Loading...
HomeMy WebLinkAboutNCD980602163_20021231_Warren County PCB Landfill_SERB C_Patrick Barnes - Community Advisor Contract, 1999 - 2002-OCR, . ·~~~·A ---;~~ .--,;,, ---NC DEN R North Carolina Department of Environment and Natural Resources DIVISION OF PURCHASE AND SERVICES Michael F. Easley, Governor Laird A. Davison, Director William G. Ross, Jr., Secretary December 31, 2002 AMENDMENT NO. 2 AMENDMENT TO CONTRACT NUMBER N200018 BETWEEN PATRICK A. BARNES AND THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Pursuant to paragraph ten (10) of Contract Number N200018, the Department of Environment and Natural Resources and the Contractor mutually agree to change the contract as follows: Article 2 is revised as follows: uThe DEPARTMENT hereby agrees to pay the CONTRACTOR as indicated on the Revised Estimated Payment Schedule for a sum of money not to exceed ONE HUNDRED SIXTY- ONE THOUSAND THREE HUNDRED FIFTY-FOUR DOLLARS ($161,354.00), said sum to be full and complete compensation for services to be rendered under this agreement." The contract is being reduced from $199,100.00 to $161,354.00 based on the "Revised Scope of Services for PCB Landfill Technical Community Advisor for the period from November 1, 2002 through September 30, 2003" and the MRevised Estimated Payment Schedule" as described in Attachment A which are incorporated as part of Amendment No. 2 to Contract No. N200018. Article 2(b) is revised as follows: "Invoices are to be submitted to the Contract Administrator not later than the fifth day of the month for work done during the previous month. Final invoice must be received by the DEPARTMENT within 45 days after the end of the contract period." Article 6 is revised as follows: "The services of the CONTRACTOR are to commence on the 15th day of June, 2002 and shall be undertaken and completed in such sequence as to assure their expeditious completion in light of the purposes of this agreement, but in any event, all of the services .required hereunder shall be completed by the 30th day of September, 2003." 1605 Mail Service Center, Raleigh, North Carolina 27699-1605 Phone: 919-733-9746 \ FAX: 919-715-0684 \ Internet: www.admin.enr.state.nc.us/purchase/ An Equal Opportunity/ Affirmative Action Employer• 50 'I, Recycled I 10 % Post Consumer Paper Amendment No. 2 Contract No. N200018 December 31, 2002 --- Article 20 is revised as follows: "Patricia M. Backus is designated as the Contract Administrator (project coordinator) for the State. However, any changes in the scope of the contract which will increase or decrease the CONTRACTOR'S compensation shall not be effective until they have been approved by the DEPARTMENT Head or Authorized Agent." It is the intent of this amendment to address the provision(s) noted only, and in no way should this amendment be construed to further modify this contract. Please indicate acceptance by your signatu~re below. Approved: Q,r.,.,,/'I_ , /4: / / <-~Jt {;, ..,._ .... "" ~~J{, 1£..,,'l.,rf.,~ Laird A. Davison, DENR Patrick A. Barnes Return one (1) duplicate original to: Purchase & Contract Section DENR Division of Purchase and Services 1605 Mail Service Center Raleigh NC 27699-1605 cc: Brenda Rivers/Pat Backus, DENR DWM DENR Office of the Controller DUPLICATE ORIGINAL 1605 Mail Service Center, Raleigh, North Carolina 27699-1605 Phone: 919-733-9746 \ FAX: 919-715-0684 \ Internet: www.admin.enr.state.oc.us/purchase/ An Equal Opportunity / Affi~tiv• Action Employer • 50 '/, Recycled I 10 •;, Post Consumer Paper .. ATTACHMENT A REVISED SCOPE OF SERVICES FOR PCB LANDFILL TECHNICAL COMMUNITY ADVISOR Period from November 1, 2002 thru September 30, 2003 The following tasks and the associated fees are estimates based on previous work activities. If during the course of execution of this scope of work the Warren County PCB Landfill Community Advisory Board desires the presence or services of the Technical Community Advisor, such work can be performed provided it meets the intent of the contract and the overall budget is not exceeded. The advisor will coordinate this work with the state and provide separate written documentation of such activities. • Task 1: Attendance at Project and CAB Meetings Under this task the Technical Community Advisor (Advisor) is authorized to attend monthly project meetings between the Detoxification Contractor, Oversight Contractor, and the Department of Environment and Natural Resources (DENR) Project Manager; attend monthly meetings of the Community Advisory Board (CAB); and visit the site to review the progress of the detoxification and inspect the condition of the site. His purpose under this task is to access whether community concerns are being addressed. The Advisor will inform the DENR Project Manager of any concerns and may offer advice based on these concerns. He is also tasked to help clarif}1 any technical issues in non-technical terms for the community. The Advisor will provide monthly reports (both oral and written) of these efforts to the community at the CAB meeting and to the newsletter staff. TASK DESCRIPTION REMAINING ID BUDGET 1.1 Attendance at CAB meetings before Completed detoxification contractor is selected 1.2 Attendance at CAB meetings after $800 per month for detoxification contractor is selected eleven months TOTAL REMAINING FOR TASK $8,800 Rc11uircments for pavment: The Advisor must include in his monthly invoice a copy of his report presented to the CAB. The report should be at least one page in length. The monthly status report that accompanies his invoice should summarize his attendance at the listed meetings, any comments he feels appropriate concerning the meetings, and any infonnation from these meetings that should be passed on to DENR or the community. If no i11formatio11 is provided, it will he assumed that there are no community concerns for that period of time that need to he addressed. The Advisor has the option to participate by phone for the monthly progress meeting in months when a CAB meeting is not scheduled in order to make an unannounced site visit at a different time during the month. ♦ Task 2: Document Review and Presentation Proper communication is key to the success of any project. As in the past, under this task, the Advisor will review various technical documents and communicate their meaning to the general community. Under this task the Advisor is permitted to review all analytical results obtained from the treated soil and air monitoring. These records are available at the site in the Earth Tech/DENR trailer. The Advisor will also review all correspondence provided by the state concerning the progress of the project. The Advisor will provide monthly reports (both oral and written) of these efforts to the community at the CAB meeting. The goal of the reports will be to provide an independent view as to whether or not the detoxification process is meeting the historical concerns of the community. Page 1 of 4 Revised Scope of Services for PCB Landfill Technical Community Advisor December 31, 2002 TASK DESCRIPTION REMAINING ID BUDGET 2.1 Review during the construction phase Completed 2.2 Review during the treatment phase $200 per month for eleven months TOTAL REMAINING FOR TASK $2,200 Requirements for pnment: The Advisor must include information from this task review in his monthly report to the community. The monthly status report that accompanies his invoice should summarize any comments or issues he feels appropriate based on his review. If no information is provided, it will be assumed that there are no community concerns for that period of time that need to be addressed and that the project is meeting the historical concerns of the community. ♦ Task 3: Technical Assistance in Screening and Identifying Local Resources All tasks completed. TASK DESCRIPTION REMAINING ID BUDGET 3.1 Conduct Local Business Information Session Completed 3.2 Prepare Local Business Resource Book Completed 3.3 Train and Suooort CIC and Job Developer Completed 3.4 Advise CIC and Job Developer Completed 3.5 Provide Assistance to Local Contractors Completed 3.6 Assist Job Developer and Educate Residents Completed ♦ • Task 4: Measuring and Monitoring Outreach Performance Some work was conducted under this task, however, the project manager for Shaw, the detoxification contractor, supplies a spreadsheet that include the amount spent under the contract in the community and with minority businesses. TASK DESCRIPTION REMAINING ID BUDGET 4.1 Develop Svstem to Measure Performance Completed 4.2 Evaluate and Modify Completed 4.3 Assist Community in Assessing Economic Impact Completed ♦ Task 5: Newsletter Preparation and Distribution Tasks have been completed. Advisor is to provide information to Warren Family Institute for the newsletter under reporting requirements of Task 1.2 and Task 2.2. TASK DESCRIPTION REMAINING ID BUDGET 5.1 Prepare Newsletter Completed 5.2 Prepare and Assist CIC with Newsletter Completed 5.3 Contribute Information to Newsletter Completed Page 2 of 4 ; Revised Scope of Services for PCB Landfill Technical Community Advisor December 31, 2002 • Task 6: Miscellaneous Assistance Tasks 6.1-6.3 are considered completed. Four new tasks, 6.4-6.7, have been created. While visiting Warrenton each month, the Advisor is authorized under Task 6.4 to schedule a few hours to be available to the community at the PCB CAB office. The Advisor will ask the CAB secretary to advertise the office time in the newsletter and local paper. The Advisor will inforn1 the DENR Project Manager of any concerns and may offer advice based on these concerns. Task 6.5 covers the presence of the Advisor at the Performance Demonstration Test. The results of this test will detemune whether Midwest Soil Remediation obtains a national TSCA permit. It is important that the Advisor be present to observe and report to the community the activities associated with this key event. Task 6.6 covers the assistance of the Advisor during the site cleanup verification sampling. This sampling is required under TSCA for Region IV. The Advisor will be consulted during the development of the sampling plan for his concurrence. However, the DENR project manager will make the final decision of where to sample based on the requirements of TSCA Region IV and the advice of the Advisor, qualified DENR personnel, and Earth Tech. the oversight contractor. The sampling event will be scheduled to concur with a monthly meeting so that the Advisor can participate in the event during a monthly visit to Warren County. Task 6.7 is for miscellaneous assistance that might be needed by the DENR. Prior approval for any work under this task from Pat Backus or Mike Kelly is required or it will not be paid. TASK DESCRIPTION REMAINING ID BUDGET 6.1 Assistance with Redevelopment Plans Completed (,.2 Assistance Requiring Technical Expertise Completed 6.3 Investigate Special Commw1ity Concerns Completed 6.-t Availability at CAB Office for Community $400 per month for 11 Questions months 6.5 Observation of Performance Demonstration $2 ,400 for one event Test for Community 6.6 Assistance during site evaluation sampling $1 ,600 for one event 6.7 Prior Approved Miscellaneous $1 ,000 TOTAL REMAINING FOR TASK $9,400 Rcyuircments for payment: The Advisor must include information from tl1ese activities in his monthly report to tl1e community. The monthly status report tl1at accompanies his invoice should summarize any comments or issues he feels that are community concerns. If no information is provided, it will he assumed that there are no community concerns for the work that was performed In addition, the Advi.w,r must document that he received prior approval from either Pat Backus or Mike Ke/(11 for any amount invoiced against Item 6. 7. Wzt.hout this documentation ofprior approval, he will not he paid for work claimed under this task. ♦ Task 7: Travel and Lodging Most of the previous tasks will require the Advisor's presence in Warren County. The Advisor lives in Orlando. Florida. It is estin1ated that he will nlake one trip a month to Warren County and will require one day of lodging and a rental car for travel from RDU airport.!_o Warren County. An additional trip will be allowed during the month in which tlle performance demonstration test occurs. Travel, lodging and subsistence are allowed expenses. Allowable subsistence and lodging expenses will be the same as is allowed for state employees listed in tl1e Budget Manual of the State of North Carolina. Reimbursements will be made in compliance with applicable policies as contained in the Budget Manual of tl1e State of Nortl1 Carolina. Pages from tl1e Travel Policies and Regulations section of tl1e Page 3 of 4 Revised Scope of Services for PCB Landfill Technical Community Advisor December 31 , 2002 Budget Manual that address subsistence rates, lodging, transportation by common carrier, and transportation by rental vehicle were included in the original contract. TASK ID DESCRIPTION REMAINING BUDGET 7 Travel Ex'J)enses $500 per ten months $1000 for on month TOTAL REMAINING FOR TASK $6,000 Requirements for payment: In his monthly invoice the Advisor must include a detailed listing of expenses. Receipts for air travel, lodging, and car rental must be included. Reimbursements will be made in compliance with applicable policies as contained in the Budget Manual of the State of North Carolina. Page 4 of 4 Tasks 2 3 4 5 6 7 Revised Estimated. .,1ent Schedule Description Contract I Earned to Estimate Date INV 19" INV 20'' INV 21" INV 22" INV 23" INV 24" INV 25" INV 26" INV 27" INV 28" INV 30" INV 31" "' -·~·?:~~~::fr~·:] I5,.·, ~~·· ·< i....-, Period from 10/01/2002 11/01/2002 12/01/2002 01/01/2003 02/01/2003 03/01/2003 04/01/2003 05/01/2003 06/01/2003 07/01/2003 08/01/2003 09/01/2003 to 10/21/2002 11/31/2002 12/31/2002 01/31/2003 02/28/2003 03/31/2003 04/30/2003 05/31/2003 06/30/2003 07/31/2003 08/31/2003 09/30/2003 Attendance at CAB & SCO Meetings I 40,000I 26,5501 1,6001 8001 BODI BODI 8001 BODI 8001 __ 8DOL _ 8001 8001 1,2001 1,200 1.11 3,200 I 3,200 1.21 36.soo I 23,350 1,600 800 800 Document Review and Presentation 5,200 I 4,100 200 200 200 2.1 3.200 I 3,200 2.2 2.000 I 1,500 200 200 200 Technical Assistance/Local Resources 431200 I 34,230 0 0 0 3.1 9,600J ____ 9,772 3.2 9,600 L __ 9.sos 3.3 4.soo I _ _4,soo 3.4 0 3.5 15,000 8,550 3.6 4,200 1,300 Measuring and Monijoring Outreach 13,000 2,980 0 0 0 4.1 2,880 2,880 4.2 0 4.3 10,120 100 Newsletter Prep and Distribution 22,600 20,145 0 0 0 5.1 7,200 7,200 5.2 7,200 7,920 5.3 8,200 5,025 Miscellaneous A_p__1>_roved Assistance 30,000 22,228 200 400 400 6.1 6,000 1,080 6.2 18,500 16,198 6.3 5,500 4,950 6.4 0 200 400 400 6.5 0 6.6 0 6.7 0 Travel and lodgin__g_ 45,100 21,160 961 500 500 Transportation I I 15,894 961 500 500 Subsistence I I 4,549 Other I I 717 !-·.···,, 1,900 . 161,354 PAYMENTS Check Date I:" "'•': Amount•,, TOTAL L_~'._2f; ___ t_'i 800 200 200 0 0 0 2,800 400 2,400 1,000 1,000 ; j)}i~ :;: 4,800 800 800 200 200 200 200 0 0 0 0 0 0 400 400 400 400 500 500 500 500 '•ff~T~s~i~,,,~Jj~\~,:~". I r,itt . p1,9DOI " '1:900 800 200 200 0 0 0 400 400 500 500 t. ~i{•'i 1,900 800 800 800 800 800 200 200 200 200 200 200 200 200 200 200 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 400 2,000 400 0 1,000 400 400 400 1,600 1,000 500 500 500 500 500 500 500 500 500 500 .,.~r,1'1:-:-;;.:·r:·"' -~ir~~~?.L,: :~~'fr~ 1,900 3,500 2,900 .'.{:::.:: '.:v~0";'!l~DIW~ } :, ',l\"i~!)r"]04;'.§ \F;' l::'l';'?;s't.,:r,w;;rt,~ December 31, 2002) I r'· ' ' l .. REQUEST FOR EXCEPTION TO CONTRACT RE# _______ _ 1. Ptoject Title: Warren County PCB Landfill Technical Community Advisor 2. Division: Waste Management 3. Source of Funds: Appropriations:$ 199,100 Receipts: ...._ ____________ _ Federal: ~--------Match Required:=----------- 4. Budget Codes: GL Company: 1604 GL Account: 53-2199 GL Center: _ __.4_._7=2.a:a..5 ___ _ 5. Is there a deadline for obligation of these funds? If so, date: _______ _ 6. Type of contract requested: Contract for Services ___________ _ Award of DENR Grant Funds _________ _ Amendment to existing contract/grant ____ ✓ __ _ 7. Proposed Vendor/Recipient: __ ---:..P-=a=tr=ic=k.:...;A:....:..:..... :B.::.a:..:.rn.:.::e::.:::s"-'-P.:..;:. G""'.'----------------- 8. Summary of work/activities to be performed under this contractual arrangement: Services needed to provide technical assistance and support for outreach activities of the PCB Landfill Detoxification Project. See attachments for revised scope of services and contract changes. 9. Justification of Need for Contract: A) Was this vendor selected through a competitive process? ___ Yes ___ Will Be First contract with vendor as a science advisor was through a competitive process. This contract was sole source based on experience with first contract. B) Explanation of why this work cannot be performed within the resources of the DENR Agency: Technical Community Advisor must be independent and therefore could not be from DENR. C) Is there a State Agency/University that could perform this work? ....:!__ Yes ___ No D) If Yes , provide a list of those agencies: Various UNC System Universities E) Contacts made to determine the ability of other state agencies/universities to perform this work (name of contact, agency, telephone number and response): None F) If not utilizing another state agency/university, state the reason: The community does not consider any state agency/university to be independent. G) Calculation of available funding for this contract. Include amount available and amount previously obligated/approved to be obligated: Original contract cost= $199,100 Revised contract cost= $161,354 Funds to be unemcumbered = $37 ,746 SUBMITTED BY: __ ....a..P-=a=tr""'ic .... i a;a..;,;.M.;.;.. -=B=a=c=ku=s'--_ Phone: 733-4996 x308 Date: 11/27/02 Phone: 733-4996 x308 Contact Person for questions regarding this contract: ___ -'-P=a"-t =B-=a=ck;.;..;u=s'-_ APPROVALS: □ Approved D Disapproved ______________ Division Director □ Approved D Disapproved ______________ SPA □ Approved D Disapproved ______________ Chief Deputy Date Transmitted to Purchase and Services: _____________ _ FORM 2800 , AGREEMENT INFORMATION & CONTRACT BUDGET ENCUMBRANCE DENR DIVISION OF PURCHASE AND SERVICES 1. A. PARTIES TO THIS AGREEMENT DENR Division of: Waste Management Division Section Division Address (MSC#, City, State, Zip) 1646 Mail Service Center Raleiah l\lr. 27699-1646 Division Contract Administrator Patricia M. Backus, P.E. Telephone No. (919) 733-4996 ext 308 . .. . .. -·. . . .. ' . -.... . . .. . . . .. '. . . . . . . . . ................. -. - -......•.. . .... .. . ... . . ......... ····-•-·· -······ .,t t>IVISiQN AP~R_Q\iAL (MA.NWl,l:O~:V)) .......... ·-.'.'..... . . . . . . . . . ................. ' ........ ' ......•... ·······•··•······••··•••·••············•• ........... ························ ................................... ---........ •···················· . ···············"·• ........ ·-· ............... ·-···--···• ..... . .. ·····--·-···· . . . ................ --··· -·•·· ........................................... -. . . -····· ........ . piviiloii Director/Authorized Agent . . > Date *DENR CONTRACT NO: N200018 *PURCHASE ORDER NO: REVISION NO: B. Contractor (Name Contract Issued To:) Patrick A. Barnes, P.G. I.R.S. Number or Social Security Number 063-62-1412 Address (to which checks will be mailed) 4755 Anderson Rd. (City, State, Zip) Ortando, FL 32812 Please check one of the following: I Check if Applicable Private and/or -Nnn-Profil .:!_ African American owned Woman owned _Handicapped owned _ Hispanic owned _ Other minority owned _None of the above Contractor Contact Person/Key Personnel: Patrick A. Barnes, P.G. I Telephone Number (407) 896-8608 3. DIVISION CONTRACT COORDINATOR: __ -""B,.,,re:.und..,a.._R,_,_i'""ve,.,.r.,._s ___________ PHONE NO: ___ {9~1=9}-7~3=3--4=9~9~6~x2=0~4 4. FISCAL YEAR: ___ .,_FY-'--"'0=2--=0=3 _____ _ 5. START DATE: ___ ~J~u~n-e_1~5~2~0~00~ ________ (Contractor cannot begin work until contract is executed by DENR) 6. TERMINATION DATE: September 30, 2003 (Limit to time required; contract cannot exceed 3 years) 7. CURRENT CONTRACT AMOUNT: __ ---',._1,.,,9'""9~1'--"0'""0 _________________________ _ 8. *AMENDMENT AMOUNT: {$37,746) (Indicate Previously Assigned Contract No. & PO in appropriate block ABOVE) 9. REVISED CONTRACT TOTAL :$ $161,354 (Original Amount+ Amendment Increase/Decrease) 10. UNENCUMBRANCE (Balance remaining in Contract that will not be paid to Contractor): $ ____ ___;$:o:..:3,:..:7_._,7.,_4.,_,6=--------- 11. ITEM DESCRIPTION 12. DENR CONTRACT AMOUNT Contract Purpose/Brief Narrative: (Estimate of Expenditures each FY if multiple year contract) Services needed to provide technical assistance and support for outreach activities of the PCB Landfill Detoxification Project FY 00-01 $88,483 FY 01-02 $29,078 FY 02-03 $37,093 FY 03-04 $ 6,700 13. CFDA CODE: (Catalog of Federal Domestic Assistance Code, if applicable) 14. GL COMPANY: 1604 GL ACCT: 53-2199 GL CENTER 47~5 GL COMPANY: GL ACCT: GL CENTER GL COMPANY: GL ACCT: GL CENTER GL COMPANY: GLACCT: GL CENTER 15 Federal Funds State Funds Contractor Match Other Funds TOTAL PROJECT COST $ $161 ,354 $ $ $161 ,354 16. Division Budget Officer (Mandatory Signature) Date I I Changes for Contract Amendment These are items from the contract that I am requesting be modified based on the change in scope, funding, etc. The changes ate highlighted. Change: Reason: Change: Reason: Change: Reason: Change: Reason: Change: Change: 2. The DEPARTl\1ENT hereby agrees to pay the CONTRACTOR as indicated on the b~1sitt•~~~iim&iti~rv•••11111~~~ sum to be full and complete compensation for services to be rendered under this agreement. Change in scope of services. Consistent with detoxification contract. No confusion on when due. Easier for me to track project budget. 6. The services of the CONTRACTOR are to commence on the 15m day of June, 2000, and shall be undertaken and completed in such sequence as to assure their expeditious completion in light of the purposes of this agreement, but in any event, all of the services required hereunder shall be completed by the $O:Wffiivit$e&aribit200:J. Corresponds with end of detoxification contract. Email from Kathy Norris indicated that Laird Davison has given approval to request beyond three years to avoid to preparing another an1endment. 20. J:¾jfiqffi:M:;~ij¢@$ is designated as the Contract Administrator (project coordinator) for the State. However, any changes in the scope of the contract which will increase or decrease the CONTRACTOR'S compensation shall not be effective until they have been aooroved by the DEPARTl\1ENT Head or Authorized Agent. I've been doing it for the past two and a half years. Scope of Services -Revised Scope is included in package. Estimated Payment Schedule -Revised Payment Schedule is included in package. REVISED SCOPE OF SERVICES FOR PCB LANDFILL TECHNICAL COMMUNITY ADVISOR Period from November 1, 2002 thru September 30, 2003 ♦ Task 1: Attendance at Project and CAB Meetings Under this task the Technical Community Advisor (Advisor) is authorized to attend monthly project meetings between the Detoxification Contractor, Oversight Contractor, and the Department of Environment and Natural Resources (DENR) Project Manager; attend monthly meetings of the Community Advisory Board (CAB); and visit the site to review the progress of the detoxification and inspect the condition of the site. His purpose under this task is to access whether community concerns are being addressed. The Advisor will inform the DENR Project Manager of any concerns and may offer advice based on these concerns. He is also tasked to help clarify any technical issues in non-technical terms for the community. The Advisor will provide monthly reports (both oral and written) of these efforts to the community at the CAB meeting and to the newsletter staff. TASK DESCRIPTION REMAINING ID BUDGET 1.1 Attendance at CAB meetings before Completed detoxification contractor is selected 1.2 Attendance at CAB meetings after $800 per month for detoxification contractor is selected eleven months TOTAL REMAINING FOR TASK $8,800 Requirements for pa,·ment: The Advisor must include in his monthly invoice a copy of his report presented to the CAB. The report should be at least one page in length. The monthly status report that accompanies his invoice should summarize his attendance at the listed meetings, any comments he feels appropriate concerning the meetings, and any infomiation from these meetings that should be passed on to DENR or the community. If no information is provided, it will be assumed that there are no community concerns for that period of time that need to be addressed. The Advisor has the option to participate by phone for the monthly progress meeting in months when a CAB meeting is not scheduled in order to make an unannounced site visit at a different time during the mont11. ♦ Task 2: Document Review and Presentation Proper communication is key to the success of any project. As in the past, under this task, the Advisor will review various technical documents and communicate their meaning to the general community. Under this task the Advisor is permitted to review all analytical results obtained from the treated soil and air monitoring. These records are available at t11e site in t11e Eart11 Tech/DENR trailer. The Advisor will also review all correspondence provided by t11e state concerning the progress of tlle project. The Advisor will provide monthly reports (both oral and written) of these efforts to the community at tlle CAB meeting. The goal of the reports will be to provide an independent view as to whet11er or not tlle detoxification process is meeting the historical concerns of the community. TASK DESCRIPTION REMAINING ID BUDGET 2.1 Review during the construction phase Completed 2.2 Review during the treatment phase $200 per month for eleven montlls TOTAL REMAINING FOR TASK $2,200 Page 1 of 4 Revised Scope of Services for PCB Landfill Technical Community Advisor November 27, 2002 Requirements for pavment: The Advisor must include information from this task review in his monthly report to the community. The monthly status report that accompanies his invoice should summarize any comments or issues he feels appropriate based on his review. If no information is provided, it will be assumed that there are 110 community concerns for that period of time that need to be addressed · and that the project is meeting the historical concerns of the community. ♦ Task 3: Technical Assistance in Screening and Identifying Local Resources All tasks completed. TASK DESCRIPTION REMAINING ID BUDGET 3.1 Conduct Local Business Information Session Completed 3.2 Prepare Local Business Resource Book Completed 3.3 Train and Support CIC and Job Developer Completed 3.4 Advise CIC and Job Developer Completed 3.5 Provide Assistance to Local Contractors Completed 3.6 Assist Job Developer and Educate Residents Completed ♦ Task 4: Measuring and Monitoring Outreach Performance Some work was conducted under this task, however, the project manager for Shaw, the detoxification contractor, supplies a spreadsheet that include the amount spent under the contract in the community and with minority businesses. TASK DESCRIPTION REMAINING ID BUDGET 4.1 Develop System to Measure Perfom1ance Completed 4.2 Evaluate and Modify Completed 4.3 Assist Community in Assessin_g Economic Impact Completed • Task 5: Newsletter Preparation and Distribution Tasks have been completed. Advisor is to provide information to Warren Family Institute for the newsletter under reporting requirements of Task 1.2 and Task 2.2. TASK DESCRIPTION REMAINING ID BUDGET 5.1 Prepare Newsletter Completed 5.2 Prepare and Assist CIC with Newsletter Completed 5.3 Contribute Information to Newsletter Completed ♦ Task 6: Miscellaneous Assistance Tasks 6.1-6.3 are considered completed. Four new tasks, 6.4-6.7, have been created. While visiting Warrenton each month, the Advisor is authorized under Task 6.4 to schedule a few hours to be available to the community at the PCB CAB office. The Advisor will ask the CAB secretary to advertise the office Page 2 of 4 Revised Scope of SeIVices for PCB Landfill Technical Community Advisor November 27, 2002 time in the newsletter and local paper. The Advisor will inform the DENR Project Manager of any concerns and may offer advice based on these concerns. Task 6.5 covers the presence of the Advisor at the Performance Demonstration Test. The results of this test will determine whether Midwest Soil Remediation obtains a national TSCA permit. It is important that the Advisor be present to observe and report to the community the activities associated with this key event. Task 6.6 covers the assistance of the Advisor during the site cleanup verification sampling. This sampling is required under TSCA for Region IV. The Advisor will be consulted during the development of the sampling plan for his concurrence. However, the DENR project manager will make the final decision of where to sample based on the requirements of TSCA Region IV and the advice of the Advisor, qualified DENR personnel, and Earth Tech, the oversight contractor. The sampling event will be scheduled to concur with a monthly meeting so that the Advisor can participate in the event during a monthly visit to Warren County. Task 6.7 is for miscellaneous assistance that might be needed by the DENR. Prior approval for any work under this task from Pat Backus or Mike Kelly is required or it will not be paid. TASK DESCRIPTION REMAINING ID BUDGET 6.1 Assistance with Redevelopment Plans Completed 6.2 Assistance Requiring Technical Ex'Pertise Completed 6.3 Investigate Special Community Concerns Completed 6.4 Availability at CAB Office for Community $400 per month for 11 Questions months 6.5 Observation of Performance Demonstration $2,400 for one event Test for Communitv 6.6 Assistance during site evaluation sampling $1 ,600 for one event 6.7 Prior Approved Miscellaneous $1,000 TOTAL REMAINING FOR TASK $9,400 Requirements for pavment: The Advisor must include information from these activities in his monthly report to the community. The monthly status report that accompanies his invoice should summarize any comments or issues he feels that are community concerns. If no information is provided, it will be assumed that there are no community concerns for the work that was performed In addition, the Advisor must document that he received prior approval from either Pat Backus or Mike Kelly for any amount invoiced against Item 6. 7. W,t/wut this documentation of prior approval, he will not be paid for work claimed under this task. ♦ Task 7: Travel and Lodging Most of the previous tasks will require the Advisor's presence in Warren County. The Advisor lives in Orlando, Florida. It is estin1ated that he will make one trip a month to Warren County and will require one day of lodging and a rental car for travel from RDU airport to Warren County. An additional trip will be allowed during the month in which the performance demonstration test occurs. Travel, lodging and subsistence are allowed expenses. Allowable subsistence and lodging expenses will be the same as is allowed for state employees listed in the Budget Manual of the State of North Carolina. Reimbursements will be made in compliance with applicable policies as contained in the Budget Manual of the State of North Carolina. Pages from the Travel Policies and Regulations section of the Budget Manual that address subsistence rates, lodging, transportation by common carrier, and transportation by rental vehicle were included in the original contract. TASK ID DESCRIPTION REMAINING BUDGET 7 Travel Expenses $500 per ten months $ 1000 for on month TOTAL REMAINING FOR TASK $6,000 Page 3 of 4 Revised Scope of Services for PCB Landfill Technical Community Advisor November 27, 2002 Requirements for payment: In his monthly invoice the Advisor must include a detailed listing of expenses. Receipts for air travel, lodging, and car rental must be included. Reimbursements will be made in compliance with applicable policies as contained in the Budget Manual of the State of North Carolina. Page 4 of 4 Barnes Contract Adj THk• De,crtptlon Contract I Ea med to Estimate Date INV19•• INV20•• INV 21 .. INV22•• INV 23 .. INV 24 .. INV2S-INV2&•• INV 27•• INV28•• INV 30.. I • INV 31 .. .::::::::t:::::;.:::::::.:: :·:n:=:;=(=/l::l:(?ET:=:::::Jj/f:::}'t] ::/=/:}/::::::'-:l}}:}/:/::::;:J::::=:t'f'-':'·':t''*''fa;'''::{•'•'•'-:::::J}:fr:idllifilnrntrnwwr::::t1TY:STFl':I:Uft: Period from I •-· •·----1 · ·· ··----1 ·-· ----1 ·· ··----, -· ··----1 -· ··----1 to 10/1/?00?I 11/1/?00?I 1?/1/?00?I 1/1/?nml ?/1/?0011 1/1/?0011 4/1/2003 5/1/2003 6/1/2003 7/1/2003 8/1/2003 9/1/2003 10/21/2002 11/31/2002 12/31/2002 1/31/2003 2/28/2003 3/31/2003 4/30/2003 5/31/2003 6/30/2003 7/31/2003 8/31/2003 9/30/2003 Attendance at CAB & SCO Meet~ 40,000 26,550 1 600 800 800 800 800 800 800 800 800 800 1200 1 200 1.1 3,200 3,200 1.2 36,800 23,350 1,600 800 800 800 800 800 800 800 800 800 800 800 2 I Document Review and Presentation 5,200 4,700 200 200 200 200 200 200 200 200 200 200 200 200 2.1 3,200 3.200 2.2 2,000 1,500 200 200 200 200 200 200 200 200 200 200 200 200 3 IT echnir.al Assistance/Lor.al Resources 43,200 34,230 0 0 0 0 0 0 0 0 0 0 0 0 3.1 9,600 9,772 3.2 9,600 9,808 3.3 4,800 4,800 3.4 0 3.5 15,000 8,550 3.6 4,200 1,300 4 I Measuring and Monitoring Outreach 13,000 2,980 01 0 0 0 0 0 0 0 OI 0 0 0 4.1 2,880 2,880 4.2 0 4.3 10,120 100 5 !Newsletter Prep and Distribution 22,600 20,145 0 0 0 0 0 0 0 0 0 0 0 0 5.1 7,200 7,200 5.2 7,200 7,920 5.3 8,200 5,025 6 I Miscellaneous A_l)J)_roved Assistance 30,000 22,228 200 400 400 2 800 400 400 400 400 2 000 400 0 1,000 6.1 6,000 1,080 6.2 18,500 16,198 6.3 5,500 4,950 6.4 0 200 400 400 400 400 400 400 400 400 400 6.5 0 2.400 6.6 0 1,600 6.7 0 I I I I 1,000 7 !Travel and LodJli_rlg_ 45,100 21,160 9611 5001 5001 1,000 500 500 500 500 5001 500 500 500 TranSJ)_ortatlon 15,894 9611 5001 5001 1,000 500 500 500 500 5001 500 500 500 Subsistence 4,549 Other 717 ··, (::=:=: ... · : : .: .... ,· ..... :.: .·': ·· .. \..'.L:::;::::=nmmrnrnmn::::21u::::w::::::::]?::2nc:J::::::::::.:nu·r::r::::i??:l::vx<;;+:::=:1:n::>FW:::::::=:·:::1:::n+vu=:rtt.<>.':;::1:.:,.~::,.:.\AX/:?C:a;L2z1ih I TOTAL I 199,1001 131,9931 2,9611 1,9001 1,9001 4,8001 1,9001 1,9001 1,9001 1,9001 3,5001 1,9001 1,9001 2,900 161,354 I .. ::· c~~=~·r'TTTTrn,oo,r Update 10/31/2002 Ma ~ 16 0 2 04:23p Barn es, Ferl and~ Assoc. (407J 896 -·1822 North Carolina Department of Environment and Natural Resources DIVISION OF PURCHASE AND SERVICES Michael F. Easley, Governor Laird A. Davison, Director William G. Ross, Jr., Secretary ......... , •·•• ... "-· April 2, 2002 AMENDMENT NO. 1 , .. "' AMEN,DME~if to" c'bNTRA'ct''NOMB'ER 'N10CJ0'18 ' , · BETWEEN PATRICK A. BARNES AND THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Pursuant to paragraph ten (10) of Contract Number N200018, the Department of Environment and Natural Resources and the Contractor mutually agree to change the contract ending date from June 14, 2002 to June 14, 2003. It is the intent of this amendment to address the provision(s) noted only, and in no way should this amendment be construed to further modify this contract. Please indicate acceptance by your signature below. Approved: Return one (1) duplicate original to: Purchase & Contract Section DENR Division of Purchase and Services 1605 Mail Service Center Raleigh NC 27699-1605 cc: Brenda Rivers/Pat Backus, DENR DWM DENR Office of the Controller 1605 Mail Service Center, Raleigh, North Carolina 27699-1605 Phone: 919-733-9746 \ FAX: 919-715-0684 \ Internet: www.admin.cnr.state.nc.us/purchase/ An Equal Opportunity/ Affirmative Action Employer• 50 % Recycled I 10 % Post Consumer Paper p.2 North Carolina Department of-Environment and NaturaIBesources ~,,_A_ Division of Waste Management Michael F. Easley, Governor NCDENR William G. Ross Jr., Secretary Dexter R Matthews, Director TO: DATE: COPIES TO: FROM: SUBJECT: MEMORANDUM Michael Bryant DENR Division of Purchase and Services March 27, 2002 Mike Kelly, Dexter Matthews, Brenda Rivers Pat Backus~ Extension ofDENR Contract Number N200018 DENR Contract N200018 is a personal services contract with Patrick Barnes to provide assistance to DENR and the Warren County community on the PCB Landfill Detoxification Project. The scope of services includes attendance at project and community meetings, review and interpretation of technical documents for the community, identification of local subcontractors, assistance to local and minority subcontractors, newsletter preparation, travel and support for miscellaneous DENR-approved activities. This contract is scheduled to expire on June 14, 2002. The work performed under this contract is closely tied to the actual detoxification. The original contract schedule was developed before a contractor had been selected for the detoxification. Mr. Barnes has worked with DENR to modify his scope of services and contract schedule to match the actual needs as the project has progressed. As such, some contract activities have not been completed and approximately $95,000 of the $ I 99,100 budget remains. Mr. Barnes' services will be needed until the detoxification project is complete. Assuming that both Phases I and II are completed, his services will be required for approximately another year. The remaining budget is sufficient to provide the services during the additional time. Therefore, by the letter I am requested that you extend this contract until June 14, 2003. If you need additional information or have questions, please contact me. [Fwd: Contract Expiration(s) Within 90 Days] Subject: [Fwd: Contract Expiration(s) Within 90 Days] Date: Mon, 25 Mar 2002 08:56:32 -0500 From: Brenda Rivers <brenda.rivers@ncmail.net> To: PAT BACKUS <PAT.BACKUS@ncmail.net> Subject: Contract Expiration(s) Within 90 Days Date: Thu, 21 Mar 2002 17:52:59 -0500 From: Pat.Powell@ncmail.net Organization: NC-DENR To: BRENDA RIVERS <BRENDA.RIVERS@ncmail.net> The following contract(s) assigned to Division of Waste Management will expire within 90 days. Please verify the information in this notification and if incorrect, please notify Pat Powell. N200018 6/15/2000 -6/14/2002, Admin: Mike Kelly Please contact the Contract Administrator listed on each of these contracts to determine if the work is on schedule or if an amendment to the contract will be necessary. If an amendment is necessary, please submit the necessary paperwork to Michael Bryant, Division of Purchase and Services, Purchase and Contract Section, as soon as possible. Please note -contracts cannot be amended after the contract expiration date. Also, no contract can go beyond a three (3) year period. Please send any comments/recommendations, concerning the contractor, to the Division of Purchase and Services. Contact the Division of Purchase and Services, Purchase and Contract Section, if you have any questions. 1 of 1 03/2712002 10:59 AM JAMES E . HUNT JR. GU'/ERSCR L AIRD D AVISON June 22. 2000 ivl r. P2trick A. B2rne:o L!.755 Anderson Ro2:: Ori2ndo. Fioride 32512 De:::, iVlr. Berne:o NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND -NATURAL RESOURCES DIVISION OF PURCHASE AND SERVICES ::r:c:osec ere two duoiic2r::c on~in2is of Comr2ct No. N200018 betw::c::cn P2tric:-: .c.. Eanes 2nd the De!J2ii:me:it cf E:i vi ronmem 2nd N2tur2i Resource:o. I woL.:ic :::::creci2te your heving the:o::c c:cc:.m,ents executed 2nd re:urning one i-:) origin::: 5,g ned dccume:ir re r.1;1 office wirhin 30 d2ys. Until Suen tme th2, this ccnli2c: ~ :oign ed by 2ii 02nie:o 2no i::c:ur:-.e:. t:ie crccsss fer c2,;me:ir c2nnot ce :cr,tr2ct P.,dmirii:0,,2:cr i'vlike Ke:!;.'. OENF. Oivisior; cf V\/es,'2 M2n2•~'2'T:'2:i, . .\i2 ii S::c:·1ic e Ce:iT '=" R2Ie:g:-: i',;C 27::99-1 cde cncr.'2 (919) 71::-3ci.~ Ple:::sa note -untii one origi n2I signed contr2c: is rsturned tc th e fc ilc'Ni11s; 2ddrcs2. invoic2s will not t::e procass2c: DENR Division:; Furch ese en d S:e,../:cs:o 1605 Meil Service Center Re leigh , NC 27c99-1605 Sincerely. ~I,~ • ,_:::.--,-,--; 1l~1 _i ) -~\-\. ~ ,. i ,\ l }.~"v'lichae! G . Bryant \i Purchase and Contrect Section :kn cc: Brenda Rivers, DENR Waste Management Pat Backus, DENR Waste Management 1605 MAIL SERVICE CENTER. RALEIGH, NORTH CAROLINA 27699-1605 www.enr.state.nc.us/ENR PHONE 919-733-9746 FAX 919-71 s-oss4 AN EQUAL OPPORTUNITY/ AFFIRMATIVE ACTION EMPLOYER -50% RECY CLED/10 010 POST-CONSUMER P APER I . .. ' STATE OF NORTH CAROLINA COUNTY OF WAKE \.JVl'il I 1,T"\\J I l'ilV. 1"1"-UUU IU CONTRACTOR'S FEDERAL 1.D. OR SOCIAL SECURITY NO. 063-62-1412 CFDA CODE: N/A THIS AGREEMENT, made and entered into this 13th day of June, 2000, by and between Patrick A. Barnes, hereinafter referred to as "CONTRACTOR", and North Carolina Department of Environment and Natural Resources, hereinafter referred to as "DEPARTMENT"; \JV I TN ES S ETH: ---------- THAT WHEREAS, the CONTRACTOR has submitted to the DEPARTMENT a proposal for the performance of certain technical or professional services: and WHEREAS, the DEPARTME NT desires to enter into a contract with th e CONTRfa,CTOR to perform the services set out in the proposa l; NOW, THEREFORE, for and in consideration of the mutual promises to each other, as hereinafter set fo rth . the parties hereto do mutually agree as fo llows: 1. The CONTRACTOR hereby agrees to serve , in a manner satisfactory to the DEPARTMENT, as a technical community advisor for the PCB Landfill Project in Warren County as described in Attachment A which is incorporated as part of this contract. The activities and services to be performed pursuant to this contract are of a very sensitive nature req ui ring substantial coordination by the Contract fa.dmi nistrat or. To protect against disru ption of the purpose th at the services to be performed under this contract are intended to support, the CONTRACTOR shall cons ult with and obtain the consent of the Contract Administrator befo re releasing information accumulated or created under this contract or before discussing the services performed under this contract with persons outside the DEPARTMENT. 2. The DEPARTMENT hereby agrees to pay the CONTRACTOR as indicated on the Estimated Payment Schedule for a sum of money not to exceed ONE HUNDRED NINETY-NINE THOUSAND ONE HUNDRED DOLLARS ($199,100.00), said sum to be full and complete compensation for services to be rendered under this agreement. (a) Payment for services will be made upon receipt of an invoice from the CONTRACTOR documenting the costs incurred in the performance of work under this contract. (b) Invoices are to be submitted to the Contract Administrator at least quarterly. Final invoice must be received by the DEPARTMENT within 45 days after the end of the contract period. 1 of 4 CONTRACT NO. N200018 (c) Amended or corrected invoices must be received by the Office of the Controller within six months after the end of the contract period. Any invoices received more than six months after the end of the contract period will be returned without action . 3. The CONTRACTOR represents that he has, or will secure at his own expense, all personnel required in performing the services under this agreement. Such personnel shall not be employees of the DEPARTMENT. 4 . None of the work to be performed under this contract which involves the specialized skill or expertise of the CONTRACTOR or his employees shall be subcontracted without prior approval of the Contract Administrator. The Contract Administrator must approve all subcontracts. 5. The CONTRACTOR is an independent contractor and assumes all responsibility for self and does, therefore, hold harmless the Contract Administrator for the DEPARTMENT, the DEPARTMENT or any other state government persons for payment of federal and state taxes and any other required payments. This Agreement wil l in no way be construed to constitute an employer/employee relationship. 6. The services of the CONTRACTOR are to commence on the 15th day of June, 2000, and shall be undertaken and completed in such sequence as to assure their expeditious completion in light of the purposes of this agreement, but in any event, all of the services required hereunder shall be completed by the 14th day of June, 2002 . 7. If, through any cause, the CONTRACTOR shall fail to fulfill in timely and proper manner the obligations under this agreement, the DEPARTMENT shall th ere upon have the right to terminate this contract by giving written notice to the CONTRACTOR of such termination and specifying the reason thereof and the effective date thereof. In that event, all finished or unfinished documents, data, studies, surveys, drawings, maps, models, photographs, and reports prepared by the CONTRACTOR shall, at the option of the DEPARTMENT, become its property, and the CONTRACTOR shall be entitled to receive just and equitable compensation for any satisfactory work completed on such documents and other materials. The CONTRACTOR shall not be relieved of liability to the DEPARTMENT for damages sustained by the DEPARTMENT by virtue of any breach of this agreement, and the DEPARTMENT may withhold payment to the CONTRACTOR for the purpose of set off until such time as the exact amount of damages due the DEPARTMENT from such breach can be determined. 8. The DEPARTMENT may terminate this agreement at any time by notice in writing from the DEPARTMENT to the CONTRACTOR. In that event, all finished or unfinished documents and other materials shall, at the option of the DEPARTMENT, become its property. If the contract is terminated by the DEPARTMENT as provided herein, the CONTRACTOR will be paid in an amount which bears the same ratio to the total compensation as the services actually performed bear to the total services of the CONTRACTOR covered by this agreement, or for each full 2 of 4 CONTRACT NO. N200018 day of services performed where compensation is based on each full day of services performed, less payment of compensation previously made. The CONTRACTOR shall repay to the DEPARTMENT any compensation he has received which is in excess of the payment to which he is entitled herein. 9. The parties to this contract agree and understand that the payment of the sums specified in this contract is dependent and contingent upon and subject to the appropriation, allocation, and availability of funds for this purpose to the DEPARTMENT. 10. The DEPARTMENT may, from time to time, request changes in the scope of the services of the CONTRACTOR to be performed under this agreement. Such changes, including any increase or decrease in the amount of the CONTRACTOR'S compensation , which are mutually agreed upon by and between the CONTRACTOR and the DEPARTMENT, shall be incorporated in written amendments to this contract. 11. The CONTRACTOR shall ensure that all publications produced as a result of this contract are printed double-sided on recycled paper. 12. Any information, data, instruments, documents studies or reports given to or prepared or assembled by the CONTRACTOR under this agreement shall be kept as confidential and not divulged or made available to any individual or organization without the prior written approval of the DEPARTMENT. 13. The filing of a petition in bankruptcy or insolvency by or against the CONTRACTOR shall terminate this agreement. 14. The CONTRACTOR shall not assign or transfer any interest in this agreement. 15. In accordance with Federal regulation CONTRACTOR certifies that he will not engage in the unlawful manufacture, distribution, dispersing, possession, or use of a controlled substance in the performance of this contract. 16. No reports, maps or other documents produced in whole or in part under this agreement shall be the subject of an application for copyright by or on behalf of the CONTRACTOR. 17. It is agreed between the parties hereto that the place of this contract, its situs and forum, shall be Wake County, North Carolina, and in said County and State shall all matters, whether sounding in contract or tort relating to the validity, construction, interpretation and enforcement of this agreement, be determined. 18. The CONTRACTOR agrees that the State may have the right to audit the records of the CONTRACTOR pertaining to this contract both during performance and for 36 months after completion or termination. The CONTRACTOR 3 of 4 vUI\J I l"V-\v I I\JU. N..!UUUHS must retain all records relating to this contract and allow employees or agents of the DEPARTMENT to inspect such records during the period of time set out herein. 19. The CONTRACTOR agrees that he shall be responsible for the proper custody and care of any State owned property furnished him for use in connection with the performance of his contract and will reimburse the State for its loss or damage. 20. Mike Kelly is designated as the Contract Administrator (p roject co ordinator) for the State. However, any changes in the scope of the contract which will increase or decrease the CONTRACTOR'S compensation shall not be effective untii th ey have been approved by the DEPARTMENT Head or Authorized Agent. IN WITNESS WHEREOF, the CONTRACTOR and the DEPARTMENT have executed this agreement in duplicate originais. one of which is reta ined by each of the parties. the day and year first above written. :::JNTRACTOR ,· , :_.,;' ,/.,----.. Ey /~/2~,.1 ~p'~- Contractor's SigTa°ture ,;:~,z{ e,,L//. ,?f'.77?v~-___,~ Typed Name W ITNESS: Approved as to Form: Attorney General of North Carolina 0JORTH CAROLINA DE?ARTi'vlEi'lT 0~ =NVlRONMENT AND NATU;;.AL RESOURCES ,,; Bill Holman. Secretary 4 of 4 Department Head's Signature or Authorized Agent WITNESS: Signature OUPLICATF ORIGINAL ATTACHMENT~/) __ SCOPE OF SERVICES FOR PCB LANDFILL TECHNICAL COlVIMUNITY ADVISOR + Task 1: Attendance at Project and CAB Meetings Under this task the Technical Community Ad,isor (Advisor) will attend monthly project meetings between the Detoxification Contractor and the Department of Environment and Natural Resources (DENR) Project Manager and will attend monthly meetings of the Community Advisory Board (CAB). His purpose at the project meetings will be to access whether community involvement as outlined in the Community Outreach and Involvement Plan and other community concerns that may arise during the project are being addressed. The Advisor will meet with DENR Project Manager and the Community Involvement Coordinator after the project meeting to discuss any concerns from the meeting and any advice based on the concerns. He will also help clarify any technical issues in non-technical terms for Community Involvement Coordinator. The Advisor will provide monthly repons of these effons to the community at the CAB meeting. Based on the current detoxification schedule. meetings involving the Detoxification Contractor will not commence until approximately month four of the advisor's contract. Estimated cost for task: Total cost of S35.200. Per month cost: S 800 for months 1-4 of contract and S 1.600 for months 5-24 of the contract. Requirements for payment: The Advisor must include in his monthly invoice a brief report summarizing his anendance at the listed meetings. any comments he feels appropriate concerning the meetings. and any information from these meetings that should be passed on to DENR or the community. He should also include an estimate of cumulative percent completion for each subtask as identified on the included Gantt cl.J.art and a copy of any ,vritten material tl.J.at he pro,ided at any of tl.J.ese meetings. ·> Task 2: Document Review and Presentation Proper communication is key to the success of any project. As in the past under this task. the Ad,isor will re\·iew various technical documents and communicate their meaning to the general community. Th.is inciudes presenting the results of design documents as well as assisting \vith explanation of the Request fo r Proposal and contracting process. Tne Ad,isor ,,ill provide monthly reports of these effons to the community at tl.J.e CAB meeting. Estimated cost for task: Total cost is S21 ,600. Per month cost is S 1,600 for months 1-10 of contract and S400 for months 11-24 of the contract. Requirements for payment: In his monthly invoice the Advisor must include a briefreport summarizing his efforts under this task. He should also include an estimate of cumulative percent completion for each subtask as identified on the included Gantt chart and a copy of any written material that he provided as a part of this task. ♦ Task 3: Technical Assistance in Screening and Identifying Local Resources A major component of the approved Community Outreach and Involvement Plan is involving local businesses and residents in the financial benefits of the project The Advisor will assist the Community Involvement Coordinator and Job Developer in the identification of local firms that may be needed in the detoxification project. The Advisor will help inform local businesses of other resources (such as the North Carolina Institute of Minority Economic Development and Region K-Certified Development Company) which may enhance their capacity to participate in the detoxification project. He will provide consulting services to the Community Involvement Coordinator and Job Developer about job requirements and recommended training for workers to help facilitate their effort in the screening of potential project work force applicants. The Advisor \vill prepare a Local Business Resources notebook containing information about local businesses. This notebook will be an expanded version oftbe list found in AppendLx 2 of the Community Outreach and Involvement Plan and contain contact information for firms and listing any peninent info1TI1ation such as contractor licenses the firms have or Historically Underutilized Business certification. This initial notebook should be completed by the end of August and reviewed monthly during the construction phase to update information on firms that indicated they where in the process of obtaining licenses or certifications that might enhance their ability to participate in the project. The Advisor is encouraged to use the PCB Community Advisory Board office secretary to help in this effort The Advisor will conduct an information session for local firms to inform them of information they can provide; such as licenses, certifications, and equipment; to put in the Local Business Resources notebook. At the session the Advisor will also identify some of the resources available to firms that are listed in the Community Outreach and Involvement Plan. The Advisor will inform the resource agencies of this meeting so they can send representatives and/or materials if they choose. This session should be completed by the end of the third month of the contract. Tile initial effon ,,ill be extensive and require the emironmental. small business and minority business expenise of the Advisor. After the initial effon. howe';er, it is felt that the Community Involvement Coordinator and the Job Developer can maintain the Local Business Resources notebook. The Advisor will be expected to advise them on how to do this. Tue Ad,·isor ,,ill remain available after the initial effo n to advise the Community Involvement Coordinator and Job Developer should they have questions. The Advisor will notify the DENR Project Manager if there is a need for funds for the duplication of materials or other expenses for the information session. Tue DENR Project Manager will arrange for these services outside this contract. Estimated cost for task: Total cost is S43,200. Per month cost is S6,400 for months 1-3. S3,200 for months -1--6 and S800 for months 7-2 4 of contract. Requirements for payment: In his monthly invoice the Ad,-isor must include a brief repon summarizing his cffons. He should also include an estimate of cumulative percent completion for each subtask as identified on the included Gantt chart. The Advisor \vill pro,-ide a Local Business Resources notebook and conduct a local business information session by the end of the third month of the contract ♦ Task 4: Measuring and Monitoring Outreach Performance The outreach goals and objectives of this project have been clearly communicated in the Community Outreach and Involvement Plan. However, in order to maximize the achievement of these goals by the Detoxification Contractor, routine monitoring and measurement must be performed. The Advisor working with the DENR Project Manager will create a system to properly gauge the success of the outreach effon and to report the findings to the community. This system will be developed in the first three months of the Advisor's contract. The system should include a fonn (such as a spreadsheet) for the Detoxification contractor to fill out and provide at monthly project meetings. For the remainder of the task, he will evaluate the success of the mechanism in monitoring outreach performance and advise of any changes required. After the construction phase, less of an effort will be required and monitoring by the Advisor will be considered a part of Task 1 or Task 6. Estimated cost for task: Total cost is $9,600. Per month cost is $1,600 for months 1-6. Requirements for payment: In his monthly invoice the Advisor must include a brief report summarizing his efforts. He should also include an estimate of cumulative percent completion for each subtask as identified on the included Gantt chart. The Advisor ,vill provide a system for monitoring outreach performance by the end of the third month of the contract + Task 5: Newsletter Preparation and Distribution Over the two year life of the project, the results of activities outlined in the above tasks as well as general consUllction progress will be communicated to the public through a monthly newsletter. Toe ne,vslener will also include information on redevelopment of the site following the detoxification. Preparation of a newsletter is one of the responsibilities listed in the grant application for the Community Involvement Coordinator. However, the Coordinator will probably not have a technical background and will need assistance in preparing the technical sections of the newsletter. The Coordinator has not been hired as of the beginning ofthis contract and more assistance ,vi.11 be needed in the first si.-x months of the project to prepare the initial newsletters. It is expected that the Coordinator ,vill be able to take over full responsibility for preparing the newsletter by the sixth month of this contract. After that tl1e Advisor will provide input to the newsletter based on his involvement in the preceding tasks. Funds were allocated in the Community Involvement Coordinator grant for materials and duplication. The Ad,·isor ,vill notify the DENR Project Manager if there is a need for funds for that purpose .. Toe DENR Project Manager will arrange for these services outside this contract. Estimated cost for task.: Total cost is S21,600. Per month cost is $2,400 for months 1-6 and S--1-00 for months 7-24 of the contract.. Requirements for payment: In his monthly invoice the Advisor must include a briefrepon summarizing his efforts. The Advisor should include an estimate of cumulative percent completion for each subtask as identified on the included Gantt chart and a copy of any wr:inen material that he pro,ided as a pan of this task. -> Task 6: Miscellaneous Assistance Based on previous experience, the assistance of the advisor may be needed to assist in various acti,ities such as the assistance to the CAB in writing lcners requiring technical or business expertise, or to address other issues that may arise during the project. During the first si.-x months of the contract. the Advisor's assistance will be needed to help the community stan e:-.--ploring redevelopment opportuniti es. Estimated cost for task: Total cost is 522,800. Per month cost is $2,000 for months 1-3 and S800 for months 4-24 of the contract. Requirements for payment: In his monthly invoice the Advisor must include a brief report summarizing his efforts. The Advisor should include an estimate of cumulative percent completion for each subtask as identified on the included Gantt chart and a copy of any written material that he provided as a part of tliis task. + Task 7: Travel and Lodging Most of the previous tasks will require the Advisor's presence in Warren County. The Advisor lives in Orlando, Florida. It is estimated tliat he will make two trips a month to Warren County and that his stay will be approximately five days per visit. Travel, lodging and subsistence are allowed expenses. Allowable subsistence and lodging expenses will be the same as is allowed for state employees listed in the Budget Manual of tl1e State of North Carolina. Reimbursements will be made in compliance with applicable policies as contained in the Budget Manual of the State of North Carolina Pages from the Travel Policies and Regulations section of tl1e Budget Manual that address subsistence rates, lodging, transportation by common carrier, and transportation by rental vehicle are attached for reference. Estimated cost for task: Total cost is $45,100. Per month cost is $2,200 for months 1-17 of the contract and S 1, I 00 for months 18-24 of the contract Requirements for payment: In his monthly invoice the Advisor must include a detailed listing of expenses. Receipts for air travel, lodging, and car rental must be included. Reimbursements will be made in compliance with applicable policies as contained in the Budget Manual of the State of North Carolina. I ' I IVONTHOF I CONTRACT I I 1 I S 2 i $ 3 I S 4 !S 5 !S 6 !S 7 I $ 8 I S 9 I $ 10 I $ 11 I S 12 I S 13 1s 14 !$ 15 I S 16 1$ 17 I S 18 !$ 19 I $ 20 I S 21 I S 22 I S 23 I S 24 1s I ESTI!\'IATED PAYMENT SCHEDULE FOR TECHN1CAL COIVIMUNITY ADVISOR TASK NUMBER ! I I I I I I I TOTALFOR ! I I 1 2 3 4 I 5 6 I 7 11/DNTH I I ! I ! I I 8CO $ 1,6CO I S 6,4CO I S 1,6CO I S 2,4CO I $ 2,COJ I S 2.2CO I S 17,CCO 8CO $ 1,6CO $ 6,4CO I S 1,6CO I S 2,4CO I $ 2,COJ I S 2,2CO I $ 17,CCO 8CO $ 1,6CO I $ 6,4CO i S 1,6CO I $ 2,4CO I $ 2,CCO I S 2.2CO I S 17,CCO 8CO I $ 1,6CO I $ 3,2CO I S 1,6CO I S 2,4CO I S eco I S 2.2CO I S 12EOO 1,6CO I$ 1,6CO I S 3,2CO i S 1,6CO I S 2,4CO I S ECO I S 2,2CO I S 13.4CO 1,6CO I $ 1,6CO I S 3,2CO ! S 1,6CO I S 2,4CO I $ ECO I S 2,2CO I S ,-4CO l..J .. 1,6CO I $ 1,6CO I $ 8CO i I S 4CO IS 2CO I S 2,2CO I S 7ACO 1,6CO $ 1,6CO I $ 8CO i i S 4CO I $ 8CO I S 2,2CO I $ 7,4CO 1,6CO I$ 1,6CO I $ 8CO I I S 4CO $ 8CO I S 2,2CO I $ 7,4CO 1,6CO $ 1,6CO I $ 8CO , I S 4CO I S 8CO I S 2,2CO I $ 7,4CO 1,6CO $ 4CO I S 8CO ! I S 4CO I $ 8CO I S 2,2CO I $ 6.2CO 1,6CO $ 4CO I $ ECO , I S 4CO I S 8CO i S 2,2CO I $ 6.2CO 1,6CO $ 4CO I S BCO : 1S 4CO I S 8CO i S 2,2CO I $ 6.2CO 1,6CO $ 4CO I $ 8CO i i S 4CO I $ ECO I S 2,2CO I $ 6,2CO 1,6CO $ 4CO I $ BCO : !$ 4CO I $ 8CO I S 2.2CO I S 6.2CO 1,6CO $ 4CO I $ 8CO ! I S 4CO I $ BCO I S 2.2CO I S 6.2CO 1,6CO I $ 4CO I S 8CO : ,s 4CO I $ 8CO I S 2.2CO I S E.2CO 1,6CO I $ 4CO I $ BCO ' I S 4CO I $ BCO I S 1, 1 CO I S 5.1CO 1,6CO $ 4CO $ 8CO I I S 4CO $ 8CO I S 1, 1 CO I $ 5,1CO 1,6CO $ 4CO I $ 8CO I I S 4CO $ 8CO I S 1, 1 CO I $ 5,1CO 1,6CO $ 4CO $ sco I I S 4CO $ 8CO I S 1,1CO $ 5,1CO 1,6CO $ 4CO $ 8CO i I S 4CO $ 8CO I $ 1,1CO $ 5,1CO 1,6CO $ 4CO $ 8CO I I S 4CO $ 8CO I $ 1,1CO $ 5,1CO 1,6CO $ 4CO $ 8CO I I S 4CO $ 8CO I $ 1,1CO $ 5,1 CO I I I TOTAL I CONTRACT $35,200 I I $ 21.e00 s 43.200 I s 9,6CO I S 21 ,600 I $ 22,000 I $45,100 I $ 1 S'9.1CO Project performance will be analyzed by the DENR Project Manager using the earned value method. A Gantt chart is included which breaks the project tasks into subtasks which will be used in the analysis. -·-----.. Project Name: Technical Con Task ID Task Name Schedule St.irt Sr.he: 1.0 Attendance at Project and CAB Meetings · ----06/15/0( -··-1.1 Before Detoxification Contractor hired 06/15/00 1.2 After Detoxification Contractor hired ----10/15/00 2.0 Document Review and Presentation 06/15/0( .. --3.0 Technical Assistance for Local Resources 06/15/0( --4.0 Measuring Outreach Performance 06/15/0[ 4.1 Develop system to measure performanco ----06/15/00 ---~-4.2 Evoluato ond modify system 00/15/00 5.0 Newsletter Preparation and Distribution 06/15/0( ---5.1 Prepare newsletter 06/15/00 5.2 Prepare and/or assist CIC in preparing nowslcttor 0!)/·15/00 5.3 Contribute information to newsletter ---i21f5100 -· 6.0 Miscellaneous Assistance 06/15/0[ 6.1 Assistance in starting redevelopment pl,ms 06/15/00 6.2 Assistance requiring technical expP.rtise ---06/1 5/00 -Travel and Lodging ---06/15/0( -· 7.0 7.1 Travel and lodging 06/15100 ---·---·~·-----··--PMB -Proposed Timeline 06/04/00 --· --· -~--·----,munity Advisor dnle r:inish 06/14/02 10114/00 OG/1~/02 . 06/14/02 06/14/02 ----1-12/14/00 ~mnr ·· J · 1 ·17-Ars-,o-TN. 1 · n --= ::J ' ==i ~= . _j~T1 ~/0011 VT/77777777777A ----------·2no1 \ ~uu~ F 1--M --pq-M7 7 ,-rr-A -,s·-r-o--p;JT o-7-1r1MTA-1MT 'J. 17'-I---I-771 I-12111100 06/14/0, X;,h?.!~.1~-· on,T,i,oo 12/14100'' 06/14102 06/14/02' riii/14100 Ofi/14/02 ·o6t14/02 Ofi/14/02 :.D ~ t~-1-4--?ll»JJJ?//?JJ7?77?7J??/?7?l/ 'T/7/T//T/7./7./T//T/T/77./.77./.T./TLTLT/7/2/ 77/////////, '2ZL2ZZZLLLZL277ZZZZZZZZZZZZll70ZZZZZZVZ7LLLLLL7./7T/ZZLZZZ.Lf LLLL2777LZ ----~-~--I BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGHvrENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 Travel Policies and Regulations Purpose SECTION 5 PAGE 1 Stahltory regulations for per 'diem, transponation, and subsistence allowances for state depamnents, agencies, boards, commissions, committees, and councils are contained in G.S. 138-5 , 13 8-6, and 138 -7. It is the intent of this section to provide statements of policy to enable state depamnems and agencies a comprehensive reference for uniform interpretation to pay or reimburse allowable state travel expenses penaining to official traYel and subsistence. E mployee Responsibility An employee traveling on official st:i.te bu.siness is expected to exercise the same care in incurring expenses that a prudent person would exercise if traveling on personal business and expending personal funds. Excess costs, circuitous routes , delays, or luxury accommodations and sef\'ices unnecessary, unjustified, or for the convenience or personal preference of the employee in the performance of official state bu.siness are not acceptable under this standard. Employees \Yill be responsible for unauthorized costs and am· additional expenses incurred for personal preference or convenience. Trani Policies for State Employees Per Diem Compensation Per diem compensation is not applicable for state employees. Subsistence Rates 1l1e maximum allowable statutory rate (G.S. 138.6) for meals and lodging is S81.00 for in-state travel and $93 .00 for out-of-state travel. The Payment of sales tax, lodging tax, local tax, or service fees applied to the cost of lodging is allowed in addition to the lodging rate and is to be paid as a lodging expense. The employee may exceed the part of the ceiling allocated for lodging without approval for overexpendihlre provided that the total lodging and food reimbursement that the employee is entitled to for that day does not exceed the maximum allowed daily subsistence. BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 SECTION 5 PAGE2 The following schedule shall be used for reponing allowable subsistence expenses incurred while traveling on official state business: Breakfast Lunch Dinner Lodging (actual, up to) Total Authorization for Lod~iing In-State S 6.00 S 8.00 S14.00 S53.00 (actual. uo to) S81.00 Out-of-State S 6.00 S 8.00 SI 6.00 S63.00 factual. uo to\ S93.00 W1itten appronl by the department head or his or her designee must be obtained in order to qualify for reimbursement fo r overnight stays. Supervisory personnel cenifying the reimbursement request as necessary and proper must require documentation from the traveler to substantiate that the overnight lodging \\"as necessary and accomplished. The travel must involve a travel destination located at least 35 miles from the employee's regularly assigned duty station (Yicinity) or home. whichever is less. Reimbursement for Lodging: E::ich employee is responsible fo r his or her own request for reimbursement. The tr::ivci must involve a travel destination located at least 35 miles from the employee's regularly assigned duty station (vicinity) or home, whichever is less. Requests for reimbursement should be filed within 30 days after the travel period ends for which the reimbursement is being requested. Specific dates of lodging must be listed on the reimbursement request, and substantiated by a receipt from a commercial lodging establishment, not to exceed S53 per night for in-state lodging or S63 per night for out-of-state lodging. Reimbursement for lodging in an establishment treated as an apartment building by state or local law or regulation is not allowed unless approved by the Office of State Budget and Management in advance. Telephone access fees for business calls are considered a miscellaneous expense. Telephone access fees for personal calls are not reimbursable. Baggage handling tips may be claimed as "Miscellaneous." Excessive tips must be documented with a receipt. BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STA TE BUDGET AND MANAGE:tv1ENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 Excess Lodging SECTION 5 PAGE3 Excess lodging authorization for instate, out-of-state, and out-of-country travel must be obtained in advance from the depanment head or his or her designee. Excess lodging is allowed when the employee is in a high cost area and unable to secure lodging within the current allowance, or when the employee submits in writing an opinion that his/her personal safety or security is unattainable within the current allowance. Excess lodging authorization is not allowed for reason of convenience or personal preference for the employee. The employee may exceed the pan of the ceiling allocated for lodging without approval from department head of his or her designee provided that the total lodging and food reimbursement does not exceed the maximum daily subsistence. Penalties and Charges Resulting from Cancellations Penalties and charges resulting from the cancellation of travel reservations (including airline or hotel reservations and conference registration) shall be the depanrnent's obligation if the employee's traYel has been approved in advance and the cancellation or change is made at the direction of and/or for the convenience of the department. If the cancellation or change is made for the personal benefit of the employee, it shall be the employee's obligation to pay the penalties and charges. However, in the event of accidents. serious illness. or death within the employee's immediate family or other c1itical circumstances beyond the control of the employee. the depanment may pay the penalti es and charges. Authorization for Meals Written approval by the depanmem head or his or her designee must be obtained in order to qualify for reimbursement for meals. Supervisory personnel cenifying the reimbursement request as necessary and proper must require documentation from the traveler to substantiate that the payment for meals was necessary and accomplished. Reimbursement for Meals Each employee is responsible for his or her own request for reimbursement. Tips for meals are included in the meal allowance. Each meal reimbursement rate must be listed on the reimbursement request. Times of departure and arrival must also be listed on the reimbursement request. The costs of meals included in other related activities (registration fees, conference costs, hotel registration, etc.) may not be duplicated in BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGE1\1ENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 SECTION 5 PAGE4 reimbursement requests. If requested, each employee may be reimbursed for breakfast even if their lodging establishment offers a free continental breakfast Meals during Overnight Travel A state employee may be reimbursed for meals including lunches. while on official state business when the employee is in overnight travel status. The travel must involve a travel destination located at least 35 miles from the employee's regularly assigned duty station (vicinity) or home, whichever is less. i\leals during Daily Travel Employees may be reimbursed for meals for panial days of rravei \\·hen in overnight travel status and the panial day is the dav of depanure or the day of return. The following aopl ies: • Breakfast: depan duty station prior to 6:00 a.m and extend the workday by 2 hours. 0 Lunch: depan duty station prior to Noon ( day of depanure J or return to duty station after 2:00 p.m. (day of return). c Dinner: depan duty station prior to 5 :00 p.m. 1 day of depanure I or return to duty station after 8:00 p.m. (day of return) and extend the workday by 3 hours. 0 The travel must involve a travel destination located at least 35 miles from the employee's regularly assigned duty station (vicinity) or home. whichever is less. Allowances cannot be paid to employees for lunches if travel does not involve an overnight stay; however, employees can be eligible for allowances for the breakfast and evening meals when the following applies: • Breakfast (morning): depart duty station prior to 6:00 a.m and extend the workday by 2 hours. • Dinner (evening): return to duty station after 8:00 p.m and extend the workday by 3 hours. BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STA TE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 SECTION 5 PAGES • The travel must involve a travel destination located at least 35 miles from the employee's regularly assigned duty station (vicinity) or home. whichever is less. • Allowances for the breakfast and evening meals for employees working nontraditional shifts must have prior approval of the Office of State Budget and Management. l\leals and Day-to-Day Activities Stare employees may not be reimbursed for me:.1ls e:.1ten in conjunction with a congress. comerence. assembly, convocation or mee,ing. or by whatever name called. of the employees within a single state depanment, institution or agency, or ben-veen the employees of two or more state departments, institutions or agencies to discuss issues relating to the employee's normal day-to-day business activities. !\Ieals for Required Employee Attendance . ..\. st:.1te employee may be reimbursed for meals. including lunches. when the employee's _1ob requires his attendance at the meeting of a board, commission. committee . or co uncil in his official capacity and the meal is preplanned as part of the meeting for the entire board, commission. committee or council. Such board, conmlission. conm1ittee. or council must include persons Other than the employees of a single state department. ins~ituri on. or agency. l\leais and Commercial Air Travel Employees are allowed to claim reimbursement for meals even though they are shown and offered as a pan of one's flight schedule on a commercial airline. Excess Meals No excess reimbursement will be allowed for meals unless such costs are included in registration fees and/or there are predetermined charges, or the meals were for out-of- country travel. The depanrnent head or his or her designee may grant excess subsistence for meals for out-of-country travel. BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 Convention Registration SECTION 5 PAGE 6 State law allows reimbursement of the actual amount of convention registration fees as shown by a valid receipt or invoice [G.S. 138-6(a)(4)]. Passports Reimbursement for cost incurred in obtaining or renewing a passport may be made to an employee who, in th e regular course of his duties, is required to travel overseas in the furtherance of official state business. Passport expenses are chargeable to the same fund that supports the employee's trip. Transportation by Common Carrier Reimbursement fo r air. rail. or bus fare is limited to actual coach fare, su bstantiated by receipt. Transportation by International Flights Employees traveling internationally on o\·erseas flights may be reimbursed acrual business class fare (substantiated by re ceipt) \Yith prior approval of th e department he::id or his or her designee. Pe nalties and Charges Resulting from Cancellations Penalties and charges resulting from the cancellation of airline reservations ( or other navel reservations) shall be the department's obligation if the employee's travel has been approved in advance and the cancellation or change is made at the direction of and for the convenience of the department. If the cancellation or change is made for the personal benefit of the employee, it shall be the employee's obligation to pay the penalties and charges. However, in the event of accidents, serious illness, or death within the employee's immediate family, or other critical circumstances beyond the control of the employee, the department shall pay the penalties and charges. Super Saver Rates When traveling by common carrier to conduct official state business, employees traveling to their destination earlier than necessary and/or delaying their return to avail the state of reduced transportation rates may be reimbursed subsistence for additional travel days if, BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 SECTION 5 PAGE 7 in the opinion of the depanment head or his or her designee, the amount saved due to the early and/or delayed travel is greater than the amount expended in additional subsistence. When the reduced airfare rates require staying overnight one Saturday night, to be eligible for reimbursement, the state employee must stay overnight on the Saturday closest to the first or last day of official state business to which the employee is attending. With sufficient justification, the department head or his or her designee can make an exception to this requirement prior to travel commencing. Frequent Flyer Miles Frequent flyer miles earned by a state employee while traveling on state business at state expense are the propeny of the state. Frequent flyer miles accumulated by an indiYidual state employee during previous state business trips should. to the extent possible. be used by the state employee accumulating the frequent flyer miles while traveling on future state business trips. Coupons or Certificates for Reduced Air Fare Coupons or cenificates for reduced air fare if ac quired by a state employee while traveling on state business at state expense are the propeny of the State and should be used. ro the extent possible, by the state employee on future state business nips. Fees and Service Charges With sufficient justification and documentation and with approval of the department head or his or her designee, state employees can be reimbursed for usual, customary, and reasonable fees and services charges imposed by travel agents for assistance in making travel arrangements. Transportation by Personal Vehicle Map mileage is reimbursable. Mileage is measured from the closer of duty station or point of departure to destination (and return). The business standard mileage rate set by the Internal Revenue Service (currently set at 31 cents per mile, but it will be raised to 32.5 cents per mile effective January 1, 2000) will be paid. Parking fees, tolls, and storage fees are reimbursable. Receipts are required. When it is in the best interest of the State to do so and/or because of budgetary considerations, state agencies may reimburse travelers at rates lower than those allowed by the rules and regulations as I . BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGErvfENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 SECTION 5 PAGES herein stated in the State Budget Manual. Also, if a state employee's position qualifies him or her for a permanently assigned state vehicle and the employee chooses to drive his or her personal vehicle, then the agency can reimburse the employee at the Motor Pool rate (23 cents) not the IRS rate. Transportation by a Rental Vehicle Rental vehicles may be used; however, rental vehicles are not to be used at state expense solely for the convenience or personal preference of the employee. A receipt is necessary fo r reimbursement. Transportation by Chartered Aircraft The use of ch:mer aircraft must be approved by the depanmem head or his or her designee, provided the following is substantiated and put in writing: • A state aircraft is not available or not appropriate for the size of the pany traveling or the destination airpon. e The use of a chaner flight is more economical than a conuncrcial flight. 0 The use of a chaner flight 1s necessarv because of unusual travel circumstanc :s. Transportation by Use of Aircraft Owned by a State Employee Reimbursement for costs incurred in the use of aircraft, owned by a state employee. on official state business may be approved by the department head or his or her designee. provided the following is substantiated and put in writing: " The use of the aircraft owned by a state employee is necessary because of unusual travel circumstances and is not for the sole convenience of the employee who owns the plane. • The use of the aircraft, owned by a state employee, at the rates published below is cheaper than any other method of air travel. • The allowable reimbursement rate for aircraft owned by a state employee is $.68 per mile per passenger. BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 Transportation by State Vehicle SECTION 5 PAGE9 Procedures for obtaining and using state vehicles owned by the Division of Motor Fleet Management (Department of Administration) are set out in the Rules and Regulations provided by that division. Every individual who uses a permanently assigned state owned passenger motor vehicl e, pickup truck, or van to drive between his official workstation and his home, sha11 reimburse the state for these trips at a rate computed by the Department of Administration. Non-state Employee Riders Non-state employees may accompany s,me employees in state-o,vned vehicles \Yhen they have a business interest in the purpose of the trip and their presence is related to state business. Students of state universities. colleges, and institutions may be passengers in state-owned vehicles to attend athletic events and other activities officially sanctioned by the institution. provided the proper account is reimbursed at the standard mileage cost rate by the student activity fund inYolved. Spouses and children of state employees may accompany them in state-owned vehicles, if ample space is available and al l n·avel is strictly for official state business [G.S. 143-341.8( i)(7)]. Hitchhikers are not pennitted to ride in state-owned Yehicles. Transportation by State Vehicle at Destination At the employee's destination. state-mrned Yehicles may be used prudently ior travel to obtain meals, but not for private purposes or for entenainment while off duty. No common carrier or public transponation fares are reimbursable on a nip on which an employee uses a state-owned vehicle, unless it is shown that such transponation was more economical in a panicular situation. Commuting No reimbursement sha11 be made for the use of a personal vehicle in commuting from an employee's home to his duty station. (No mileage reimbursement is allowed to employees on "call back" status. For the state's policy on compensation to employees on "call back" status, see the State Personnel Manual.) BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 Travel to/from Airport at Employee's Duty Station SECTION 5 PAGE 10 Reimbursement for travel between the emp loyee's duty station and the nearest airline terminal ( or train/bus station if applicable) and for parking may be made under the following circumstances. For travel by: • Taxi or Airport Shuttle -Actual costs with receipts. • Private car -the business sta ndard mileage rate set by the Internal Revenue Services for a maximum of two round trips with no parking charge, or fo r one round trip with parking charges. Receipts are required for airport parking claims. 0 Use of P ublic Transportation -In lieu of using a taxi or airport shuttle, employees can be reimbursed without receipts S5 fo r each one-way trip either from the airport to hotel/meeting or fro m the hotel/meeting to th e airport. TraYel to/from A irport at Employee's Destination Reimbursement for travel to and fr om the airline terminal ( or train/bus station if applicable) at the employee's destination mav be made where travel is via most economical mode available as listed bel O\\: • T axi or Airpo11 Shuttle sen-ice -Actual costs with receipts. • Rental vehicles -may be use d with the prior approval of th e department head or his or her designee; however, rental vehicles may not be used for the sole convenience of the employee (receipt required). • Use of Public Transportation -In lieu of using a taxi or airport shuttle, employees can be reimbursed without receipts S5 for each one-way trip either from the airport to hotel/meeting or from the hotel/meeting to the airport. BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 Travel Involving Trips Other than to and from the Airport SECTION 5 PAGE 11 The actual cost of taxi and shuttle service fares are reimbursable when required for travel on official state business. The request must be documented with a receipt. The use of public transportation is reimbursable up to $5 per one way trip. A uthorization for Out-of-Country Travel All out-of-country travel must be authorized by the depanmem he ad or such depanment official designated by him or her. Travel Advances All employees who travel on state business may be issued adnnces when aurho1izcd by the depamnent head or his or her designee in order that personal funds \\·ill not be required. Fiscal records must be maintained by the depanment for proper control. Eligibility for advances and reponing requirements are as follO\vs: 0 State Employees who han been issued state credit cards for tra\·el purposes should not be issued travel advances, unless there is substantiated justification. " Travel advances for occasional travel must not exceed the estimated cost of the trip and may not be issued more than five working days prior to the date of depanure. Advances must be deducted from the reimbursement request on the travel expense report which shall be submitted within 30 days after the travel period or June 30, whichever comes first. • Travel advances for regularly $Cheduled travel for employees who travel each month, an annual advance of funds equal to the average monthly expense may be made. All reimbursement requests shall be filed and paid monthly for incurred expenses and the advance must be repaid as ofJune 30 annually or earlier if required by the agency. If it is determined that the monthly reimbursement has averaged less than the annual advancement, the advance must be reduced to the newly established amount. BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 Travel Policies for State Officials Political Functions SECTION 5 PAGE 12 From time to time state officials. both elected and appointed, attend functions or meetings that are political in nature. The following policies are intended to be guidelines for the payment from state funds for travel and subsistence costs surrounding the attendance of state public officials at political functions or meetings: Travel Related to a Political Function ?\:o state funds may be used to pay traYe! and1or subsistence costS for a state offici::il ,,·hile ::irrending a political function or meeting. In the event a state-o,vned aircraft is used. the reimbursement rate will be the acru::il operating cost rate per flight hour. If a state-owned ,·ehicle is used. the reimbursement rate to the state will be the motor pool rate. Travel Related to Official State Business that includes Political Functions If a trip includes both official state business and political functions or meetings. stare funds may be used to pay up ro one-half of the rraYel and/or subsistence costs. In the e\'ent that a state-owned aircraft is used. the cost to the state will be charged at the regular rate per flight hour and the charge ro a non-st::ite source ,,·ill be at the actual operating cost rate per flight hour. If a state-owned vehicle is used. the reimbursement rare tO the state \\'ill be the motor pool rate. All Other Travel Travel reimbursement policies and regulations for all other travel for state officials is the same as for state employees. Travel Policies for Members of State Boards, Commissions, Committees, and Councils (Other than Licensing Boards and Members of the General Assembly) Per Diem Compensation Pursuant to G.S. 138-S(a)(l), non-state employees who are members of state boards, commissions, committees, and councils shall receive $15 per day of official service. State employees and members of all state boards, commissions, and councils whose salaries or any ponion of whose salaries are paid from state funds shall receive no per diem BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGE~NT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 SECTION 5 PAGE 13 compensation from state funds for their services. It is the responsibility of the fiscal officer of the Board, Commission, Comminee, or Council to insure that such per diem compensation is not pai d to state employees. Subsistence Meal subsistence for non-state employee members of state boards, councils, conm1issions. or committees is a daily, lump-sum allowance payable per day of official service. Th e subsistence reimbursement for actual lodging expenses must be documented by a receipt of actual lodging expenses from a commercial establishment. Meals and lodging are to be reimbursed as follows: In-State Trani: • S28 fo r meals. • Actual expenses up tO S53 lodging documented by a receipt of acrual lodging expenses for a commercial lodging establishment. Out-of-State Travel: • S30 for meals. • Actual expenses up t0 S6 3 lodging documented by a receipt of acrual lodging expenses for a commercial lodging establishment. Excess Subsistence Authorization for excess expenses for in-state or out-of-state travel may be granted by the department head or board chairperson head or his or her designee when such costs are included in registration fees and/or there are predetermined charges. Authorization for Out-of-state travel Expenses for out-of-state travel on official business shall be reimbursed only upon authorization obtained in the manner prescribed by regulations governing out-of-state travel for state employees. BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 Transportation SECTION 5 PAGE 14 Transportation policies and regulations are the same as for those for state employees. except that a mileage reimbursement rate set by any other law by reference to G. S. 138- 6(a)( I) is established at 25 cents a mile, not the IRS rate. Subsistence of State Employees serving as Board Members As allowed under G.S. 13 8-6, a state employee who is a member of a state board. commission, committee or council that operates from funds deposited with the State Treasurer. may be reimbursed for actual cost of any meal (including lunch) eaten while on offic ial state business if the meal is preolanned ::is pan of the meeting for the entire board. commission. committee. or council. HO\\"e\·e r. \Yben an o\·emight stay is required. the s,1te employee is limited to a daily reimbursement as follO\\-S: Subsistence In-State Travel o S28 for meais. • Actual expenses up to S53 lodging documented by a receipt of actual lodging expenses for a commercial lodging establishment. Out-of-Stare o S30 for meals. • Actual expenses up to S63 lodging documented by a receipt of actual lodging expenses for a commercial lodging establishment. No Overnight Stay When an overnight stay is not required. the state employee is allowed actual cost of any meal (including lunch) eaten while on official state business if the meal is preplanned as part of the meeting for the entire board, commission, committee or council. Other Meals If the employee is eligible for reimbursement for any other meal, that reimbursement is limited by the same reimbursement amounts and regulations as those allowed for in-state BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 SECTION 5 PAGE 15 and out-of-state travel by a state employee who 1s not a member of a state board, commission, committee, or council. Meetings Refreshments, i.e., coffee, soft drinks, cookies, doughnuts, may be served at official board meetings. Reimbursement may be paid from state funds for actual cost not to exceed S4.00 per member and required staff, per meeting per day. "Required Staff' shall be defined as an employee who, in the regular course of his duties, is expected to attend the meeting and any other employee whose presence is necessary to accomplish a purpose of rhe meeting. TraYel Policies for Licensing Boards (Other than State E mpioyees) Per Diem Compensation Pursuant to G.S. 938-5 , non-state employee members of licensing boards sh::ill rccein: SI 00. 00 per d::iy of official serYice. Stare employees and members of all licensing boards \\·hose salari es or any porrion of w hose sal::iries ::ire paid from state funds shall recei,e no per ciiem compensation from s,are funds for their services. It is the rcsponsibi iiry of the budget officer of the li ce nsing board to insure that such per diem compensation is nor p::iid to state employees. Subsistence Subsistence polici es and regulations are the same as for those fo r srnte employees. Convention Registration Convention registranon policies and regulations are the same as for those for state employees. Transportation Transportation policies and regulations are the same as for those for state employees, except that a mileage reimbursement rate set by any other law by reference to G. S. 138- 6( a)(l) is established at 25 cents a mile, not the IRS rate. BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 Meetings SECTION 5 PAGE 16 Refreshments, i.e., coffee, soft drinks, cookies, doughnuts, may be served at official board meetings. Reimbursement may be paid from state funds for actual cost not to exceed S4.00 per member and required staff, per meeting per day. "Required Staff' shall be defined as an employee who, in the regular course of his duties, is expected to attend the meeting and any other employee whose presence is necessary to accomplish a purpose of the meeting. Travel Policies for Members of the General Assembly Serving on State Boards. Commissions. Committees, and Councils Per Diem Compensation Pursuant to G.S. 120-3. l. per diem compensation is not applicable. Subsistence . ..\ member of the General Assemblv shall receive a subsistence allowance for me;:ils and lodging at J daily r::nc ( \Yhich is curren,iy S 104) equ;:il to the m;:ixirnum per diem rJte for federal employees traveling to R;:ileigh. ?\.C.. JS set out at 58 Federal Register 67959 (December 22. 1993 ). while the Gener;:il A.ssembly remains in session. and. except as otherwise proYided in this subsection \\·hen. \\'ith the approval of the Speaker of the House in the c;:ise of Representatives or the President Pro Tempore of the Senme in c;:ise or Senators. the member is: 0 Traveling as J represernanve of the General Assembly or of ns committees or commissions. • Otherwise in the service of the state. Excess Subsistence A member who is autho1ized to travel. whether in or out of session, within the United States but outside of North Carolina may elect to receive, in lieu of the amount provided in the preceding paragraph, a subsistence allowance of twenty-six dollars (S26.00) a day for meals, plus actual expenses for lodging when evidenced by a receipt satisfactory to the Legislative Services Officer, not to exceed the maximum per diem rate for federal BUDGET .MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 SECTION 5 PAGE 17 employees traveling to the same place, as set out at 58 Federal Register 67950-67964 (December 22, 1993) and at 59 Federal Register 23702-23709 (May 6, 1996). Transportation A member will receive a travel allowance at the rate equal to the business standard mileage rate set by the Internal Revenue Service in Rev. Proc. 93-51 , December 27, 1993, (29 cents) whenever the member travels. \Yhether in or out of session. as a representative of the General Assembly or of its committees or commissions. with the approval of the Legislative Services Commission. Convention Registration Convention regi.stranon policies and regu1auons are the s:ime :is for those ror state employees. Travel Policies for !\on-State Employees Non-state Employees !'\on-state employees traveling on offici:il srate business whose expenses are paid by the state are subject to these regulations. including statutory subsistence al]O\vances. to the s:ime extent as are state employees. Travel expenses for members of a non-employee's family are not eligible ro be paid by the s::ire. l\io travel advances \\ ill be m:ide to non- state employees. Prospective Professional Employees A depanmem head or his or her designee is authorized to approve reimbursement of transponation expenses of prospective professional employees visiting state depanmems for employment interviews. These expenses are limited to transponation and subsistence for 3 days (5 days if one is a Saturday) at the in-state rate. Excess lodging expenses may be approved by the depanment head or his or her designee . Students Students at stare institutions who travel on official state business other than for athletic events or student organizations and whose expenses are paid or reimbursed by the state are subject to these regulations, including statutory subsistence allowances, to the same extent as are state employees. Travel by students for the purpose of participating in BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 SECTION 5 PAGE 18 athletic contests and activmes of student organizations must be paid from funds supponing the particular organization or activity. Attendants Payment of travel and subsistence expenses (motel and meal costs) for attendants for handicapped employees while traveling on official state business may be reimbursed to the same extent as are state employees if advance approval is obtained from the department head or his or her designee. Expert Witness Fees . ..\ny person \\·i10 is used by :my state depamnem, agency. commission. commmee. licensing board. or council as an expen wimess may be reimbursed by said group a fee agreed upon by both parties. All travel costs will be reimbursed the same as fo r state employees. The source of funds used for such expenditures should comply with G.S. l43- 23(a2)(2). unless otherwise directed by the General Assembly. Conferences. Seminars, \Vorkshops. Training Sessions and Retreats External Conference Definition External conferences are those that mYoive the attendance of persons other than the employees of a single state department. institution or agency. Payment for meals is allowable if included in the registration fee. but such fee must not consist excJusiYely of meal or it will not be allowable unless meeting overnight travel c1iteria. Conferences sponsored or co-sponsored by a state depanment are authorized when thev meet the limitations and requirements listed belo,Y. Requirements and Limitations for External Conferences The conference is planned in detail in advance, with a formal agenda or curriculum. There is a written invitation to participants, setting fonh the calendar of events. the social activities, if any, and the detailed schedule of costs. Assemblies should be held in state facilities; however, non-state facilities can be rented and the cost charged to a state agency without allocation to panicipants' daily subsistence allowances. BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 SECTION 5 PAGE 19 Registration fees may be charged by the sponsoring department to panicipants for costs of external conferences. Registration fees may not include costs of entenainment, alcoholic beverages, setups, or flowers. Registration fees collected and not used to defray expenses of the panicular conference may not be used for other programs and must reven to the general or highway fund as applicable (G.S. 138-6(a)(4). Sponsoring depanmems may provide refreshments for "coffee breaks" provided there are twenty or more panicipants and costs do not exceed fo ur dollars (S4.00) per panicipant per day. When assemblies are to be held under the sponsorship of a state depanmem in which the funding for all participants is budgeted. lump-sum payments to a conference center or ::m organization may be made upon wrinen authorization from the depanment head or his or her designce. The authorization must proYide the following: • The purpose and duration of the conference. • The number of persons expected to anend. 0 The speciric meals to be sef\'ed at the conference (law prohibits lunches being proYided ta state empioyees unless reg,.stranon fees are charged ,o all attendees;. • The approximate daily subsistence cost per person. • The name of the conference center, hotel. caterer, or other orgamzation providing the service. It is the responsibility of the depanmems to ensure that reimbursement for meals included in the lump-sum payment is not also included in reimbursement payments made to state employees who are conference panicipants. Internal Conference Definition Internal conferences are those that involve the attendance of employees within that panicular department, institution or agency only. No payment for meals is allowable unless overnight travel criteria are met. A routine staff meeting is not an internal conference. I • BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 Requirements and Limitations for Internal Conferences SECTION 5 PAGE 20 • The conference is planned in detail in advance, with a formal agenda or curriculum. • There is a written invitation to panicipams, setting fonh the calendar of events and the detailed schedule of costs. • No excess travel subsistence may be granted for internal depanmemal meetings. conferences, seminars, etc., and such meetings must be held in state facilities w hen aYailable. No registration fee may be charged. " Sponsoring depanmems may proYide refreshments for "coffee bre:iks" pro\ icied there :ire twenty or more panicipants and costs do not exceed four dollars ( S-J..00 ) per p:inicipant per day. o .-\ depanmem can not use state funds to suppon or undennite a meeting. assembly. conference. seminar. rally, celebration. or similar function by whatever name called that promotes any cause or purpose other that the mission and objectiYe of the depanmem. Training Session Definiiion ::mployee training inYolYes courses that de\·elop :in employee·s k.110\Yledge. skill. zrnd :ibiiiry to pcrfom1 the duties of his,her present job: such JS, courses on computer usage or management skills development. These courses generally haYe a set fee. are of relatiYely shon duration. and are not pan of a curriculum the employee is panicipating in leading to an educational degree. Requirements and Limitations for Training Sessions • Fees for training courses that pro\'ide training in specific areas are charged m the Accounting system to "Employee Training" under "Other Services." • Depanments sponsoring training sessions may provide refreshments for "coffee breaks" provided there are twenty or more panicipants and costs do not exceed four dollars (S4) per panicipant per day. BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 Management Retreat Definition SECTION 5 PAGE 21 .--\. management retreat is a meeting or series of meetings consisting of a depanment or di,ision head and his or her top assistants and coworkers. Retreats are sometimes held at a sire other that the usual workplace and are held no greater that once a year. Requirements and Limitations for Management Retreats S,are employees who are elected by a ,;ore of the people or appointed by the goYemor. the presid ent of The University of North Carolina. the chancellors of the constituent insrirutions of the university, the executive director of Uni,·ersity of Non h Carolina Hospitals at Chapel Hill. chaimnn of the State Board of Education. and the presidcm of the Community Coll ege System may authorize an annual management ren-e a:. Expenditures are pe m1issible in a manner as if it \Yere an intern al conference. Informal Meetings with Guests of Department Heads Informal Meeting Definition ,..\n infom1al meeting is a meeting consisting of a depanmem head and his or her designce ::md non -state employees during which official state business is the discussed for the ma_ioriry of the meeting. lnfom1al meetings are one-time occurrences and are not held on a recurring or routine basis. Requirements and Limitations for informal meetings State employees w ho are elected by a \'Ote of th e people or appointed by the go,-emor. the president of The University of Nonh Carolina. the chancellors of the constituent institutions of the university, the executive director of University of North Carolina Hospitals at Chapel Hill, chairman of the State Board of Education, and th e president of the Community College System. or their designee when given prior written approval by the depamnent head for a specific event, may be reimbursed from state funds for actual costs of meals for themselves and individuals ,vho are not state employees who are their guests, when accompanying them in the course of conducting official state business. Cost of meals and other expenses for family members of the above referenced state officials are not reimbursable. I . BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGErvfENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 Telephone Calls Long Distance SECTION 5 PAGE 22 Employees are not allowed to charge long distance phone calls to the state for calls made of a personal nature, except as stated below. All long distance calls that are to be paid by the state are those m ade pursuant to the employee conducting official state business. Reimbursement Official phone calls are reimbursable under "\-Iiscellaneous." IndiY idual calls O\'Cr S5 .00 must be identified as to point of origin and destination. Allowable Person al Calls .-\.n employee who is in uan:1 status for ~,o or more consecuti\'e nights in a week is allowed one personal long distance telephone call fo r each two nights for \\·hich reimbursement to the employee may not exceed S3.00 for each in-state cal l or S5.00 for each our-of-state call. Employee emergency calls Employees may use the state nern·orK syste;11. state credit card. or may be reimbursed for a personal long distance call( s) if such callt s l is;are of an emergency narure as determineci by the depanmem. An example is a call made when an employee calls home to infom1 someone that the travel period has been extended beyond original plans due to unforeseen reasons. l\lobile Telephones Because mobile telephone charges (cellular and digital) are based on measured use. no personal calls should be made on mobile telephones except in case of emergency as determined by the depanment. Mobile telephone calls to conduct official state business should only be used when more economical means of telephoning are n ot reasonably availabl e. If an employee uses his/her personal mobile telephone in conducting state business. the employee can be eligible for reimbursement. In order for the agency to reimburse the employee, the employee must indicate on his;her telephone bill the reimbursable calls. BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEivIENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 SECTION 5 PAGE 23 individuals called, and nature of calls and submit the telephone bill to their supervisor for approval. If the supervisor approves the calls as state business related, the agency will reimburse the actual billed cost of the call. Us e of Telephone with Computer Hook-ups Employees traveling on official state business needing to transmit data. including e-mail. via their computers should use the m ost efficient manner available. including services Gvailable through the State's Infonnation Technology Services (ITS) access. Exceptions . ..\ny exception to the rules Gnd regulations as herein stated in the Swte Budge, (\fanual. except those expressly delegated. must be Gpproved in advance by the Office of St::ttc Budget and Management. Definitions Employee's Duty Station "Duty station" is defined as the headquarters or job location at which the employee spends the majority of his or her working hours [G.S. 138 -6(a)(l)]. For an employee in rr:r,el s:arus. the duty station should be the point \\"here traveling begins the majority of the time ( home or office). The designation of an employee's home as the duty stGtion by a department head requires prior approval by the Office of State Budget and ivlanagernem (OSBM) on an annual basis. (For additional information. see on Designation of Duty Station Report.) Departments, institutions, and agencies must make one submission for the entire department, institution or agency by the second week in December of each preceding calendar year of all employees whose home is also their duty station. When hiring new employees or designating the home as the duty station of current employees during the calendar year, a revision to the annual report must be submitted to OSBM for its prior approval. Employees assigned to regional offices or who are living in state- owned facilities should not be listed on the report. External Conference External conferences are those that involve the attendance of persons other than the employees of a single state department, institution, or agency. Payment for meals is allowable if included in the registration fee, but fee must not consist exclusively of meal or it will not be allowable unless meeting overnight travel criteria. BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEi'vfENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 Informal Meeting SECTION 5 PAGE 24 An informal meeting is a meeting consisting of a department head and his or her designee and non-state employees during which official state business is the discussed for the majority of the meeting. Informal meetings are one-time occurrences and are not held on a recurring or routine basis Internal Conference Internal conferences are those that inYolYe the attendance of employees \\·ithin that panicular depanmem. institution. or agency only. No payment for me::ils is allowable :mless oYcrnigh: tran:I criteria arc met. .--\ routine staff meennr: is not an internal conterencc. :\Ianagement Retreat .--\ managernen retreat is a meeting or series of meetings consisting of ::i depanmem or diYision head and his or her top assistants and coworkers. Retreats are sometimes held at a site other that the usual workplace and are held no greater that once a year. Out-of-Country Travel Out-of-country travel status be~ns \\·hen the employee leaves the country and remains i;1 effect umil the employee returns to the country. If the employee and other qualified official travelers use hotel and meal facilities located outside Nonh Carolina. but \\"ithin the continental United States. immediately prior to and upon returning from out-of- counrry travel but during the same traYel period. out-of-state subsistence rates shall apply. Out-of-State Travel Out-of-state travel status begins when the employee leaves the state and remains in effect until the employee returns to the state. However, in-state allowances and reimbursemem rates apply when employees and other qualified official travelers use hotel and meal facilities located in North Carolina immediately prior to and returning from out-of-state travel during the same travel period. Per Diem Compensation Applicable only to members of state boards, commissions, committees and councils who do not receive any salary from state funds for their services. BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGHvfENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 Registration Fees SECTION 5 PAGE 25 The registration fee is typically made for defraying the cost of speakers, building (room) use, handout materials, breaks and lunches at conferences and conventions. These tees are charged to other services "Registration Fees." The agency may require itemization and/or documentation of expenses. An employee can not be reimbursed for meals included in a registration fee. Required Staff Required staff is a state employee \Yho, in the regular course of his or her duties is expected to attend the meeting and any orhe, s,ate employee \\·hose presence is necess::iry t0 accomplish a purpose of the meeting. Subsistence (I\leals and Lodging) Subsistence is an allowance related to lodging and meal costs. and gratuities thereon. General Statute 138-6 provides for allowances to be p::iid in ::imounts or rates specified . For purposes of detennining eligibility for aliO\\·ances . travel status means being ::t\\'::tY from the employee's normal duty station or home. The duty station is defined as the location or near vicinity of the employee's work pl::tce. To be eligible for allowances in connection with travel. the emolovee musr be acnng m offici::il c::ip::icity as required by his/her work aci\·ities. Training Session Employee training involves courses that deYelop an employee ·s knowledge, skill. and ability to perform the duties of his/her present job: such as, courses on computer usage or management skills development. These courses generally have a set fee, are of relatively short duration, and are not part of a curriculum the employee is participating in le::iding to some educational degree. Transportation Includes personal automobile, taxi, bus, train. airplane, motor pool charges, auto rental, tolls, and parking fees. All travel expenses must be incurred by and for state employees or other eligible travelers in conducting official state business in order to be eligible for reimbursement. BUDGET MAl\TUAL STATE OF NORTH CAROLINA OFFICE OF STA TE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 SECTION 5 PAGE 26 When travel by car is determined to be feasib le, a state-owned vehicle. when available, should be used instead of a private vehicle. State depanments must determine whether or not state-owned vehicles are considered to be available. State depanments must periodically reYiew employee duty stations (see paragraph below on "Duty Station") for the purposes of determining cost effectiveness of having a state vehicle pem1anemly assigned to the geographical area ( depanmem/instirutions duty station location or Yicinity). If found to be cost-effectiYe. state-owned vehicles shou ld be requested for :issignment on a pem1anent basis. Travel Period 1:-J\·el period is ciefined as the calendar momil ciurin~ \\·ilich ,he traYcl ended. BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Personnel EFFECTIVE DATE: October 1, 1999 fiscal Policies and Regulations Related to Personnel Salary Control SECTION 6 PAGE 1 The Salary Control Unit in the Office of State Budget and Ivlanagemem serves as a control point fo r all matters regarding salary. I ts functions include: " The establishment and maintenance of records necessary to prc\·cm the overcommitment of budgeted salaries. --;-1ie Drocessing and aDDro\·al of all budget rc':isions inYoh·ing saiary rcs erYc r:-:insr':r.3. e The compiiation of data on position coums :rnd Yacancics. Lnless autho1iry has been delegated to an agency. all budget rcYisions !BD-606) related to salary go through this unit for approYal. Although this unit maintains records on salary reserve balances for control purposes. each depanmental budget officer is charged \Yith maintaining salary control records ( salary rescrYc l. Salary Reserve A.dditional information can be found in Section 3. Bud~er Execution. page 1 :. u nempioyment Compensation Chapter 96 of the General Statutes of Nonh Carolina provides for full unemployment insurance for all Nonh Carolina employees. both private and public. Fiscal management of all state agencies should be knowledgeabl e of its requiremems and provisions. The state personnel manual provides infom1arion relating to c !aims and services for employees. Under the provisions of G.S . 96.9(d). the State of Nonh Carolina elected in lieu of paying premiums, to become liable for unemployment compensation payments made on its behalf by the Employment Security Commission. Among the requirements is the provision that remittances shall be paid by each employing unit (department) within 25 days of invoicing (G.S. 96.9(f)(l )). Late payments are subject to a 10% penalty. (' l, 'OR ASSISTANCE• SEE l'NSTltUc:TIO~ 0/11 .MCI /f.C. Dlplnmcnt or Emilormait and Namral Jlaourccs • 1~~, ,,r Pun:bue and Services AGREEMENT INFORMATION 1. PARTIES TO nus AGREEMENT: A. DiftlioD Waste Management lactkm Division Addrm (PO Bal, Scmt. City, Sease, Zip) 1646 Mail Service Center Ceatract Admtntsrntor Telepboae Number 2. DIVJSION APPROVAL (MANDATORY) di.:.cf.~ Division DirectorikithorizeAieru Date .. •••• •• .,,..,. •1'-• l~NI ,F 0lalract No. -Coamct Sysem No. 1'urebuc Order No. Vmlor Number I Casndor Patrick A. Bames , ··~ ..... . . ·-., ~--. U.S. Number• SodaJ &ecm1ry Namber a.ck ii' Applicable 063-62-1412 -PVIINon-Profit .uctr.. (t• wWdi dleca wm 11e adtd) <Saeet. PO Bo1> 4755 !. .-'!_, _ .. ,. Road (Cily. Slaic. Zip) Orlando. FL 32812 Pleut cbtck t111t or &be IDllowinc: lL Afriwl American owned _ Woman owned _Handicapped owned _ Hispanic owned _Odler minority owned _None of &ht above Contractor CaDlact Penon: Telephone Number Patrick A. Barnes 407-282-5649 l>MSION COl'n'RACT COORDINATOR:J.at.....Ea.clcus--------PHONE NO: 919-733-4996 ext 204 ( i PURPOSE OF AGREEMENT: Iecboi caJ Camnmi tr Advisor for PCB Landfill Project in Warren Co. 4. 5. TIME PERIOD OF AGREEMENT: BeiiMini Date06 I 15 /J.000 (CO~TRACT CANNOT EXCEED 3 YRS.) Mo Day Year AGREEMENT STATUS: ..!.,_ New _ Continuin& Revised Endin& Date QL., 14 / 2002 Mo Day Year Year of Initial A&reement ____ _ 6. NEEDSTATEMENT: Services needed to provide teclmical assistance and support for outreach activities of PCB Landfill Detoxification Project 1 7. JUSTIFICATION: Contractor chosen by Division and PCB Cormnmity .Advisory Board based on expertise. See attachnents for more detail. 8. flSCAL INFORMATION: Does this 11reemem involve disbursement of funds? .z_ from DENR _ 10 I>ENR. _ l\o I ~· 199,100 I :--· SUBHEAD: GL Company I k O 4 Budget Code 49916 GLAccount Budget F\md s S199 .100 536989 GL Center_4..:...-'1_~-~----- 4725 I PVRCHASE AND SERVICES USE ONLY 1 PAYMENT SCHEDULE: DENR 2500 (Revised 1199) ... 1,: ' . IIEPAll'l'MEPff or DMRONMENI' AND NAnJLU. D50tJllCES AGRFFlrfFWI' POLICY 1be Secmuy of lbe ~ of F.nviromDeDl and Namral Resources must approve all agreemems including contracts illvolvma lhe disbunemcm of funds. Only me SeweWy of 1be Dcpanmem may ol>Jipte lbe qency to a wrinen l&fCCDlcnl. AD requests for eontrac:tslacreemmts MUST be seat to the Division ~ Purchase and Senices, Purcbase and Contnct Section. 1be requesting Division must ~lete DENR 2500. One copy of DENR 2500 is to be orei,ared for each contract. DENR 2500 is to be ~ by die division ~ible for neac,tialion of a camract and is to &e used as a cover for each com:ract submitted 10 ibe Division of Purchase and Services. PURPOSE: PREPARATION: DISPOSITION: INS'lllUCDONS FOR COMPLETING AND ROUTING DENR 2500 . -~ .. • • • ·i:,.., 1be blocks in die upper ri&h1 hand ~on of die form (FOR DENR USE ONL Y{m for use by tbe Division of Purchaie and Services for kkntification and c:omrol purposes. lsems 1-8 are completed by lbe ~ division/section for all qreemems. Correspondence and payments will be mailed to the address abowD in Item 1.B. FOR DENR USE ONLY (COMPLETED BY DPS AND/OR CONTROLLER) Comract No. Auigned by Purchase and Services Contract System No. Purchase Order No. Auipd by DENR Office of the Controller Auigned by DENR Office of tbe Controller Vendor Number Assigned by DENR Office of the Controller PARTIES TO nus AGJU:EME?trr (COMPLETED BY REQUESTING DMSJON) Item l(A) Item l(B) Item 2 Item 3 Item 4 Items Item 6 Jaem 7 Iaem 8 Enter the Division and Section raponsible for the agreement (include complete address and Telephone No.). Identify the state agency, provider, private organization, etc., requested to enter into a contract with the Dcpanment. Enter the address, name and ielephone number of a contact person within the designated contracting organization. Indicate if African American owned, Women owned, Handicapped owned, Hispanic owned, other Minority owned or None of the Above. IRS Number is mandatory for processin&. Agreement must have requesting Division's Approval to be processed. Describe generally the purpose of the agreement and refer whenever possible to the persons or conditions that will lrcnefit from the agreement. List the beginning and ending dates of the agreement. These dates are n1remely important. No contnct work can . begin prior to a fully executed (signed) contract bcin& in place with DENR. Check the block which appropriately describes the status of the proposed agreement. If the agreement is a revision of a prior agreement or a ~~n!inuation of a prior agreement, enter the year the agreement was first mmated. State why ~e. service is necessary and why ii cannot be performed by resources within the Depanment. State why tbe specific comractor is being requested. Check the appropriate box. Jndicate in the space provided the total funds to be disbursed when applicable. The contract is wrinen only for the amount DENR will be paying the Contractor. PURCHASE AND SERVICES USE ONLY-DO NOT COMPLETE 1lllS BLOCK. Copies of this agreement should be retained five (5) years or until audit requirements are sausfied. Additional copies of DENR 2500 may be ordered from: N.C. Depanment of Environment and Natural Resources Division of Purchase and Services P.O. Box 27687 Raleipi, NC 27611-7687 Couner 52-01-00 ) ' .. i,c. \... ueparuncm ,JI .C.OVlrOWDC:Dl iWU 1,iU.UliU ~goun;c:s Division of Purchase and Services Page_of _ . CONTRACT BUDGET Contract No. ------ Contract System No. _______ _ Waste MaMgement Division/Section/Program For Fiscal Year 99100 -0l/02 Purchase Order No. ____ _ i.;. ::;.:.;,,..... . ~ ....... ·· .. . .,;._,,. Revision No. __ Purpose: Teclmical Ccmnunity Advisor ---------------Patrick A. Barnes Patrick A. Barnes Tow Bud&et: or Amendment S 199,100 ------------------------------- ITEM DESCRIPTION Teclmical Ccmmmity Advisor for PCB Landfill Detoxification (MANDATORY IF FEDERAL JU."DING) CFDACODE: (CATALOG OF FEDERAL DOMESTIC ASSISTANCE CODE) 1,0~ S369B9 1:/:.'ldS GL GLAccount GL Center Company { I 2482 (Revised 1/99) CONTRACTOR AMOUNT Of Aoolicablc) Division/Section Head or Authorized A&ent (Mandatory) DE1''R CONTRACT AMOU1''T $199,100 fnu1,,(i(~ Division Budget Officer (Mandatory) • .. , PURPOSE: Thia fonn hu been deYeloped for UH by personnel responsible for reporting detailed contract Information for' use by the· ... Oiviaion of Purchase and Services (DPS). PREPARATION: (Type Al Fields) 1. 2. 3. 4. 5. e. 7. 8. 9. 10. 11. 12. Effective Date: Termination Date: Page_of_ Oivilion/Sec:tion/Program: Contract No.: £XCEl'TION: Contract System No.: EXCEPTION: Purchase Order No.: EXCEPTION: Fw:al Year: Revision No.: Contractor: Purpose: Contractor Contact: . Enter contract beginning date • format: MM/DD/VY Enter contract ending date •format: MM/DD/VY Example: Page 1 of 1 or Page 1 of 3 Enter the Division/Section/Program to which the Contractor will provide aarvices ' ~-:~. IAave Blank-Auignad by Division of Purchase and Services ~ "-:. ... ., FIU IN WITH CONTRACT NO. ASSIGNED •Y 0/#S WHEN INCREASING/DECREASING ORIGINAL CONTRACT AMOUNT IAave Blank--Auigned by Office of the Controller FILL IN WITH NO. ASSIGNED •Y THE OFFICE OF THE CONTROUER WHEN INCREASING/DECREASING ORIGINAL CONTRACT AMOUNT Leave Blank-Auigned by Office of the Controller FIU IN WITH NO. ASSIGNED aY THE OFFICE OF THE CONTROUER WHEN INCREASING/DECREASING ORIGINAL CONTRACT AMOUNT Enter Fiscal Year of contract • Example: 98-99. Enter two-digit number • Example: Revision No. Ql. Use when increasing/decreasing contract amount Vendor to whom contract is awarded An abbreviation of the purpose of the contract. Limited to ten C101 positions Individual assigned by the Contractor (not a DENR employee) 13. · Total Budget or Total expend•ble budget. When submitted as a budget revision, enter the NET change. Amendment 14. 15. 16. 17. 18. 19. 20. •: When change Is negative or minus • use M suffix, l.e ., < t 1 1000 > M Item Description: Contractor Amount: DENR Contract Amount: CFDA CODE: GL COMPANY GL ACCOUNT GL CENTER Division/Section Head: Division Budget Officer: Use: 8100 GENERAL SERVICES Budgeted amount of Contractor funding • if applicable Budgeted amount of State funded item (amount DENR is to pay Contractor) Catalog of Federal Domestic Assistance Code • Example: 66-274 MANDATORY IF FEDERAL DOLLARS ARE EXPENDED IN CONTRACT Obtained from and/or provided by requesting Division's Budget Officer (All GL Information Is mandatory on Iha 2482) MANDATORY ORIGINAL SIGNATURE BY AUTHORIZED INDMDUAL Form wm be rttumed to Division If original aignatura la not provided. MANDATORY ORIGINAL SIGNATURE BY AUTHORIZED INDMDUAL Form wUI be returned to Division If original signature la not provided. DISTRIBUTION: Submit Form 2482 to the Division of Purchase and Services with Form 2500 (Agreement Information) when a contrac is requested to be issued. Submit Form 2482 with • memo to the Division of Purchase and Services with explanation of why a contract amendm· · la required to increase or decrease funding in a contract. DISPOSITION: Retain for five (51 years or until pending audit require~nts are satisfied. Additional copies of this form.may be requested from: NC Dept. of Environment and Natural Resources · Division of Purchase and Services PO Box 27687 Raleigh, NC 27611•7687 COURIER BOX 52·01-00 ,---03/29.2000 15:09 PAGE 02 • !JI Tim ia(onudma it M dee! -ar1let .., Wp 4Mcraiat ➔etlter die wons ii All anploycc or -iadepcnknt t.ODtracrm fat aocial ae.aarity ud income ia MthboWm, purpaeca. 11aia QUESnONNAIRE a1aoald be completed far ey indMdua1 OD a persoul acNU IIJ'WDCDl for whkh there may be a qucation at to employmcal tar IWU&. lf you UC certam AD cmploye/cmployer r~l1rion,J.ip mlU betweo the $tat.e an.d Ule Worker, complt..te on.1y itr-.ml 1 • A OD tiua u.d tht aCl1 pasc of this queaionn,i~ mad &ign. mlc. and daLC tDc ~ DD PliC 7. All ilems ahoald be UA"ered, marW •Uabae_ • or 1>oea a0t apply.• If you Deed mere ap~ fot -Jlemaru· CD the 1aat paF, atacll uom.er &hut. U you ued help iD. complam& dm form, conlaC the Slate C=trolkr's Office at (919)-733-0178. i NCDENR -Division of Waste Manag~ent ApAl!JNUM 1646 Mail Service Center Raleigh, NC 27699-1646 Patrick A. Barnes Werku'a Name .. 4755 Anderson Road Orlando, FL 32812 \.\' oriw-'1 Addrea• 063-62-1412 Won.al"'• Social Security Sumbu Daie Won:u't ~ faa-formcd F-rom 06/15/2000 To Q6/14/2002 ( Moruh. dlz\•, vctv I nc~ix t!l~ a;:::::,"• bl.li~s.s The Division of Waste Management reg,1] ates the rnanggement of solid and hazardous wastes and petroleum underground storage tanks, _and the cleanup of old sites contaminated by chemicals. (!) Ple~e iut ~: worke:'a oc.::.ipwari or titk . Independent science advisor (b) De._-roc th: •erk pcrlc:ccd by tlua mdividw . The science advisor works with the state and comrm.mity to help interpret and and corrment on remediation activities and decisions. He will also be aiding in the recruitment and use of local workers and businesses for the proJect. (c) :Pl:ue attacl\ a ·Job A1u:10un.:e:nc:it• for w, poiition, iI available. Scope of Work is attached. 3. (a) If the -..erk ... doh.C ur.cicr a wtir.e.::1 &g!t:.m:~t or contract. plcue a1t.1ch a copy. Contract is attached. · (b) If th: a;re::mit wu not ill Mi~ ~be ~ win, ud condiriom or ~ 111ork arrang=ncnt. Does not apply (c) If the Mnt&1 wor.iifta uras,~nt dilfi:.n:.d iG uy w.iay from du: 111rittaa qrumeiit. aplain the d.iirc~ ~y they oc::.urred &Dd the d&tc or da~ ol ,uch clwigc. Does not apply • (d) Jue anv ~:-wor~r• = th.ia c.a1qmy ~ ,'riuen a,poc:mei1ta « con~? I£ ac who are thcv' Yes. 'Mr. Barnes and Mr. Joel Hirshhorn were previously under' contract·· as iudeneodeot science advisors for this project. OSCI-JJ9 1 •. t - - Jl9-715-0684 NCDE~/Pl.RCHASING .. • • I PAGE 03 ,.,. n,·. 1.-1,.--lel•tl•tNp a-•--•'re -4. At daia ,oint. if J0111 arc atilfitd tk above aw.cl wmm pr~ sema adtz a pcnoaal scnk.c -.,cemcat. II • employee lot parpo6" ol PICA* TMOfflC Ta withholdin& atop llc:rc and So to paae 7 9Dd lip. title, ud au,~ ccni&adoL If~ uris6«:d. pleM,-wnpJet.c the qneltM)Gntire. 1b fo11owmg gneatiooe vc correlated to caacspaDd wilh the 20 COMMON UW FACl'OJlS aet f.onh iD the IRS ~tiON u heiDg ia4icatM ~wbetllcr or MC u rm~/eaplayer rdarioecip mu. For Y~ or No QuettiOD&, please ckck one. 1. IPiSTILUCTIONS (a) Ia tbe wacbr pw.n ~ in dle way ta: won it to be done'l (Yes_ or No ......... x_) u,-, ai~ apec:i&c cza,aplu .. _____________________ _ (b) Auacb rcpr~acnlat.ive copie. of uiywrinc:, Dl,ltnJCOon! or proc=dures. Does not apply (c) Doc.a yow a£CDC)' have the riabt towns:~=~ w.c.d by tb.c worcr or dircd. that pc.non on ~ to do the 'Wad1 (Ye:!-_ or No~) E.J::pwn you: IQ&'et An independent science advisor for the purpose of gi ying ....£Q__1111Illility professional opinions that are not infJueuced by tbe ag0ocy The qnaJificatioos tor an independent science advisor require that be be abJe act and make decisions without supervision. 2. TJtU'.","lSG (2) u 1..;e work=:-givc.n tra.il:i.in£ b~· ycur age~::.~ :Y:5_ c,t So.2L) If yes, pleue =-s-,r.-er the foll!>wm.g: What kind? _____________________________ _ How often~------------------------------ (b) Wu the worker required to work .,;.ih a tr~ e:nployet o! &&ency? (i'e1_ or No...2L) (c) Wu tu worker required to attend ata.ff m~7 (Yea_ or-No_,!__) :3. •~-n:GR..\l'lON INTO BUSl?\"'£SS oPE.JtAnO~"S (a) Dou the opc:1tion of the ~cy'• bU&~ require tb.&t tbe worker be aupcrvaed or controlled in the pc:forman.ee of the aemu? (Yes or !iic;..!_} F:spJ•io your an1WC: The quaIIT:i.cations for the position require someone that can work independently to meet the objectives of the contract scope .i. SER.VICES llSI>ER.ED PERSOSALL\' (a) u it Wlde:stDC>d Lhat t~ worker will perform~ tcrvicca pcn.oo.ally and not~ or dclep~? (Yea~ or No __ ) E.q,~ ycur anawcr The contract is specifically with an individual for professional services. No other individuals or firms are listed on the contract • OSCP,,,,,,JJ~ ., .. · . ., - -· 03/29/::0,M 15: 09 19-715-0684 NCDE&~/PLRCuAeING ..,...,_. "V -·--,....,_, , .. m. ~ esWaalJ Qa•tltGu1rt .5. RD.ING. SUPDVISING. AND P A'YING ASSIS'LUlIS Doeadlewarbrh\telldpcn? (Ye& "-orNo__) JC yea:· Arc lac1pen laired by. ~--Worku_.L. If lurcA by ri.e wocku1 it lhe -s=cY'• appronl aec:c,,wy1 (Yu __ or No x ) Wllopa,-tachelpera7 Agaw:y, __ Watker x . Ate aociaJ acc:urity tuz:a ud Federal mcomc IIX widilt.dd from lbc ~per,· wag=s'7 {Yea .....x.-or No____) If yes: Who reporu aad pa)'I thcac tuea? A&enl:'J _ Worb::r _x __ PAGE 04 W'lao rcpona 1be helpcn' income1 to ihc htunal R.eveJWC sm;c.e? A«t:oJ:J __ Worker _x _ lf the worur pa)'I the he1pen, doca ll,c tpDc:y repay the work.er? (Ye.a __ or No ...,.x.,...,__) Wu.t aemcea do the h:lpcn per!crm? clerical suppport Wbo evaluates th: helpc.n' pcrforman~? W0tbr x Agcn:y __ f:. co'h·TI?iUl?<iG REUTJO.NSRJP The as:n~· c:,,aaa:.a me wor~r: 1. X Tc ~:form and c::,mplcte. pautic-.tlllr job csuy. 1. __ _ To 11o"Orit at a job f~ an huiencit.e pc..--iod of time. 3. __ _ 0th= (:.xplJ.ir.) ____________________ _ 1. SET HQl!llS OF WORK (a) >..re Kl houri c!~·cri: prc&er~ fer tu work::? (Y~_No~) (b) Doe! th: wor~ ~ a Li:De r:::.ord to th.: aa:ncy? (Yes_ So~) .AUadi rc:;,rcst11UL"--= ~pies o! tizne rcporu.. ~-Ft1.L-TIME U:Q'(j'J'Rl:D Varies depending on ( :1) Hov.· tr.ID)' how, l wc:k llC>C$ the worker spcrid pcrlor:ning ~ for tbc ~~ task (b.) lf. _..__ full . . 1 • "" Services needed do not require full-time tt:M ui&U -tmlC, p~~ ~ am Woy. ___________________ _ effort. (c) If l:s& th.an Ml-time, na.mt the month, and aur:lbcr of cia)" worked meat± zonth dunil£ th.is ~rio<l of employmczu. This will vary over the life of the contract. 9. DOING won ON £MPLO\"EJl'S PR.!MJS[S (a) At ,·hat lueatioa arc the 1er.'ias pedonncd? Agency __ Worker__ ** See Remarks. (b) ~'bo wc~ed the place whc:·: the work wu dotu~7 .A&eDcy __ Workc: __ ** See Remarks. (c) Doea 1.bit worker uacmbll: ~ pror..caa • produc:: at home or away from du: &geDCj-'1 p~c: cf bwm.e!.57 (Yea __LNo __) Jfyu: V.'bo ~ materials or 1oods uacd by d,..e worker, A,ae11cy_ Worker__,:_ la~ .-orw fun:.ished a paneni., er offic.e equipment or ,ive.n in.nruaiozu to !!)11091· in miJ&g the Fodu::: oc pr~ the acm.ce? (Ye.a-:So x ) la 1h.e worka reqwrcd to rcrur-a the fi.nahcd produa u, 1hc aa:ney or some~ dw.gnatcd by the ~ (Yca_2S,_~o __ ) OSCP,n,,J,; 3 03/29. ·.:-000 ., 15:09 7 15-0584 NCDE&~/PLFCHASING PAGE 05 OJ!k, oJ,,., Sltll, C,Cll)Tl,~ , .. 319 • ..... ,.., •• dtuld, ~--•'" 10. ORDU 01 SIQDENCI SET (a) la the worm required to fDllaw a mamac ar Khedulc eceNitbc-4 by ~(Yes__No_x_) llyca. 1M1At ia tu ro~ "'tchedwc? ____________________ _ (b) la the wed.ct &ec: to ddumiac dae ~ ar arckt ~ aequeat:e of work 10 foJloiw or ia he &= to dlOOK wh~ ar i.o--lbe vmrk ia to be ~mplilhed? (Ye...,!._ No_) lfyea,pleucc:xplaiD. The detoxjfjratjrn prc~ecr scbeduJe wiJJ gromm rbe overall sequence and schedule of the worker's activities. However, on a ~ay-to-day basis, the advisor is free to c;hoose bow he schedules ms time 11. ORAL oa warrn:.."i REPORTS to accomplish contract tasks. {a) Doc:a tlsc worker report 10 tlsc AgCDC)' or iu rc?rc.&:nwiYc1 (Yea _x__ No ) How oft:n7 Monthly For wr.at purpo,e7 ___ T_o,.__u_.pda ____ t_e_a,_g_e __ n_c_.y ___ o_n_c.o ... rn_.p_l_e_t_i..;..on_o ... f_a_c_t_i v_1_· t_1_· e_s_an_d_e_xpe ___ n_s_es 1~ ..,11.1.t u::AQZl::-(iD pcrs.on, in wrnm;. by-t:l:~ ::.c.)~ __ wr_1_· t_t_e_n __________ _ (a) Type cl p1y •·or.ker r:c::v:s: Not available. Contract is not in place yet. SiW1'_Commwion_Hourly ,,..&£'! __ Pi~,a,'Ork_Lump Sum.....2L_Othe:-__ _ If c,t.llcr, C-i)w.n (b) I! th: &g:~C"f wc:::ker aJ.i.o...,.cd a dra~ •~wit or advanc.:1 against pay? (Y~a_,.No~ If ~s; ls the v.·orl:er paid 1w:h adtl~c.:.s oc • regular ba.w: (Y:.a __ No_) How doc1 tiu:: 'MlTW ,,pay au.ch-~~: ___________________ _ (c) Was wo:kc::-fillm.g a J)08itioa est1bluhed m th.: a;=cr, bl)dgc!? (Ycs _ No--L.) 13. PA''iMJ:!li"T OF B'L'Sl~"'£.SS OR TllA\'ELING tl."JIESSE (11) la the worku eliJi'b~ for• pc~ paid \"acations_ lia.leavc., ct~ (Ycs_No_:_) I! yes. speci..')' (l-) Does the &gCZJ~ carry work.men's compe:mti® msw-an:: OD tac ~rk.er? (Ye,_ No2._ ) (c) D°"' ~ 9iCD::Y dcdua aocial ICCU'ity tu frOD2 am.owns p&id to work.er? (Yc:s ___ No x ·, (d) Doe.I u,.c ~c:y cicdu.a Federal m'-Omc tu:$ from amo\lCC& paid worker1 (Yc:.s _ No x ) (e) Hew doe.I the a,ency report~ .-ork.t.r', iDcomc U> the :W~-nal ltcvcnuc Seniice? [ Form W-..,· --, _F0~ 1099; _Docs ~ot repatt; -.LOtiac:-(specify) _____________ } (f) Doc.a th= agcn.:y botid the worke:7 (Y~ _ .:-,io _2L._) 1SC FOl"fft J!9 . ' -· - 15:09 .9-715-0684 NCDE~/Pl.RCHASING PAGE 06 'W1..,. -., --·-_ ...... ' ________ _!•?--:~31'~--~ .. ~~--=· r~•=•~•~'-':■:d:•:-':z•_::Oa~_....===•:1,-:.,. _______ ~ 14. nraNISIUNG '?00lS AND MATDlAL (a) Stat.e the kizad and ftlue olrooll au cqmpmat 6lnmlaed by. The ac~:._~N~on~e;;_ _______________________ _ ~ wor~r Typical busine~s SJJJ;lport ec,p1i pneor sucb as desk, computer, printer, telephone, etc. -----------------------(b) Slat& &la.e kmd aod ft}~ ol 1upplicl ead aateriala flniaheA by: Tbea,eru;y._.JJl,liW;:... ___________________ _ Tne-.ukcr Typical pusiness suJ;lPlies s11cb as. paper, pens, etc (c) wi,,, cxpcDK1 ar, iDc:urrcd by ibc worku in UM: performance o£ 1ervicca for tllc qency? ____ _ Travel, local transportation~ lodging, meals and incidentals ( d) Doca the -,ency rcimbunc: &.be •orm for MY ezpcuc,7 (Yu 2._ No_) Uy:upecify the reimbuned apeas:s Travel 1 ocaJ rcaosportatj OD, J odging, roeaJs and incidentals 'C SJGSIFlCA.'-t'T I~"'VESTML~"T (a) Doe, cl~ work.er ha,-e a ma.new ul\'eitme.:I m I busineu re~ted to the ~'!.ZS pe-.-formcd~ X C'fca_?--o_UwoW11 ) (b) Ia a lier.nae n.cu.uary for tb.c v.-ark'? (Y:a_~o~Unknown x ) If ye1, what kiod of liGcJUc is r:quit~? ______________________ _ By v.·ho~ ia it is.aced? ___________________________ _ By ,a.•h!im ia ~ li":lK fee pa.id? ______________________ _ (c) Doc., Lh.e worker have ma.lpraaiu inlurG~? (YCJ _so_ Uo.bc·,.11 x ). ( d) If yea, ii the c.o.t of~ insura.nu paid for ~ the ar-:icy _ or worker __ '! !6. WORKING FOR MOR£ TilA.'i 0?11"£ AGESC\' OR FIRM AT A Tl .. fE V . d d. (a) Apprcmm.a.tcly how many bour, a day d~ tht •·orur pe....fonn ICMUS for th: -St:IC)~ries etpee l.Ilg Oil dSA (b) Doc.. the worxer perform a.unilaz .eni~ fer othcn? (Yr.a_ No_ t:~-n __x_) Ifyei; Arc lheae acrvi=, perfonn,d on a daily buia for otAc: aacucics or~ genc:al public? Perc:ntaac of time 1pcn1 in pcrfanni.q ~ K1'Vic:s for: Thia &geDcy, _____ Gc:i:r&l l'ublic. ____ Unbov.i, (~cl:). _____ _ Docs the liJ:DC)' have priority 011 the work:r'1 time? (Yei _No_) Jfao, e:,cp-·------------------------------ (c) la the work.er prohibited from CDIZlpc:izia with \lu: a,e:u:y citha' while pe:-!Qrmi.a.g sc:'\icu or during acy lat.er period'? (Yt:j _So~ osc 1'-.!J9 ,---1 03/29i ~D00 15:09 '1-715-0584 NCDE~/Pl.F?CHASING PAGE 07 ..... • • Har 18 •gs Oflk1 of 1M Stat, 0111b'Olhr fona Sit • b)loya.at lelars..lalp Qwt1ou1Cre 11 :C6 P.07 • ,-.,. .• 17. M.UJNG SRVIC£5 AV,\JLA9LE TO GENEIAL PDBUC (•) Does the. warku petform ae:ni=a f« die 91CKY iwkr. 1k ar..JW:)"• buaiDc&i aamc ______ _ T1IA: wod:er'a ~ iwne Patrick A Barnes 00,er(spcafy) _____________________ _ (b) Docs ~ worm advcrtiae or maincaiil • bu,,ineu 1iatiDa iD &he telephone directory, l trade joumal, etc. (Yea_No_ tlabown_:__) tf --#4'-' yea,.,---:.--------------------------- (c) Poc.s ~ worker represent bimael! or henclf to th.e aencral public M bc.ini in blWlle.s& to perform Lhc sur.e e:-aimilu SG.""'ic.ea? (Yea_!_ No_ l!wOW%2 _) li~·;s, ~.:79,· ____________________________ _ (d) :Cvea t!.: -...orur hn: bis or bcr awn wp or otric:7 (\'ea~ No_ Unbown _) !!yea., "-n.c:-c ____________________________ _ (c) DtU ~ ~ rcpr~,enc the Yt-orw u 11:1 emplcye..e of the Su.cc to the public7 (Ye~_so~UnknoW13_) U .n.o, ~ ia the. ..,'Orker n:pt~ll1e ______________________ _ (f) Hmi., clid the a.ency lurn of the worker·, s:~'.' He was previously employed as an independent science advisor after selection based on responses to a ~-RJGHT ro DlSCHAltGE request for proposals. {a) w ti:.: 1£CZl')' dacbargc Lhc worur al a:iy time without incurring liability? (Yes2,._ No_) una. c;:,wn. __________________________ _ 19. RJGHT TO ttR.MtsAtt (a) CaD LI:.: WOThr t:r=inale Lh.e a.cmc.ei at any time -..ilhout incurrin& liability? (Ye£_!_ No_) lf na, :xplain ___________________________ _ 03/29;2000 15:09 ,, . I r;19-715-0584 NCDE&NR/PURCHASING ..... -'17 ---P411----, -- 20. PEUl7>110NOFPJlOPITORLOSS . (Cu the w«kcr ioaa.r a loM ill die performance. a the performance of the~ for the agctM:)'7 (Y~_No x ) PAGE 08 l!Jt',~·-------------------------- Attach~ umca and addrcuca of~ total nu:ber of WOl"U-""Z in this dtia from page 1, or the name.sand . addre..ca of 10 wdi workt:n jf there are mDf'C tbz1 10. Attach a detailed explanatioa of why you bclie\'e th: work.er ia an iodcpeudent ~Dtrac:tor or i, a.n employee of the agcncy. _ _:Th:.:.:::e:....:.:w::.o.::.rk::.e~r:;_:1:.:· s~an::.:....:in;:.::::d,;;.epe~n~d:!:e~n~t;;...:;c~o:!.:n~t•rlalla,lill,c~to~r...._.be~c""'ai.l,11 ... slliie-.ibliii,e_WJ11.· J_,Ji-.i.D.u.A,1,1,t_· .be=.. .... u.:.s .. i vu;g!,- . •·-· _facilities or egw,prnept or the di yi si on. The w01:::k9;r:;: u,ill bs determining hie work schedule and hm1rs of work The worker wi J J ~ot bs &UopQrv:i.see ~ t.he division. The worker will he compensated based AD d&linQrsbJe& aad4iiomplstioH -~f tasks rather than hours worked. i ,:::E~TIFY ch.it all copies of c.octracu and all &Ul::1e:.s su'bmiucd he:~th arc cn:e, corrcc.L, and t.atoplcte tc. the. tic!l of my .lt·lO'lilokcig: aiid belief. (Sir.ti: ~~~ lb, ~,.A, /4:::::'.'.'.'. (TC:( PCB Landfill Project Manager (Add."!!!; 1646 Mail Service Center; Raleigh, NC 27699-1646 (TelepJ,one Nurnu.,:\ _ __,,(....,9 __ 19"""").....;..7.;:;.;33;;..--'4=9-=--96,_.,;:ex=t-:3;;..;;0;..;;8 ______ _ *** Remarks 9. DOING WORK ON EMPLOYER'S PREMISES The nature of the job will dictate the location of the work. done at the worker place of business, some work will be done and some work may be done at the state-owned landfill. Some work will be at public meetings, The products assembled by the worker will be written documents such as reports, letters, and newsletters. .., . Estimated cost for task: Total cost is $45,100. Per month cost is $2,200 for months 1-17 of the contract and $1,100 for months 18-24 of the contract Requirements for payment: In his monthly invoice the Advisor must include a detailed listing of expenses. Receipts for air travel, lodging, and car rental must be included. Reimbursements will be made in compliance with applicable policies as contained in the Budget Manual of the State ofNorth Carolina. NONTHCF CONTRACT 1 1 $ 80'.) 2 $ 80'.) 3 $ 80'.) 4 $ 80'.) 5 $ 1,600 6 $ 1,600 7 $ 1,600 8 $ 1,600 9 $ 1,600 10 $ 1,600 11 $ 1,600 12 $ 1,600 13 $ 1,600 14 $ 1,600 15 $ 1,600 16 $ 1,600 17 $ 1,600 18 $ 1,600 19 $ 1,600 20 $ 1,600 21 $ 1,600 22 $ 1,600 23 $ 1,600 24 $ 1,600 TOTAL CONTRACT $ 35,AX> ESTIMATED PAYMENT SCHEDULE FOR TECHNICAL COMMUNTIY ADVISOR TASKNUNBER 2 3 4 5 6 $ 1,600 $ 6,400 $ 1,600 $ 2,400 $ 2,00J $ 1,600 $ 6,400 $ 1,600 $ 2,400 $ 2,00J $ 1,600 $ 6,400 $ 1,600 $ 2,400 $ 2,00J $ 1,600 $ 3,200 $ 1,600 $ 2,400 $ 80'.) $ 1,600 $ 3,200 $ 1,600 $ 2,400 $ 80'.) $ 1,600 $ 3,200 $ 1,600 $ 2,400 $ 80'.) $ 1,600 $ 80'.) $ 400 $ 80'.) $ 1,600 $ 80'.) $ 400 $ 80'.) $ 1,600 $ 80'.) $ 400 $ 80'.) $ 1,600 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $ 400 $ 80'.) $21,600 $ 43,AX> $ 9,600 $21,600 $ 22,1:ro TOTAL.FOR 7 NONTH $ 2,200 $ 17,axJ $ 2,200 $ 17,axJ $ 2,200 $ 17,axJ $ 2,200 $ 12,600 $ 2,200 $ 13,400 $ 2,200 $ 13,400 $ 2,200 $ 7,400 $ 2,200 $ 7,400 $ 2,200 $ 7,400 $ 2,200 $ 7,400 $ 2,200 $ 6,200 $ 2,200 $ 6,200 $ 2,200 $ 6,200 $ 2,200 $ 6,200 $ 2,200 $ 6,200 $ 2,200 $ 6,200 $ 2,200 $ 6,200 $ 1,100 $ 5,100 $ 1,100 $ 5,100 $ 1,100 $ 5,100 $ 1,100 $ 5,100 $ 1,100 $ 5,100 $ 1,100 $ 5,100 $ 1,100 $ 5,100 $45,100 $ 199,100 Project performance will be analyzed by the DENR Project Manager using the earned value method. A Gantt chart is included which breaks the project tasks into subtasks which will be used in the analysis. Project Name: Technical Community Advisor Task ID Task Name Schedule Start Schedule Finish zuuu .. uv' zuuz .J .J A s 0 N D .J ,. Ill " Ill .J .J A 8 u N u .J ,. Ill A Ill .J .J 1.0 !Attendance at Project and CAB Meetings 06/15/0( 06/1410, 1.1 Before Detoxification Contractor hired 06/15100 10/14/00 u 777. '777, TT,> 7,1-, 1.2 After Detoxification Contractor hired 10115/00 06/14/02 ,,, 'F/ ,,, ,, ,,. ,,, ,,, ,, ,, ,,, ,,, ,,. ,,, ,,, ,,, ,,, ,,, •n 2.0 Document Review and Prnantatlon 06/15/0( 06/1410, 3.0 Technical Assistance for Local Resources 06/15/0( 06/1410. 4.0 Measuring Outreach Performance 06/15/0( 12/1410C 4.1 Develop system to measure performance 06115100 09/14/00 r ,,, ,,, ,,._, 4.2 Evaluate and modify system 09/15100 12/14/00 ,,, 5.0 Newsletter Preparation and Distribution 06/15/0( 06/14/0.; 5.1 Prepare newsletter 06/15/00 09114/00 VT, '7TH, •.r;r,,z TA-, 5.2 Prepare and/or assist CIC in preparing newsletter 09115100 12114/00 ,, ,,, " 5.3 Contribute information to newsletter 12/15100 06/14/02 ,,, ,,, // ,, '/ '// ,,, ,,, // ,,. ,,,, ,,, ,,,, ,,, ,,,, ,,, ,,,,, ,,, ,,,, 6.0 Miscellaneous Assistance 06/15/0( 06/1410, 6.1 Assistance in starting redevelopment plans 06/15100 09/14/00 r ,,, ,, ,,, ,. 6.2 Assistance requiring technical expertise 06/15100 06/14/02 ~T. 'TT TT CT •TT •= = ,,, ,,, // ,,, '// ,,, ,, ,,, ,,, ,,, ,, ,,, ,,, ,, ,,, ,, ,,, 7.0 Travel and Lodging 06/15/0(] 06/1410. 7.1 Travel end lodging 06/15100 06/14/02 ~T 'FT TT ,, ,, 'TT 'TT ,, '/ ,,, '/ ,,, '/ '/ ,, ,,, ,,, // '/ ,,, '/ '/ ,,, '/ 'A PMB -Proposed Timeline 06/04/00 BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 Travel Policies and Regulations Purpose SECTION 5 PAGEl Statutory regulations for per diem, transportation, and subsistence allowances for state departments, agencies, boards, commissions, committees, and councils are contained in G.S. 138-5, 138-6, and 138-7. It is the intent of this section to provide statements of policy to enable state departments and agencies a comprehensive reference for uniform interpretation to pay or reimburse allowable state travel expenses pertaining to official travel and subsistence. Employee Responsibility An employee traveling on official state business is expected to exercise the same care in incurring expenses that a prudent person would exercise if traveling on personal business and expending personal ftmds. Excess costs, circuitous routes, delays, or luxury accommodations and services unnecessary, unjustified, or for the convenience or personal preference of the employee in the performance of official state business are not acceptable under this standard. Employees will be responsible for Wlauthorized costs and any additional expenses incurred for personal preference or convenience. Travel Policies for State Employees Per Diem Compensation Per diem compensation is not applicable for state employees. Subsistence Rates The maximum allowable statutory rate (G.S. 138.6) for meals and lodging is $81.00 for in-state travel and $93.00 for out-of-state travel. The Payment of sales tax, lodging tax, local tax, or service fees applied to the cost of lodging is allowed in addition to the lodging rate and is to be paid as a lodging expense. The employee may exceed the part of the ceiling allocated for lodging without approval for overexpenditure provided that the total lodging and food reimbursement that the employee is entitled to for that day does not exceed the maximum allowed daily subsistence. BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 SECTION 5 PAGE2 The following schedule shall be used for reporting allowable subsistence expenses incurred while traveling on official state business: Breakfast Lunch Dinner Lodging (actual, up to) Total Authorization for Lodging In-State $ 6.00 $ 8.00 $14.00 $53.00 <actual, up to) $81.00 Out-of-State $ 6.00 $ 8.00 $16.00 $63.00 (actual, up to) $93.00 Written approval by the department head or his or her designee must be obtained in order to qualify for reimbursement for overnight stays. Supervisory personnel certifying the reimbursement request as necessary and proper must require documentation from the traveler to substantiate that the overnight lodging was necessary and accomplished. The travel must involve a travel destination located at least 35 miles from the employee's regularly assigned duty station (vicinity) or home, whichever is less. Reimbursement for Lodging Each employee is responsible for his or her own request for reimbursement. The travel must involve a travel destination located at least 35 miles from the employee's regularly assigned duty station (vicinity) or home, whichever is less. Requests for reimbursement should be filed within 30 days after the travel period ends for which the reimbursement is being requested. Specific dates of lodging must be listed on the reimbursement request, and substantiated by a receipt from a commercial lodging establishment, not to exceed $53 per night for in-state lodging or $63 per night for out-of-state lodging. Reimbursement for lodging in an establishment treated as an apartment building by state or local law or regulation is not allowed unless approved by the Office of State Budget and Management in advance. Telephone access fees for business calls are considered a miscellaneous expense. Telephone access fees for personal calls are not reimbursable. Baggage handling tips may be claimed as "Miscellaneous." Excessive tips must be documented with a receipt. BUDGET MANUAL STA TE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 Convention Registration SECTION 5 PAGE6 State law allows reimbursement of the actual amount of convention registration fees as shown by a valid receipt or invoice [G.S. 138-6(a)(4)]. Passports Reimbursement for cost incurred in obtaining or renewing a passport may be made to an employee who, in the regular course of his duties, is required to travel overseas in the furtherance of official state business. Passport expenses are chargeable to the same fund that supports the employee's trip. Transportation by Common Carrier Reimbursement for air, rail, or bus fare is limited to actual coach fare, substantiated by receipt. Transportation by International Flights Employees traveling internationally on overseas flights may be reimbursed actual business class fare (substantiated by receipt) with prior approval of the department head or his or her designee. Penalties and Charges Resulting from Cancellations Penalties and charges resulting from the cancellation of airline resetvations (or other travel resetvations) shall be the department's obligation if the employee's travel has been approved in advance and the cancellation or change is made at the direction of and for the convenience of the department. If the cancellation or change is made for the personal benefit of the employee, it shall be the employee's obligation to pay the penalties and charges. However, in the event of accidents, serious illness, or death within the employee's immediate family, or other critical circumstances beyond the control of the employee, the department shall pay the penalties and charges. Super Saver Rates When traveling by common carrier to conduct official state business, employees traveling to their destination earlier than necessary and/or delaying their return to avail the state of reduced transportation rates may be reimbursed subsistence for additional travel days if, BUDGET MANUAL STATE OF NORTH CAROLINA OFFICE OF STATE BUDGET AND MANAGEMENT SUBJECT: Travel Policies and Regulations EFFECTIVE DATE: October 1, 1999 SECTION 5 PAGE8 herein stated in the State Budget Manual. Also, if a state employee's position qualifies him or her for a permanently assigned state vehicle and the employee chooses to drive his or her personal vehicle, then the agency can reimburse the employee at the Motor Pool rate (23 cents) not the IRS rate. Transportation by a Rental Vehicle Rental vehicles may be used; however, rental vehicles are not to be used at state expense solely for the convenience or personal preference of the employee. A receipt is necessary for reimbursement. Transportation by Chartered Aircraft The use of charter aircraft must be approved by the department head or his or her designee, provided the following is substantiated and put in writing: • A state aircraft is not available or not appropriate for the size of the party traveling or the destination airport. • The use of a charter flight is more economical than a commercial flight. • The use of a charter flight is necessary because of unusual travel circumstances. Transportation by Use of Aircraft Owned by a State Employee Reimbursement for costs incurred in the use of aircraft, owned by a state employee, on official state business may be approved by the department head or his or her designee, provided the following is substantiated and put in writing: • The use of the aircraft owned by a state employee is necessary because of unusual travel circumstances and is not for the sole convenience of the employee who owns the plane. • The use of the aircraft, owned by a state employee, at the rates published below is cheaper than any other method of air travel. • The allowable reimbursement rate for aircraft owned by a state employee is $.68 per mile per passenger. SCOPE OF SERVICES FOR PCB LANDFILL TECHNICAL COMMUNITY ADVISOR ♦ Task 1: Attendance at Project and CAB Meetings Under this task the Technical Community Advisor (Advisor) will attend monthly project meetings between the Detoxification Contractor and the Department of Environment and Natural Resources (DENR) Project Manager and will attmd monthly meetings of the Community Advisory Board (CAB). His purpose at the project meetings will be to access whether community involvement as outlined in the Community Outreach and Involvement Plan and other community concerns that may arise during the project are being addressed. The Advisor will meet with DENR Project Manager and the Community Involvement Coordinator after the project meeting to discuss any concerns from the meeting and any advice based on the concerns. He will also help clarify any technical issues in non-technical terms for Community Involvement Coordinator. The Advisor will provide monthly reports of these efforts to the community at the CAB meeting. Based on the current detoxification schedule, meetings involving the Detoxification Contractor will not commence until approximately month four of the advisor's contract. Estimated cost for task: Total cost of $35,200. Per month cost: $ 800 for months 1-4 of contract and $1 ,600 for months 5-24 of the contract. Requirements for payment: The Advisor must include in his monthly invoice a brief report summarizing his attendance at the listed meetings, any comments he feels appropriate concerning the meetings, and any information from these meetings that should be passed on to DENR or the community. He should also include an estimate of cumulative percent completion for each subtask as identified on the included Gantt chart and a copy of any written material that he provided at any of these meetings. ♦ Task 2: Document Review and Presentation Proper communication is key to the success of any project. As in the past, under this task, the Advisor will review various technical documents and communicate their meaning to the general community. This includes presenting the results of design documents as well as assisting with explanation of the Request for Proposal and contracting process. The Advisor will provide monthly reports of these efforts to the community at the CAB meeting. Estimated cost for task: Total cost is $21,600. Per month cost is $1 ,600 for months 1-10 of contract and $400 for months 11-24 of the contract. Requirements for payment: In his monthly invoice the Advisor must include a brief report summarizing his efforts under this task. He should also include an estimate of cumulative percent completion for each subtask as identified on the included Gantt chart and a copy of any written material that he provided as a part of this task. ♦ Task 3: Technical Assistance in Screening and Identifying Local Resources A major component of the approved Community Outreach and Involvement Plan is involving local businesses and residents in the financial benefits of the project The Advisor will assist the Community Involvement Coordinator and Job Developer in the identification of local firms that may be needed in the detoxification project. The Advisor will help inform local businesses of other resources (such as the North Carolina Institute of Minority Economic Development and Region K-Certified Development Company) which may enhance their capacity to participate in the detoxification project. He will provide consulting services to the Community Involvement Coordinator and Job Developer about job requirements and recommended training for workers to help facilitate their effort in the screening of potential project work force applicants. The Advisor will prepare a Local Business Resources notebook containing information about local businesses. This notebook will be an expanded version of the list found in Appendix 2 of the Community Outreach and Involvement Plan and contain contact information for finns and listing any pertinent information such as contractor licenses the firms have or Historically Underutilized Business certification. This initial notebook should be completed by the end of August and reviewed monthly during the construction phase to update information on firms that indicated they where in the process of obtaining licenses or certifications that might enhance their ability to participate in the project The Advisor is encouraged to use the PCB Community Advisory Board office secretary to help in this effort The Advisor will conduct an information session for local finns to infonn them of information they can provide; such as licenses, certifications, and equipment; to put in the Local Business Resources notebook. At the session the Advisor will also identify some of the resources available to firms that are listed in the Community Outreach and Involvement Plan. The Advisor will inform the resource agencies of this meeting so they can send representatives and/or materials if they choose. This session should be completed by the end of the third month of the contract The initial effort will be extensive and require the environmental, small business and minority business expertise of the Advisor. After the initial effort, however, it is felt that the Community Involvement Coordinator and the Job Developer can maintain the Local Business Resources notebook. The Advisor will be expected to advise them on how to do this. The Advisor will remain available after the initial effort to advise the Community Involvement Coordinator and Job Developer should they have questions. The Advisor will notify the DENR Project Manager if there is a need for funds for the duplication of materials or other expenses for the information session. The DENR Project Manager will arrange for these services outside this contract. Estimated cost for task: Total cost is $43,200. Per month cost is $6,400 for months 1-3, $3,200 for months 4-6 and $800 for months 7-24 of contract. Requirements for payment: In his monthly invoice the Advisor must include a briefreport summarizing his efforts. He should also include an estimate of cumulative percent completion for each subtask as identified on the included Gantt chart. The Advisor will provide a Local Business Resources notebook and conduct a local business information session by the end of the third month of the contract ♦ Task 4: Measuring and Monitoring Outreach Performance The outreach goals and objectives of this project have been clearly communicated in the Community Outreach and Involvement Plan. However, in order to maximize the achievement of these goals by the Detoxification Contractor, routine monitoring and measurement must be performed. The Advisor working with the DENR Project Manager will create a system to properly gauge the success of the outreach effort and to report the findings to the community. This system will be developed in the first three months of the Advisor's contract. The system should include a form (such as a spreadsheet) for the Detoxification contractor to fill out and provide at monthly project meetings. For the remainder of the task, he will evaluate the success of the mechanism in monitoring outreach performance and advise of any changes required After the construction phase, less of an effort will be required and monitoring by the Advisor will be considered a part of Task 1 or Task 6. Estimated cost for task: Total cost is $9,600. Per month cost is $1 ,600 for months 1-6. Requirements for payment: In his monthly invoice the Advisor must include a brief report summarizing his efforts. He should also include an estimate of cumulative percent completion for each subtask as identified on the included Gantt chart. The Advisor will provide a system for monitoring outreach performance by the end of the third month of the contract ♦ Task S: Newsletter Preparation and Distribution Over the two year life of the project, the results of activities outlined in the above tasks as well as general construction progress will be communicated to the public through a monthly newsletter. The newsletter will also include information on redevelopment of the site following the detoxification. Preparation of a newsletter is one of the responsibilities listed in the grant application for the C.Ommunity Involvement C.Oordinator. However, the C.Oordinator will probably not have a technical background and will need assistance in preparing the technical sections of the newsletter. The C.Oordinator has not been hired as of the beginning of this contract and more assistance will be needed in the first six months of the project to prepare the initial newsletters. It is expected that the C.Oordinator will be able to take over full responsibility for preparing the newsletter by the sixth month of this contract After that the Advisor will provide input to the newsletter based on his involvement in the preceding tasks. Funds were allocated in the C.Ommunity Involvement Coordinator grant for materials and duplication. The Advisor will notify the DENR Project Manager if there is a need for funds for that purpose .. The DENR Project Manager will arrange for these services outside this contract Estimated cost for task: Total cost is $21,600. Per month cost is $2,400 for months 1-6 and $400 for months 7-24 of the contract .. Requirements for payment: In his monthly invoice the Advisor must include a brief report summarizing his efforts. The Advisor should include an estimate of cumulative percent completion for each subtask as identified on the included Gantt chart and a copy of any written material that he provided as a part of this task. ♦ Task 6: Miscellaneous Assistance Based on previous experience, the assistance of the advisor may be needed to assist in various activities such as the assistance to the CAB in writing letters requiring technical or business expertise, or to address other issues that may arise during the project. During the first six months of the contract, the Advisor's assistance will be needed to help the community start exploring redevelopment opportunities. Estimated cost for task: Total cost is $22,800. Per month cost is $2,000 for months 1-3 and $800 for months 4-24 of the contract. Requirements for payment: In his monthly invoice the Advisor must include a brief report summarizing his efforts. The Advisor should include an estimate of cumulative percent completion for each subtask as identified on the included Gantt chart and a copy of any written material that he provided as a part of this task. ♦ Task 7: Travel and Lodging Most of the previous tasks will require the Advisor's presence in Warren C.Ounty. The Advisor lives in Orlando, Florida. It is estimated that he will make two trips a month to Warren C.Ounty and that his stay will be approximately five days per visit Travel, lodging and subsistence are allowed expenses. Allowable subsistence and lodging expenses will be the same as is allowed for state employees listed in the Budget Manual of the State of North Carolina. Reimbursements will be made in compliance with applicable policies as contained in the Budget Manual of the State of North Carolina Pages from the Travel Policies and Regulations section of the Budget Manual that address subsistence rates, lodging, transportation by common carrier, and transportation by rental vehicle are attached for reference. QUALIFICATIONS OF PATRICK BARNES TO SERVE AS TECHNICAL COMMUNITY ADVISOR In 1982 a landfill pennitted under the Toxic Substances Control Act was constructed in Warren County, North Carolina The pmpose of the landfill was to contain soil that had been contaminated from the illegal spraying of liquids containingpolycblorinated biphe:nyls (PCB) along 210 miles of road in North Carolina. The contaminated roadsides were listed as a Superfund site and the Warren County PCB Landfill was the selected remedy. Many in the community feh that the Warren County was the selected location for the landfill because it has a predominantly minority population and is one of 1he poorer counties in the state. Residents and civil rights leaders vehemently protested the location of the landfill in Warren County. That community activism was considered the "watershed event'' that brought environmental justice to the national level The governor of North Carolina at 1he time, James B. Hunt., Jr., wrote a letter to the citiz.ens promising that the state would "push as hard as it can for detoxification of the landfill when and if the appropriate and feasible technology is developed." A study conducted in the mid-1980s concluded that no such technology was available. When Governor Hunt was re-elected in 1994, a Joint Warren County/State PCB Landfill Working Group (Working Group) was established to study the status of the landfill and determine the feasibility of detoxification. Several members of the community were appointed to the Working Group to represent local interests while the Department of Environment and Natural Resources Division of Waste Management (DWM) represented the state's interests. The community members did not have the technical backgrounds associated with environmental remediation. The Working Group requested that an independent science advisor be hired. A request for proposals was issued for the position with qualifications included the following: ♦ The ability to provide a variety of skills necessary to objectively offer scientific advice to members of the working group concerning the PCB Landfill ♦ A demonstrated knowledge of toxic substances with emphasis on PCBs, dioxins, and furans. • Academic training in a relevant science or engineering field. • A demonstrated working knowledge and technical ability to coordinate scientific and technical experts and -information in the areas required for the efforts in evaluating and detoxifying the PCB Landfill. ♦ The ability to communicate and translate technical and scientific information into terms understandable to the public while maintainine scientific or technical accuracy and objectivity. ♦ Demonstrated experience with clients who did not possess extensive technical backgrounds. ♦ The ability to draft, review and interpret various technical documents and write reports for the Working Group. ♦ The ability and commitment to attend scheduled meetings and attend special or non-routine meetings upon request by the Working Group. Mr. Patrick A Barnes and Mr. Joel Hirshhorn were selected from the respondents to the request and were hired to serve as independent science advisors during the evaluation of the existing landfill and the selection of an appropriate detoxification technology. Their contracts ended with the selection of a detoxification technology. The selection of a detoxification technology completed the mission of the Working Group. A new Citizens Advisory Board (CAB) was established in 1999 whose mission is to work together to complete detoxification of the landfill. The remaining phases of the detoxification project are treatment and restoration/demobilization. The treatment phase will include completion of the remediation design, site preparation, obtaining required pennits, excavation of landfill materials, demonstration testing of the process, soil treatment, process wastewater treatment, and monitoring/testing of air, soil, and water. The restoration/demobilization phase will include backfilling of material; reclamation of the site; and decontamination, dismantlement, and demobiliz.ation of the equipment The CAB feels that there is a need for a technical community advisor during this phase based on their experience during the technology selection phase. The DWM would like to support that request through a personal services contract with Mr. Patrick A. Barnes. The requirements for a technical community advisor during the remaining phases of the detoxification and redevelopment project are essentially the same as were required for an independent science advisor during the technology selection phase as noted above. Experience during that phase also indicated that the person chosen for the personal service contract must be able be work cooperatively with the DWM, CAB, and community while providing independent. objective technical support to the c0Dm1unity. Mr. Barnes has the qualifications required as can be noted from reviewing his attached resume. Mr. Barnes is a professional geologist registered in the States of Florida and North Carolina In addition to his work with the PCB Landfill in Warren County, he has experience consulting on numerous hazardous waste assessment issues and as a technical advisor on remediation projects including the Wingate Superfund site in Fort Lauderdale, Florida and the Love Canal site in New York. He has been involved in several c0Dm1nnity involvement efforts including Restore Orlando, the African American Olamber of Commerce of Central Florida and the Fort Lauderdale Wingate Superfund site. Mr. Barnes has received several awards for his efforts including the Nations Bank Amos Tuck Business Scholarship Award for individuals dedicated to business growth and community economic development in minority communities, the African American Chamber of CoDllllerce of Central Florida award for Businessman of the Year honoring the African American businessman most dedicated to business growth and community outreach, and the African American Chamber of CoDllllerce of Central Florida Professional Service Company of the Year Award for outstanding dedication to professional service of its client. As an independent science advisor during the selection of the detoxification technology he worked with the DWM and community representatives and gained the trust and respect of both. The CAB specifically requested that Mr. Barnes be hired based on his previous performance. He has coDllllunicated technical infonnation in a manner that the local community can understand. During the Phase III Final Design for the PCB Detoxification project. Mr. Barnes, as an employee with Barnes, Ferland, and Associates, prepared the Community Outreach and Involvement Plan for the project. This plan contains pertinent information, resources and programs that may be used to facilitate and/or enhance the positive impact of the project on the Warren Count community. It presents an approach to maximiz.e local business involvement and economic benefits associated with the detoxification and redevelopment of the PCB Landfill To prepare this plan, he contacted many community organizations including those involved with education, business, religious, community development. labor and contractors. The DWM and CAB want the local community to benefit as much as possible from the financial opportunities provided by the detoxification project. As the author of this plan, Mr. Barnes has personal understanding of the plan and its implementation. In addition Mr. Barnes can be technical and business resource for the Community Involvement Coordinator and Job Developer who will support the detoxification effort through an EPA grant. The DWM feels that the selection of Mr. Barnes is justified because he is has the required technical background and experience; the detailed knowledge of the history, objectives, and requirements of the detoxification project; and had proven himself successful in working and communicating with both DENR and community. PATRICK A. BARNES, P.G. PRESIDENT/SENIOR HYDROGEOLOGIST AREAS OF SPECIALIZATION As President of BF A, Mr. Barnes is respoDS1ble for the management of all day-to-day activities, client liaison and market development. He also manages the water resource needs for several of BF A's municipal clients. He has designed and conducted numerous large-scale site water resource evaluations, managed several numerical and analytical groundwater flow analyses for contamination and water supply projects. He has also designed and performed hydrogeological investigations for many municipal and haz.ardous waste landfills. Mr. Barnes works extensively in the minority community and has functioned as the minority business utili:zation coordinator for several multi-million dollar municipal construction projects. With TAMS Consultants, Inc. of New York, he was responsible for the analysis and characteri:zation ofhaz.ardous conditions at several superfund (CERCLA) sites. At the Lamont-Doherty Geological Observatory of Columbia University, Mr. Barnes was involved in various aspects of environmental and scientific research. EXPERIENCE Barnes, Ferland and Associates, Inc., President Dyer, Riddle, Mills & Precourt, Inc., Manager, Hydrogeology Dept. TAMS Consultants, Inc., Project Hydrogeologist Lamont & Doherty Geological Observatory, Research Assistant EDUCATION S.U.N.Y. at Stony Brook, B.S. Geology, 1985 Graduate Study in Seismology, Geophysics and Water Resources PROFESSIONAL REGISTRATION Professional Geologist, FL Professional Geologist, NC CERTIFICATION OSHA certified for hazardous materials handling and site supervision. ASSOCIATIONS Florida Association of Professional Geologists Board Member Association of Ground Water Scientists and Engineers -NGW A National Society of Black Engineers African American Chamber of Commerce Board Member Restore Orlando Board Member AWARDS 1994-Present 1988-1994 1986-1988 1985-1987 • Nations Bank -1998 Winner of the AMOS TUCK Business Scholarship Award. One of two awardees selected by Nations Bank in the southeast. The award is given to individuals dedicated to business growth and community economic development in minority communities. • African American Chamber of Commerce of Central Florida -1997 Businessman of the Year -The award is given to the African America businessman most dedicated to business growth and community out reach. • Black Business Investment Fund -1997 Honored Business Award-This award is given to successful graduates of the BBIF outreach program. Graduation indicates ones ability to survive in the mainstream business community BFA • National Society of Black Engineers -1996 Businessman of the Year-This award is given to the owner of an engineering business that has experienced tremendous growth over the past year. • African American Chamber of Commerce of Central Florida -1996 Professional Service Company of the Year-This honor is given to the company that exemplifies the outstanding dedication to professional service of its clients. • National Society of Black Engineers of Central Florida Alumni Extension -1995 Entrepreneur of the Year- this award is given to the member that demonstrates the most entrepreneurial sprit. COMMUNITY INVOLVEMENT • Restore Orlando -Board of Directors. Restore Orlando is a community-based Christian organization dedicated to rebuilding improvised areas of Orange County. • African American Chamber of Commerce of Central Florida -Founding member, served as Vice Chairman and Chairman of several committees including economic development and resource. • National Society of Black Engineers -Central Florida -Founding member and active participant in pre- college incentives. • Florida Association of Professional Geologists -Founding member currently serving on the Board of Directors and as Treasurer. • Joint Warren County PCB Landfill Working Group -Served as Science Advisor to community desiring to detoxify the landfill. Successfully provide technical services needed to communicate the often complex, project issues to the citizens and aided in securing funding for remedial design of the landfill. • Fort Lauderdale Wingate Superfund Site -Served as Technical Advisor charged with incorporating the community's concerns into remedial design of the facility. HAZARDOUS WASTE/ CONTAMINATION ASSESSMENT EXPERIENCE • Warren County PCB Landfill -BF A Project Manager -Facility Site Investigation and Detoxification Design. Also served as Science Advisor responsible for review and analysis of technical information concerning the safety of the State's PCB Landfill. Developed and implemented a field Sampling Plan to characterize the condition of the facility and communicated the results to the Community and State officials. • Fort Lauderdale Community Development Commission (CDC) -Community Technical Advisor working under an EPA Grant to assist the CDC in understanding the technical ramifications of the proposed Superfund remedy to the former Wingate incinerator. Worked to reopen the Record of Decision and incorporate issues important to the residents of the Wingate area. • FOOT -Performed contamination screening, evaluations for PD&E studies for several road-widening projects including S.R. 776, U.S. 41 and S.R. 78. This work included Phase-I transaction audits of over 100 properties. Phase II assessment activities were required at several of the sites. • NYSDEC -Love Canal Emergency Declaration Area -Sample collection and handling, health and safety monitoring, landfill liner placement inspection, facility closure activities inspection, monitoring well design and construction inspection, and community relations. • NJDEP -International Flavors and Fragrances Plant (CERCLA) -Monitoring well construction supervision, groundwater, surface water and sediment sampling, health and safety personnel monitoring and surface geophysical survey design and supervision. BFA • NJDEP-GEMS Landfill RI/FS (CERCLA) -Monitoring well construction supervision, groundwater, surface water and sediment sampling, health and safety personnel monitoring, decontamination activities supervision, aquifer testing, and groundwater treatment systems pilot testing. • USEPA -Bridgeport Rental and Oil Services (BROS) Lagoon RI/FS (CERCLA) -Performed soil and sediment sample handling site characterization and health and safety monitoring. RI/FS report development. • NJDOT -Glassboro Landfill -Developed field sampling and testing plan, performed monitoring well construction supervision and sampling. Supervised geophysical survey including soil resistivity and terrain conductivity. • Armonk, NY RI/FS -Prepared field sampling and testing plan. Performed sampling and sample handling for monitoring wells, lake sediment, and hazardous waste containers, also performed field screening of samples using a portable gas chromatograph. • City of Palm Bay (fire station) -Developed and implemented a CAR and RAP for leaking underground fuel tanks. Remedial methods included groundwater withdrawal, treatment and reintroduction. Treatment was accomplished with air stripping and treated water was discharged in the shallow aquifer through infiltration wells. • City of Titusville -Implemented contamination assessment activities and developed a CAR for the City's police station. • Brunetti Property Landfill Impact Assessment -Designed and implemented a field sampling and testing plan to determine the effect of the Orange County landfill on directly adjacent ground and surface water bodies. • SCEA -Wrights Road C&D Landfill -Developed groundwater impact assessment plan. Developed and implemented groundwater and soil remedial action plan. Contaminants included primarily heavy metals. • SCEA -Upsala Road Landfill Contamination Assessment -Developed a CA field sampling and testing plan. Supervised monitoring well construction and sampling activities. Developed recommendation based on results. Contaminants included primarily pesticides. • Lake County -Astatula I and II Landfill Contamination Assessment -Developed field sampling and testing work plans as well as quality assurance and health and safety plans. Designed and implemented surface geophysics investigation program using terrain conductivity and field screening using photo gas chromatograph. City of Ormond Beach Municipal Landfill-Developed permitted and implemented a comprehensive ground and surface water, monitoring plan to assess the current and long term potential impact of the facility on the neighboring environment. • City of Palm Bay -Performed over 33 Phase I and II contamination assessments for real estate transactions. • City of Ormond Beach -Principal in Cllarge of UST contamination assessment activities and the development ofremedial action plans for three (3) City-owned facilities. WATER RESOURCE EVALUATION/ SUPPLY EXPERIENCE • City of Edgewater -Well field development impact assessment, consumptive use permitting and construction management services. Development of a well field groundwater flow model using the PLASM flow code. BFA • Orlando Utilities Commission -Principal in Charge ofBFA's work activities related to the development and implementation of a lower Floridan aquifer testing program for south and southeast Orange County, and construction of production wells at the Conway and planned southeast Water Treatment Plants. • City of Jacksonville -Principal in Olarge of BFA's activities in the development of an aquifer testing program and construction for the planned Ridenour Well field improvements. • Utilities Commission. City of New Smyrna Beach -Project Manager for wellfield design and impact assessment modeling, permitting, development of supporting documents, administrative hearing assistance, well specifications and construction management services. • City of Lakeland -Wellfield site aquifer testing and impact assessment modeling. Production well construction management, environmental monitoring and mitigation plan development. • City of Titusville -Project Manager for development of groundwater resource management plans for the Area II and Area III well fields, sustainable yield determination through groundwater flow/solute modeling, and consumptive use permitting. • City of Titusville -Project Manager for water resource and sources evaluation, RO feasibility evaluation and future wellfield expansion area determination. Developed and implemented a detailed hydrogeologic testing program. • Florida Cities Water Company -Performed Waterway Estates wellfield and aquifer testing, water use permitting, and saline interface monitoring activities. Wellfield design specifications and construction management. • Venice Gardens Utility -Development and implementation of an injection well mechanical integrity test to determine the operational status of the Utility's brine injection well. • City of Ormond Beach -Project Manager for aquifer testing, groundwater flow modeling and consumptive use permitting, also performed well field design and construction management. BFA Project Name: Technical Community Advisor Task ID Task Name Schedule Start Schedule Finish 2000 ~UUl 2uu2 J J A s 0 N u J t-M A M J J A s u N u J F M A M J J 1.0 Attendance at Project and CAB Meetings 06/15/00 06/14/02 1.1 Before Detoxification Contractor hired 06/15/00 10/14/00 Vh 1////// //////, ////// ~ 1.2 After Detoxification Contractor hired 10/15/00 06/14/02 '1//// //////, 1////// 1////// //////, ////// //////, '1/////, ////// //////, '////// //////, '///// '/////, ////// //////, '//J 2.0 Document Review and Presentation 06/15/00 06/14/02 3.0 Technical Assistance for Local Resources 06/15/00 06/14/02 4.0 Measuring Outreach Performance 06/15/00 12/14/00 4.1 Develop system to measure performance 06/15/00 09/14/00 r/,,., 1////// //////, ~ 4.2 Evaluate and modify system 09/15/00 12/14/00 '-V/, 1////// //////, '1/,1 5.0 Newsletter Preparation and Distribution 06/15/00 06/14/02 5.1 Prepare newsletter 06/15/00 09/14/00 Vh 1////// '1/////, ~ 5.2 Prepare and/or assist CIC in preparing newsletter 09/15/00 12/14/00 '-V/, 1////// //////, ~ 5.3 Contribute information to newsletter 12/15/00 06/14/02 /// //////, '1/////, //////, ////// //////, '1/////, //////, //////, 1////// //////, '1/////, 1////// 6.0 Miscellaneous Assistance 06/15/00 06/14/02 6.1 Assistance in starting redevelopment plans 06/15/00 09/14/00 Vh 1////// '1/////, 1//A 6.2 Assistance requiring technical expertise 06/15/00 06/14/02 1///, '1/////, //////, ////// //////, 1/////, //////, /////// 1////// //////, '1/////, /////,/ /////// /////, ////// ////// '////// //A 7.0 Travel and Lodging 06/15/00 06/14/02 7.1 Travel and lodging 06/15/00 06/14/02 r//, '////// '/////, ////// /////,/ //////, 1////// //////, 1/////, '1////// ////// //////, 1////// //////, '1////// 1////// //////, ////// ////// '1////// 1//A PMB -Proposed Timeline 06/02/00 Project Name: Technical Community Advisor March 2001 April 2001 May 2001 June 2001 July 2001 August 2001 September 2001 October 2001 November 2001 Task ID Task Name Total Total Cost Total Total Cost Total Total Cost Total Total Cost Total Total Cost Total Total Cost Total Total Cost Total Total Cost Total Total Cost Units Units Units Units Units Units Units Units Units 1.0 Attendance at Project and CAB Meetings 17h $1,677 16h $1,576 16h $1,624 16h $1,576 16h $1,624 16h $1,600 16h $1,576 16h $1,624 16h $1,576 1.1 Before Detoxification Contractor hired 1.2 After Detoxification Contractor hired 17h $1,677 16h $1,576 16h $1,624 16h $1,576 16h $1,624 16h $1,600 16h $1,576 16h $1,624 16h $1,576 2.0 Document Review and Presentation 17h $1,677 9h $936 4h $406 4h $394 4h $406 4h $400 4h $394 4h $406 4h $394 3.0 Technical Assistance for Local Resources 8h $839 8h $788 8h $812 8h $788 8h $812 8h $800 8h $788 8h $812 8h $788 4.0 Measuring Outreach Performance 4.1 Develop system to measure performance 4.2 Evaluate and modify system 5.0 Newsletter Preparation and Distribution 4h $419 4h $394 4h $406 4h $394 4h $406 4h $400 4h $394 4h $406 4h $394 5.1 Prepare newsletter 5.2 Prepare and/or assist CIC in preparing newsletter 5.3 Contribute information to newsletter 4h $419 4h $394 4h $406 4h $394 4h $406 4h $400 4h $394 4h $406 4h $394 6.0 Miscellaneous Assistance 8h $839 8h $788 8h $812 8h $788 8h $812 8h $800 8h $788 8h $812 8h $788 6.1 Assistance in starting redevelopment plans 6.2 Assistance requiring technical expertise Sh $839 Sh $788 Sh $812 Sh $788 Sh $812 Sh $800 Sh $788 Sh $812 Sh $788 7.0 Travel and Lodging 2 $2,306 2 $2,167 2 $2,233 2 $2,167 2 $2,233 2 $2,200 2 $2,167 2 $2,233 1 $1,580 7.1 Travel and lodging 2 $2,306 2 $2,167 2 $2,233 2 $2,167 2 $2,233 2 $2,200 2 $2,167 2 $2,233 1 $1,580 All task totals: 55h $7,758 45h $6,649 41h $6,293 39h $6,107 41h $6,293 40h $6,200 39h $6,107 41h $6,293 39h $5,520 Project Name: Technical Community Advisor June 2000 July 2000 August 2000 September 2000 October 2000 November 2000 December 2000 January 2001 February 2001 Task ID Task Name Total Total Cost Total Total Cost Total Total Cost Total Total Cost Total Total Cost Total Total Cost Total Total Cost Total Total Cost Total Total Cost Units Units Units Units Units Units Units Units Units 1.0 Attendance at Project and CAB Meetings 4h $427 8h $812 8h $800 8h $788 13h $1,251 16h $1,576 16h $1,624 16h $1,600 15h $1,523 1.1 Before Detoxification Contractor hired 4h $427 8h $812 8h $800 8h $788 4h $373 1.2 After Detoxification Contractor hired 9h $877 16h $1,576 16h $1,624 16h $1,600 15h $1,523 2.0 Document Review and Presentation 9h $853 16h $1,624 16h $1,600 16h $1,576 16h $1,624 16h $1,576 16h $1,624 16h $1,600 15h $1,523 3.0 Technical Assistance for Local Resources 34h $3,413 65h $6,496 64h $6,400 46h $4,597 32h $3,248 32h $3,152 19h $1,932 8h $800 8h $761 4.0 Measuring Outreach Performance 9h $853 16h $1,624 16h $1,600 16h $1,576 16h $1,624 16h $1,576 7h $747 4.1 Develop system to measure performance 9h $853 16h $1,624 16h $1,600 7h $723 4.2 Evaluate and modify system 9h $853 16h $1,624 16h $1,576 7h $747 5.0 Newsletter Preparation and Distribution 13h $1,280 24h $2,436 24h $2,400 24h $2,364 24h $2,436 24h $2,364 13h $1,339 4h $400 4h $381 5.1 Prepare newsletter 13h $1,280 24h $2,436 24h $2,400 11h $1,084 5.2 Prepare and/or assist CIC in preparing newsletter 13h $1,280 24h $2,436 24h $2,364 11h $1,120 5.3 Contribute information to newslette, 2h $219 4h $400 4h $381 6.0 Miscellaneous Assistance 11h $1,067 20h $2,030 20h $2,000 13h $1,330 8h $812 8h $788 8h $812 8h $800 8h $761 6.1 Assistance in starting redevelopment plans 6h $640 12h $1,218 12h $1,200 Sh $542 6.2 Assistance requiring technical expertise 4h $427 8h $812 8h $800 8h $788 8h $812 8h $788 8h ~812 8h $800 8h $761 7.0 Travel and Lodging 1 $1,173 2 $2,233 2 $2,200 2 $2,167 2 $2,233 2 $2,167 2 $2,233 2 $2,200 2 $2,094 7.1 Travel and lodging 1 $1,173 2 $2,233 2 $2,200 2 $2,167 2 $2,233 2 $2,167 2 $2,233 2 $2,200 2 $2,094 All task totals: 79h $9,067 150h $17,256 148h $17,000 122h $14,397 110h $13,228 110h $13,198 81h $10,311 52h $7,400 50h $7,042 Project Name: Technical Community Advisor December 2001 January 2002 February 2002 March 2002 April 2002 May 2002 June 2002 Totals Task ID Task Name Total Total Cost Total Total Cost Total Total Cost Total Total Cost Total Total Cost Total Total Cost Total Total Cost Total Cost Units Units Units Units Units Units Units 1.0 Attendance at Project and CAB Meetings 16h $1,624 16h $1,600 15h $1,523 17h $1,677 16h $1,576 16h $1,624 7h $723 $35,200 1.1 Before Detoxification Contractor hired $3,200 1.2 After Detoxification Contractor hired 16h $1,624 16h $1,600 15h $1,523 17h $1,677 16h $1,576 16h $1,624 7h $723 $32,000 2.0 Document Review and Presentation 4h $406 4h $400 4h $381 4h $419 4h $394 4h $406 2h $181 $21,600 3.0 Technical Assistance for Local Resources Sh $812 Sh $800 Sh $761 Sh $839 Sh $788 Sh $812 4h $361 $43,200 4.0 Measuring Outreach Performance $9,600 4.1 Develop system to measure performance $4,800 4.2 Evaluate and modify system $4,800 5.0 Newsletter Preparation and Distribution 4h $406 4h $400 4h $381 4h $419 4h $394 4h $406 2h $181 $21,600 5.1 Prepare newsletter $7,200 5.2 Prepare and/or assist CIC in preparing newsletter $7,200 5.3 Contribute information to newsletter 4h $406 4h $400 4h $381 4h $419 4h $394 4h $406 2h $181 $7,200 6.0 Miscellaneous Assistance Sh $812 Sh $800 Sh $761 Sh $839 Sh $788 Sh $812 4h $361 $22,800 6.1 Assistance in starting redevelopment plans $3,600 6.2 Assistance requiring technical expertise Sh $812 8h $800 8h $761 8h $839 8h $788 8h $812 4h ~361 $19,200 7.0 Travel and Lodging 1 $1,117 1 $1,100 1 $1,047 1 $1,153 1 $1,083 1 $1,117 0 $497 $45,100 7.1 Travel and lodging 1 $1,117 1 $1,100 1 $1,047 1 $1,153 1 $1,083 1 $1,117 0 $497 $45,100 All task totals: 41h $5,177 40h $5,100 38h $4,853 42h $5,347 39h $5,023 41h $5,177 18h $2,303 $199,100 FROM THE DESK OF PATRICK A. BARNES, P.G. April 26, 2000 .. Mr. Mike Kelly ti=F';.;ax:##77'.,Q-:Z-;:,,!'-";::;-:::~:-f;,,,;.;;ax:--;,.-,--------l State of North Carolina Department of Environment and Natural Resou,,.,v.., 1601 Mail Service Center Raleigh, N.C. 27699-1601 SUBJECT: Scope of Work for Personal Services Contract Dear Mike: PCB Landfill Detoxification Project Technical (Science) Advisor and Other Issues As both you and Pat Backus have indicated there are several issues associated with the PCB Landfill Detoxification Project that can be addressed by a Technical or Science Advisor position. Attached is a draft scope of services to perform such services as well as the necessary project community outreach. In preparing the original budget for this project an amount of $200,000 was allocated to perform Science Advisor services during construction. As you know, I am extremely interested and excited about the opportunity to perform these services for the community and the State. As I mentioned to you during the last community meeting, I believe that there i$ overlap between the services of such an Advisor and those of a Construction Manager (CM). However, I am in no way advocating that all the CM activities be necessarily assigned to the Technical Advisor. There is merit to having a separate contract with a firm to fully address the comprehensive management issues. The unfortunate reality is, the State cannot rely on any selected construction firm to provide the necessary QA/QC of their own work. There is no conflict of interest between a Community Technical Advisor and the CM because both are charged, to some degree, with oversight of the construction process. The major difference is one would be responsible for developing the human side of the project while the other addresses the construction side. We hope that when the CM project is advertised BFA has an opportunity to sl.i:>mit our qualifications and experience either in a prime role or as a sub-consultant to a NC based remedial CM company. In either case, I think we would provide valoo to the State. I know you don't know us as a CM firm but I assure you we have supstantial experience in that regard. We are in the process of obtaining reciprocity for 'fr P.E.s Mr. Mike Kelly April26,2000 Page2 and certification for BFA. I apotogize for not completing it sooner, but truly I was under the impression that it was not required because the selected construction firm would have to customize the design for their particular needs. In other words, we were essentially developing what's known in the industry as a detailed design criteria package. Over the years, we have worked very hard together for both the State and the community to help keep the project on track without potentially fanning the flames. I believe that is a goal we both sincerely share. During the process I have tried not just to obtain the respect of the State and the community, but to prove our technical value to the project. I can only hope I have accomplished that. The primary purpose of this letter is to transmit a scope of services for the 1echnical Community Advisor as I promised. Attachment A is a task by task scope and Table 1 summarizes the associated fees. The total proposed budget is $451,200 for the services outlined. It is different from the amount originally proposed because the scope is much broader. This includes all anticipated travel and other direct costs. It is recommended that the fee be paid monthly based on a 24 month schedule. Please review it and call me if you have any questions. As usual, I took fbrward to assisting the State on this very, very important pro· Patrick A. Barnes, P.G_ PAB/pgs/+1JMK cc: Pat Backus, NCDENR Task 1: ATTACHMENT A SCOPE OF SERVICES FOR PCB LANDFrLL CONSTRUCTtON PHASE DETOXIFICATION TECHNtCAL ADVISOR General Coordination and Meetings Under this task the Advisor will provide clear coordination of technrcal project issues which affect both the selected Contractor and the community. For example, this task 'eJ · "(, includes regularly communicating with the Contractor and the State to determine what lJ-l/Y". ,->;'; ~ the project needs are and determining what, if any of those needs can be met by the '"1 , , community resources. Once identified, the Advisor will work with all parties to facilitate '7' a mutually agreeable arrangement. Monthly reports of such efforts will be provided at I c , the CAB meeting. This task also includes the Advisor working closely with the CAB and the State to investigate avenues for potential funding. These services include letter writing on behalf ? of the CAB and correspondence with State and Federal officials as may be necessary. _, "' ; , £,.• , , c{,.~ 1_/_,, The Advisor will make an effort to attend all regularly scheduled project meetings as well as special meetings given a 10 day notic~ period. C /-·· ,j , --r ' .)(..../ :.,,IJ't .(. ·-...:::... t. ,' --t ,.· ;' : -. <~ I Task 2: Document Review and Presentation Proper communication is key to the success of any project. As in the past, under this task, the Advisor will digest various technical project documents and communicate their meaning to the general community. This includes presenting the results of design documents as well as assisting with explanation of the RFP and contracting process. When the construction activities are underway, this task will cover data review and the preparation of summaries submitted to the community. Task 3: Resource Screening and Capacity Building A major component of the approved Community Outreach Plan was involving the local business and residents in the project. Under this task the Advisor will lead this effort of outreach from the perspective of the project's technical requirements. The Advisor will work with the Warren Family Institute (WFI) to perform final screening of potential project work force applicants. It is assumed that the identification and initial screening activities will be performed by the WFI. Whenever possible, local firms will be pre-qualified to participate in the cohstruction activities. The Advisor will also, when practical, work to enhance the capacity of a local firm to enable them to maximize their potential involvement. PBAttA -1- Avenues for developing new locally based business entities that can participa e on the project will be evaluated under this task. Task 4: Training Assistance As indicated in the Community Outreach Plan, the selected Contractor is being asked to provide training to potential site employees. Under this task the Advisor will work with both the Contractor and the local work force to facilitate the outreach effort. This type of facilitation is necessary because of the potential for a considerable communication gap between the two groups. Task 5: Monitoring and Measuring Outreach Performance The outreach goals and objectives of this project have been dearly communicated. However, in order to maximize the probability that the selected contractor attempts to achieve them, routine monitoring and measuring must be performed. The Advisor working with the State's Project Manager will devise a mechanism to properly gage the success of the outreach effort and to report the findings to the community. Task 6: Assistance with Redevelopment Planning As we move closer to construction, the reuse of the property will become a more important issue. Under this task, the Advisor will work with the CAB to investigate the merits of various redevelopment options. This task includes attendance at meetings, letter writing and correspondence with various project stakeholders. Task 7: Newsletter Preparation and Distribution Over the two year life of the project, the results of activities outlined above in tasks 1 through 6, as well as general construction progress, will be communicated to the public through a monthly newsletter. The project's Technical Advisor will be responsible for assembling the pertinent information and the development and dissemination of that newsletter. PBAttA -2- I - TABLE 1 COMPENSATION BUDGET Project Activities Correspondence with State as necessary to execute the Scope of Services Correspondence with CAB and Community as necessary to execute the Scope of Services Correspondence with tocal contractors. vendors, etc. and construction firm as necessary to execute the Scope of Services Correspondence with WFI as necessary to execute the Scope of Services Meeting Attendance as necessary to execute the Scope of Services -assumes 4/month Data Review and Presentation as indicated in Task 2 Monthly Newsletter Preparation as indicated in Task 7 Direct Costs (Monthty) Newsletters* -500 copies/month@ @ $1,400/mo. Air Travel -$300/trip )( 2 trips Lodging, Meals -$100/day@ 10 days/month Car Rental -10 days @ $60/day Total Direct Costs (Monthly) *Note: The newsletter will be printed by a local firm ~verage Houts/Month 16 8 40 16 16 24 ~ 152 hrs ~ $100/hr $15,200 $ 1,400 IS 600 $ 1,000 $ 600 $ 3,600 $ 15,200 ·+ 3 600 18,800 24mo. $ S1,200 , { 1 fax !umber of pages including cover •;heet 'hone 3X PhOM --.,-~1/ 1 l 1 ?--~ < ,c- IECT: q KS: Barnes, Ferland and Associates , Inc. 3655 Mag uni'.! B!vd. Suite 1 SO Orlando. Flotida 32803 P:n----n:• (407) 896-8608 f~w~ Phone (407} 896 ___ -1_82_2~--- FYI O See Attached O Urgent O For your review O Reply ASAP O Ple.ase comment r -~'---~!!!1!!1!!!!!1-~IWA!!!!"" !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!F!!!!!!R!!!!!!!!!O!!!!!!!!!M!IJ!!l!!!!T!!!!!!!!!H!!IIIE_D_E_S_K_O_F!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!ll!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!"!'!"llll I PATRICK A. BARNES, P.G. ii i I I April 17, 2000 . Mike Kelly ,ate of North Carolina 2partment of Environment and Natural Resources 501 Mail Service Center --~!eigh , N.C. 27699-1601 _ ,_:8JECT: Scope of Work for Personal Services Contract ~Jr Mike: P r:':9 Landfill Detoxification Project Technical (Science) Advisor ,"l nd Jther Issues .. ;)Cth yet; :~,-;: ?at Backus have indicated there are se'Jerai iss ues associated with the ·;s Landfo! Geloxification Project that can be addressed by a Technical or Science .·visor posit1c1 _:,reparing the t udget for this project an amount of $200.000 was allocated to perform . .;ch services during construction. As you know, I afT' extremely interested in ~:forming these services for the community and the State . , I mentioned to you during the last community meeting . I believe that there is overlap 0 t,1✓een the se:vices of such an Advisor and those of a Construction Manager (CM). -:;Never, I am in no way advocating that all the CM activities be necessarily assigned to -:? Technical Advisor. There is merit to having a separate contract with a firm to fully _·:dress the comprehensive management issues. The unfortunate reality is, the State · _:,nnot rely on any selected construction firm to provide the necessary QNQC of their ·m work. There is no conflict of interest between a Commun ity Technical Advisor and -:: CM because ~,oth are charged, to some degree, with oversight of the construction .cess The .. ~2r:r difference is one would be responsible for developing the human .9 of the proir::~:! v,,~ile the other addresses the construction side. ·~ hope that when the CM project is advertised BFA has an opportunity to submit our ,.;alifications and experience either in a prime role-or as a sub-consultant to a NC . .:,sed remedial CM company. In either case, I think. we would provide value to the tste. I know you don't know us as a CM firm but I assure you we have substantial .q;erience in that regard. We are in the process of obtaining reciprocity for our P.E.s · 'H1 r.P.rtifir.:::itinn for A~A I apologize for not completing it sooner, but truly I was under '·-e impression that it was not required because the selected construction firm would l,9J,d ! ht--." 1ionf +hf'" ~l'O GLl v.ct- j \"100 e_ If\ P+- 1?--+-5c,.,cl 'l-'h.; "'5 ' Gn 5 ,.,e"v-'r"> .5M I(..>.>;> i N N,c. ltiiiiiiiiiiiiiiiiii.z.. Mike Kelly .:,r ji 17, 2000 ,· •ge 2 ·. ve to customize the design for their particular needs. In other words, we were ::;entially devekiping what's known in the industry as a detailed design criteria -ckage. T1ase recall that on several occasions Ted Hortenstine asked if we would be required '.lull permits and the response was always no, because a potential bidder might want :·iandle sorr'li)thing a little differently. We are very familiar with the p~ocess you are .. ,rrently going through and we do not anticipate having a problerri-meeting its · '·'quirement. I was a little surprised by the comments you made which seemed to imply that my ·mtinued invo!vement in the project is a result of me being black. I am not ashamed to '/ that that was part of the reason I was initially asked to propose for the Science Jvisor position. That is called outreach. I always believed the project leaders (you luded) felt tt·,at such outreach was desirable. Over the years, I have worked very ::;r d for both the State and the community to help keep the project on traek without 1tentially fanning the flames. I believe that is a goal we both sincerely share. During <::: process I have tried not just to obtain the respect of the State and the community, t to prove our technical value to the project I thought I had accompllshed that. · ,e primary purpose of this letter is to transmit a scope of services for the Technical -J mmunity Advisor as I promised. Attachment A is a task by task scope and Table 1 ,rn marizes the associated fees. The total proposed budget is $451,200 for the ,_;rvices outlined. This includes all anticipated travel and other direct costs. It is ·f:::ommended t~0,it the fee be paid monthly based on a 24 month schedule. , ··i?ase revie•/,.' it and call me if you have any questions. As usual, I look forward to ·"'sisting the State on this very, very important project. Sincerely, Patrick A. Barnes, P.G. ·' ,if:Jlp<;;Sf4-13MK Pat Backus, NCDENR ATTACHMENT A SCOPE OF SERVICES FOR PCB LANDFILL CONSTRU CTION PHASE DETOXIFICATION TECHNICAL ADVISOR G~n-e ral Coordination and Meetings ::::r this task the Advisor will provide clear coordination of technical proje<:rt issues ._::-i affect both tne selected Contractor and the community. For example, this task -~ -:des regularly communicating with the Contractor and the State to determine what oroiect needs are and determining what, if any of those needs can be met by the 1nu.nity ;,e:;, __ ,rc8s. Once identified , the Advisor v.;ill •.;,.:,r i with all parties to facilitate ·utua!ly ;:;~re ~able arrangement. Monthly reports ot such efforts will be provided at :::::AB meetir; task aisc i:i c:ud es the Advisor working closely with the CA.B and the State to sJgate avenues for potential funding. These services inc!ude !etter writing on behalf ·, ~ CA3 and correspondence with State and Federal officials as may be necessary 0 Advisor wiil make an effort to attend all regularly scheduled project meetings as l .3s special meetings given a 10 day notice period. Doc1,Jment Review and Presentation per commu nicc1tion is key to the success of any project. As in the past. under this " , the Advisor vv il! digest various technical project documents and communicate their .;:1:1ing to the ~:1:~neral community. This includes presenting the results of design · ·.uments as v. -:-!: 8S assisting with explanation of the RFP and contracting process . .=;n the cons~:-1.:,:~io n activities are undervvay, this task will cover data review and the · ;·aration of summaries submitted to the community Rssource Screening and Capacity Building -,ajor compone;,t of the approved Community Outre:::ich Plan was involving the local ,in ess a:id re si dents in the project. Under this task tile ,A,dvisor will lead this effort of -:,each from the perspective of the project's technical requirements. The Advisor will :,rk with the \Narren Family Institute (WFI) to perform final screening of potential · <jl'~ct work force applicants. It is assumed that the identification and initial screening · ~:ivities will be performed by the WFI. . :1enever possible, local firms will be pre-qualified to participate in the construction --~:vities. The Advisor will also , when practical, work to enhance the capacity of a local ;; ::1 to enable them to maximize their potential involvement. -1 . -;nues for developing new locally based business entities that can participate on the · · ,ect will be evaluated under this task. :3 r< 4: Training Assistance · .. indicated in the Community Outreach Plan, the selected Contractor is being asked to -~vide training to potential site employees. Under this task the Advisor will work with _ -·:: the Contractor and the local work force to facilitate the outreach effort. This type of :tation is ne --~'=~Sary because of the potential for a considerable communication gap -:,;cen the tvm groups. . _-,sk 5: Monitoring and Measuring Outreach Performance . 2 outre2..:1, ;,pals and objectives of this project have been clearly communicated. ·-':✓ever. w cr,J;.3r to maximize the probability that the selected contractor attempts to · :-::ve the:n ry Jtine monitoring and measuring must be performed . The Advisor :,; ng with the State's Project Manager will devise a mechanism to properly gage the ,::ess of the outreach effort and to report the findings to the community. Assistance with Redevelopment Planning _ we move cioser to construction, the reuse of the property will become a more :extant issue. Under this task, the Advisor will work with the CAB to investigate the ,, ts of various redevelopment options. This task includes attendance at meetings, ~r writing and correspondence with various project stakeholders. ::k 7: Nev,r:::letter Preparation and Distribution · ~r the two r ~-'-:?ir i;fe of the project, the res ~..i:ts c f activities outlined above in tasks 1 ·::c.:gh 6, as ,\':.=:di as general construction progress , \Viii be communicated to the public · ·J,.;gh a .'71or:thi~r newsletter. The projects Technica: A.cv1sor will be responsible for .. ':embling the pertinent information and the development and dissemination of that -... wsletter. -2- ~oject Acti'.Jiti8s TABLE 1 COMPENSATION BUDGET ::;-;-espondence with State as necessary to ·.· ':"cute the Scope of Services _ Arespondence with CAB and Community as necessary execute the Scope of Services · ;·espcnder.c::: with local contractors, vendors. etc. Average Hours/Month 16 8 40 :; constr:.iction fi rm as necessary to execute the Scope of Services -_;rrespondence with WFI as necessary to execute =-Scope of Services .:9ting Artend a~ ~:e as necessary to execute the ~::;pe of Services -assumes 4/month -:;,a Review and Presentation as indicated in Task 2 ~nth!y Newsiener Preparation as indicated ·ri Ta:- 16 16 24 10 +-I @ 1 ISi (,on ~ ~ 152 hrs k......---~------X $1 00/hr >,vsletters· -500 copies/month@ @ $1,400/mo. ? o,frrc ..::-11,1 'l0/<1';-.. (!3 · Travel -S300,'trip x 2 trips //~ -1;;.. -<'.j SA- dging, Meals -$100/day@ 10 days/m onth . ;r Rental -10 days@ $60/day io/1,,/,-1,.,,, >< 1ot1.tJ -PJ, · Total Direct Costs (Monthly) 1/J AA< /..-i.,.. '--_J.·_"3_ ·e · Th ,oc,,zoo byalocal firm $ $ $15,200 $ 1,400 $ 600 $ 1,000 $ 600 $ 3,600 15,200 + 3.600 18,800 24 mo. 51,200 Patricia M. Backus, PE Division of Waste Management 401 Oberlin Road, Suite 150 Raleigh, NC 27605 Phone: 919-733-4996 ext. 308 Fax: 919-715-3605 Fax To: Michael Bryant Fax: 715-0684 Phone: 715-3891 Re: BFA Assistance with RFP Michael, .. --~.-?JIL ;:41 · llllllllllllllllllllllllllllllllli. NCDENR From: Pat Backus Pages: 6 Date: 03/08/00 CC: I asked Pat Barnes to provide more details of how BFA could assist the state in preparation of a RFP. BFA is an environmental consulting firm and would not be bidding on the remediation project for the landfill. The PCB Landfill Detoxification Project involves a significant amount of construction type • activities and the project specifications for that part of the work are written in a construction industry format. Since our meeting several weeks ago, I've tried to become better educated on contracting and writing bid documents. Every reference I've found on construction contracting indicates that the architectural-engineering firm involved with the design is hired to help in the manner that Pat has described. BFA was this type of firm for the final design. Because they were involved with the final design they are uniquely qualified to provide this support. (I am almost certain that the State Construction Office does this also. You may want to check with them for reference.) While successful soil treatment is the goal of the project, I think there is enough construction involved to warrant some flavor of a construction type approach in bidding and contracting. Mike Kelly and I reviewed Pat's proposal. The proposal for preconstruction assistance seems reasonable and would help the state issue a better quality RFP and deal with the responses in a timely fashion. In addition to being the standard way of dealing with the construction aspects of this project, contracting with BFA would also provide a continuity of the technical advisory support to the community. Pat Barnes has been working with the community for several years and his opinions are respected and trusted by the community. Pat has a personal commitment to the community and has indicated to me that he intends to stay involved whether we contract with him or not. We know that there will be some tough decisions ahead and I think is it to the state's advantage to have someone outside of state government who has a technical background and community respect to be involved in the RFP process. How can we proceed with this issue in a timely manner? , .... •~,r ■ ~ 11. ---,... ....__. ......... Date ···-··-•---_.,, ------j __ , .. ..,,j: __ --··--NUmUVI" Ql p~g~~ 1111w1uu1119 11,;uv~, sheet To: I _,, I I f--'h K II'. I"\ vJ lU Phone I I _,, ~ I 0-----~--•--.,J """.-.A l\.cel'\.r.i .. ♦nn IP111-1o Ddl lltf::>, rt:I ldl IU AIIU ,.._,;:,_,..,..,,,. l C.:>, II Iv. 3655 MaAuire 8!vd. $u!te 150 Orlando, Florida 32803 . From: -~ i '~--r~ Tr t CJ~ -J...) av n e..s Phone i: !:IV C,i,"'\no. . --. ··-··- (407) 896-8608 i.in'P\ one 4 o'iiJ \-.vi' I .,..,u-,u.,_~ CC: .,,..--., i Va\-Ba~k:uS ( 9 19) J 15 -3 Coos ,,, "lll IA ,crrT• ..,..,,_~.., .... -... r R~MARKS: n FYI ✓ See Attached n Urgent n FQr y9ur review ! I I n P!ea5e r-omment ! •_.*~""'A «>.-:-~ Environmentai consuitan~ 2-=8 --::z::rn.: = = =-- a ...... -.... l:,arlsinrl ::,nrl A.&&Dciates. Inc. &;;1Q111v~, • v.-• .. ••--••...---------. _ March 6, 2000 Mr. Mike Kelly State oiNorih Caroiina ~ . , .. -_..., __ ---• ,....,c 'f:\_'T.,:--~_,,,.c=i.T'\.+ -a.,..,rl 1'..T~·h1t"'!;l l R P:~f\llrr..P.s uc:::pi1ru11t;i,1,..1,L v1. L'l.&.Ya.1."'.1..1.1.1..1.""'.1. ... L -....a-A ... -~--__________ _ 1 ~f\1 ll.6"~1 Ci.:....,.,.:"'°' ,.,,::::aT'l♦A1" 1 UV 1 J.VJ,(1.1.J. ...:,\,,,,.1, v .J.'lw'-'--'"""&.4~...,.• Raleigh, N.C. 27699-1601 Dear Mike: BFA #99-001 As requested by Pat Backus, this is a ta~k by ta~k proposal to provide assistance t0 the State during the RFP development and bidding process for the PCB Landfill detoxification. I have also included a scope of work to assist during the construction phase. As discussed in my ietter to you dated February 14, 2000, it is GUStomai-y for the pn::;j~t G'.'.'ner to retain the services of t..lle de:,ign firm to assist with the project bidding and even the construction is particularly important ♦ ... :, given tne pro_po::;eu ~ .., "' • ~ ... 1~ •"-------•~·-•!---1--......... -.&-+·i.._ .. -........ :o.,..+C" ,,.,. k.a.11,:a,,,,., th,. .f,.·,11,-,\X!f·no .uaseQ On 0Uf expeilCilCC Wll,U Lilt; l,;Ull::)UU\;UUU ,l)Ua;>c UJ. VUl\.l f-'"'.I"''"''" "'"' •-'~"-~•-... ~ ,.v••-··•••o tasks w•ll be necessary. Preconstruction Services rasK 1: .;i.ssisiance wiii, ii.FF veve:upmiiii Bf .A. will work closely with the State to help ensure that a.n RFP is developed which is consistent _-, with the State's contracting practicc:zs and tb.e tecimicai anci ourreacn goais u:i:' l~ic pii.",j.;.::;L. '.,V~ will review the information collected, thus far by the State, compare i.t with typical ianguage used in recent similar J.tFPs ,ve ha"'e in-house an.d make rec-on1mendation.s to the State. \\l'nere applicable, under this task we will also make consistent with the historical desires of the r .n.,.,...n,11"1tv. ---------., . BF A will al!'io work with the State to heip accommodate the desires expressed by the cotrtitiUi1ity into the RFP. It is assumed that e-mail and conference calls will be used to fa.cilitate the i11volv~me1it of the CAB rnembsrs. It is asimm~d that this task -will be completed within 30 days of the State's notice to ofoceed. . , • I 3655 Maguire Boulevard • Suite 150 • Orlando. Fioricia 32603 Offi~A (407) 8!ats-l:StjUlj • Fax i4u7j o;o-~ c:;2~ Mr. Mike Kelly March 6, '.2000 Task 2: Bid Forms and Front-End Documents BF A will assist the State with developing potential modifications tc standard documents to accommodate the goals and objectives of this project. f"r.nnt_,o.f'\rl 1.1 \..'J.I.\. ..... aa,A T·t ; .. 1.!., .... __ 1_ TIT.IA __ ..:.11 ,-.';:_..._,.._ ... ~ ..... .u.,.. ..... ,.:..,._..,,.+1.--.. ...... ~ ...... ,...,;,...,9"1 ,-1,-.,,.,.,._..,..,.::.,n+C" n 1t"\t'1 r•i\t'\£\t¥1ir•tiAn C-T\Pf'ifl,-,,~tinriQ in I l't"'\f"lJ=l'T'Tnl~ ·~~" ""'r'IS.Jl '-AIIII ,~.,1 ... ~1v 1r.v1r:'N 111r: L1r.:-,.,1>,-"II LlllL.LJIIIL..llL."") illl\..l VV11.3L.1.'-4'-'t...1.V.1.a ..:,v.._,....,. .... .J.. ................ '\J .............. . .._...._,._....,.A ...... .,,_..., ,._.._......,..._.._, .._,,,..._ • • .. ,.-.,-..•. -.-.----J --• --. • --------o -------------. .. .. • ~nncert. vvith the State~s star1dard nractices to deten11in.e the format ru1d c,on.te.nt of the project~·s bid-f~~-For exanmle. whether a~particular item is bid in a unit price or a lump sum format will be considered and e;al~ated, It i.s ~ssumed that BF A will develop the final bid fonn. ---..... ~ .. It is also assumed that all quantities to be potentially used in the b1d. term w111 t>e ta1<en trom work previously performed. This task will occur concurrently with Task 1 and will take no more than 30 days. C"" .......... .,..,.r Aw~w:a.n JlJ,l,liH r11 ,,..,.,,., .• ,, r ., ••·-,,._,,,,_ ••~••·• ....... ., -------------·-o ~--------,., .... • ..i ... -i __ ..._ ... i _ -c--. .... _ ..... _ ---~i i L _________ !Li-'-;'_ ... ...,._._ ......... ~ ................ .,.J-............. ~ ........ --.--•· L.-.. .......... ~ ... -..-n:·: A ,,ri l l 111S assumeo lOJil lU~ i::)l,ilC Wlll llt: rc::;po11:;1u1c lUl }'1UJl.1..l auv1.a1;,,;;;ui,;;u.~, uvvvcvc.1, ,_, •. ,. VYUl r.u ,a:le.hl. "" fla...+"''f""t'\t'\ -tho -tnlln,'.\Mnn• C."4 • 1,,1,.1..1."4"-"A'°' LV 1.1-& .a.._,,..1..a.& ~ ... -A'-'.&.._..._,•• &&.1.e,• 3. l Pre-Bid Meeting. BF A will have representatives present at the project pre-bid meeting to assist in describing project technical requirements and respond to questions. " 2 R-so-n~ ..... '17n'""•"'-n .... !".l.., .. :,..._s Be .................. e .... + ......... 0 ,..,.,,.__"".....__1•".'I"';.,.,., '""+ ... +~~ "'""*'";.:.nt ;t ~ ... ~ .... +~,""';V-..... t..:a,? ... ,T .c ..,. U lU LU VY 1LLC1l \.,lU\;~UU11 • \.,<l.U.O:, V .1. l.lJ..",:, ~u.11.1.p1.~.i\.ll..J' v.1. U.J.'-' p.1.VJ'-''-'~ •'->..:;:t .......,,a.,L,1,"-'A!-"c:.&.u .... '-...1.. that notential bidders v~till have seve.ral auestions about the desi~n during the biddi ng ----process. BF A will respond to all pertinent questions by wTiting to ensure proper rcvic\v 1 .. ii ___ ... _, _ _L:_i i_:_j_j ___ _ oy 41..U puLenmu muucns ~ ~ PrP.n:Jre: Aridenc1nn;~ HFA wHl ;;.~.:;i .;:t the Si;itf: ir1 nre.narit11J hld addendnrns llt::t;~~~~trv tn ,... --.--.-.-,... ----,-~---------- -··--- ------------------~--,-----o ----·-··-· ······ ...... ···--., clai-ifv the detoxification desil:m and fonnallv address issues identified bv potential bidders. 3.4 Document .Production. BFA will reproduce docmnents as may be necessary to ensure di$tribution of both plans and specifications to interested potential bidders. Whenever possible, docwuents wili be provided in electronic fom1at to t.½.e State. The cost ot the ~ bid te production will be transferred to the bidder. ---__ _,,_.. ___ ,._. _,. ~ ----.... It is asaumed that the biddins process will be completed within 60 dayiil. Task 4: Bid Tabulatio11 Evaluation and Award TT-'°'...,. 1,._,:,-1 ""'"""',:_,._ D"C" J\ ,.,,.;11 '"'"'".:n+ +~.G ~♦"+.a.·-+ ..... t-..,,1n+;...,_ +1,,,-i...:,.:a,... r>'nr.'h +'-',.,+ r\ .....,,... _ _,~.,. c:nr"h•~+;,...,._ ,...,._+ 1 lt n l l l 1 111 1 ,., .. ,.,., •• '" .. I :Ill r"II L...,., •• ,., .. ,.,.,,., 1 111. •• , • ..,,L . I l l • .., ••••• ,., ........ ,,, ••• , ........ "'111'1..II 1114'"11 r"9. ...... , .... , 1..v ..-1111,r-1 1111,, .. ?, -r~-----------·c, ----··-------------~ ----... -... ---.... ---·-·c:, ·-------.... ...,.....-...... ,., ....... --... _. r -----r ... ,.. -· -.-.-----~ ....... ---- CO-tS by category ca.'! be made. -,- I l\ ,f~ 11.ira .... l(" Pllv lVJ..J.. ~Y.LJ.A..'-' .,....__&&J • ,_ ,. r """""',-,. Maren O; L.UUV Page 3 After the State has amved at a reco·mmendeU uwwd~ BFA ':-.-1.!! "..;'~!'!-~ ~Af!th rh~ :-;r~r.e to '~·0!!1..TE~micate the results to the community through the CAB. One CAB meeting is ruiticipated under this task. h is anticipated that this task wiii take i G days to complete. -------· Task 5: Pre-Construction Meeting BFA will ~tte~d t.11.e project's pre-rorrstrnGtkm meeting. The ~oal of the pre-constn1ction ......... tinn le. tn introilnce nroiect team members to the selected contractor and review the Ll..l""""'-",._~t;:, .a.u •-,..,,._ ------r , .. ~ construction reauirements. It i.s anticipated that a representati.ve from the CAB. the Cow1ty, W~u1~ii f.ruuily I~~tit'~te ;!..~d ~!h~! ~!~~h0l<l~rs will be present for the kick-off of fo~ construction activities. BF A will prepare minutes for the meeiing. Task 6: Geot~chnical InvestiRation ? As discussed during the design. process, prior to construction the State must furnish iite specific eeotechnicai data4 Th.at data w-ili be i1eeded by L.~e pote.ntial bidder to gain a complete ..,, understanding of tb.e site:s suitaoiiiiy for foe cu11~u--,-u~iiuii !viid5 ~~i~i:v~~~d. I!:.~de:-!_h.!~ !~~~ BF_A. will develop a scope of work for the potential geotechnicai contractor and plaoe stakes ai P' roposeo .. tes·T ,.1ocat"~ons·. T"lT:' ,I. __ _::'i +'i,.. .... _ ..... 1....t-.~~~ 1 ~; .. ·t :i .f-rnl'Yl 1,-.. ,.-..~~ ,-.,-,r1tr-~1 t:.f1t i:;: ~nii Wi~!13.i7e thi;;: \. .a. or/-\. W 111 UlC:11. UUlt.UlJ. ... , l.J.lUO:, .1.1. V1..l.l •.v-u . .L _.._.. ............................ -... ..., .............. ----------c:,. ..._ -.. ..... effort for the State, Because the actual cost will be determined by formal quotes, we recomrnend th.::.t the Stat:: .acco!!'~tr!.O·,i:ite t½.t cost of this t?-5k wit½ an allowance, In addition to the two meetin~s discussed in Tasks 3 and 5, BF A anticipates the need for two additional meetings to coordin.ate with the State and the community. --...-.-. • ~ I r , ~ 1 • • . • ,._ t. 1 • 1 . • 1 •' J:S.t-A 1s a1so 1meresieo. ui assi:ttiiig i:11.10i,gu t"'i.3 ..:0r..::;!~.::t1c:;. p::;~e~~ ::;y p!"C'!!:l!hg pr0gr~~;. rnanagement, construction engineeri:.1g 3..11.d ma.11agement servi~es, A.d.ditionally, BFA pro poses to f,if!(:ti0n ~s th~ s11nnort mechfuT}.iSm for 1naximizing tb.e use of !oc-al contracto:r~ on the uroiect. A A -~ -.• Specifically, BF A proposes to assist the State by perfonning the following tasks. T ,.,..l,. 1., ... 14..:tn, .£. Once · a construction contract has been awarded; BFA wili provide general adxninistrative • i .: • ,.. .. .. I... . . T • .J , C 1, . services aur1ng conS·iiUCtiUii iOC UlC U.CtVAiijCat;uu prGj~~t ;t l~ ~~U.r::le~ !._!1-:.!' th~ ,.-;..,r.~;;)~;-;v ~t·.c~~:• _ .. ... "".. •" ,. ~ • • • • • ....... o...a..&-.................... ··----o ---r-- Ot v,iork shaiJ t,e prov1aea ror one (1) constr...1ct1on co11tract '..AJ1tl1 a 18-mont.11 d1.rrat.ion. 1.1 Provide a technical constmction professional to work with the Contractor and ensure .. Mr. Mike Kelly March 6. 2000 P~o~ 4 . -e-. Outreach and Invoivement Pian::. \.\tithout sacrificin§ t.lie project teiz:hnit;:al goals in any way. 1.2 Atte:nd a maximum of 18 monthly progress meetings with the State and Contractor and provide minutes of the meeting. 1.3 Provide consultation and advice to the State during the construction process. 1.4 1.5 Provide clarificati.on and interpretation of the spedfk&.tion~ and drav.'ingg. l.6 Review 1thoo drawin~s. detaiied ccn:istruction drawings, and roateriai samples submitted . -. "· --. by the Contractor for generai conformance wim mi: lic~ig.'"i i;Gii.C~pt .:;ft!~~ p!";;je:t. ~ -~ "'!""": 1 --..L -___ -1 ...i,d, ..... ____ :_.A +~~ :-:.~-"'~~"!'n~;;;h, !'!.f ~!!}!\:":iti-;~;:. i.;:;;fr.-:-;::;]~ ;j~d A,.,n;•·n·t"lot"lt nrn1,n~,:-.,i 1. / r,vaiuau: w1u u~t.c:111111..l.ic:: u1\,,, A'-""""P"u.v.1..u"J -· .., __ ..,~;.~~;..=-..;.;.;.~=---..:...:.:..:..:.:... :-:-.-. .-.. -'-~.!...!!uun .. ..-!H. _!-'!.' .. '!·''""'..,. __ i.10 1 •• • .ll 1.12 l 11 .l,o.l....J 1-1,, ♦hlllQt r..,nnt-rQr♦nr VJ \..•.•-_.._._ • .,.., __ &-_-. • T'\ ...... : _j_ -J;"'J;OVlUC ~ r ""'-T .. 1 "-T "l~T'T,"'\ V.&. .L"'IIIV>~.a prnjc-et i con$trncted in accordance with the specifications and State requirements. Provide other prof~::;~lQn~J staff as may be rn:r{'.:ss1:1,ry t0 ensure on behaif oft~ State that the detoxification effort is performing in accordance with the project objectives. BF A will review the Contractor's recommendation to the State. payment requests and prov1de Revie'.v and monitor the pro~ess ~f d1e w~rk .versus. scheduled construction ,u1d advise "-'--Cl ... :--•--!""'"".·--.1.._ ----... n.r,.-. .n.-.,....1 T't. ... l"\hlAfl'\C' a-H,u,tit"u,. ~lll"h nt"t,orP.Q~ ~llV ~LctlC: ~ I.\.J '-..1..a.ic;; p.1u~,\.,,~.:> Q.H~ .t-'.a.vv.a. ............ ., '"4 ........ --......... 0 '-"----..-. r---0 ... -........... Review and report to tie Siate claim.s for cost and time extensions subrrJtted by the Contractor. Assisi: tnl! Sti:itc with contract change order, as required. .. 1. .... Ull:;'.• r,...~.,b.-.t tu:n n: fin~1 im:n~r.tfr,rix of the comnleted nroiect with representatives of the ......,....,~,.---~ .......... ,-,, ............... _ .. -·-r---·--~---------... ~ .. .., State. Tne first irtsoection will be to develop a punch list fer the Con.tractor and the second inspection wiJl be to confim1 that items on the punch list have been adequately ,._..,1,..:a_.,..,.,.,_~ "i-.-u ♦\...-r'n .... -t.-.r.r.1"1-n.-if' i+ 1Q ~PtPrn,lnA-1 fhAt th~ ~nntra.etc,r l.-.,as. fulfilled 11,:~ O.U\.M90~._,,.... '--'J 'r.a.•-'-"'-'••---•-,.• _.....,. _ _...,._.,,.,,.._,._..,...,_ ....... ------------------·-·· .., - obiigations, BrA will recommend. final acceptance of the project. Folh.Jwing final acceptance BF A wiii review me iinai pay requesi: aiiu rcc6ii'iiiiciij ~ii~ c..lJ.lVU.tt! (;!' fa~~: !"'~~imPnt. : I I I ~~~ ..-:::>....-~ "'?-= -sn, z:;tC'iitt rr: 1 Mr. Mike Kelly 'f',_,f.,.,.~k::.. '1f\f\f\ IVl,l"llLI I II_ L.\1\S\6 -' -------'7 ---- Page 5 l. 14 Prepare record drawings from information prnvided by BF A's on-site representative, the ~+ t ; Q1"\P.PtnrQ ~nf'1 th,=,, r'Att1'-r'!ll,-..f'A1'" r1~1~T'\Po::lf'~nn ,-·hp r1;...-nenc;l"'lo'nC' j~,...a.,.;""'"' Qn.4 ~ 1 .. ,,'>.,.; ....... n ,....+ ... ►-~...a"e .. n~Y"" ...... ~....,.a...r ....... .a.-.""' ...... ""' .._~"" .... .1,......,,~ .... ""'"' ... '"'"'"" .... U .1'11.JLLI...J.J..le 1.1.,.tu ~.• .. • .. 1 •. 1. -'--'·'-')·'·"-'·'· ... ···', _,._,._,"' 1--1,J11 u.J.!\.-l T.!.'... ~!.l'!.!'_J.;. .. ,_,.,! all facilities constructed. BF A will not be responsible for field verification of the ...... ..-,·v•r~,-fo,~ :;.._,$.,,..........,...~♦~--T\-..r.:. Ct+,..♦.o. .. -.r!11 -=n~!...-r.o ,.....,..-. ,...-.+ ....,-t'-.... 1.,,,-_..._ __ .._,..] ___ !"Ll-----.l ._, ____ -/·"l'\ !11uv1~n,A1 ~1.a n11_1_!rr:11.~-~-'.• .. ~.· .!..• .. •.1.-•• _,1_':!'.'-.. · ~!!!!'-·'-·I_·!~•-·'-'!!'-·~'.:..-~ I_'.!.!!!)'!~ !i::}-'~c.J!...!!...!~!!..!!!:,:r: ~.!!..! ~!!!':~ ~-"?) sets of prints of the record drawings. Prn,,Jf'ipr, T'\l"f"liPl"t l"'P.ri1hl'!'l:t1An ·ti'\ r~{rn l ,;lfnY"'lr aru:::ann~.c:a.c, n,13rf,;.f,,~,,u·" T'h'=ll;-.f'~o ....,..,.n;.o,,♦ ~ .r" ,...,.,. ................. i =•= .., .__-. .-.--y.-.-J---. __ .._IL>,._..__._...,~_.,-... .., 1.v ,.._....,C""".4·""'1.'-'&.,J w~""'&.1.""'•'-'" '-'"".1.1,.L.J.J.1.L.I~ I..L.l<LL L.1...1..._,. }-'.I.VJ'-'""" 1.'.> ~V111.l-'1'-'\A,,. and in general compliance with permits issued by the regulatory agencies an.d submit rPnnirPrl r.Prlifif'~tinn rlnf'llt'M,:>nf~ tn t'h,=, .. ,.,....,l<>tr..-., on.:>,...,..,.,,,. ---~--""··""·--..., ..... ,._,...._ .... ,._ __ ~.1.-..1. ... ---a.a..&,1.,1.--.,,1.,1.'-"" .,_V ...,_,a.'lra,t .1.'-'~'-'"..&.'-41."\J..L! L,L!:"-"·.&.J.W&.~.,~. 1.16 Prepare a concise detoxification sununary report for the State; and regul;nory agency's records. The report will 1:;ontain all pertinent dat~ collected du.ring the detoxification Compensation Pre-Construction Services Ta~~ 1: Assistance with ~.fP Develonmem and r:omm1mirv r.nnnlin~tinn Task 2: Task 3: Task 4; ·rask 5: & --···-·· ------------., ---------·---- Bid Form Development and Front-En.d Documents Assistance Services During Bidding Bid. Tabulatjon, Evaluation and Award Pre-Construction Meeting and Stakeholder Coordination r-,,..._,...,.._1,.. ___ :, __ , ,, .. JC:::u u::~~U~ll..:<U AJlrnvant""P fA...,. l,,r~l ,.,..i:ar,,,♦,c:a,.-t,-~,...ol /.:-.....\ ........ .,.._ .... -.-. .. --..__ ... ,. ___ _., t:,"-''-"'""""' .. .Ll.-'""""".L A,.1.l.&&&.) Meetings (Direct Costs) ·1u1AL ~ 11n no ~-' . . ................ 1 :nn nn _.,.,__,,..,,.._.. . .._.. . ., 4)80,00 2,520.00 1,060.00 ,C AAA A n. O ,VVIJ.VV 2.i40.00 $37,500.00 T h~VP. nr.t "inr hi,1r.1 thA ,--.: ..... ,~t~ f,-,r f~-,u r,,rtr~,...,;..;n,_ "D~n/"j--• .. -- ----• -.................. _ .. ____ ........ ~ V'-"1,:1\•~ ..I.V'i. '-&..I,"-' ~v.o..:,u. U\.,\.lU.11 .1 1,1.a~c ~e1v1~c; Ua\;iliiiC l ii~VC: iiOi. h.aci i:Ile opportun.ity to discuss it fully with either you or Pat. ttowever, if the State is interested in retaining a firm to provide construction administration, the approach outlined is one we typicaiiy Thanks for the opportunity to prepare this pre-construction services scope i:md cost estimate. The scope outlined is diiectly in line with the work we performed for the State a.s an independent Advisor to the Ww-ren County community. We hope that this can be processed in that va~e, Yres1dent cc: i I I I i 'SZil'.4 . -.&.-. ::;;;,.,,;;,,a:;;::::;;;;;;,.,,,,.,;;;;:-;;:;:~ I ' ..BF A Environmental Consultants Barnes, Ferland and Associates, Inc. March 6, 2000 Mr. Mike Kelly State of North Carolina Department of Environment and Natural Resources 1601 Mail Service Center Raleigh, N.C. 27699-1601 BFA #99-001 SUBJECT: BFA Assistance with RFP, Bidding Process and Construction Process Dear Mike: As requested by Pat Backus, this is a task by task proposal to provide assistance to the State during the RFP development and bidding process for the PCB Landfill detoxification. I have also included a scope of work to assist during the construction phase. As discussed in my letter to you dated February 14, 2000, it is customary for the project owner to retain the services of the design firm to assist with the project bidding and even the construction management process. This is particularly important given the proposed aggressive implementation schedule .. Based on our experience with the construction phase of other projects we believe the followin g tasks will be necessary. Preconstruction Services Task 1: Assistance with RFP Development BF A will work closely with the State to help ensure that an RFP is developed which is consistent with the State's contracting practices and the technical and outreach goals of the project. We will review the information collected, thus far by the State, compare it with typical language used in recent similar RFPs we have in-house and make recommendations to the State. Where applicable, under this task we will also make consistent with the historical desires of the community. BF A will also work with the State to help accommodate the desires expressed by the community into the RFP. It is assumed that e-mail and conference . calls will be .used to facilitate · the involvement of the CAB members. It is assumed that this task will be completed within 30 days of the State's notice to proceed. 3655 Maguire Boulevard~~ Suite 150 • Orlando, Florida 32803 Office (407) '8~6-8608 • -Fax (407}'896-1822 Mr. Mike Kelly March 6, 2000 Page 2 Task 2: Bid Forms and Front-End Documents BF A will assist the State with developing potential modifications to standard · front-end documents to accommodate the goals and objectives of this project. Under this task, BF A will closely review the design documents and construction specifications in concert with the State's standard practices to determine the format and content of the project's bid form. For example, whether a particular item is bid in a unit price or a lump sum format will be considered and evaluated. It is assumed that BF A will develop the final bid form. It is also assumed that all quantities to be potentially used in the bid form will be taken from work previously performed. This task will occur concurrently with Task 1 and will take no more than 30 days. Task 3:' Services during Bidding It is assumed that the State will be responsible for project advertisement; however, BF A will be available to perform the following: 3.1 Pre-Bid Meeting. BFA will have representatives present at the project pre-bid meeting to assist in describing project technical requirements and respond to questions. 3 .2 Respond to Written Questions. Because of the complexity of the project it is anticipated that potential bidders will have several questions about the design during the bidding process. BF A will respond to all pertinent questions by writing to ensure proper review by all potential bidders 3 .3 Prepare Addendums. BF A will assist the State in preparing bid addendums necessary to clarify the detoxification design and formally address issues identified by potential bidders. 3 .4 Document Production. BF A will reproduce documents as may be necessary to ensure distribution of both plans and specifications to interested potential bidders. Whenever possible, documents will be provided in electronic format to the State. The cost of the bid reproduction will be transferred to the bidder. It is assumed that the bidding process will be completed within 60 days. Task 4: Bid Tabulation Evaluation and Award Upon bid closing, BF A will assist the State in tabulating the bids such that a proper evaluation of costs by category can be made. B.FA • Mr. Mike Kelly March 6, 2000 Page 3 After the State has arrived at a recommended award, BF A will work with the State to communicate the results to the community through the CAB. One CAB meeting is anticipated under this task. It is anticipated that this task will take 10 days to complete. Task 5: Pre-Construction Meeting BF A will attend the project's pre-construction meeting. The goal of the pre-construction meeting is to introduce project team members to the selected contractor and review the construction requirements. It is anticipated that a representative from the CAB, the County, Warren Family Institute and other stakeholders will be present for the kick-off of the construction activities. BF A will prepare minutes for the meeting. Task 6: Geotechnica/ Investigation As discussed during the design process, prior to construction the State must furnish site specific geotechnical data. That data will be needed by the potential bidder to gain a complete understanding of the site's suitability for the construction loads anticipated. Under this task BFA will develop a scope of work for the potential geotechnical contractor and place stakes at proposed test locations. BF A will then obtain 3 bids from local contractors and manage this effort for the State. Because the actual cost will be determined by formal quotes, we recommend that the State accommodate the cost of this task with an allowance. In addition to the two meetings discussed in Tasks 3 and 5, BF A anticipates the need for two additional meetings to coordinate with the State and the community. Construction Phase Services BF A is also interested in assisting through the construction process by providing program management, construction engineering and management services. Additionally, BF A proposes to function as the support mechanism for maximizing the use of local contractors on the project. Specifically, BF A proposes to assist the State by performing the following tasks. Task 1: General Services During Construction Once a construction contract has been awarded, BF A will provide general administrative services during construction for the detoxification project. It is assumed that the following scope of work shall be provided for one (1) construction contract with a 18-inonth duration. 1.1 Provide a technical construction professional to work with the Contractor and ensure maximum outreach to the Warren County community as stipulated in the "Community ..BFA ' Mr. Mike Kelly March 6, 2000 Page 4 Outreach and Involvement Plan". It is our aim that all outreach will be accomplished without sacrificing the project technical goals in any way. 1.2 Attend a maximum of 18 monthly progress meetings with the State and Contractor and provide minutes of the meeting. 1.3 Provide consultation and advice to the State during the construction process. 1.4 Prepare sketches and drawings to resolve actual field condition conflicts encountered. 1.5 Provide clarification and interpretation of the specifications and drawings. 1.6 Review shop drawings, detailed construction drawings, and material samples submitted by the Contractor for general conformance with the design concept of the project. 1. 7 Evaluate and determine the acceptability of substitute materials and equipment proposed by the Contractor. 1.8 Review laboratory, shop and test reports of materials and equipment utilized. 1.9 Provide a full-time State of North Carolina Professional Engineer to ensure that the project is constructed in accordance with the specifications and State requirements. Provide other professional staff as may be necessary to ensure on behalf of the State that the detoxification effort is performing in accordance with the project objectives. 1. 10 BF A will review the Contractor's monthly payment requests and provide a recommendation to the State. 1.11 Review and monitor the progress of the work versus scheduled construction and advise the State as to the progress and problems affecting such progress. 1.12 Review and report to the State claims for cost and time extensions submitted by the Contractor. Assist the State with the negotiations and prepare and submit the final contract change order, as required. 1.13 Conduct two (2) final inspections of the completed project with representatives of the State. The first inspection will be to develop a punch list for the Contractor and the second inspection will be to confirm that items on the punch list have been adequately addressed by the Contractor. If it is determined that the contractor has fulfilled his obligations, BF A will .recommend final acceptance of the project. Following final acceptance BF A will review the final pay request and recommend the amount of final payment. ..BFA. '· . Mr. Mike Kelly March 6, 2000 Page 5 1.14 Prepare record drawings from information provided by BFA's on-site representative, the State inspectors and the Contractor delineating the dimensions, location and elevation of all facilities constructed. BF A will not be responsible for field verification of the provided information. The State will receive one set of mylar reproducibles and three (3) sets of prints of the record drawings. 1.15 Provide project certification to regulatory agencies certifying that the project is complete and in general compliance with permits issued by the regulatory agencies and submit required certification documents to the regulatory agencies. 1.16 Prepare a concise detoxification summary report for the State and regulatory agency's records. The report will contain all pertinent data collected during the detoxification project. Compensation Pre-Construction Services Task 1: Assistance with RFP Development and Community Coordination Task 2: Bid Form Development and Front-End Documents Assistance Task 3: Services During Bidding Task 4: Bid Tabulation, Evaluation and Award Task 5: Pre-Construction Meeting and Stakeholder Coordination Task 6: Geotechnical Allowance for local geotechnical firm) Meetings (Direct Costs) TOTAL $ 5,440.00 3,260.00 12,300.00 4,780.00 2,520.00 1,060.00 6,000.00 2.140.00 $ 37,500.00 I have not included the costs for the Construction Phase services because I have not had the opportunity to discuss it fully with either you or Pat. However, if the State is interested in retaining a firm to provide construction administration, the approach outlined is one we typically use. Thanks for the opportunity to prepare this pre-construction services scope and cost estimate. The scope outlined is directly in line with the work we performed for the State as an independent Advisor to the Warren County community. We hope that this can be processed in that vane. cc: Pat Backus, NCDENR Barnes nd an Patrick A. Barnes, P. President JAMES 8 . HUNT JR. GOVERNOR BILL HOLMAN SECRETARY WILLIAM. L . MEYER l DIRECTOR NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WASTE MANAGEMENT December 16, 1999 MEMORANDUM: TO : FROM: SUBJECT: MICHAEL BRYANT, DENR CONTRACTS & PURCHASING PAT BACKUS ./Jni,,/, DWM r··-- EXTENTION OF CONTRACT WITH ETG ENVIRONMENT AL (DENR Contract No. N9008) The department's contract with ETG Environmental for the Phase III final design for the detoxification of the Warren County PCB Landfill ends on January 31, 2000. A topographic survey of the site, which was essential to many of the design drawings, took much longer to complete than estimated. This task was part of the critical path of the project and delayed • 1 completion of the project by approximately six weeks. ETG has indicated that they will be finished with the entire project and provide all the plans and deliverables for our review by January 27, 2000. 1-.:-• .: -~~ ··.: .... ~· . ~. -:~·::, -~ ~ t':y :· .:':~~;;~}-~1 Our contract with ETG states that the final payment will be made only after the state has approved the completed final design documents. Through this letter, I am requesting that the contract be extended by six weeks to March 13, 2000, to permit the department to thoroughly review these documents and resolve any outstanding issues. Please call me if you have any questions. Thank you for your help in this matter. 1646 MAIL SERVICE CENTER, RALEIGH, NORTH CAROLINA 27699-1646 401 OBERLIN ROAD, SUITE 150, RALEIGH, NC 27605 PHONE 919-733-4996 FAX 919-71 5-3605 AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER • 50% RECYCLED/I 0% POST-CONSUMER PAPER '