Loading...
HomeMy WebLinkAbout1403_Caldwell_Foothills_MSWLF_Cell6B_WellInstall_FID1821304_20231115GROUNDWATER MONITORING WELL INSTALLATION REPORT: MW-12 FOOTHILLS REGIONAL MSW LANDFILL CALDWELL COUNTY, NORTH CAROLINA SOLID WASTE PERMIT NO. 1403-MSWLF-1998 R q�h REPUBLIC 40*4 SERVICES Prepared For: Republic Services of North Carolina, LLC 1070 Riverside Drive Asheville, North Carolina 28804 BLE Project Number J23-1235-110 November 15, 2023 BLE North Carolina Corporate Licenses C-284 and C-1538 it IM BEJNNELL LAMMONS ENGINEERING 60Q4 Ponders Coarr I Greenville, 5C 29615 f,864,288.1265 �1 064.288.4330 Minfo@bl2corp.com BtECORP.COM BUNNELL LAMMONS ENGINEERING November 15, 2023 Republic Services of North Carolina, LLC 1070 Riverside Drive Asheville, North Carolina 28804 Attention: Mr. Mike Loyd Environmental Manager Subject: Groundwater Monitoring Well Installation Report: MW-12 Foothills Regional MSW Landfill Caldwell County, North Carolina Solid Waste Permit Number 1403-MSWLF-1998 BLE Project Number J23-1235-110 Dear Mr. Loyd: As authorized, Bunnell-Lammons Engineering, Inc. has performed the installation of one (1) groundwater monitoring well at the Foothills Regional MSW Landfill in Caldwell County, North Carolina in association with the construction of Cell No. 613. The enclosed report describes the work performed and provides the boring log, well construction diagram, survey, and well development results. We appreciate the opportunity to serve as your geological consultant on this project and look forward to working with you on future projects. If you have any questions, please contact us at (864) 288-1265. Sincerely, BUNNELL LAMMONs ENGINEERING INC. A�che J. Downes, P.G. Project Geologist Licensed, North Carolina No. 2618 cc: Mr. Riley L. Blais, G.I.T. — BLE At./ Andrew W. Alex der, P.G. Consultant Hydrogeologist Licensed, North Carolina No. 1475 '6004 Panders Court, Greenville, SC 29615 1,864,288.1265 A864,288.4430 info@hleccrp,com BLECORP.COM 1s 1m 1i Groundwater Monitoring Well Installation Report: MW-12 Foothills MSW Landfill — Caldwell Co., North Carolina TABLE OF CONTENTS November 15, 2023 BLE Project No. J23-1235-110 1.0 PROJECT INFORMATION........................................................................................................1 1.1 Site Information............................................................................................................................... 1 1.2 Geologic Setting.............................................................................................................................. 1 2.0 FIELD EXPLORATION AND ACTIVITIES............................................................................ 2 2.1 General.............................................................................................................................................2 2.2 Drilling Procedures and Subsurface Conditions Encountered......................................................... 2 2.3 Groundwater Monitoring Well Installation and Construction......................................................... 2 2.3.1 Groundwater Monitoring Well Development......................................................................... 3 3.0 SUMMARY.................................................................................................................................... 3 4.0 QUALIFICATIONS OF REPORT.............................................................................................. 3 TABLES Table 1 Monitoring Well Construction & Groundwater Elevation Data FIGURES Figure 1 Site Location Map Figure 2 Groundwater Monitoring Network APPENDICES Appendix A Survey Data Appendix B North Carolina Well Installation Form GW-1 Appendix C Drilling Procedures Appendix D Boring Logs and Installation Diagrams Appendix E Monitoring Well Development Forms iofi 1s 1m 1i Groundwater Monitoring Well Installation Report: MW-12 November 15, 2023 Foothills MSW Landfill — Caldwell Co., North Carolina BLE Project No. J23-1235-110 1.0 PROJECT INFORMATION 1.1 Site Information The Foothills Regional Municipal Solid Waste Landfill (MSWLF) is owned by Caldwell County and operated by Republic Services ofNorth Carolina, LLC (Republic). The site is located at 2800 Cheraw Road in Caldwell County, 2 miles northwest of Lenoir, North Carolina (Figure 1). The permitted facility boundary consists of about 277 acres. The landfill was permitted for operation in August 1998. Republic is currently expanding the existing MSWLF footprint by constructing the permitted waste unit Cell No. 6B (Figure 2). One additional groundwater monitoring well (MW-12) was permitted to be installed as part of the development plan. This report documents the well installation activities. 1.2 Geologic Setting The subject site is located within the Inner Piedmont Belt of the Piedmont Physiographic Province. The crystalline rocks of the Inner Piedmont Belt occur in generally northeast -southwest trending geologic belts in the Carolinas and consist of a stack of highly metamorphosed thrust sheets bound on the northwest by the Brevard Shear Zone and to the southeast by the Kings Mountain Shear Zone. The Inner Piedmont includes high-grade metamorphosed sedimentary and igneous rocks that have been exposed to multiple deformations (Horton and Zullo, 1991). Rock types that resulted from the multiple metamorphisms include gneiss, schist and amphibolite with northeast/southwest trending foliation with varying degrees of dip. The typical residual soil profile consists of clayey soils near the surface, where soil weathering is more advanced, underlain by micaceous sandy silts and silty sands. Residual soil zones develop by the in situ chemical weathering of bedrock and are commonly referred to as "saprolite." The boundary between soil and rock is not sharply defined. A transitional zone of partially weathered rock (PWR) is normally found overlying the parent bedrock. Partially weathered rock is defined, for engineering purposes, as residual material with standard penetration resistance in excess of 100 blows per foot (bpi). Fractures, joints, and the presence of less resistant rock types facilitate weathering. Consequently, the profile of the partially weathered rock and hard rock is quite irregular and erratic, even over short horizontal distances. Also, it is not unusual to find lenses and boulders of hard rock and zones of partially weathered rock within the soil zone, well above the general bedrock level. 1 of 3 1s 1m 1i Groundwater Monitoring Well Installation Report: MW-12 November 15, 2023 Foothills MSW Landfill — Caldwell Co., North Carolina BLE Project No. J23-1235-110 2.0 FIELD EXPLORATION AND ACTIVITIES 2.1 General Field activities were performed between November 2 and November 3, 2023. A North Carolina licensed driller from Geologic Exploration, Inc. of Statesville, North Carolina performed the well installation activities which were documented by a geologist from BLE. Survey for horizontal and vertical control of the completed well was performed by WithersRavenel of Cary, North Carolina on November 8, 2023. The survey data for the new well is included in Appendix A and is summarized on Table 1. A well installation form (NC Form GW-1) was prepared for the groundwater monitoring well and is included in Appendix B. 2.2 Drilling Procedures and Subsurface Conditions Encountered The boring was conducted using an ATV -mounted drilling rig employing hollow stem auger and air - hammer drilling techniques. Drilling procedures are described in Appendix C. The soil and rock descriptions are indicated on the boring log (Appendix D) and were based on visual examination by a North Carolina registered geologist. An information sheet, which describes the Unified Soil Classification System (USCS) terms and symbols used on the test boring log, is also included in Appendix D. The subsurface conditions encountered at the MW-12 location consisted of rocky fill and residual soil underlain by gneiss bedrock. This location encountered groundwater below the top of bedrock, therefore, the screened interval of the monitoring well was set to encounter the uppermost water -bearing fractures. 2.3 Groundwater Monitoring Well Installation and Construction A new groundwater monitoring well, MW-12, was installed at the facility in general accordance with the North Carolina Well Construction Standards Rule 15A NCAC 2C, .0108 (Standards for Construction: Wells other than Water Supply) and the facility's approved Environmental Monitoring Plan (EMP). The groundwater monitoring well location is shown on Figure 2 and a well construction diagram is included in Appendix D. It should be noted that NM-12 was installed approximately 200 feet north of its permitted location due to an oversight by the grading contractor. We contacted Ms. Jaclynne Drummond of the North Carolina Solid Waste Section (SWS), Division of Waste Management (DWM) on November 2, 2023 while drilling was in progress to obtain a regulatory opinion on the relocation. Ms. Drummond provided verbal approval with the understanding that the as -built location is within typical well spacing at the facility and is hydraulically downgradient of the waste unit to be monitored. Groundwater monitoring well MW-12 was constructed with 2-inch diameter polyvinyl chloride (PVC; Johnson Schedule 40, NSF -rated) casing with flush -threaded joints inserted in a 6-inch nominal diameter borehole. The bottom 15-foot section of the well is a manufactured well screen with 0.010-inch-wide machined slots with a 0.25-foot-long sediment trap threaded onto the bottom of the screen section. Silica filter sand (DSI, #0) was placed around the outside of the pipe in the borehole annulus to a level above the top of the well screen. A 2-foot minimum thick hydrated bentonite seal (Baroid brand 3/8-inch diameter chips) was installed on top of the filter sand to seal the monitoring well at the desired level. The remaining well annulus was grouted with a 5% bentonite-cement mixture from the top of the bentonite seal to within one -foot of the ground surface. 2 of 3 1s 1m 1i Groundwater Monitoring Well Installation Report: MW-12 November 15, 2023 Foothills MSW Landfill — Caldwell Co., North Carolina BLE Project No. J23-1235-110 The surface completion of each well consisted of a PVC cap and a lockable 4-inch x 4-inch x 5-foot standup protective steel cover, with a 3-foot by 3-foot concrete pad at the base of the steel cover. A well identification placard was affixed to the protective steel cover. The well was constructed with a vent hole in the PVC casing near the top of the well and a weep hole near the base of the outer protective steel cover. 2.3.1 Groundwater Monitoring Well Development Monitoring well MW-12 was purged and developed to reduce the groundwater turbidity to the lowest practical level utilizing conventional development techniques (surging and pumping) for approximately three (3) hours. The well had a moderate yield and approximately 70.0 gallons of groundwater was purged from the well. Turbidity was measured during the well development using a Hach 2100Q Portable Turbidimeter. The well had very high initial turbidity but was developed until further development did not substantially reduce turbidity levels. The final turbidity value achieved was 2.79 NTUs. MI,1110V 1u Ell :i11 One (1) new groundwater monitoring well was installed (MW-12) in general accordance with the facility's approved EMP and the applicable North Carolina well construction standards. BLE personnel developed the new monitoring well upon installation. 4.0 QUALIFICATIONS OF REPORT The activities and evaluative approaches used in this scope of work are consistent with those normally employed for services of this type. Our services have been performed based on our understanding of the site and the observations made during our work. This report has been prepared on behalf of and exclusively for the use of Republic. This report and the findings contained herein shall not, in whole or in part, be used or relied upon by any other parry (excluding the North Carolina Division of Waste Management - Solid Waste Section) without BLE's prior written consent. 3 of 3 Tables TABLE I MONITORING WELL CONSTRUCTION INFORMATION Foothills Regional MSW Landfill Caldwell Co., North Carolina BLE Project Number J23-1235-110 Monitoring Well Northing (ft) Easting (ft) Latitude (dd) Longitude (dd) TOC Elevation Ground Elevation Well Depth (ft bgs) Screen Depth Screen Elevation Geology Monitored Date Installed MW-1R2 801,247.51 1,232,215.64 35.923957 -81.593474 1,516.22 1,512.84 40.2 25.08 - 40.08 1,487.76 - 1,472.76 Bedrock 9/5/2018 MW-2R 798,219.93 1,231,629.74 35.915601 -81.595185 1,253.36 1,250.18 60.5 45.50 - 60.50 1,204.68 - 1,189.68 Bedrock 8/l/2002 MW-3 798,097.54 1,231,308.42 35.915242 -81.596259 1,242.95 1,239.53 76.4 66.20 - 76.20 1,173.33 - 1,163.33 Bedrock 3/25/1999 MW-3R 798,085.97 1,231,333.90 35.915212 -81.596172 1,242.69 1,239.80 74.9 59.90 - 74.90 1,179.90 - 1,164.90 Bedrock 8/l/2002 MW-3R2 798,085.28 1,231,105.81 35.195194 -81.596942 1,242.04 1,238.66 69.0 59.00 - 69.00 1,179.66 - 1,169.66 Bedrock 8/17/2006 MW-4 798,361.75 1,230,578.80 35.915915 -81.598746 1,171.18 1,168.95 50.0 40.00 - 50.00 1,128.95 - 1,118.95 Residuum/Bedrock 3/25/1999 MW-5 798,613.07 1,230,537.21 35.916602 -81.598909 1,175.07 1,172.26 52.0 41.67 - 51.67 1,130.59 - 1,120.59 Residuum/PWR 7/23/2001 MW-6 798,998.77 1,230,460.41 35.917656 -81.599202 1,176.82 1,173.75 50.6 35.35 - 50.35 1,138.40 - 1,123.40 Residuum 10/12/2005 MW-7 799,591.48 1,230,261.50 35.919269 -81.599926 1,183.13 1,180.36 37.6 22.37 - 32.37 1,157.99 - 1,147.99 Bedrock 4/19/2010 MW-8 800,317.45 1,230,064.42 35.921249 -81.600655 1,195.18 1,192.35 43.9 28.70 - 43.70 1,163.65 - 1,148.65 Residuum 4/9/2013 MW-9 798,515.11 1,231,973.00 35.916436 -81.594053 1,290.79 1,288.10 74.9 59.61 - 74.61 1,228.49 - 1,213.49 PWRBedrock 7/6/2016 MW-10 799,077.81 1,232,405.55 35.918013 -81.592642 1,358.53 1,355.08 84.8 69.59 - 84.56 1,285.49 - 1,270.52 Bedrock 10/19/2015 MW-11 799,549.20 1,232,383.56 35.919305 -81.592757 1,401.71 1,398.66 105.4 90.15 - 105.15 1,308.51 - 1,293.51 Bedrock 9/7/2018 MW-12 800,113.23 11232,337.71 35.920851 -81.592962 1,459.23 1,456.40 128.82 113.57 - 128.57 1,342.83 - 1,327.83 Bedrock 11/3/2023 Notes: 1. Surveying for MW-12 was performed by WithersRavenel of Cary, NC on November 8, 2023. 2. Elevations are in FEET (NAVD88) 3. TOC = top of casing 4. bgs = below ground surface 5. PWR = partially weathered rock 6. Surveying for MW-2R through MW-5 was performed by Donaldson, Garrett, & Assoc., Inc. of Charlotte, NC. 7. Surveying for MW-1R2, MW-6, MW-7, MW-8, MW-9, MW-10, and MW-I I performed by Wright & Fields of Troy, NC. 1235-110 Foothills MW Install Tables.xlsx Prepared By: TCG Table 1 Checked By: ZJD Figures Oli�ette v GREASY CREEK RD V t600 Grassy Knob Q � s P A O P�eaked>Top o v � a a o � Q 1ti�J mj U Ir� DD - o �4 G,Bw to a BROOKS ingdon 0 � M� N(SETZ�R 72a 9200 !y Q ia 2000 1000 0 2000 4000 REFERENCE: USGS TOPOGRAPHIC MAP, 7.5 MINUTE SERIES, APPROXIMATE SCALE IN FEET LENOIR, N.C. QUADRANGLE, 2019. DRAWN: DATE: FIGURE LAIMM M O N ZJD 07-03-23 '� B � MONS S SITE LOCATION MAP CHECKED: RLB CAD: FHLF110-SLM ENGINEERING FOOTHILLS REGIONAL MSW LANDFILL 6004 Ponders Court, Greenville, SC 29615 CALDWELL COUNTY, NORTH CAROLINA 1 APPROVED: TWM JOB NO: J23-1235-110 Phone: (864) 288-1265 Fax: (864) 288-4430 OAF ITT t OIL 7 o` O N B D MW-8 ET DETENTION BASIN NO. 3 , l O N 0 � I N F 0 N MW-11 MW-7 .0 �i r ETENTI N NO. MW-6— WET BA`. ■ MW-5 SW-3 T gy MW-4 SEDIMEN- ASIN NO. G MW \ MW-3R2 F��ST �'c A TFO s� jF 610 �O • to N ` or M ON TOR N G LOCAT ON LEGEND MW-1 SURVEYED LOCATION OF GROUNDWATER MONITORING WELL GP— SURVEYED LOCATION OF METHANE MONITORING PROBE SW-1 APPROXIMATE LOCATION OF SURFACE WATER MONITORING POINT UD-1 APPROXIMATE LOCATION OF UNDERDRAIN MONITORING POINT MW-12 Q PERMITTED LOCATION OF GROUNDWATER MONITORING WELL SURVEYED LOCATION OF RECENTLY INSTALLED GROUNDWATER MONITORING WELL TOPOGRAPHIC GEOLOG C LEGEND TOPOGRAPHIC SURFACE CONTOUR IN FEET ABOVE MSL CONTOUR INTERVAL = 2 FEET STREAM OR CREEK ROAD -- EXISTING UNDERDRAIN PROPERTY BOUNDARY 300 FOOT BUFFER EXISTING CELL BOUNDARY FUTURE CELL BOUNDARY 1100 GROUNDWATER ELEVATION CONTOUR (FEET MSL) CONTOUR INTERVAL = 20 FEET NOTES: SW-4 1. MEAN SEA LEVEL ELEVATION (MSL) IS REFERENCED TO THE NATIONAL GEODETIC VERTICAL DATUM OF 1929 (NGVD). 2. THE GROUNDWATER ELEVATIONS REPRESENT THE MEASUREMENTS COLLECTED ON MARCH 4, 2013. 3. THE CONFIGURATION OF THE GROUNWATER CONTOURS BENEATH THE EXISTING CELL FOOTPRINTS ARE BASED ON HISTORICAL WATER TABLE MAPS OF THE SITE. GENERAL MAP REFERENCE 200 100 0 200 400 APPROXIMATE SCALE IN FEET REFERENCES: 1. TOPOGRAPHIC INFORMATION SHOWN FROM AN AERIAL SURVEY BY COOPER AERIAL SURVEYS CO., DATE OF PHOTOGRAPHY DECEMBER 9, 2020. MAPPING CONTROL BASED ON HISTORICAL LANDFILL CONTROL POINTS. 2. WETLAND AND STREAM BOUNDARIES IN LANDFILL AREA BASED ON SURVEY BY DONALDSON, GARRETT & ASSOCIATES, INC. DATED AUGUST 28, 2002. 3. WETLAND AND STREAM BOUNDARIES IN CONSERVATION AREA BASED ON SURVEY BY DONALDSON, GARRETT & ASSOCIATES, INC. DATED OCTOBER 7, 2002. 4. PROPERTY BOUNDARY TAKEN FROM A BOUNDARY SURVEY PREPARED BY WRIGHT & FIELDS LAND SURVEYING, DATED AUGUST 14, 2007. 5. CELL BOUNDARIES FOR CELLS 1-8A WERE TAKEN FROM THE ENGINEERING DRAWINGS — PHASE NO. 3 PLANS PREPARED BY HODGES, HARBIN, NEWBERRY, & TRIBBLE, INC., DATED JULY 2008. 6. PHASE 5 WASTE LIMITS WERE TAKEN FROM PRELIMINARY (MARCH 2O17) PERMIT TO CONSTRUCT PLANS BEING PREPARED BY HODGES, HARBIN, NEWBERRY, & TRIBBLE, INC. 7. MW-12 SURVEY PERFORMED BY WITHERSRAVENEL OF CARY, NORTH CAROLINA ON NOVEMBER 8, 2023. REVISIONS No. DESCRIPTION BY DRAWN: ZJD CHECKED: RLB APPROVED: TWM DATE: 11-9-23 CAD FILE: FHLF110-EMN JOB No: J23-1235-110 M LAMMONS ENGINEERING 6004 Ponders Court, Greenville, SC 29615 Phone: (864) 20B-1265 Fox: (864) 2B8-4430 GROUNDWATER MONITORING NETWORK FOOTHILLS REGIONAL MSW LANDFILL CALDWELL COUNTY, NORTH CAROLINA FIGURE NO. 2 APPENDIX A As -Built Survey Data Survey Report 11/09/2023 Mr. Zach Downes, P.G. Bunnel Lammons Engineering Project Geologist 6004 poners Court, suite 830 Greenville, SC 29615 RE: Foothills MSW LANDFILL MONITORING WELL SURVEY (MW-12 ) Dear: Zach Downes The below certification statement is intended to be permanently attached to and accompany the digital file data deliverable for the survey services performed on November 8th 2023. This statement ensures the care and accuracy standards of the state of North Carolina 21 NCAC 56.1606 were met. I, Marshall Wight, certify that the data represented in the digitial files provided were created via, WithersRavenel (WR) conventional survey, completed under my supervision. Project deliverables consist of a .txt. The following information details the survey: MW-12 TOPO OF PVC CASING N: 800,113.23 E: 1,232,337.71 ELEV:1,459.23' LAT:35.920851 LON:81.592962 GROUND SURFACE:1456.40' CONCRETE PAD:1456.27' Ms M Point Northing Easting Elevation Description 8281 800112.000 1232339.179 1456.36 EDGE OF CONCRETE 8282 800111.758 1232336.354 1456.36 EDGE OF CONCRETE 8283 800114.602 1232336.139 1456.45 EDGE OF CONCRETE 8284 800114.808 1232339.000 1456.44 EDGE OF CONCRETE 8285 800114.979 1232339.186 1456.23 NG 8286 800111.797 1232339.351 1456.15 NG 8287 800111.565 1232336.128 1456.22 NG 8288 800114.778 1232335.974 1456.27 NG 8289 800113.315 1232337.529 1456.47 MW 8290 800113.231 1232337.712 1459.23 TOP PVC 8291 800113.236 1232337.729 1459.47 TOP METAL CAP 8292 800110.982 1232335.552 1456.17 BOLLARD 8293 800114.979 1232335.210 1456.30 BOLLARD 8294 800115.646 1232339.537 1456.29 BOLLARD 8295 800111.298 1232340.213 1456.05 BOLLARD I, Marshall Wight, certify that this project was completed under my direct and responsible charge from an actual survey made under my supervision; that this survey was performed at the 95 percent confidence level to meet Federal Geographic Data Committee Standards; that this survey was performed to meet the requirements for a topographic/planimetric survey to the accuracy of Class A and vertical accuracy when applicable to the Class C standard, and that the original data was obtained on 11/8/23 that the survey was completed on 11/8/23 that contours shown as [broken lines] may not meet the stated standard; and all coordinates are based on Localized 00 NAD 83(2011) and all elevations are based on NAVD 88. °°°o°°` N CA0000000R 0°O0 E162C73F441B864C1 DocuSigned by:t" o0 '' SS/O°o11/9/2023 ' Q 9 'SEAL 0... e o r- °o 'e 0 -7 L-5034 0 0 Marshall Wight, PLS L-5034 00 �9 oo. p S U R\1 000 'Z' 00 °° 'S' °°°°°°°°°°°°-HQ) °°°° °°°°°°yA L L G o°° °°OOo000000 FOOTHILLS LANDFILL Survey Report -R/ WithersRavenel As -built Monitoring Well Survey (MW-12) 1/ Engineers I Planners I surveyors LENOIR CALDWELL NC Project #23 0098.00 115 MacKenan Drive I Cary, NC 27511 City Count State t: 919.469.3340 license #: F-1479 www.withersraveneLcom APPENDIX B North Carolina Well Installation Forms (GW- 1) WELL CONSTRUCTION RECORD (GW-1) For Internal Use Only: 1. Well Contractor Information: JOHNNY BURR Well Contractor Name A - 3098 NC Well Contractor Certification Number GEOLOGIC EXPLORATION Company Name 2. Well Construction Permit #: List all applicable well construction permits (i.e. UIC, County, State, Variance, etc) 3. Well Use (check well use): Water Supply Well: ❑Agricultural ❑Geothermal (Heating/Cooling Supply) ❑ Industrial/Commercial ❑ Irrigation Non -Water Supply Well: El Aquifer Recharge ❑Aquifer Storage and Recovery ❑Aquifer Test ❑Experimental Technology ❑Geothermal (Closed Loop) ❑Geothermal (Heating/Cooling 4. Date Well(s) Completed: ❑Municipal/Public ❑Residential Water Supply (single) ❑Residential Water Supply (shared) ❑ Wells > 100,000 GPD ❑Groundwater Remediation ❑Salinity Barrier ❑ Stormwater Drainage El Subsidence Control ❑Tracer ❑Other (explain under #21 1 11/03/23 WellID# MW-12 5a. Well Location: FOOTHILLS REGIONAL MSW LANDFILL SW Facility #1403-MSWLF-1998 Facility/Owner Name Facility ID# (if applicable) 2800 CHERAW ROAD, LENOIR, 28645 Physical Address, City, and Zip CALDWELL County 2830209835 Parcel Identification No. (PIN) 5b. Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field, one lat/long is sufficient) 35.920851 N 81.592962 W 6. Is(are) the well(s): OPermanent or ❑Temporary 7. Is this a repair to an existing well: ❑Yes or ONo If this is a repair, fill out known well construction information and explain the nature of the repair under #21 remarks section or on the back of this form. 8. For Geoprobe/DPT or Closed -Loop Geothermal Wells having the same construction, only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells drilled:-' 9. Total well depth below land surface: 128.8 (ft.) For multiple wells list all depths if different (example- 3@200' and 2@100') 10. Static water level below top of casing: 94.18 (ft.) If water level is above casing, use "+ " 11. Borehole diameter: 8.0/6.0 (in.) 12.Well construction method: Hollow Stem Auger and Air Rotary (i.e. auger, rotary, cable, direct push, etc.) 14. WATER ZONES FROM TO DESCRIPTION 111 rt 128.8 lFractures in Bedrock fr. rr. 15. OUTER CASING for multi -cased wells OR LINER if a licable FROM TO DIAMETER THICKNESS MATERIAL 0.0 ft 113.6 ft 2 in Sched.40 1 PVC 16. INNER CASING OR TUBING eother al closed -loop) FROM TO DIAMETER THICKNESS MATERIAL g g in. ft. ft. in. 17. SCREEN FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL 113.Eft• 128.E ft' 2.0 in. 0.010 Sched.40 PVC ft. ft. in. 18. GROUT FROM TO MATERIAL EMPLACEMENT METHOD & AMOUNT 0.0 ft. 99 ft, Bent. Grout Tremie 99 tt. 112 tt. Bent. Chips Gravity rt. rt. 19. SAND/GRAVEL PACK (if applicable) FROM TO MATERIAL EMPLACEMENT METHOD 112 ft' 128.8 ft- #0 Filter Sand Gravity ft. rt. 20. DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION color, hardness, soilfrock type, grain size, etc.) ft. rt. See Boring Log For MW-12 rt. et. ft. ft. ft. ft. rt. et. rr. fr. rt. et. 21. REMARKS 22. Certification: ICJ Signature of Certified Well Contractor 11/10/23 Date By signing this form, I hereby certify that the wells) was (were) constructed in accordance with 1 SA NCAC 02C .0100 or 1 SA NCAC 02C .0200 Well Construction Standards and that a copy of this record has been provided to the well owner. 23. Site diagram or additional well details: You may use the back of this page to provide additional well construction info (add 'See Over' in Remarks Box). You may also attach additional pages if necessary. 24. SUBMITTAL INSTRUCTIONS Submit this GW-1 within 30 days of well completion per the following: 24a. For All Wells: Original form to Division of Water Resources (DWR), Information Processing Unit, 1617 MSC, Raleigh, NC 27699-1617 24b. For Injection Wells: Copy to DWR, Underground Injection Control (IDC) Program, 1636 MSC, Raleigh, NC 27699-1636 24c. For Water Supply and Open -Loop Geothermal Return Wells: Copy to the county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d. For Water Wells producing over 100,000 GPD: Copy to DWR, CCPCUA 13a. Yield (gpm) Method of test: Permit Program, 1611 MSC, Raleigh, NC 27699-1611 13b. Disinfection type: Amount: Form GW-1 North Carolina Department of Environmental Quality - Division of Water Resources Revised 6-6-2018 APPENDIX C Drilling Procedures APPENDIX C Drilling Procedures Hollow -Stem Auger Drillin Soil borings were advanced by mechanically twisting a continuous flight of 8.25-inch OD steel hollow - stem augers into the soil. Air -Hammer Drillin Where consolidated subsurface material was encountered that was impenetrable to hollow -stem augers, a 6-inch OD down -hole pneumatic air -hammer was used to advance the borehole. The pneumatic drill hammer advanced through the subsurface materials by rapidly striking the rock while the drill pipe was slowly rotated; compressed air was used to remove the soil and rock cuttings from the borehole. The drill hammer was constructed of alloy steel with tungsten -carbide inserts that provide the chipping or cutting surfaces. An in -line air filter was attached to the air compressor on the rig to remove oil from the air and to prevent oil contamination in the borehole. General A North Carolina registered driller performed the drilling and well installation activities. A North Carolina registered geologist examined the soil and rock samples and prepared boring logs. APPENDIX D Boring Logs and Monitoring Well Installation Diagrams It ' IMMINC. GROUNDWATER MONITORING WELL NO. MW-12 PROJECT: Foothills Regional MSW Landfill PROJECT NO.: J23-1235-110 CLIENT: Republic Services of NC, LLC START: 11-2-23 END: 11-3-23 BUNNELL-LAMMONS ENGINEERING, INC. LOCATION: Caldwell County, North Carolina ELEVATION: 1456.40 DRILLER: J. Burr, Geologic Exploration LOGGED BY: T. Gerringer GEOTECHNICAL AND EN VIRONMENTAL CONSULTANTS DRILLING METHOD: GeoProbe 3230 DT with 8.25-inch OD HSA and 6-inch OD Air Rotary DEPTH TO - WATER> INITIAL: �Z 92.05 AFTER 24 HOURS:1 90.72 CAVING>3m ELEVATION/ DESCRIPTION SOIL MONITOR WELL INSTALLATION DEPTH (FT) TYPE rjjj DETAILS Brown to red, micaceous, fine sandy SILT with trace gravel - (FILL) Cement Grout, 0 to 99.0 feet 1455 5 SURFACE COMPLETION 1450 4" x 4" stand-up locking steel protective cover with a TxT concrete pad at the base. 1/8-inch weep hole and vent hole installed in steel cover and PVC stick up, respectively. 10 Top of PVC casing elev. = 1,459.23 1445 feet Ground surface elev. = 1456.40 feet Northing = 800,113.23 feet 15 Easting = 1,232,337.71 feet 1440 Stick up = 2.83 feet 20 1435 25 1430 30 1425 35 1420 GROUNDWATER MONITORING WELL NO. MW-12 Sheet 1 of 4 It ' IMMINC. GROUNDWATER MONITORING WELL NO. MW-12 PROJECT: Foothills Regional MSW Landfill PROJECT NO.: J23-1235-110 BUNNELL-LAMMONS CLIENT: Republic Services of NC, LLC START: 11-2-23 END: 11-3-23 ENGINEERING, INC. LOCATION: Caldwell County, North Carolina ELEVATION: 1456.40 GEOTECHNICAL AND EN VIRONMENTAL DRILLER: J. Burr, Geologic Exploration LOGGED BY: T. Gerringer CONSULTANTS DRILLING METHOD: GeoProbe 3230 DT with 8.25-inch OD HSA and 6-inch OD Air Rotary DEPTH TO - WATER> INITIAL: �Z 92.05 AFTER 24 HOURS:1 90.72 CAVING>3m ELEVATION/ DESCRIPTION SOIL MONITOR WELL INSTALLATION DEPTH (FT) TYPE DETAILS 1415 45 1410 50 Gray GNEISS 1405 Brown, micaceous, fine sandy SILT with trace gravel 55 1400 60 1395 Gray GNEISS Light brown, micaceous, fine sandy SILT with trace gravel - (RESIDUUM) 65 1390 70 1385 75 1380 GROUNDWATER MONITORING WELL NO. MW-12 Sheet 2 of 4 It ' IMMINC. GROUNDWATER MONITORING WELL NO. MW-12 PROJECT: Foothills Regional MSW Landfill PROJECT NO.: J23-1235-110 BUNNELL-LAMMONS CLIENT: Republic Services of NC, LLC START: 11-2-23 END: 11-3-23 ENGINEERING, INC. LOCATION: Caldwell County, North Carolina ELEVATION: 1456.40 DRILLER: J. Burr, Geologic Exploration LOGGED BY: T. Gerringer GEOTECHNICAL AND EN VIRONMENTAL CONSULTANTS DRILLING METHOD: GeoProbe 3230 DT with 8.25-inch OD HSA and 6-inch OD Air Rotary DEPTH TO - WATER> INITIAL: �Z 92.05 AFTER 24 HOURS:1 90.72 CAVING>3m ELEVATION/ DESCRIPTION SOIL MONITOR WELL INSTALLATION DEPTH (FT) TYPE DETAILS 1375 85 1370 Gray GNEISS - (BEDROCK) 90 1365 95 1360 Bentonite seal, 99.0 to 112.0 feet 100 1355 105 1350 110 1345 Fracture zone from 111.0 to 128.82 feet below ground surface. Filter pack, sand 112.0 to 128.82 feet 115 1340 GROUNDWATER MONITORING WELL NO. MW-12 Sheet 3 of 4 It ' IMMINC. GROUNDWATER MONITORING WELL NO. MW-12 PROJECT: Foothills Regional MSW Landfill PROJECT NO.: J23-1235-110 BUNNELL-LAMMONS CLIENT: Republic Services of NC, LLC START: 11-2-23 END: 11-3-23 ENGINEERING, INC. LOCATION: Caldwell County, North Carolina ELEVATION: 1456.40 DRILLER: J. Burr, Geologic Exploration LOGGED BY: T. Gerringer GEOTECHNICAL AND EN VIRONMENTAL CONSULTANTS DRILLING METHOD: GeoProbe 3230 DT with 8.25-inch OD HSA and 6-inch OD Air Rotary DEPTH TO - WATER> INITIAL: �Z 92.05 AFTER 24 HOURS:1 90.72 CAVING>3m ELEVATION/ DESCRIPTION SOIL MONITOR WELL INSTALLATION DEPTH (FT) TYPE DETAILS 2-inch diameter, 0.010-inch slotted Schedule 40 PVC well screen, 1335 113.57 to 128.57 feet 125 1330 Pipe cap Total well depth, 128.82 feet Boringterminated at 128.82 feet below round surface. Groundwater g 130 encountered at 92.05 feet below ground surface at time of drilling and at 90.72 feet below ground surface 24 hours after drilling. 1325 135 1320 140 1315 145 1310 150 1305 155 1300 GROUNDWATER MONITORING WELL NO. MW-12 Sheet 4 of 4 APPENDIX E Monitoring Well Development Tables MONITORING WELL DEVELOPMENT LOG DATE 11/7/2023 TOTAL WELL DEPTH (TWD); TOP OF CASING = 131.65 1/100 ft PERSONNEL T. Gerringer DEPTH TO GROUND WATER (DGW) = 94.18 1/100 ft SITE Foothills Regional MSW Landfilll LENGTH OF WATER COLUMN (LWC) = TWD - DGW = 37.47 1/100 ft JOB # J23-1235-110 1 CASING VOLUME (CV) = LWC x 0.17 = 6.37 gallons WELL ID MW-12 NUMBER CV REMOVED = 10.99 CV TOTAL VOLUME OF WATER REMOVED = 70 gallons METHOD OF WELL DEVELOPMENT = Submersible pump WELL YIELD = Moderate TIME ELAPSED DEV. TIME VOLUME PURGED event (gallons) total (gallons) SURGE WATER TEMP (C) pH (units) SPECIF. COND. (µmho/cm) TURBIDITY (NTU) COLOR (subjective) PURGING METHOD 11/7/23 8:58 0 min 0 0 Yes 16.5 6.06 112.20 >2000 Brown Pump 11/7/23 9:06 8 min 5.0 5.0 16.0 6.25 85.81 770 Very Cloudy Pump 11/7/23 9:12 14 min 5.0 10.0 16.1 5.90 85.33 125 Cloudy Pump 11/7/23 9:18 20 min 5.0 15.0 Yes 16.2 5.97 85.38 827 Cloudy Pump 11/7/23 9:26 28 min 5.0 20.0 16.9 5.73 84.27 32.2 Cloudy Pump 11/7/23 9:40 42 min 5.0 25.0 16.9 5.90 85.34 23.5 Clear Pump 11/7/23 9:53 55 min 5.0 30.0 17.0 5.79 85.05 15.6 Clear Pump 11/7/23 10:20 1 hr 22 min 10.0 40.0 Yes 17.3 5.89 84.74 153 Cloudy Pump 11/7/23 10:53 1 hr 55 min 10.0 50.0 17.2 5.85 85.13 14.2 Clear Pump 11/7/23 11:26 2 hr 28 min 10.0 60.0 17.5 6.00 85.04 12.8 Clear Pump 11/7/23 12:05 3 hr 7 min 10.0 70.0 18.2 5.84 84.81 2.79 Clear Pump MW-12 Bunnell-Lammons Engineering, Inc. 1235-110 Development Logs.xls Greenville, SC