Loading...
HomeMy WebLinkAboutNCD980602163_19961011_Warren County PCB Landfill_SERB C_October 1996 Proposal - Replacement pages (and originals)-OCR.. ♦S&ME October 11, 1996 Mr. William L. Meyer, Director North Carolina Department of Environment, Health and Natural Resources Division of Waste Management P.O. Box 27687 Raleigh, North Carolina 27611-7687 Reference: Proposal for Excavation, Handling and Storage of PCB Contaminated Soils from Warren County PCB Landfill Warren County, North Carolina S&ME Proposal No. P1012-96V Dear Mr. Meyer: -- S&ME, Inc. (S&ME) is pleased to submit this proposal to provide excavation, handling and storage of PCB contaminated soils from the Warren County PCB Landfill. Our proposal is in response for your Request for Proposals (RFP), dated February 5, 1996 and the addendum dated September 18, 1996. Additionally, we have incorporated information received during a pre-bid meting on February 16, 1996 and a site visit on February 21, 1996. The following presents a scope of services that will be performed according_ to the attached work plan, costs to complete this scope, qualifications and experience of the project team, and the financial information that was requested. The attached proposal outlines (1) our understanding of the project information, (2) a proposed scope of services for the work, (3) a cost estimate for the excavation handling and storage of the landfill soils, and (4) work schedule for completing the field work and issuance of a written report. S&ME, Inc. 3100 Spring Forest Road, Raleigh, North Carolina 27604, (919) 872-2660, Fox (919) 790-9827 Moiling address: P.O. Dax 58069, Raleigh, North Carolina 27658-8069 .,,,,,, PROJECT DESCRIPTION The Warren County PCB Landfill is located on the east side of SR 1604 approximately 2.0 miles from the intersection of SR 1604 and US 401, south of Warrenton, North Carolina. The Landfill, occupying 2.5 acres, was designed to accept PCB-laden soils excavated from the shoulders of approximately 241 miles in 14 counties of North Carolina highways which had been contaminated by an illegal release in 1978. Concentrations of PCBs in soils within the landfill range from 150 to 900 mg/Kg (parts per million) with an average concentration of 350 mg/Kg. The State of North Carolina is committed to detoxification of the PCB landfill utilizing appropriate and feasible technology. Toward this end, the State has established a Joint Warren County/State PCB Landfill Working Group to evaluate technologies for detoxification of the landfill. The purpose of this proposal is to provide a work plan and cost estimate for excavating, handling and storing PCB-contaminated soils from the landfi_~ for utilization in bench scale detoxification studies. SCOPE OF SERVICES This proposal describes the methodology S&ME proposes to use to obtain 24 to 28 cubic feet of landfilled soil for bench scale testing of the landfill soils. Soil for the pilot tests will be obtained from two locations. At the completion of drilling, a 6-inch PVC recovery well will be constructed in each borehole to allow future extraction of water trapped within the landfill. The scope of work includes an engineering evaluation of the upper liner system. S&ME intends to perform the work in an efficient, cost effective manner that is protective of personnel present at the site and that does not compromise the integrity of the landfill liner system. 2 .I N. C. Division of Waste Management Warren County PCB Landfill S&ME Proposal P1012-96V October 11 , 1996 The following paragraphs discuss the organization of our submittal. Our proposal is complete, covering such tasks as project site security, sample QA/QC to substantiate the work and if you wish (optional) involvement with the local community. Section 1 includes a discussion of the project background. Section 2 presents the Work Plan that will be used to direct the work at the site. Section 3, presents the Sampling and Analysis Plan that describes the methodology that will be used. Sections 4 and 5 are the Quality Assurance Plan and Data Management Plans. These procedures provide assurances that the work will be able to stand up to any regulatory or citizen group scrutiny. Sections 6 and 7 outline the schedule and detail estimated project costs. Section 8 is a Statement of Qualifications for S&ME. We believe that you will find S&ME is uniquely qualified to complete this project. At the completion of the project activities, a report will be prepared documenting the field activities performed, sampling protocols, laboratory results and our interpretation of cap conditions at the two locations. COST ESTIMATE S&ME proposes to provide the revised scope-of-services presented above on a time and materials cost basis in accordance with the attached Schedule of Fees. Based on the scope of work outlined above, we estimate the time-and-material cost of the work will be approximately $ 99,502. Should you want to include the optional scope of work that includes the community relation services, the optional services are estimated to cost approximately $25,000. 3 N. C. Division of Waste Management Warren County PCB Landfill SCHEDULING S&ME Proposal P1012-96V October 11, 1996 Upon authorization, S&ME will immediately begin preparations to implement the field activities, from authorization to issuance of the final report will require approximately 1 O weeks . We anticipate that the initial startup activities would require approximately two weeks. Mobilization of personnel to construct the decontamination pad, temporary staging areas, and opening of the excavations would be scheduled first. It is anticipated that during the first week at the site, both excavations will be opened to evaluate portions of the PVC liner and the field permeability testing would be completed. The drill rig and crew would be mobilized to the site during the second week. We anticipate advancement of the boreholes, split spoon sampling a_nd well construction will require another one to two weeks. QA/QC sampling, characterization of wastes, and preparations for demobilization will require part of the following week. Issuance of a report will require approximately four weeks from the completion of the field activities. QUALi FiCA TIONS S&ME is uniquely qualified to provide the requested scope of services. Our qualifications are below: ■ Extensive Landfill Experience in North Carolina: S&ME has completed various services for landfills in more than 60 counties in North Carolina. We believe this experience is unmatched. 4 N. C. Division of Waste Management Warren County PCB Landfill S&ME Proposal P1012-96V October 11, 1996 ■ · Experience with PCB Contaminated Soils: Two members of our project team have extensive experience in working with PCB contaminated sites and with TSCA regulations. S&ME has also provided extensive studies on a PCB Landfill in Bloomington, Indiana. ■ Technical Qualifications: Members of our project team hav1~ extensive and specialized knowledge relating to technical issues at this site including; Geology and Groundwater, with specific experience in assessing landfills (Ann M. Borden, P.E.), drilling technologies (Walter J. Beckwith, P.G.), PCB / TSCA Issues (Walter J. Beckwith, P.G. and Gary M. Birk, P.E.), and landfill design (Dan Brewer, P.E.). ■ Drilling and Field Capabilities: S&ME owns and operates 21 dril l rigs mounted on a variety of carriers including trucks, all-terrain vehicles and skids, and has the capability to advance boreholes through virtually any soil or rock conditions. Approximately one-third of these rigs are located in Raleigh. ■ Local Presence: S&ME is one of the largest firms in North Carolina with approximately 450 employees. Our corporate office is located in Raleigh, and will be the project management locations for this scope of services in Warren County. ■ Knowledge of Soil and Subsurface Conditions in Warren County: S&ME has completed approximately 50 subsurface and/or soil testing projects in Warren County. Thus, we understand the issues that could arise at the Warren County PCB Landfill. Additionally, S&ME has completed over 15,000 subsurface and soil testing projects in North Carolina, with many of these sites located in the Piedmont Physiographic Province of the State. 5 .> N. C. Division of Waste Management Warren County PCB Landfill S&ME Proposal P1012-96V October 11, 1996 ■ Experience with Contaminated Soils in North Carolina: S&ME has provided environmental site assessment and remedial recommendations across North Carolina for over 15 years. These studies have ranged from landfills, to industrial sites, to military installation, to commercial sites, etc. ■ Laboratory Testing Capabilities: S&ME has one of the most extensive physical testing laboratory capabilities in the United States. We can provide virtually any physical test associates with liner materials, both clay and geosynthetics, and other materials such as drainage materials, landfill refuse, etc. S&ME can evaluate the liner material used at the Warren County PCB Landfill for chemical resistance, weight and shape changes under service conditions, expo~ure, etc. CLOSURE We trust your review of our proposal will be favorable. Should you require any further clarification on the scope of work proposed or if you have any additional questions, please call us at (919) 872-2660. Sincerely, S&ME, INC. ~~ Ann M. Borden, P.G. Vice President toff<L~ Vice President 6 Proposal for Excavation, Handling, and Storage of PCB Contaminated Soils From the Warren County PCB Landfill TABLE OF CONTENTS S&ME Proposal No. P1012-96V October 11, 1996 1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2.0 WORK PLAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 2.1 OBJECTIVES OF THE FIELD INVESTIGATION .................. 4 2.2 SCOPE OF WORK ......................................... 4 2.2.1 Task 1 -Evaluation of The Upper Liner System .............. 5 2.2.2 Task 2 -Borehole Advancement and Well Construction ....... 8 3.0 SAMPLING AND ANALYSIS PLAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 3.1 Surface Wipe Sampling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 3.1.1 Waste Characterization Sampling ........ _:. . . . . . . . . . . . . . . 14 3.1.2 QA/QC Sampling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 3.2 SAMPLE MANAGEMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 3.3 DOCUMENTATION ........................................ 17 3.4 DECONTAMINATION PROCEDURES ......................... 17 3.6 INVESTIGATIVE DERIVED WASTE MANAGEMENT ............. 19 3.7 PROJECT SITE SECURITY ................................. 20 3.8 REPORTING ............................................. 21 3.9 COMMUNITY RELATIONS .................................. 21 4.0 QUALITY ASSURANCE PLAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25 4.1 PROJECT ORGANIZATION ................................. 25 4.2 DATA QUALITY OBJECTIVES ............................... 27 4.3 VARIANCES AND FIELD CHANGES .......................... 28 4.4 ANALYTICAL PROCEDURES ............................... 29 4.5 FIELD DATA VALIDATION AND REPORTING .................. 29 4.6 LABORATORY DATA AND REPORTING ...................... 30 4.7 IDENTIFICATION OF FIELD QUALITY CONTROL SAMPLES ...... 31 4.8 PERFORMANCE AND SYSTEM AUDITS ...................... 31 4.9 PREVENTATIVE MAINTENANCE ............................ 32 4.10 LABORATORY PRECISION, ACCURACY AND COMPLETENESS .. 33 4.11 CORRECTIVE ACTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 5.0 DATA MANAGEMENT PLAN ....................................... 37 I , Proposal for Excavation, Handling, and Storage of PCB Contaminated Soils From the Warren County PCB Landfill S&ME Proposal No. P1012-96V October 11, 1996 6.0 SCHEDULE ..................................................... 39 7 .0 COST ESTIMATE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 8.0 STATEMENT OF QUALIFICATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42 8.1 GENERAL QUALIFICATIONS EVALUATION ...................... 42 8.1.1 Office Location and Organization . . . . . . . . . . . . . . . . . . . . . . . . 42 8.1.2 Firm Location and Knowledge of North Carolina . . . . . . . . . . . . 42 8.1.3 Organization of the Project Team (PMO) .................. 43 8.1.4 Team Qualifications and Competence .................... 43 8.2. GENERAL WORK EXPERIENCE ............................. 47 8.2.1 Special Work Experience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48 8.2.2 Personnel Resources ................................. 49 8.3 FINANCIAL EVALUATION CRITERIA ......................... 52 Proposal for Excavation, Handling, and Storage of PCB Contaminated Soils From the Warren County PCB Landfill S&ME Proposal No. P1012-96V October 11, 1996 TABLE OF CONTENTS (CONTINUED) Figure 1 Figure 2 Proposed Soil Containment during Drilling Proposed Borehole/V\Jell Construction Appendix A Selected S&ME Staff Resumes Appendix B Selected S&ME Project Descriptions Labor Equipment Material Subcontract Expense Miscellaneous TOTALS: Labor Equipment Material Subcontract Expense Miscellaneous TOTALS: PROJECT TOTAL: WARREN COUNTY PCB LANDFILL Request for Proposal TABLE 1 -TASK TOTAL SUMMARY TASK 1.0 TOP LINER EVALUATION HASP/ Engineering Mobilization Evaluation Field Activities Subtask No. 1.1 Subtask No. 1.2 Subtask No. 1.3 $5,942 $4,210 $7,256 $3,180 $2,074 $10,575 $175 $5,942 $4,210 $23,260 TASK 2.0 BOREHOLE / WELL INSTALLATION Project Management Field Activities QA/QC Subtask No. 2.1 Subtask No. 2.2 Subtask No. 2.3 $4,556 $19,280 $2,286 $6,300 $8,782 $440 $6,350 $7 ,770 $450 $4,556 $41,162 $10,496 $10,498 $45,372 $33,756 Project Management TASK Subtask 1.4 TOTAL $725 $18,133 $3,180 $2,074 $10,575 $175 $725 $34,137 Reporting TASK Subtask 2.4 TOTAL $9,152 $35,274 $6,300 $9,222 $14,120 $450 $9,152 $65,366 $9,877 $99,502 *Note: This cost does not include Community Relations (Optional Scope of Work) which is estimated to be approximately $25,000. * Proposal for Excavation, Handling, and Storage of PCB Contaminated Soils From the Warren County PCB Landfill S&ME Proposal No. P1012-96V October 11 , 1996 8.0 STATEMENT OF QUALIFICATIONS 8.1 GENERAL QUALIFICATIONS EVALUATION 8.1.1 Office Location and Organization This discussion of our branch office location and our management and support structure is divided into three subsections. The first section focuses on our location and knowledge of locality. The second describes the organization, functions and composition of the our Program Management Office (PMO). The third focuses on the p~ofessional qualifications and competence of the proposed technical team. 8.1.2 Firm Location and Knowledge of North Carolina S&ME will manage and coordinate the work for this contract from our office located in Raleigh, North Carolina, where we employ approximately 100 people. Eight of our Raleigh employees live in Warren County. Our Raleigh office is located approximately 40 miles from the site. We are a North Carolina-based firm with 22 years experience in the state. As one of the largest North · Carolina-based engineering companies, employing approximately 450 people (approximately 200 in North Carolina), we have completed more than 10,000 subsurface investigations (with a significant percentage of these in the Piedmont region in which the project site is located). We have participated in the writing of North Carolina groundwater and solid waste legislation and regulations, and we employ 50 engineers and/or geologists registered in North Carolina. Thus, we are extensively familiar with North Carolina codes, laws, regulations, geologic conditions. 42 Proposal for Excavation, Handling, and Storage of PCB Contaminated Soils From the Warren County PCB Landfill S&ME Proposal No. P1012-96V October 11 , 1996 and many included assessing contamination from sources both on-site and off-site. One of these projects included extensive studies at a potential site where off-site contamination from an Installation Restoration (IR) facility threatened the feasibility of developing the landfill. S&ME has worked on more landfill sites in North Carolina than any other firm. In addition to Solid Waste landfills, S&ME has experience with hazardous waste (Subtitle C) landfills. We sited and designed (through the conceptual stage) a proposed hazardous waste landfill to be built in Anson County, North Carolina. We were retained by Rowan County to represent them in opposing a hazardous waste landfill proposed within their county. S&ME has completed approximately 20,000 total projects in North Carolina, which range from environmental, geotechnical, construction testing, industrial hygiene and asbestos services. The approximate numbers of the various types of projects in North Carolina is presented in Appendix D. 8.2.1 Special Work Experience As demonstrated by the selected project descriptions (see Appendix Band E), the S&ME team has extensive experience with poly-bichlorinated biphenols. These projects indicate not only our specialized experience, but also our geographical coverage, knowledge of state and federal environmental regulations, and our experience with the NCDEHNR (including the Hazardous Waste Section, the Solid Waste Section, the Superfund Section and the Groundwater Section) and the EPA (both RCRA and CERCLA) programs. Our 48 I ]l October 11, 1996 Mr. William L. Meyer, Director North Carolina Department of Environment, Health and Natural Resources Division of Waste Management P.O. Box 27687 Raleigh, North Carolina 27611-7687 Reference: Proposal for Excavation, Handling and Storage of PCB Contaminated Soils from Warren County PCB Landfill Warren County, North Carolina S&ME Proposal No. P1012-96V Dear Mr. Meyer: S&ME, Inc. (S&ME) is pleased to submit this proposal to provide excavation, handling and storage of PCB contaminated soils from the Warren County PCB Landfill. Our proposal is in response for your Request for Proposals (RFP), dated February 5, 1996 and the addendum dated September 18, 1996. Additionally, we have incorporated information received during a pre-bid meting on February 16, 1996 and a site visit on February 21, 1996. The following presents a scope of services that will be performed according to the attached work plan, costs to complete this scope, qualifications and experience of the project team, and the financial information that was requested. The attached proposal outlines (1 l our understanding of the project information, (2) a proposed scope of services for the work, (3) a cost estimate for the excavation handling and storage of the landfill soils, and (4) work schedule for completing the field work and issuance of a written report. S&ME, Inc. 3100 Spring Forest Rood, Raleigh, North Carolina 27604, (919) 872-2660, Fax (919) 790-9827 Moiling address: P.O. Box 58069, Raleigh, North Carolina 27658-8069 ---------~--·- •• •·1 • N. C. Division of Waste Management Warren County PCB Landfill PROJECT DESCRIPTION S&ME Proposal P1012-96V October 11, 1996 The Warren County PCB Landfill is located on the east side of SR 1604 approximately 2.0 miles from the intersection of SR 1604 and US 401, south of Warrenton, North Carolina. The Landfill, occupying 2.5 acres, was designed to accept PCB-laden soils excavated from the shoulders of approximately 241 miles in 14 counties of North Carolina highways which had been contaminated by an illegal release in 1978. Concentrations of PCBs in soils within the landfill range from 150 to 900 mg/Kg (parts per million) with an average concentration of 350 mg/Kg. The State of North Carolina is committed to detoxification of the PCB landfill utilizing appropriate and feasible technology. Toward this end, the State has established a Joint Warren County/State PCB Landfill Working Group to evaluate technologies for detoxification of the landfill. The purpose of this proposal is to provide a work plan and cost estimate for excavating, handling and storing PCB-contaminated soils from the landfill for utilization in bench scale detoxification studies. SCOPE OF SERVICES This proposal describes the methodology S&ME proposes to use to obtain 24 to 28 cubic feet of landfilled soil for bench scale testing of the landfill soils. Soil for the pilot tests will be obtained from two locations. At the completion of drilling, a 6-inch PVC recovery well will be constructed in each borehole to allow future extraction of water trapped within the landfill. The scope of work includes an engineering evaluation of the upper liner system. S&ME intends to perform the work in an efficient, cost effective manner that is protective 2 f N. C. Division of Waste Management Warren County PCB Landfill S&ME Proposal P1012-96V October 11, 1996 of personnel present at the site and that does not compromise the integrity of the landfill liner system. The following paragraphs discuss the organization of our submittal. Our proposal is complete, covering such tasks as project site security, sample QA/QC to substantiate the work and if you wish (optional) involvement with the local community. Section 1 includes a discussion of the project background. Section 2 presents the Work Plan that will be used to direct the work at the site. Section 3, presents the Sampling and Analysis Plan that describes the methodology that will be used. Sections 4 and 5 are the Quality Assurance Plan and Data Management Plans. These procedures provide assurances that the work will be able to stand up to any regul~tory or citizen group scrutiny. Sections 6 and 7 outline the schedule and detail estimated project costs. Section 8 is a Statement of Qualifications for S&ME. We believe that you will find S&ME is uniquely qualified to complete this project. At the completion of the project activities, a report will be prepared documenting the field activities performed, sampling protocols, laboratory results and our interpretation of cap conditions at the two locations. COST ESTIMATE S&ME proposes to provide the revised scope-of-services presented above on a time and materials cost basis in accordance with the attached Schedule of Fees. Based on the scope of work outlined above, we estimate the time-and-material cost of the work will be approximately $ 99,502. Should you want to include the optional scope of work that 3 .1., -; N. C. Division of Waste Management Warren County PCB Landfill S&ME Proposal P1012-96V October 11, 1996 includes the community relation services, the optional services are estimated to cost approximately $25,000. SCHEDULING Upon authorization, S&ME will immediately begin preparations to implement the field activities, from authorization to issuance of the final report will require approximately 10 weeks . We anticipate that the initial startup activities would require approximately two weeks. Mobilization of personnel to construct the decontamination pad, temporary staging areas, and opening of the excavations would be scheduled first. It is anticipated that during the first week at the site, both excavations will be opened to evaluate portions of the PVC liner and the field permeability testing would be completed. The drill rig and crew would be mobilized to the site during the second week. We anticipate advancement of the boreholes, split spoon sampling and well construction will require another one to two weeks. QA/QC sampling, characterization of wastes, and preparations for demobilization will require part of the following week. Issuance of a report will require approximately four weeks from the completion of the field activities. 4 ] N. C. Division of Waste Management Warren County PCB Landfill CLOSURE S&ME Proposal P1012-96V October 11, 1996 We trust your review of our proposal will be favorable. Should you require any further clarification on the scope of work proposed or if you have any additional questions, please call us at (919) 872-2660. Sincerely, S&ME, INC. ~~~- Vice President ~~ ?61:.. Do er, P.E. Vice President 5 Proposal for Excavation, Handling, S&ME Proposal No. P1012-96V and Storage of PCB Contaminated Soils October 11, 1996 Fm the Warren County PCB Landfill TABLE OF CONTENTS SECTION NUMBER AND TITLE PAGE NUMBER 1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 2.0 WORK PLAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 3.0 SAMPLING AND ANALYSIS PLAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 4.0 QUALITY ASSURANCE PLAN ....................... · ............... 25 5.0 DATA MANAGEMENT PLAN ....................................... 37 6.0 SCHEDULE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39 7.0 COST ESTIMATE ................................................. 41 8.0 STATEMENT OF QUALi FiCA TIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42 I I ' WARREN COUNTY PCB LANDFILL Request for Proposal !======================== I I I I I I I I I Labor Equipment Material Subcontract Expense Miscellaneous TOTALS: Labor Equipment Material Subcontract Expense Miscellaneous TOTALS: PROJECT TOTAL: TABLE 1 -TASK TOTAL SUMMARY TASK 1.0 TOP LINER EVALUATION HASP/ Engineering Mobilization Evaluation Field Activities Subtask No. 1.1 Subtask No. 1.2 Subtask No. 1.3 $5,942 $4,210 $7,256 $3,180 $2,074 $10,575 $175 $5,942 $4,210 $23,260 TASK 2.0 BOREHOLE / WELL INSTALLATION Project Management Field Activities QA/QC Subtask No. 2.1 Subtask No. 2.2 Subtask No. 2.3 $4,556 $19,280 $2,286 $6,300 $8,782 $440 $6,350 $7,770 $450 $4,556 $41,162 $10,496 $10,498 $45,372 $33,756 Project Management TASK Subtask 1.4 TOTAL $725 $18,133 $3,180 $2,074 $10,575 $175 $725 $34,137 Reporting TASK Subtask 2.4 TOTAL : $9,152 $35,274 $6,300 $9,222 $14,120 $450 $9,152 $65,366 $9,877 $99,502 I' 'I ' I ' ' . I Proposal for Excavation, Handling, S&ME Proposal No. P1012-96V and Storage of PCB Contaminated Soils October 11, 1996 Fm the Warren County PCB Landfill 8.0 STATEMENT OF QUALi FiCA TIONS 8.1 GENERAL QUALi FiCA TIONS EVALUATION ] 8.1.1 Office Location and Organization 1 This discussion of our branch office location and our management and support structure is divided into three subsections. The first section focuses on our location and knowledge of locality. The second describes the organization, functions and composition of the our Program Management Office (PMO). The third focuses on the professional qualifications and competence of the proposed technical team. 8.1.2 Firm Location and Knowledge of North Carolina S&ME will manage and coordinate the work for this contract from our office located in Raleigh, North Carolina, where we employ approximately 100 people. Eight of our Raleigh employees live in Warren County. Our Raleigh office is located approximately 40 miles from the site. We are a North Carolina-based firm with 22 years experience in the state. As one of the largest North Carolina-based engineering companies, employing approximately 44 people (approximately 200 in North Carolina), we have completed more than 10,000 subsurface investigations (with a significant percentage of these in the Piedmont region in which the project site is located). We have participated in the writing of North Carolina groundwater and solid waste legislation and regulations, and we employ 50 engineers and/or geologists registered in North Carolina. Thus, we are extensively familiar with North Carolina codes, laws, regulations, geologic conditions. 42 g Proposal for Excavation, Handling, S&ME Proposal No. P1012-96V and Storage of PCB Contaminated Soils October 11, 1996 Fm the Warren County PCB Landfill and many included assessing contamination from sources both on-site and off-site. One of these projects included extensive studies at a potential site where off-site contamination from an Installation Restoration (IR) facility threatened the feasibility of developing the landfill. S&ME has worked on more landfill sites in North Carolina than any other firm. In addition to Solid Waste Jandfills, S&ME has experience with hazardous waste (Subtitle C) landfills. We sited and designed (through the conceptual stage) a proposed hazardous waste landfill to be built in Anson County, North Carolina. We were retained by Rowan County to represent them in opposing a hazardous waste landfill proposed within their county. Additionally, S&ME provided siting studies for the Warren: County PCB landfill. S&ME has completed approximately 20,000 total projects in North Carolina, which range from environmental, geotechnical, construction testing, industrial hygiene and asbestos services. The approximate numbers of the various types of projects in North Carolina is presented in Appendix D. 8.2.1 Special Work Experience As demonstrated by the selected project descriptions (see Appendix 8 and E), the S&ME team has extensive experience with poly-bichlorinated biphenols. These projects indicate not only our specialized experience, but also our geographical coverage, knowledge of state and federal environmental regulations, and our experience with the NCDEHNR (including the Hazardous Waste Section, the Solid Waste Section, the Superfund Section and the Groundwater Section) and the EPA (both RCRA and CERCLA) programs. Our 48