johnston County Landfill 680 County Home Road Smithfield, NC 27577 GPS COORDINATES: Lat.: 35.51424' Long.:-78.42643' FACILITY CONTACT NAME AND PHONE NUMBER: Name: Brian Beasley, Johnston County Solid Waste Director Phone: (919) 938-4748 Email address: brian.beasley�ic,iohnstonnc.com FACILITY CONTACT ADDRESS: Johnston County Landfill PO Box 2263 Smithfield, NC 27577 PARTICIPANTS: Amanda Thompson, NCDEQ, Solid Waste Section Brian Beasley, Interim Johnston County Solid Waste Director Eddie Overby, Johnston County Solid Waste Andrew Braswell, Johnston County Solid Waste Pieter Scheer, Smith Gardner, Inc. Date of Last Inspection: July 12, 2023 STATUS OF PERMIT: In 1973. Landfill operations began in Phase 1 on this property. Facility Permit 51-03 is a combination of facility permits 51-01 and 51-02. Permit to Construct Johnston County MSW Landfill, Phase 6 issued May 8, 2020. Permit to Operate 5103-MSWLF Phase 4A and 5103-CDLF Area 2 Cells 1 and 2 issued May 8, 2020. Permit for Closure for MSW Phases 1 through 4 and C&D Area 1 issued May 8, 2020. Life of Site Permit for 5103-MSWLF and 5103-CDLF issued May 8, 2020 and will expire August 8, 2057. Permit to Construct Johnston County MSW Landfill Phase 6 issued November 30, 2021. Permit to Operate 5103-MSWLF Phase 4A, 5, and 6A and C&D Area 2, Cells 1 and 2 issued November 30, 2021. Permit for Closure MSW Phases 1 through 4 and C&D Area 1 issued November 30, 2021. PURPOSE OF SITE VISIT: Phase 1 through 4 Closure Meeting and Partial Compliance Inspection STATUS OF PAST OBSERVED VIOLATIONS: None. Page 1 of 4 NORTH CARnLINAD_E Q�� o.n.mm.m m c.w.mmen.i a.i� OBSERVED VIOLATIONS: None. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. ADDITIONAL COMMENTS Facility Inspection 1. The facility is fenced and is secured by a locking gate when it is not open for operation. 2. The correct signage is at the entrance of the facility listing the facility name, permit number and emergency contact information as well as materials accepted at the facility. 3. The facility accepts waste Monday through Saturday from 8:00 am until 4:45 pm and closed on Sunday. 4. The permit, operations plan, waste screening, and training records were not reviewed during this inspection. 5. The perimeter roadways around the active MSWLF and closed CDLF are being properly maintained. 6. Permanent edge of waste (EOW) markers were observed around the active portion of the MSWLF and closed CDLF. Yard Waste 7. The yard waste was windrowed and being prepped for grinding. Mr. Beasley stated that the yard waste would be ground in the next few months. 8. No areas of standing water were observed in the western portion of the yard waste area. Continue to monitor and repair the yard waste area as needed. 9. A painted pallet was observed within the white wood stockpile. Mr. Beasley removed the painted pallet for proper disposal during this inspection. Phase 4A MSWLF 10. The southern side slope of Phase 4A is the last remaining side slope to be covered and closed. The other side slopes have been seeded and some vegetation has begun to grow. Mr. Beasley stated that the side slopes would be monitored, repaired, and revegetated as needed. 11. Phases 1 through 4A have received authorization for closure. Monthly meetings have been scheduled to provide status updates during the process. 12. One well was observed to be unlocked during this inspection. In a follow-up conversation with Mr. Beasley, the well was determined to be an abandoned well, however, a new lock was placed on the well. 13. The stormwater basins located around Phase 4A have been mowed and the woody vegetation removed. Continue to ensure that the stormwater basins are mown and maintained in working order. Phase 5 MSWLF 14. The slopes of Phase 5 have been covered. Grasses have begun to grow on the eastern side slope. Once the final grade has been achieved on the western side slope, the area will be seeded. 15. Additional cover was being applied to the top of Phase 5 to meet slope requirements. The top will be seeded after grading has been completed. 16. Windblown waste was actively being picked up during this inspection. Continue to ensure that the windblown waste is picked up daily. Page 2 of 4 FACILITY COMPLIANCE INSPECTION REPORT D_E Q�� Division of Waste Management NORTH CAROLINA Ow-- W Emironm l puelily Solid Waste Section Phase 6 MSWLF 17. The working face of Phase 6 was small and compact. The working face was actively being covered during this inspection. Phase 4 Closure Meeting 16. The closure meeting provided a status update for the closure of Phases 1 through 4. The closure status is on schedule for the project. Please contact me if you have any questions or concerns regarding this inspection report. Amanda Digitally signed by Amanda Thompson Thompson Date:2023.12.11 15:23:40-05'00' Phone: (910) 433-3352 Amanda Thompson Environmental Senior Specialist Regional Representative Sent on: December 11, 2023 X Email Hand delivery US Mail Certified No. Copies: Drew Hammonds, Eastern District Supervisor — Solid Waste Section Donna Wilson, Permitting Engineer — Solid Waste Section Page 3 of 4 FACILITY COMPLIANCE INSPECTION REPORT D_E Q�� Division of Waste Management NORTH CAROLINA Ow-- W Emironm l puelily Solid Waste Section Digital Photos taken by Amanda Thompson on November 30, 2023. View of Phase 4A southern side sope cover progress. View of the mown stormwater basins. Page 4 of 4