FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
X
LCID
YW
X
Transfer
Compost
SLAS
COUNTY: JOHNSTON
MSWLF
PERMIT NO.: 5103-MSWLF
Closed
X
HHW
White
Incin
T&P
FIRM
MSWLF
goods
5103-CDLF
5103-MSWLF-1984
FILE TYPE: COMPLIANCE
CDLF
X
TireT&P
Tire
Industrial
DEMO
SDTF
Collection
Monofill
Landfill
Date of Site Inspection: November 30, 2023
FACILITY NAME AND ADDRESS:
Johnston County Landfill
680 County Home Road
Smithfield, NC 27577
GPS COORDINATES: Lat.: 35.51424' Long.:-78.42643'
FACILITY CONTACT NAME AND PHONE NUMBER:
Name: Brian Beasley, Johnston County Solid Waste Director
Phone: (919) 938-4748
Email address: brian.beasley�ic,iohnstonnc.com
FACILITY CONTACT ADDRESS:
Johnston County Landfill
PO Box 2263
Smithfield, NC 27577
PARTICIPANTS:
Amanda Thompson, NCDEQ, Solid Waste Section
Brian Beasley, Interim Johnston County Solid Waste Director
Eddie Overby, Johnston County Solid Waste
Andrew Braswell, Johnston County Solid Waste
Pieter Scheer, Smith Gardner, Inc.
Date of Last Inspection: July 12, 2023
STATUS OF PERMIT:
In 1973. Landfill operations began in Phase 1 on this property. Facility Permit 51-03 is a combination of facility permits
51-01 and 51-02.
Permit to Construct Johnston County MSW Landfill, Phase 6 issued May 8, 2020.
Permit to Operate 5103-MSWLF Phase 4A and 5103-CDLF Area 2 Cells 1 and 2 issued May 8, 2020.
Permit for Closure for MSW Phases 1 through 4 and C&D Area 1 issued May 8, 2020.
Life of Site Permit for 5103-MSWLF and 5103-CDLF issued May 8, 2020 and will expire August 8, 2057.
Permit to Construct Johnston County MSW Landfill Phase 6 issued November 30, 2021.
Permit to Operate 5103-MSWLF Phase 4A, 5, and 6A and C&D Area 2, Cells 1 and 2 issued November 30, 2021.
Permit for Closure MSW Phases 1 through 4 and C&D Area 1 issued November 30, 2021.
PURPOSE OF SITE VISIT:
Phase 1 through 4 Closure Meeting and Partial Compliance Inspection
STATUS OF PAST OBSERVED VIOLATIONS:
None.
Page 1 of 4
NORTH CARnLINAD_E Q��
o.n.mm.m m c.w.mmen.i a.i�
OBSERVED VIOLATIONS:
None.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
ADDITIONAL COMMENTS
Facility Inspection
1. The facility is fenced and is secured by a locking gate when it is not open for operation.
2. The correct signage is at the entrance of the facility listing the facility name, permit number and emergency contact
information as well as materials accepted at the facility.
3. The facility accepts waste Monday through Saturday from 8:00 am until 4:45 pm and closed on Sunday.
4. The permit, operations plan, waste screening, and training records were not reviewed during this inspection.
5. The perimeter roadways around the active MSWLF and closed CDLF are being properly maintained.
6. Permanent edge of waste (EOW) markers were observed around the active portion of the MSWLF and closed
CDLF.
Yard Waste
7. The yard waste was windrowed and being prepped for grinding. Mr. Beasley stated that the yard waste would be
ground in the next few months.
8. No areas of standing water were observed in the western portion of the yard waste area. Continue to monitor and
repair the yard waste area as needed.
9. A painted pallet was observed within the white wood stockpile. Mr. Beasley removed the painted pallet for proper
disposal during this inspection.
Phase 4A MSWLF
10. The southern side slope of Phase 4A is the last remaining side slope to be covered and closed. The other side slopes
have been seeded and some vegetation has begun to grow. Mr. Beasley stated that the side slopes would be
monitored, repaired, and revegetated as needed.
11. Phases 1 through 4A have received authorization for closure. Monthly meetings have been scheduled to provide
status updates during the process.
12. One well was observed to be unlocked during this inspection. In a follow-up conversation with Mr. Beasley, the
well was determined to be an abandoned well, however, a new lock was placed on the well.
13. The stormwater basins located around Phase 4A have been mowed and the woody vegetation removed. Continue
to ensure that the stormwater basins are mown and maintained in working order.
Phase 5 MSWLF
14. The slopes of Phase 5 have been covered. Grasses have begun to grow on the eastern side slope. Once the final
grade has been achieved on the western side slope, the area will be seeded.
15. Additional cover was being applied to the top of Phase 5 to meet slope requirements. The top will be seeded after
grading has been completed.
16. Windblown waste was actively being picked up during this inspection. Continue to ensure that the windblown waste
is picked up daily.
Page 2 of 4
FACILITY COMPLIANCE INSPECTION REPORT
D_E Q�� Division of Waste Management
NORTH CAROLINA
Ow-- W Emironm l puelily
Solid Waste Section
Phase 6 MSWLF
17. The working face of Phase 6 was small and compact. The working face was actively being covered during this
inspection.
Phase 4 Closure Meeting
16. The closure meeting provided a status update for the closure of Phases 1 through 4. The closure status is on schedule
for the project.
Please contact me if you have any questions or concerns regarding this inspection report.
Amanda Digitally signed by Amanda
Thompson
Thompson Date:2023.12.11 15:23:40-05'00' Phone: (910) 433-3352
Amanda Thompson
Environmental Senior Specialist
Regional Representative
Sent on: December 11, 2023 X Email Hand delivery US Mail Certified No.
Copies: Drew Hammonds, Eastern District Supervisor — Solid Waste Section
Donna Wilson, Permitting Engineer — Solid Waste Section
Page 3 of 4
FACILITY COMPLIANCE INSPECTION REPORT
D_E Q�� Division of Waste Management
NORTH CAROLINA
Ow-- W Emironm l puelily
Solid Waste Section
Digital Photos taken by Amanda Thompson on November 30, 2023.
View of Phase 4A southern side sope cover progress.
View of the mown stormwater basins.
Page 4 of 4