HomeMy WebLinkAboutWS-6367_6367_CA_WR_20230612 June 12, 2023 Mr. James W. Brown Regional Supervisor Winston-Salem Regional Office UST Section, Division of Waste Management North Carolina Department of Environmental Quality 450 West Hanes Mill Road, Suite 300 Winston-Salem, North Carolina 27105 RE: Site Monitoring and Remediation Well Abandonments TransMontaigne – Greensboro Terminal 6801 W. Market St., Greensboro, Guilford County, North Carolina NCDENR Incident No. 6367 Dear Mr. Brown: This letter provides a report of monitoring and remediation well abandonments completed in May 2023 for the TransMontaigne-Greensboro terminal (former Southeast Terminals) facility in Greensboro, North Carolina. The well abandonments were completed in conjunction with a request outlined in an April 13, 2023 letter from Piedmont Geologic to North Carolina Department of Environmental Quality (NCDEQ) Winston-Salem Regional Office (WSRO) (Re: Request to Abandon Monitoring and Remediation Wells). The request was approved by NCDDEQ WSRO via an April 18, 2023 letter to TransMontaigne. The site location is shown in Figure 1 (Attachment 1). The site layout, including locations of the fifty-two site groundwater monitoring wells and twenty-six remaining groundwater remediation wells existing prior to the May 2023 abandonments is shown in Figure 2. Well-construction details are listed in Table 1 (Attachment 2). The well abandonments were completed from May 22-26, 2023 by a North Carolina-licensed well driller employed by MW Drilling, under supervision by Piedmont Geologic, in accordance with 15A NCAC 2C. A total of twenty-six of the existing fifty-two site monitoring wells plus all twenty-six existing site remediation wells were abandoned1. Site wells retained versus site wells abandoned are highlighted as such in Figure 2. Well abandonment procedures were as follows. NCDEQ well-abandonment records are provided in Attachment 3. A photolog documenting the well abandonments is provided in Attachment 4. • The wells were sounded to verify the completion depth and that no blockages were present. • Remediation piping/tubing in remediation well vaults was removed to the extent possible/practicable and disposed. Remaining piping/tubing ends were capped. 1 As requested in the April 18, 2023 NCDEQ letter, the abandonments included MW-6 and MW-51, whereas monitoring-wells MW-12, MW-35, MW-37, MW-38, and SME-10 were abandoned. Site Monitoring and Remediation Well Abandonments TransMontaigne-Greensboro Terminal June 12, 2023 2 PIEDMONT GEOLOGIC, P.C. • The well screens/casings were tremie grouted to grade with cement/bentonite slurry. • With the exception of remediation wells in the paved terminal loading-rack area, well manholes and stickup casings were removed and disposed, along with the associated concrete pads. Stick-up well casings were cut down to grade. The ground surface at each well location was regraded to match surrounding conditions. The remediation-well manhole casings in the paved loading rack area were retained in place and filled with concrete to grade (i.e., to minimize concrete pavement repairs). Site monitoring wells remaining following the well abandonments are shown in Figure 3. Well-construction details for the remaining wells are listed in Table 2. A total of twenty-six monitoring wells remain on site. If you have any questions or would like any additional information, please do not hesitate to call. Sincerely: Peter J. Dressel Peter J. Dressel, P.G. Project Manager cc: Gene Mao, Guilford County DHHS Doug Hall, TransMontaigne Brett Forkner, NGL Energy Partners Attachments Site Monitoring and Remediation Well Abandonments TransMontaigne-Greensboro Terminal June 12, 2023 PIEDMONT GEOLOGIC, P.C. ATTACHMENT 1 FIGURES FIGURE 1 SITE LOCATION MAP TRANSMONTAIGNE-GREENSBORO TERMINAL Groundwater monitoring well Legend SVE well We s t M a r k e t S t r e e t ( U S 4 2 1 )XXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X XXXX XXXXXXXXXXXXXXXXXXXXXXXtrack asphalt Warehouseconc.astastmh mh astmanifoldconcrete asphalt drivewaydriveway asphalt concrete pipes track spur fence wal koffice dike dike concrete eop oe drain fence oe oe ast oe oe fence ust oe ast oe disp. oe oe oe fence spur oe oe curb curb railroad Merrit Trucking dike top Richard's Auto Supply Quality Printing tank 106 gasoline tank 105 gasoline tank 107 out of service tank 111 gasoline tank 112 ULSD tank 114 gasoline tank 113 gasoline tank 102 ULSD tank 101 ULSD tank 103 ethanol air eliminator area railroad track Stormwater Retention Pond Air Sparging Well tank 104 GWE / SVE well mw35 mw-19 2 2336 PD 0 120 240 Scale (ft.) TransMontaigne Site Layout Showing Wells Abandoned vs. Wells Retained 6801 W. Market St. Greensboro, N.C. PD PD 6/7/23 Fig 2.dwg mw57 mw58 mw59 AS-5 mw37 mw38 AS-2 mw37 AS-10 AS-9 Green highlight denotes monitoring well to retain Yellow highlight denotes monitoring well to abandon Red highlight denotes remediation well to abandon mw24b mw49 mw18 mw17 mw15 mw16 mw14 mw5 mw20a mw39 mw56 mw60 mw6 sme10 sme9mw24a mw50 mw47 mw41 mw45 mw46 mw36 mw28 mw27 mw2 mw25 mw10 SVE6 / SME13 sme8 mw1 mw34 mw12 mw8 mw11 mw9 mw23 mw21 mw22 mw4 mw48 mw52 mw53 mw54 mw55 GWE-12 SVE1 SVE2 GWE1 SVE3 AS-1 GWE2AS-3 SVE4 AS-4 AS-8 SVE11 SVE10 AS-7 GWE3 AS-5 SVE5 GWE8 GWE4 GWE5 GWE6 SVE7 mw51 We s t M a r k e t S t r e e t ( U S 4 2 1 )XXXXXXXXXXXXXXXXXXXXXXXXXXXXX X X X X X XXXX XXXXXXXXXXXXXXXXXXXXXXXtrack asphalt Warehouseconc.astastmh mh astmanifoldconcrete asphalt drivewaydriveway asphalt concrete pipes track spur fence wal koffice dike dike concrete eop oe drain fence oe oe ast oe oe fence ust oe ast oe oe oe oe fence spur oe oe curb curb railroad Merrit Trucking dike top Richard's Auto Supply Quality Printing tank 106 gasoline tank 105 gasoline tank 107 out of service tank 111 gasoline tank 112 ULSD tank 114 gasoline tank 113 gasoline tank 102 ULSD tank 101 ULSD tank 103 ethanol air eliminator area railroad track Stormwater Retention Pond tank 104 3 2320 PD 0 120 240 Scale (ft.) TransMontaigne Site Monitoring Wells Remaining FollowingMay 2023 Well Abandonments 6801 W. Market St. Greensboro, N.C. PD PD 6/7/23 Fig 2.dwg Site monitoring well Legend Green highlight denotes shallow saprolite well Blue highlight denotes intermediate/deep saprolite well Red highlight denotes bedrock well mw57 mw58 mw59 mw24b mw49 mw18 mw17 mw14 mw5 mw20a mw39 mw56 mw60 sme9 mw24a mw50 mw11 mw9 mw15 mw16 mw48 mw38 mw12 mw37 sme10 mw35 Site Monitoring and Remediation Well Abandonments TransMontaigne-Greensboro Terminal June 12, 2023 PIEDMONT GEOLOGIC, P.C. ATTACHMENT 2 TABLES TABLE 1 GROUNDWATER MONITORING AND REMEDIATION WELL CONSTRUCTION DETAILS TransMontaigne - Greensboro Terminal 6801 West Market Street Greensboro, North Carolina MONITORING WELLS Well Date Total Outer Casing Outer Casing Casing Well I.D.Screen TOC I.D.Installed Depth (1)Depth (1)I.D. (in.) (2)Stickup (3)(in.) (4)Interval (1)Elev. (5) MW-1 circa 1984 18 NA NA NA 4 unknown 97.50 MW-2 10/17/84 19 NA NA 1.55 4 5-19 97.74 MW-4 10/17/84 19 NA NA 1.45 4 5-19 91.32 MW-5 10/17/84 21 NA NA 1.20 4 7-21 86.71 MW-6 circa 1984 28 NA NA 1.98 4 unknown 100.25 MW-8 2/5/90 27 NA NA 1.80 2 12-27 101.60 MW-9 2/5/90 27 NA NA 2.05 2 12-27 95.20 MW-10 2/6/90 29 NA NA 1.35 2 9-24 98.40 MW-11 2/6/90 24 NA NA 1.95 2 9-24 93.95 MW-12 2/6/90 33 NA NA 2.05 2 18-33 96.07 MW-14 8/23/90 60 NA NA 2.85 2 45-60 91.40 MW-15 8/15/90 22 NA NA 2.05 2 10-22 87.93 MW-16 8/22/90 62 NA NA 2.05 2 46-62 87.16 MW-17 8/15/90 21 NA NA 1.75 2 11-21 86.69 MW-18 8/21/09 61 NA NA 2.00 2 46-61 87.58 MW-19 12/23/02 35 NA NA NA 4 20-35 99.22 MW-20A 9/13/96 60 50 60 2.55 2 57.5-60 88.48 MW-21 12/9/91 20 NA NA 1.95 2 5-20 87.85 MW-22 12/5/91 25 NA NA 2.05 2 17.5-25 88.30 MW-23 12/5/91 20 NA NA 1.90 2 5-20 88.56 MW-24A 12/4/91 59 NA NA 2.25 2 49-59 98.14 MW-24B 12/91 39 NA NA NA 2 36.5-39 NS MW-25 12/3/91 25 NA NA NA 2 5-25 96.81 MW-27 10/26/93 20 NA NA NA 2 10-20 97.45 MW-28 10/26/93 25 NA NA NA 2 15-25 99.74 MW-34 10/28/93 24 NA NA NA 2 13-23 103.17 MW-35 12/23/02 35 NA NA NA 4 20-35 99.71 MW-36 10/28/93 24 NA NA NA 2 19-24 99.62 MW-37 3/3/94 25 NA NA 3.35 2 10-25 96.05 MW-38 3/2/94 27 NA NA 3.85 2 12-27 96.40 MW-39 2/28/94 34 NA NA NA 2 14-34 96.32 MW-41 3/4/94 24 NA NA NA 1 4-24 101.12 MW-45 11/30/98 30 NA NA NA 2 15-30 96.91 MW-46 11/30/98 60 45 6 NA 2 55-60 97.04 MW-47 11/16/98 60 45 6 NA 2 55-60 102.05 MW-48 12/1/98 126 112 6 NA 2 121-126 97.37 MW-49 12/4/98 95 80 6 NA 2 90-95 83.43 MW-50 6/4/99 127 117 6 NA 2 122-127 97.25 MW-51 7/1/99 120 105 6 NA 2 115-120 88.01 MW-52 7/9/13 15 NA NA 2.50 2 5-15 NS MW-53 7/9/13 15 NA NA NA 2 5-15 NS MW-54 7/9/13 15 NA NA NA 2 5-15 NS MW-55 7/9/13 15 NA NA NA 2 5-15 NS MW-56 7/9/13 15 NA NA 2.50 2 5-15 NS MW-57 2/3/17 103 89 6 NA 6 89-103 (6)97.84 MW-58 2/2/17 82 NA NA NA 2 72-82 97.55 MW-59 2/3/17 60 NA NA NA 2 55-60 97.51 MW-60 2/3/17 20 NA NA NA 2 5-20 97.37 SME-8 circa 1985 22 NA NA NA 4 7-22 99.29 SME-9 circa 1985 23 NA NA NA 4 unknown 98.50 SME-10 circa 1985 20 NA NA NA 4 9-20 98.10 SME-13 circa 1985 20 NA NA NA 4 unknown NS shallow saprolite shallow saprolite shallow saprolite shallow saprolite bedrock bedrock shallow saprolite shallow saprolite shallow saprolite shallow saprolite shallow saprolite interm. saprolite deep saprolite bedrock shallow saprolite shallow saprolite shallow saprolite shallow saprolite shallow saprolite shallow saprolite shallow saprolite shallow saprolite deep saprolite shallow saprolite shallow saprolite shallow saprolite shallow saprolite shallow saprolite shallow saprolite shallow saprolite deep saprolite shallow saprolite shallow saprolite shallow saprolite shallow saprolite deep saprolite deep saprolite deep saprolite shallow saprolite Geologic Zone Monitored shallow saprolite shallow saprolite shallow saprolite shallow saprolite shallow saprolite intermed. saprolite bedrock shallow saprolite bedrock deep saprolite deep saprolite shallow saprolite shallow saprolite PIEDMONT GEOLOGIC, P.C Page 1 of 2 TABLE 1 (continued) GROUNDWATER MONITORING AND REMEDIATION WELL CONSTRUCTION DETAILS TransMontaigne - Greensboro Terminal 6801 West Market Street Greensboro, North Carolina SOIL VACUUM EXTRACTION WELLS Well Date Total Outer Casing Outer Casing Casing Well I.D.Screen TOC I.D.Installed Depth (1)Depth (1)I.D. (in.) (2)Stickup (3)(in.) (4)Interval (1)Elev. (5) SVE-1 2/26/01 18 NA NA NA 6 8-18 NS SVE-2 2/26/01 15 NA NA NA 2 5-15 NS SVE-3 2/26/01 15 NA NA NA 2 5-15 NS SVE-4 2/27/01 20 NA NA NA 6 5-20 NS SVE-5 3/1/01 20 NA NA NA 6 5-20 NS SVE-7 2/28/01 20 NA NA NA 6 5-20 NS SVE-9 2/27/01 20 NA NA NA 6 5-20 NS SVE-10 9/23/13 18 NA NA NA 2 3-18 NS SVE-11 9/23/13 18 NA NA NA 2 3-18 NS GWE-1 2/26/01 35 NA NA NA 6 5-35 NS GWE-2 2/26/01 35 NA NA NA 6 5-35 NS GWE-3 3/1/01 35 NA NA NA 6 5-35 NS GWE-4 2/27/01 35 NA NA NA 6 5-35 NS GWE-5 3/1/01 35 NA NA NA 6 5-35 NS GWE-6 3/1/01 35 NA NA NA 6 5-35 NS GWE-8 3/1/01 35 NA NA NA 6 5-35 NSGWE-12 9/13/04 25 NA NA NA 6 5-25 NS AIR SPARGING WELLS Well Date Total Outer Casing Outer Casing Casing Well I.D.Screen TOC I.D.Installed Depth (1)Depth (1)I.D. (in.) (2)Stickup (3)(in.) (4)Interval (1)Elev. (5) AS-1 10/5/09 45 NA NA NA 2 40-45 NS AS-2 4/29/11 40 NA NA NA 2 35-40 NS AS-3 4/29/11 35 NA NA NA 2 30-35 NS AS-4 4/28/11 40 NA NA NA 2 35-40 NS AS-5 4/28/11 43 NA NA NA 2 38-43 NS AS-7 9/23/13 35 NA NA NA 2 30-35 NS AS-8 9/24/13 35 NA NA NA 2 30-35 NS AS-9 6/5/17 30 NA NA NA 2 28-30 NSAS-10 6/5/17 30 NA NA NA 2 28-30 NS Yellow-highlighted wells were abandoned in May 2023. (1) Measured in feet below grade.(4) All wells constructed of Schedule 40 PVC.I.D. = Inside diameter. (2) All outer casings constructed of carbon steel.(5) Measured in feet relative to site datum.NA = Not applicable. (3) Feet of well casing stickup relative to grade.NS = Well not surveryed. unknown = Well log not available.TOC = Top of casing. intermed. saprolite intermed. saprolite shallow saprolite shallow saprolite shallow saprolite shallow saprolite shallow saprolite shallow saprolite shallow saprolite shallow saprolite shallow saprolite shallow saprolite Geologic Zone shallow saprolite shallow saprolite Monitored shallow saprolite shallow saprolite shallow saprolite intermed. saprolite intermed. saprolite intermed. saprolite intermed. saprolite shallow saprolite shallow saprolite shallow saproliteshallow saprolite intermed. saprolite Geologic Zone Monitored PIEDMONT GEOLOGIC, P.C Page 2 of 2 TABLE 2 GROUNDWATER MONITORING WELLS REMAINING FOLLOWING WELL MAY 2023 ABANDONMENTS TransMontaigne - Greensboro Terminal 6801 West Market Street Greensboro, North Carolina Well Date Total Outer Casing Outer Casing Casing Well I.D.Screen TOC I.D.Installed Depth (1)Depth (1)I.D. (in.) (2)Stickup (3)(in.) (4)Interval (1)Elev. (5) MW-5 10/17/84 21 NA NA 1.20 4 7-21 86.71 MW-9 2/5/90 27 NA NA 2.05 2 12-27 95.20 MW-11 2/6/90 24 NA NA 1.95 2 9-24 93.95 MW-12 2/6/90 33 NA NA 2.05 2 18-33 96.07 MW-14 8/23/90 60 NA NA 2.85 2 45-60 91.40 MW-15 8/15/90 22 NA NA 2.05 2 10-22 87.93 MW-16 8/22/90 62 NA NA 2.05 2 46-62 87.16 MW-17 8/15/90 21 NA NA 1.75 2 11-21 86.69 MW-18 8/21/09 61 NA NA 2.00 2 46-61 87.58 MW-20A 9/13/96 60 50 60 2.55 2 57.5-60 88.48 MW-24A 12/4/91 59 NA NA 2.25 2 49-59 98.14 MW-24B 12/91 39 NA NA NA 2 36.5-39 NS MW-35 12/23/02 35 NA NA NA 4 20-35 99.71 MW-37 3/3/94 25 NA NA 3.35 2 10-25 96.05 MW-38 3/2/94 27 NA NA 3.85 2 12-27 96.40 MW-39 2/28/94 34 NA NA NA 2 14-34 96.32 MW-48 12/1/98 126 112 6 NA 2 121-126 97.37 MW-49 12/4/98 95 80 6 NA 2 90-95 83.43 MW-50 6/4/99 127 117 6 NA 2 122-127 97.25 MW-56 7/9/13 15 NA NA 2.50 2 5-15 NS MW-57 2/3/17 103 89 6 NA 6 89-103 (6)97.84 MW-58 2/2/17 82 NA NA NA 2 72-82 97.55 MW-59 2/3/17 60 NA NA NA 2 55-60 97.51 MW-60 2/3/17 20 NA NA NA 2 5-20 97.37 SME-9 circa 1985 23 NA NA NA 4 unknown 98.50 SME-10 circa 1985 20 NA NA NA 4 9-20 98.10 (1) Measured in feet below grade.I.D. = Inside diameter. (2) All outer casings constructed of carbon steel.TOC = Top of casing. (3) Feet of well casing stickup relative to grade.NA = Not applicable. (4) All wells constructed of Schedule 40 PVC.NS = Well not surveryed. (5) Measured in feet relative to site datum. shallow saprolite deep saprolite deep saprolite shallow saprolite bedrock shallow saprolite bedrock shallow saprolite shallow saprolite interm. saprolite deep saprolite bedrock bedrock shallow saprolite deep saprolite shallow saprolite shallow saprolite Geologic Zone Monitored shallow saprolite shallow saprolite shallow saprolite shallow saprolite shallow saprolite deep saprolite deep saprolite shallow saprolite intermed. saprolite PIEDMONT GEOLOGIC, P.C Page 1 of 1 Site Monitoring and Remediation Well Abandonments TransMontaigne-Greensboro Terminal June 12, 2023 PIEDMONT GEOLOGIC, P.C. ATTACHMENT 3 NCDEQ WELL-ABANDONMENT RECORDS Site Monitoring and Remediation Well Abandonments TransMontaigne-Greensboro Terminal June 12, 2023 PIEDMONT GEOLOGIC, P.C. ATTACHMENT 4 PHOTOLOG TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 1 AS-1 Before AS-1 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 2 AS-2 Before AS-2 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 3 AS-3 Before AS-3 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 4 AS-4 Before AS-4 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 5 AS-5 Before AS-5 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 6 AS-7 Before AS-7 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 7 AS-8 Before AS-8 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 8 AS-9 Before AS-9 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 9 AS-10 Before AS-10 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 10 GWE-1 Before GWE-1 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 11 GWE-2 Before GWE-2 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 12 GWE-3 Before GWE-3 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 13 GWE-4 Before GWE-4 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 14 GWE-5 Before GWE-5 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 15 GWE-6 Before GWE-6 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 16 GWE-8 Before GWE-8 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 17 GWE-12 Before GWE-12 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 1 MW-1 Before MW-1 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 2 MW-2 Before MW-2 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 3 MW-4 Before MW-4 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 4 MW-6 Before MW-6 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 5 MW-8 Before MW-8 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 6 MW-10 Before MW-10 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 7 MW-19 Before MW-19 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 8 MW-21 Before MW-21 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 9 MW-22 Before MW-22 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 10 MW-23 Before MW-23 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 11 MW-25 Before MW-25 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 12 MW-27 Before MW-27 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 13 MW-28 Before MW-28 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 14 MW-34 Before MW-34 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 15 MW-36 Before MW-36 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 16 MW-41 Before MW-41 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 17 MW-45 Before MW-45 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 18 MW-46 Before MW-46 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 19 MW-47 Before MW-47 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 20 MW-51 Before MW-51 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 21 MW-52 Before MW-52 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 22 MW-53 Before MW-53 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 23 MW-54 Before MW-54 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 24 MW-55 Before MW-55 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 1 SME-8 Before SME-8 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 2 SME-13 Before SME-13 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 3 SVE-1 Before SVE-1 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 4 SVE-2 Before SVE-2 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 5 SVE-3 Before SVE-3 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 6 SVE-4 Before SVE-4 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 7 SVE-5 Before SVE-5 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 8 SVE-7 Before SVE-7 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 9 SVE-9 Before SVE-9 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 10 SVE-10 Before SVE-10 Completion TMG-Greensboro May 2023 Well Decommissioning Greensboro, North Carolina 11 SVE-11 Before SVE-11 Completion