HomeMy WebLinkAbout1812_DukeMarshall_2023Q3_GWCR_FID1820074_20231031(� DUKE
ENERGY
October 31, 2023
North Carolina Department of Environmental Quality
Division of Waste Management
Solid Waste Section
2090 U.S. Highway 70
Swannanoa, NC 28778
Attn: Ms. Sarah Moutos (submitted electronically)
Re: Groundwater Condition Quarterly Report — July 2023 through September 2023
Industrial Landfill No.1
Permit No.: 1812-INDUS-2008
Marshall Steam Station
Terrell, North Carolina 28682
Dear Ms. Moutos:
526 South Church St.
Charlotte, NC 28202
In accordance with the NCDEQ DWM September 17, 2021, Phase 2 Permit Modification Approval letter (FID
1609547), Duke Energy is providing the quarterly report describing groundwater conditions in the area of the
Marshall Steam Station Industrial Landfill No.1 (ILF, 1812-INDUS-2008) Phases 2, 3, and 4. The report is for
the quarterly period of July 2023 through September 2023 (Q3 2023).
The quarterly report includes an analysis of groundwater levels and dewatering pump flowrates within Phases
2, 3 and 4, with an updated water level map, hydrographs, pump flowrate plots, and well construction and
water level data tables. An evaluation of groundwater levels and pump flowrates compared to model
predictions is included. All groundwater transducer data, groundwater model trend data, and dewatering pump
data are provided in an excel file format as the report Appendices.
Groundwater conditions in the vicinity of Marshall Steam Station's Industrial Landfill No.1 continue to be
monitored and evaluated. The next quarterly report (Q4 2023) will be submitted by February 1, 2024.
If you need additional information regarding this submittal do not hesitate to email or call me at
Ashley.Healy(@duke-energy.com or (717) 982-0986.
Respectfully submitted,
j4VAi
Ashley Healy, P.G.
Environmental Services
Attachments: Industrial Landfill No.1 (1812-INDUS-2008) Groundwater Conditions Quarterly Report — July
2023 through September 2023 (SynTerra; October 2023)
Appendices in excel format:
1) Appendix A Water Level Monitoring Data Files
2) Appendix B Groundwater Model Predicted Trend Files
3) Appendix C Dewatering/Underdrain Pumping Data Files
4) Appendix D Mann -Kendall Results
www.duke-energy.com Page 1 of 2
cc (via e-mail): Claire Osborn, NCDEQ
Elizabeth Werner, NCDEQ
Sherri Stanley, NCDEQ
Ed Mussler, NCDEQ
Scott Saunders, Duke Energy
Dan Zakary, Duke Energy
Chris Varner, Duke Energy
Tyler Hardin, Duke Energy
Ed Sullivan, Duke Energy
Thomas Colton, SynTerra
Craig Eady, SynTerra
www.duke-energy.com Page 2 of 2
L1
synTerra
Science & Engineering Consultants
synterracorp.com
GROUNDWATER CONDITIONS QUARTERLY REPORT -
JULY 2023 TO SEPTEMBER 2023
INDUSTRIAL LANDFILL NO. 1
(1812-INDUS-2008)
FOR
MARSHALL STEAM STATION
8320 EAST CAROLINA HIGHWAY 150
TERRELL, NC 28682
OCTOBER 31, 2023
PREPARED FOR
L7 DUKE
Z ENERGY
DUKE ENERGY CAROLINAS, LLC
C 1g Eady, NC LG 41599 ����+++++""hUrgq� Key,' 'Reilly
Senior Peer Reviewer ,�``�t� Pr ect Sc" ntist
�'��oEESS1pN'y9 ���
SEAL
056667
THOMAS,�co', Gordon Thomas Colton, NC PE #056667
rn+,I+++ Associate Engineer
Groundwater Conditions Quarterly Report — July 2023 to September 2023
Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1
Terrell, North Carolina
TABLE OF CONTENTS
SECTION PAGE
1.0 INTRODUCTION..........................................................................................................1-1
1.1 Objectives and Purpose..............................................................................................1-1
1.2 Key Findings...............................................................................................................1-1
2.0 QUARTERLY MONITORING RESULTS........................................................................... 2-1
2.1 Current Groundwater Conditions...............................................................................2-1
2.2 Groundwater Trends..................................................................................................2-1
2.2.1 Water -Level Hydrographs and Model Trends.......................................................2-1
2.3 Dewatering and Underdrain Pump Performance.......................................................2-3
3.0 QUARTERLY WATER -LEVEL REDUCTION ACTIVITIES.................................................... 3-1
4.0 REFERENCES...............................................................................................................4-1
October 2023 Page i
Project: 00.0083.46.09
Groundwater Conditions Quarterly Report — July 2023 to September 2023
Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1
Terrell, North Carolina
S1.1tel29LCT11Ci*1
Figure 1
Monitoring Location Map
Figure 2
Area of Focus Water -Level Map — Upper Flow Zone (September 2023)
Figure 3A
Background Monitoring Well Hydrographs (GWA-4S/D and MW-4/D)
Figure 313
Perimeter Hydrographs (ILF-2S/D)
Figure 3C
Northwest of Cell 5 Hydrographs (CLF21-10 and CLF21-11)
Figure 3D
CLF-UD and Southwest of Cell 5 Hydrographs (CLF-UD and CLF21-12)
Figure 3E
East of Cell 6 Hydrographs (CLF21-14/R and CLF21-15)
Figure 3F
Future Phase 3 and 4 Hydrographs (CLF-301 and CLF-402)
Figure 3G
Cell 5 and Future Phase 5 (CLF21-13/R and CLF-401)
Figure 3H
Phase 3 Hydrographs (CLF22-305 and CLF22-306)
Figure 31
Within and South of Phase 4 Hydrographs (CLF22-307 and CLF23-405)
Figure 3J
Future Phase 4 and 5 Hydrographs (CLF23-406 and CLF23-407)
Figure 3K
Within Phase 4 Hydrographs (CLF23-408)
Figure 4A
Cell 5 (Underdrain) Pumping Flow Rate Vs. Simulated Flow Rate
Figure 413
Phase 3-5 Pumping Flow Rate Vs. Simulated Flow Rate
LIST OF TABLES
Table 1 Groundwater Monitoring Network Well Information and Water Levels
LIST OF APPENDICES
Appendix A Water -Level Monitoring Data Files
Appendix B Groundwater Model Predicted Trend File
Appendix C Dewatering/Underdrain Pumping Data Files
Appendix D Mann -Kendall Data
October 2023 Page ii
Project: 00.0083.46.09
Groundwater Conditions Quarterly Report — July 2023 to September 2023
Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1
Terrell, North Carolina
LIST OF ACRONYMS
CCR coal combustion residuals
Duke Energy Duke Energy Carolinas, LLC
DWM Division of Waste Management
Future Phases ILF Phases 3, 4, and 5 expansion
gpm
ILF
NCDEQ
NPDES
reporting period
Site
gallons per minute
Industrial Landfill 1812-INDUS-2008
North Carolina Department of Environmental Quality
National Pollutant Discharge Elimination System
third quarter 2023 (July 2023 to September 2023)
Marshall Steam Station
October 2023 Page Hi
Project: 00.0083.46.09
Groundwater Conditions Quarterly Report — July 2023 to September 2023
Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1
Terrell, North Carolina
1.0 INTRODUCTION
1.1 Objectives and Purpose
• SynTerra prepared this Groundwater Conditions Quarterly Report on behalf of Duke
Energy Carolinas, LLC (Duke Energy) to document the water -level monitoring data and
dewatering/underdrain pumping records in the vicinity of the Industrial Landfill No.1
(ILF) (Permit No. 1812-INDUS-2008) at the Marshall Steam Station (Site). This report is
prepared in response to condition #3 in the North Carolina Department of
Environmental Quality (NCDEQ) Division of Waste Management (DWM) September 17,
2021, Phase 2 Permit Modification Approval letter (FID 1609547).
Data collected during the third quarter of 2023 (July 2023 to September 2023) reporting
period were used to evaluate groundwater conditions for the ILF Phase 2 expansion
(includes Cell 5 and Cell 6) and ILF Future Phases 3, 4, and 5 expansion (Future Phases).
Specifically, this report evaluates the groundwater levels, dewatering/underdrain
pumping flow rates, and efforts to expedite reducing and maintaining groundwater
levels near the ILF during the reporting period.
1.2 Key Findings
Key findings of the evaluation conducted during this reporting period include:
• Groundwater levels in the area are generally stable or decreasing.
• Water levels have been maintained at less than or approximately equal to modeled
predictions in most areas, with the exception of thirteen locations (CLF-305, CLF-306,
CLF-307, CLF-401, CLF-402, CLF21-13R, CLF21-14, GWA-4D, ILF-2D, CLF23-405, CLF23-
406, CLF23-407, CLF23-408). However, during the reporting period, these water levels
were either decreasing or stable. Water levels higher than model predictions generally
represent the effects of a slower excavation rate than assumed in the model.
The Cell 5 underdrain pump has been operational for 25 months with an average
pumping rate of 9 gallons per minute (gpm). The Future Phases dewatering pumped at
an average flow rate of 119.1 gpm during July until the pump was moved in July 2023 to
a new downstream location to support ash basin closure. While the flow rates vary, the
overall trends reasonably match the model predictions. The model predicted the
underdrain to become dry after approximately 19 months of operation; however, the
slower excavation rate has extended the period needed to operate the underdrain.
October 2023 Page 1-1
Project: 00.0083.46.09
Groundwater Conditions Quarterly Report — July 2023 to September 2023
Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1
Terrell, North Carolina
2.0 QUARTERLY MONITORING RESULTS
The established network of temporary and long-term piezometers and groundwater wells for
monitoring groundwater conditions in the ILF Phase 2 expansion area is shown on Figure 1.
Piezometer and groundwater well construction information (including water level and
groundwater elevations) for the monitoring network is included in Table 1.
2.1 Current Groundwater Conditions
Area of focus water levels were collected on September 27, 2023, for the upper (shallow) flow
zone and were used to generate a groundwater level map (Figure 2). Site -wide water level
sweeps occur semiannually during the second and fourth quarter. Observed groundwater levels
during this reporting period indicate:
• Groundwater is generally flowing north to south through the ILF area (Figure 2).
• Some groundwater levels within and near the ILF have decreased slightly, relative to
groundwater levels from Quarter 2, 2023. However, most of the groundwater levels
near the ILF remain relatively similar in elevation to that of Quarter 2, 2023.
• Underdrain operations in Cell 5 have maintained a cone of groundwater depression
around the Cell 5 blanket underdrain sump (CLF-UD, Figure 2).
2.2 Groundwater Trends
A series of groundwater monitoring wells, piezometers, and the Cell 5 underdrain (CLF-UD)
pump transducers are used to monitor water -level trends from as early as July 2021 through
September 2023 (Figures 3A through 3J). The following are key observations of overall trend
data:
• Groundwater level data collected from July 2021 (when close monitoring started)
through September 2023 were evaluated using Mann -Kendall analysis to determine
water -level trends. Statistically significant decreasing trends were observed in 21 of 26
locations. Stable trends were observed at two locations (CLF21-13R and CLF23-407).
Increasing trends were observed at CLF-UD, CLF21-12, and CLF21-14, however none of
these locations had increasing trends during the reporting period.
• Generally, decreasing or stable trends were observed in locations downgradient of the
Future Phases area during the reporting period (July 2023 through September 2023) and
decreasing trends for the overall reporting period (July 2021 through September 2023).
2.2.1 Water -Level Hydrographs and Model Trends
Pressure transducers are used to record high -resolution groundwater elevation data for
evaluation of groundwater conditions resulting from dewatering and excavation.
Transducer data in Excel spreadsheets are included in Appendix A. Manual water -level
measurements and transducer records were used to generate hydrographs. Predicted
groundwater level trends from the transient groundwater models are included in the
October 2023 Page 2-1
Project: 00.0083.46.09
Groundwater Conditions Quarterly Report — July 2023 to September 2023
Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1
Terrell, North Carolina
hydrographs (Figures 3A through 3L). Appendix B contains Excel spreadsheets with the
predicted transient groundwater level trends exported from the models.
Upgradient of the Phase 2 Expansion:
• Monitoring locations GWA-4S/D and CLF21-10 are west of the ILF Phase 2
expansion (Figure 1). The shallow and deep flow zone water levels at those
locations have overall decreasing trends and showed decreasing trends during
the reporting period (Figures 3A and 3C).
ILF-2S/D are located north of the ILF (Figure 1). The shallow and deep flow zones
water levels have an overall decreasing trend and show decreasing trends during
the reporting period (Figure 313).
• MW-4/D are located east of the ILF Phase 2 expansion (Figure 1). The shallow
and deep flow zone water levels at those locations have overall decreasing
trends. MW-4 shows a significantly decreasing trend over the reporting period
whereas MW-41D is stable during the reporting period (Figure 3A).
Within the Phase 2 Expansion:
• A transducer, identified as CLF-UD (Figure 1), was installed to monitor the Cell 5
underdrain sump water level with the temporary pump operations while the
landfill cell was under construction. In October 2022, a permanent pump was
installed; the water level in the permanent pump is recorded manually every
week. The water levels within the sump demonstrate that the underdrain
continues to operate as intended, maintaining a steady water level controlled by
the pump settings (Figure 3D).
Perimeter of the Phase 2 Expansion:
• CLF21-11, CLF21-12, and CLF21-13R are located west and south of Cell 5. Shallow
water levels at CLF21-11 show an overall decreasing trend but displays a general
increasing trend during the reporting period. Water levels in CLF21-12 show an
increasing trend overall since completion of the Cell 5 construction and remains
stable during the reporting period. CLF21-13R water levels are overall stable but
have significantly decreased during the reporting period (Figures 3C, 313, and
3G).
• Monitoring locations CLF21-14R and CLF21-15 are west of Cell 6 (Figure 1).
Water levels in CLF21-14R have an overall increasing trend since ash excavation
is complete for Cell 6, however the water levels are decreasing over the
reporting period. CLF21-15 has a decreasing trend overall and during the
reporting period (Figure 3E).
October 2023 Page 2-2
Project: 00.0083.46.09
Groundwater Conditions Quarterly Report — July 2023 to September 2023
Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1
Terrell, North Carolina
Within the Future Phase 3 Expansion:
• Monitoring locations CLF-301 and CLF22-305 are within the Future Phase 3
expansion (Figure 1). Shallow water levels at CLF-301 and CLF22-305 have an
overall decreasing trend; CLF-301 has a decreasing trend during the reporting
period, and CLF22-305 has decreased during the reporting period until the water
level dropped below the transducer (Figures 3F and 3H).
Downgradient of the Phase 2 Expansion (Future Phases Area):
• Monitoring locations CLF-401 and CLF-402 are within Future Phases 4 and 5
expansion (Figure 1). Shallow water levels at CLF-401 and CLF-402 have an
overall decreasing trend and were decreasing during the reporting period
(Figures 3G and 3F).
• Monitoring locations CLF22-306 and CLF22-307 are downgradient of the Future
Phase 3 expansion (Figure 1). Shallow water levels at CLF22-306 and CLF22-307
show decreasing levels overall. Both CLF22-306 and CLF22-307 show decreasing
trends during the reporting period. (Figures 3H and 31).
• Monitoring locations CLF23-405, CLF23-406, CLF23-407, and CLF23-408 located
in the Future Phases 3 and 4.
• Overall water levels have a decreasing trend. (Figure 31, 3J, and 3K).
2.3 Dewatering and Underdrain Pump Performance
A primary excavation and construction dewatering pump is located at the downgradient edge
of ILF Future Phases (Figure 1). An underdrain pump is installed within the Cell 5 underdrain
(CLF-UD). The dewatering pump removes ash pore water and precipitation runoff to support
ash excavation, while the underdrain pump removes groundwater from below the ILF Phase 2,
Cell 5. The Cell 5 underdrain pump does not receive precipitation runoff; the underdrain is
enclosed. Water removed by each pump is discharged to the lower portion of the ash basin
where it is ultimately pumped through a water treatment system and discharged through an
NPDES (National Pollutant Discharge Elimination System) outfall.
The Cell 5 underdrain pumping and model -predicted dewatering rates are shown on
Figure 4A. Model -predicted and measured flow rates from the Future Phases excavation
dewatering pump are shown on Figure 413.
The Cell 5 underdrain pump has been operational for 25 months, at an average pumping rate
for the reporting period of 9 gpm. The flow rate of the Future Phases dewatering pump
decreased to an average of 119 gpm (during July 2023) from an average of 177 gpm during the
prior reporting period. The Future Phases pump was moved downstream within the ash basin
during the reporting period, and now collects ash basin dewatering flows from a broader area
than what was included in the groundwater model. Therefore, the Future Phases pumping data
is not an accurate comparison to model predictions and will no longer be included in quarterly
October 2023 Paee 2-3
Project: 00.0083.46.09
Groundwater Conditions Quarterly Report — July 2023 to September 2023
Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1
Terrell, North Carolina
reports going forward. ILF Cell 5 and Future Phases pumping data, including the calculated
monthly total volume pumped and monthly average flow rate, per location, are included in
Appendix C.
Combined pumping operations for the Cell 5 underdrain and the Future Phases dewatering area
have removed approximately 4 million gallons of water during the reporting period. The Cell 5
underdrain average flow rates for the reporting period and each month are listed below.
• The Cell 5 underdrain pump had an average flow rate of 12.4 gpm overall during the
reporting period and monthly average flow rates of:
o 13.8 gpm during July 2023
o 12.7 gpm during August 2023
o 10.6. gpm during September 2023
The Future Phases pump had an average flow rate of 119.1 gpm monthly average flow rates in
early -July prior to being moved later in July 2023.
October 2023 Page 2-4
Project: 00.0083.46.09
Groundwater Conditions Quarterly Report — July 2023 to September 2023
Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1
Terrell, North Carolina
3.0 QUARTERLY WATER -LEVEL REDUCTION ACTIVITIES
Efforts made during the reporting period by Duke Energy to safely expedite the reduction of
groundwater levels within the ILF Phase 2 expansion and the Future Phases include:
Cell 5
• Underdrain operations continued, with an average flow rate of approximately 12.4 gpm.
• Cell 5 operations continue.
Cell 6
• Cell 6 operations began on October 9, 2023.
Future Phases
• Excavation of coal combustion residuals (CCR) in the Future Phases continued during the
reporting period.
• The Future Phases pump was moved downstream within the ash basin during the
reporting period, and now collects ash basin dewatering flows from a broader area than
what was included in the groundwater model. Therefore, the Future Phases pumping
data is not an accurate comparison to model predictions and will no longer be included
in quarterly reports going forward. During the period of operations within the future
phases in July 2023, the pump operated at an average 119.11 gpm.
• The installation of approximately 136 dewatering wells was completed during the
reporting period to support the construction of the Structural Fill (CC130031) northern
stability feature. The dewatering wells are phase 1 of a larger scale dewatering system
that is expected to temporarily influence the groundwater elevations in the vicinity of
ILF Future Phases nearest the stability feature dewatering system. Note the dewatering
system to support construction of the stability feature was not included in the
groundwater model simulations.
October 2023 Page 3-1
Project: 00.0083.46.09
Groundwater Conditions Quarterly Report — July 2023 to September 2023
Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1
Terrell, North Carolina
4.0 REFERENCES
SynTerra (2021). Technical Memorandum: Modeling Support for the ILF Phase 2 Permit to
Construct Modification, Marshall Steam Station. October S, 2021.
October 2023 Page 4-1
Project: 00.0083.46.09
Groundwater Conditions Quarterly Report — July 2023 to September 2023
Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1
Terrell, North Carolina
FIGURES
L7
synTerra
Science & Engineering Consultants
r �
ei
ILF 2S/D ®
ol wt -
lar
• U,
CLIF 10 _
920
s, • • 1 os° 910 �' - r_,' a,•x`.: r y^ iI I •V
GWA-4S/D
ti^ — CLF21-18 MW-4 _ •I •
. - .r ■ — 850 CLF21-19 +��' 4.
` ! a. °"
CLF21-11 830
c .,� • a -•ram,. r, - r ,
CLF21 20 , v`_ ` ;' •ftftft
►` ' CLF21-15 1 LEGEND
LONG-TERM PIEZOMETER AND/OR
° GROUNDWATER MONITORING WELL
1sli'.-� .±�� ■ � . �.�a.- - - CLF21-17 � - FO ti �y
CLF21-13® p a TEMPORARY PIEZOMETER
- '" % �, CLF21-13R _ •jyaj•� I." ' - 1 � CLF21-14 3. ♦ � DEWATERING OR UNDERDRAIN PUMP
� ABANDONED PIEZOMETER
du • �' \ m1° �' ,x�i =---; ASH BASIN WASTE BOUNDARY
CLF-301
a8o Bdq GEOGRAPHIC LIMITATION
LANDFILL COMPLIANCE BOUNDARY
Hp CLF-401----��. ' i o
yfr" ; V g20 e ��_ ` �! g•� e1 ----' STRUCTURAL FILL BOUNDARY
• • �, . LANDFILL BOUNDARY
s
LEACHATE BASIN
O.
DUKE ENERGY CAROLINAS PROPERTY LINE
CLF-402
TOPOGRAPHIC CONTOUR 10' INTERVAL
CLF-403 7 •► pe r OB 3 (MW 7) ( )
•, STREAM (MCKIM & CREED)
CLF23-4o8 0 0I ® WETLAND (MCKIM & CREED)
l CLF22-305 \
NOTES:
•4' ;a 0 � o
p d • r 1. THE CLF-UD LOCATION WAS FORMERLY KNOWN AS CELL 5 PUMP.
4 CLF22-306:• 2. ALL BOUNDARIES ARE APPROXIMATE.
CLF-404 °°
3. THE STREAMS AND WETLANDS JURISDICTIONAL DETERMINATION WAS APPROVED
*' CLF23-405 ° ■ • ° BY THE US ARMY CORPS OF ENGINEERS ON OCTOBER 25, 2017 (SAW-2015-01412).
- •` n' = _ _ '� _ 1 S WETLANDSAND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER
�y � o ` WHEELER ENVIRONMENTAL AND INFRASTRUCTURE, INC. NATURAL RESOURCES
V. 11>; ' :".1''� '•--.o LTy + �°NO.�' -' _ 2 TECHNICAL REPORT (NRTR) DATED JUNE 2015.
' 4. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS.
.. Q) FUTURE
Q ' a . : 5. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD
.o,+h„4PHASES PUMP '� ''= NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES. TOPOGRAPHY PROVIDED
890 �` v BY TRANSASH.
•a • " 6. AERIAL IMAGERY IS A COMBINATION OF DUKE ENERGY PROPELLER AERIAL
CLF22-307 _ o a PHOTOGRAPHY COLLECTED ON MAY 8, 2023, AND MAXAR SATELLITE IMAGERY
OBTAINED FROM ESRI ONLINE, COLLECTED ON AUGUST 23, 2021.
CLF-304 7. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINASTATE PLANE
COORDINATE SYSTEM FIPS 3200 (NAD83).
f'DUKE 200 ORAPHICSC200 400 FIGURE 1
ENERGY MONITORING LOCATION MAP
CAROLINAS DRAWN l (IN FEET)
ING DATE: 04/28/2022 GROUNDWATER CONDITIONS QUARTERLY REPORT
REVISED BYTLKFOREMAN DATE:110/30/2023 JULY 2023 THROUGH SEPTEMBER 2023
CHECKED BY: T. COLTON DATE: 10/30/2023
7 APPROVED BY:T.COLTON DATE:10/30/2023 MARSHALL STEAM STATION
synTerrd PROJECT MANAGER: T. COLTON TERRELL NORTH CAROLINA
' www.synterracori).com
PAO ARCGIS PRO PROJECTS\DUKE ENERGY\MARSHALL\2023\GW CONDITIONS QUARTERLY REPORT\GW CONDITIONS OUARTERLY REPORT 02.APRX
40000.�
♦
a �yR.ar
•�e°�,! � ,yam
10000%01
P: � 401 1
F.. �pryy CLF21-10
�• �p5 ' 840.14
■ .. 4 GWA-4S
I -.-- ......
ILF2S
840.89
b.`^i _ ♦ ■
IN
-940 930- ♦ �� , LEGEND
° - WELL ID
910 - - , t ' =• ` _ 76s.8o WATER LEVEL (NAVD 88, FEET)
MW 4 BACKGROUND MONITORING WELL
1 . i !`� I j - -870Pft�- 828.51 MONITORING WELL
a5o� C PIEZOMETER
° r.,< •�'I� •;Y � I♦ I ♦ CL0F21- 11
` ._., . j --��-•8-2 5.C.6 t; �tV oc ° '■�' s ' ♦ .•:
-
ABANDONEDPIEZOMETER826.49 LF21-16
WELL ABANDONED
b--♦ ���
"•a225 -� 1"'. DEWATERING OR UNDERDRAIN PUMP
.y. ♦/� S
../
�xN
880
00
I�
1-7
I40
i °♦ - A- --- INFERRED WATER LEVEL CONTOUR 2.5' INTERVAL
' I � CLF-UD � � CLF21-15 {. �' ( )
823.89
� CLF21-12 � 1 ������� GROUNDWATER FLOW DIRECTION
FUTURE PHASES
h I CLF21-17 4f , �. -� " [ " : - _ ASH BASIN WASTE BOUNDARY
- J -, CLF21-13R f ,1 � �
r 817108 _ =21-13 CLF21-14R GEOGRAPHIC LIMITATION
`
�♦ : ♦ CLF21 14 820 2w , _ LANDFILL COMPLIANCE BOUNDARY
4f I -------815-- - o
a _ y ---- CLF-301 - �` �`"� - - - STRUCTURAL FILL BOUNDARY
I�i't _ a12.s -� - 812.04 LANDFILL BOUNDARY
�L 810--- CLF23407�-- ♦ 1�°�--1 ��� aL� 03.69
YT - 806 12 k )' \' 1 / LANDFILL CELL 5 AND 6 BOUNDARY
LEACHATE BASIN
DUKE ENERGY CAROLINAS PROPERTY LINE
ski TOPOGRAPHIC CONTOUR (10' INTERVAL)
STREAM (MCKIM &CREED)
i
tJ ��`+\`N\ `� xj 900 �AL-3S 0 WETLAND (MCKIM & CREED)
i
CLF-302 o
�l . , �- `�- v �i�•%N: a � �� ♦ MW-7 (OB-3) o` NOTES:
1. WATER LEVELS WERE COLLECTED ON 9/27/2023.
797.81 (�` `~ �; ♦` ` �� ° 2.' - UNDERDRAIN/DEWATERING PUMP ELEVATION. WATER LEVEL CONTROL POINT.
CLF22-305 3. "- FUTURE PHASES PUMP LOCATION IS FOR REFERENCE ONLY. NOTA WATER
jo `2 • o:,��"-...a �.� 800.62 1 LEVEL CONTROL POINT.
? 4. ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF
N, \i CLF22-306 ,f 1988 (NAVD 88).
)1 CLF-404 797.63
J w� 5. THE STREAMS AND WETLANDS JURISDICTIONAL DETERMINATION WAS
'k, L CLF-303 o APPROVED BY THE US ARMY CORPS OF ENGINEERS ON OCTOBER 25, 2017
CLF23-405)--�` (SAW-2015-01412). WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM
PVS= aJ )a 797.92 �9� 5'� AMEC FOSTER WHEELER ENVIRONMENTAL AND INFRASTRUCTURE, INC. NATURAL
C,. - a RESOURCES TECHNICAL REPORT (NRTR) DATED JUNE 2015.
1' AB-15S _ •�. 6. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD
�, NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES. TOPOGRAPHY PROVIDED
BY TRANSASH.
R.QD B V AB-15SL r'
-�o FUTURE , 7. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS.
CLF22-307 PHASES PUMP J .AL-2S S.ALL BOUNDARIES ARE APPROXIMATE.
` $r"
r ''t 796.60 "O 9. AERIAL IMAGERY IS A COMBINATION OF DUKE ENERGY PROPELLER AERIAL
N a / PHOTOGRAPHY COLLECTED ON MAY 8, 2023, AND MAXAR SATELLITE IMAGERY
-�°'b'• - ; S - CLF-304 • e o ° C OBTAINED FROM ESRI ONLINE, COLLECTED ON AUGUST 23, 2021.
-:®-�+, , t",`z�• • f�• - p° e - 10. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE
PLANE COORDINATE SYSTEM FIPS 3200 (NAD83).
GRAPHIC SCALE
,. 84o > -c+ Cr DUKE 200 0 200 400 FIGURE 2
�C> ENERGY (IN FEET) AREA OF FOCUS WATER -LEVEL MAP
'>...
v CAROLINAS UPPER FLOW ZONE SEPTEMBER 2023
•• _T.•."- •�-,r'..�•- DRAWN BY: T. KING DATE: 05/12/2022 GROUNDWATER CONDITIONS QUARTERLY REPORT
- • � REVISED BY: L. FOREMAN DATE: 10/30/2023
CHECKED BY: T. COLTON DATE: 10/30/2023 JULY 2023 THROUGH SEPTEMBER 2023
APPROVED BY: T.COLTON DATE:10/30/2023 MARSHALL STEAM STATION
synTerra PROJECT MANAGER: T COLTON
TERRELL, NORTH CAROLINA
www.synterracorl).com
P:\0 ARCGIS PRO PROJECTS\DUKE ENERGY\MARSHALL\2023\GW CONDITIONS OUARTERLY REPORT\GW CONDITIONS OUARTERLY REPORT 02.APRX
Lr
-_•805.
' �-�.
GWA-04S/D
MW-04/D
852
4
833
4
851
00
832
I •.O
00
O
3
00 .4
3
a 850
a 831
O
z
v
oo
o
♦
z
v �♦
c 849
�
2
c 830
2
♦
M
>
iE
>
c
u, 848
—
O O
p
°c
uw 829
I
00�1
J
p
J O.
1
v 847
♦
°�{ 828 I I
I l
846
0
827
0
6/1 /2021
10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023
6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023
Date
Date
GWA-04S - Total water level change from transducer installation on 07/30/2021 to 07/26/2023 is -3.5 feet.
MW-04 - Total water level change from transducer installation on 07/30/2021 to 09/26/2023 is -3.9 feet.
GWA-04D - Total water level change from transducer installation on 07/30/2021 to 07/26/2023 is -4.2 feet.
MW-04D - Total water level change from transducer installation on 07/30/2021 to 09/26/2023 is -4.3 feet.
GWA-04S/D
MW-04/D
837
855
00
00
0 852
p
p
a 834
a
o
z
z
I
U.
0 0
to --------���
m849
Op ��
831 :;oo
�
Uj O O
a>
i
O O _
w
I
p O
>
O D
a�i
J 846
O O
v
m 828
825
843
6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023
6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023
Date
Date
LEGEND Notes:
Cell 5 construction start (05/31/2021) NAVD 88 —North American Vertical
� DUKE
DRAWN BY: D. AVARD DATE: 07/21/2021
FIGURE 3A
BACKGROUND MONTIORING WELL HYDROGRAPHS—
Future Phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988
ENERGY..
REVISED BY: D. AVARD DATE: 10/09/2023
INDUSTRIAL LANDFILL NO 1.
Cell 5 Blanket Underdrain construction start (9/20/2021)
Ft - Feet
RQl INAS
CHECKED BY: T. COLTON DATE: 10/11/2023
(1812-INDUS) PHASE 2 EXPANSION
Cell 5 Blanket Underdrain construction completion (10/22/2021)
in - inches
APPROVED BY:T. COLTON DATE: 10/11/2023
GROUNDWATER CONDITIONS QUARTERLY REPORT
Shallow Groundwater Flow Zone (Transducer Data)
110,
JULY 2023 THROUGH SEPTEMBER 2023
Deep Groundwater Flow Zone (Transducer Data) ♦ Manual Water Level Measurement
PROJECT MANAGER: T. COLTON
MARSHALL STEAM STATION
Bedrock Groundwater Flow Zone (Transducer Data)
Daily Total Rainfall (inches)
�T a
TE N
TERRELL, NORTH CAROLINA
— — - Transient Groundwater Model Water Level Predicted Trend
www.synterracorp.com
00
0
a
z
c
0
41
M
LLI
a�
d
J
N
M
ILF-02S/D
846 -
845 -
844 -
843 -
842 -
841 -
840
6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023
Date
ILF-02S - Total water level change from transducer installation on 07/30/2021 to 06/28/2023 is -0.8 feet.
ILF-02D - Total water level change from transducer installation on 07/30/2021 to 06/28/2023 is -1.3 feet.
ILF-02S/D
849 -
846 -
843 -
840 -
837
6/1 /2021
■
1pill��
�1111F1IMP111101hI�I�IM
12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023
Date
4
3
c
2 Space Not Used
1
0
Space Not Used
LEGEND
Cell 5 construction start (05/31/2021)
Notes:
NAVD 88 — North American Vertical
DUKE
DRAWN BY: D. AVARD
DATE:07/21/2021
FIGURE 3B
PERIMETER HYDROGRAPHS — INDUSTRIAL LANDFILL NO 1.
ENERGY.
REVISED BY: D. AVARD
DATE: 10/09/2023
Future Phases 3 through 5 CCR excavation start (06/18/2021)
Datum 1988
CAROI INAS
(1812-INDUS) PHASE 2 EXPANSION
Cell 5 Blanket Underdrain construction start (9/20/2021)
Ft -Feet
CHECKED BY: T. COLTON
DATE: 10/11/2023
GROUNDWATER CONDITIONS QUARTERLY REPORT
Cell 5 Blanket Underdrain construction completion (10/22/2021)
in -inches
APPROVED BY: T. COLTON
DATE: 10/11/2023
JULY 2023 THROUGH SEPTEMBER 2023
Shallow Groundwater Flow Zone (Transducer Data)
♦
Manual Water Level Measurement
PROJECT MANAGER: T. COLTON
MARSHALL STEAM STATION
Deep Groundwater Flow Zone (Transducer Data)
— — - Transient Groundwater Model Water Level Predicted Trend
Daily Total Rainfall (inches)
synTerra
TERRELL, NORTH CAROLINA
www.synterracorp.com
CLF21-10
CLF21-11
843
842
00
a
a 841
z
LPL
c 840
O
M
a�
�iD2•J
v
J
L
838
M
Mo
* 4> *0*111111l �
4
3
KA
1
837 0
6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023
Date
CLF21-10 - Total water level change from transducer installation on 08/10/2021 to 09/26/2023 is -0.9 feet.
a
00
842
a
z
Lj-
c
840
41
M
a�
LJJ
GJ
>
838
v
r
M
836 -L1--
6/1 /2021
CLF21-10
12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023
Date
C
4-
c
00
a
z
LL
C
O
co
_O
W
a�
a�
J
L
a1
m
-
sE
832
830
828
826
824
822
M
3
1
820 0
6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023
Date
CLF21-11- Total water level change from transducer installation on 08/09/2021 to 09/26/2023 is -4.0 feet.
CLF21-11
834
831
828
825
822 -L+--
6/1 /2021
\
\
\
12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023
Date
LEGEND
Notes:
t DUKE
DRAWN BY: D.AVARD
DATE:07/21/2021
FIGURE 3C
Cell 5 construction start (05/31/2021)
NAVD 88 - North American Vertical
ENERGY.;
REVISED BY: D. AVARD
DATE: 10/09/2023
NORTHWEST OF CELL 5 HYDROGRAPHS - INDUSTRIAL LANDFILL NO 1.
Future phases 3 through 5 CCR excavation start (06/18/2021)
Datum 1988
RQl INAS
(1812-INDUS) PHASE 2 EXPANSION
Cell 5 Blanket Underdrain construction start (9/20/2021)
Ft -Feet
CHECKED BY: T. COLTON
DATE: 10/11/2023
GROUNDWATER CONDITIONS QUARTERLY REPORT
`�
Cell 5 Blanket Underdrain construction completion (10/22/2021)
in -inches
APPROVED BY: T. COLTON
DATE: 10/11/2023
JULY 2023 THROUGH SEPTEMBER 2023
Shallow Groundwater Flow Zone (Transducer Data)
Manual Water Level Measurement
PROJECT MANAGER:T.COLTON
MARSHALL STEAM STATION
- Transient Groundwater Model water level predicted trend
Daily Total Rainfall (inches)
syriTeria
TERRELL NORTH CAROLINA
www.synterracorp.com
CLF-LID
CLF21-12
818 -
[.,SET.
00
00
0
a
z 814
+;
ILL
0
> 812
2
W
N
>
L 810 -
r
M
Il
3
KA
1
c
4-
c
808 0
6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023
Date
CLF-UD— Water level is stable during underdrain operations. Water levels spikes represent when pump was temporarily out of service.
CLF-UD
819 r�
p 816
a
z
41
Lj-
c
41
813
M
>
GJ
W
W
>
GJ
810
v
r
M
807 -L1--
6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023
Date
-
824
823
822
821
820
819
818
6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023
Date
CLF21-12 - Total water level change from transducer installation on 08/09/2021 to 09/26/2023 is -2.7 feet.
CLF21-12
825
OD
O
00
I
0
a 820
p
z
c
0
> 815
a�
W
N
>
I
N
J
L
810
I
sE
805 '1 L
6/1 /2021
12/1 /2021 6/1 /2022
Date
O o
12/1/2022 6/1/2023
4
3
c
2
1
0
c
of6c
LEGEND
Cell 5 construction start (05/31/2021)
Notes:
DUKE
DRAWN BY: D.AVARD
DATE:07/21/2021
FIGURE 3D
CLF-UD AND SOUTHWEST OF CELL 5 HYDROGRAPHS -
NAVD 88 — North American Vertical
ENERGY
REVISED BY: D. AVARD
DATE: 10/09/2023
Future phases 3 through 5 CCR excavation start (06/18/2021)
Datum 1988
.
INDUSTRIAL LANDFILL NO 1.
Cell 5 Blanket Underdrain construction start (9/20/2021)
Ft -Feet
CAROLINAS
CHECKED BY: T. COLTON
DATE: 10/11/2023
1812-INDUS PHASE 2 EXPANSION
( �
Cell 5 Blanket Underdrain construction completion (10/22/2021)
in -inches
APPROVED BY:T. COLTON
DATE: 10/11/2023
GROUNDWATER CONDITIONS QUARTERLY REPORT
Shallow Groundwater Flow Zone (Transducer Data)
`,�
PROJECT MANAGER: T. COLTON
JULY 2023 THROUGH SEPTEMBER 2023
- Transient Groundwater Model water level predicted trend
Manual Water Level Measurement
MARSHALL STEAM STATION
Daily Total Rainfall (inches)
�Ta
www.synterracorp.com
TERRELL NORTH CAROLINA
CLF21-14/R
CLF21-15
823 -
822 -
00
a821
z
ILL
c 820
O
M
N
>
aj
J
L
818 -
M
r
III
'
III
11101111
4
3
KA
1
817- 0
6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023
Date
CLF21-14R - Total water level change from transducer installation on 04/08/2022 to 09/26/2023 is +1.9 feet.
• • • • • CLF21-14 - Total water level change from transducer installation on 08/13/2021 to 03/22/2022 is -3.3 feet.
CLF21-14/R
830 r�
a
00
825
a
z
ILL
41
820
M
>
GJ
W
810 -LIl--
6/1 /2021
12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023
Date
c
-
sE
828
825
822
819
816
t
c
6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023
Date
CLF21-15 - Total water level change from transducer installation on 08/13/2021 to 03/30/2023 is -3.5 feet. The CLF21-15 transducer was removed in April 2023.
The transducer was re -installed in July 2023. Total water level change from transducer installation on 07/31/2023 to 09/26/2023 is +0.3 feet.
CLF21-15
828
825
822
819
816 -L --
6/1 /2021
.7
0
0
o
00
�
�O
p00
O
O
O
12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023
Date
LEGEND
Cell 5 construction start (05/31/2021)
Notes:
NAVD 88 - North American Vertical
DUKE
DRAWN BY: D.AVARD
DATE:07/21/2021
FIGURE 3E
EAST OF CELL 6 HYDROGRAPHS - INDUSTRIAL LANDFILL NO 1.
ENERGY.
REVISED BY: D. AVARD
DATE: 10/09/2023
Future phases 3 through 5 CCR excavation start (06/18/2021)
Datum 1988
CAROI INAS
(1812-INDUS) PHASE 2 EXPANSION
Cell 5 Blanket Underdrain construction start (9/20/2021)
Ft -Feet
CHECKED BY: T. COLTON
DATE: 10/11/2023
GROUNDWATER CONDITIONS QUARTERLY REPORT
`�
Cell 5 Blanket Underdrain construction completion (10/22/2021)
in -inches
APPROVED BY: T. COLTON
DATE: 10/11/2023
JULY 2023 THROUGH SEPTEMBER 2023
Shallow Groundwater Flow Zone (Transducer Data)
Manual Water Level Measurement
PROJECT MANAGER:T.COLTON
MARSHALL STEAM STATION
- Transient Groundwater Model water level predicted trend
p
Daily Total Rainfall (inches)
�1��..i ery �
TERRELL NORTH CAROLINA
www.synterracorp.com
CLF-301
CLF-402
819 -
00 817
0
a
z
41Lj-
c 815
M
a�
W
N
a>i 813 -
J
L
M
i�
�I
i
1 711 7il
811
6/1 /2021 10/1 /2021 2/1 /2022 6/1/2022 10/1 /2022 2/1 /2023 6/1/2023
Date
CLF-301- Total water level change from transducer installation on 07/27/2021 to 09/26/2023 is -4.4 feet.
CLF-301
819
0 816
a
z
c
813
M
>
GJ
W
(IJ
>
GJ
810
v
r
m
807 -L+---
6/1 /2021
0
0 00 0
� � o
O
12/1/2021 6/1/2022 12/1/2022 6/1/2023
Date
0
3
KA
1
0
c
i
sE
814
811 -
!
805
g0
•O
00 0
O
802
6/1 /2021 10/1 /2021 2/1 /2022 6/1/2022 10/1 /2022 2/1 /2023 6/1/2023
Date
CLF-402 - Total water level change from transducer installation on 07/27/2021 to 09/26/2023 is -8.9 feet.
CLF-402
815
810
805
F-011111
795
6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023
Date
3
KA
1
0
c
LEGEND
Notes:
t DUKE
DRAWN BY: D.AVARD
DATE:07/21/2021
FIGURE 3F
Cell 5 construction start (05/31/2021)
NAVD 88 — North American Vertical
ENERGY.;
REVISED BY: D. AVARD
DATE: 10/09/2023
FUTURE PHASE 3 AND 4 HYDROGRAPHS — INDUSTRIAL LANDFILL NO 1.
Future phases 3 through 5 CCR excavation start (06/18/2021)
Datum 1988
RQl INAS
(1812-INDUS) PHASE 2 EXPANSION
Cell 5 Blanket Underdrain construction start (9/20/2021)
Ft -Feet
CHECKED BY: T. COLTON
DATE: 10/11/2023
GROUNDWATER CONDITIONS QUARTERLY REPORT
`�
Cell 5 Blanket Underdrain construction completion (10/22/2021)
in -inches
APPROVED BY: T. COLTON
DATE: 10/11/2023
JULY 2023 THROUGH SEPTEMBER 2023
Shallow Groundwater Flow Zone (Transducer Data)
Manual Water Level Measurement
PROJECT MANAGER:T.COLTON
MARSHALL STEAM STATION
- Transient Groundwater Model water level predicted trend
Daily Total Rainfall (inches)
syriTeria
TERRELL NORTH CAROLINA
www.synterracorp.com
CLF21-13/R
822
820
00
a818
z
LL
c 816
0
M
u' 814
G1
ai
812
M
810
4
3
2
1
0
6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023
Date
CLF21-13R - Total water level change from transducer installation on 11/08/2021 to 09/26/2023 is -1.1 feet.
CLF21-13 - Total water level change from transducer installation on 08/09/2021 to 10/01/2021 is -0.2 feet.
CLF21-13/R
825
0 820
a
z
815
M
>
GJ
W
W
>
810
M
SNovember
CLF21-13 was abandoned and replaced on
4, 2021.
♦
O
II
1
III I II
805 -L+---
6/1 /2021
O
O
O O
12/1/2021 6/1/2022 12/1/2022 6/1/2023
Date
818
00 815
a
z
4j
LL
c 812
0
a�
W
Gl
a>, 809
J
Gl
m
806
sE
CLF-401
0 0♦
6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023
Date
CLF-401- Total water level change from transducer installation on 07/27/2021 to 09/26/2023 is -8.5 feet.
CLF-401
820
815
E-511 t
805
E-1911M
795 ' 1 L
6/1 /2021
12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023
Date
4
3
KA
1
0
C
LEGEND
Cell 5 05/31/2021
Notes:
DUKE
DRAWN BY: D. AVARD
DATE:07/21/2021
FIGURE 3G
CELL 5 AND FUTURE PHASE 5 HYDROGRAPHS—
construction start ( )
NAVD 88 —North American Vertical
ENERGY
REVISED BY: D. AVARD
DATE: 10/09/2023
Future phases 3 through 5 CCR excavation start (06/18/2021)
Datum 1988
INDUSTRIAL LANDFILL NO 1.
Cell 5 Blanket Underdrain construction start (9/20/2021)
Ft -Feet
CAROLINAS
CHECKED BY: T. COLTON
DATE: 10/11/2023
(1812-INDUS) PHASE 2 EXPANSION
Cell 5 Blanket Underdrain construction completion (10/22/2021)
in -inches
APPROVED BY: T. COLTON
DATE: 10/11/2023
GROUNDWATER CONDITIONS QUARTERLY REPORT
Shallow Groundwater Flow Zone (Transducer Data)
`,�
PROJECT MANAGER: T. COLTON
JULY 2023 THROUGH SEPTEMBER 2023
- Transient Groundwater Model water level predicted trend
Manual Water Level Measurement
MARSHALL STEAM STATION
Daily Total Rainfall (inches)
�Ta
www.synterracorp.com
TERRELL NORTH CAROLINA
CLF22-305
CLF22-306
00
00
0
a
z
LPL
C
0
41
M
a�
W
N
>
J
L
M
812 -
E:TiEc1♦
799
792
CLF22-305 water level dropped below the
transducer as noted by manual water level
recordings starting 8/8/2023.
O
O
�I
♦
ILI
1'llll
�LaL
Date
CLF22-305 - Total water level change from transducer installation on 08/10/2021 to 09/26/2023 is -8.3 feet.
CLF22-305
0
3
ICI
1
0
C
4-
c
785 -4— '. r T
T 1 1
6/1 /2021 12/1 /2021 6/1 /2022
12/1 /2022 6/1 /2023
Date
CLF22-305 was not used in the Transient Groundwater Model calibration,
water level predictions were prepared following installation of
CLF22-305 (after Transient Groundwater Model calibration)
LEGEND
Notes:
DUKE
Cell 5 construction start (05/31/2021)
NAVD 88 — North American Vertical
ENERGY.
Future phases 3 through 5 CCR excavation start (06/18/2021)
Datum 1988
CAROLINAS
Cell 5 Blanket Underdrain construction start (9/20/2021)
Ft -Feet
Cell 5 Blanket Underdrain construction completion (10/22/2021) in - inches
Shallow Groundwater Flow Zone (Transducer Data)
110
-Transient Groundwater Model water level predicted trend
� Manual Water Level Measurement
Daily Total Rainfall (inches)
synTerra
i
sE
807
804
801
798
-d L
j
.
. . . . . . .
'A
795
6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023
Date
CLF22-306 - Total water level change from transducer installation on 08/13/2021 to 09/26/2023 is -4.9 feet.
CLF22-306
:M
792
784
776
3
1
0
6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023
Date
CLF22-306 was not used in the Transient Groundwater Model calibration, water level predictions were prepared following installation of
CLF22-306 (after Transient Groundwater Model calibration)
DRAWN BY: D. AVARD DATE: 07/21/2021 FIGURE 3H
REVISED BY: D. AVARD DATE: 10/09/2023 PHASE 3 HYDROGRAPHS — INDUSTRIAL LANDFILL NO 1.
CHECKED BY: T. COLTON DATE: 10/11/2023 (1812-INDUS) PHASE 2 EXPANSION
GROUNDWATER CONDITIONS QUARTERLY REPORT
APPROVED BY: T. COLTON DATE: 10/11/2023 DULY 2023 THROUGH SEPTEMBER 2023
PROJECT MANAGER: T. COLTON MARSHALL STEAM STATION
www.synterracorp.com TERRELL, NORTH CAROLINA
CLF22-307
CLF23-405
807 -
00 804
0
a
z
ILL
c 801
0
41
M
a�
W
N
a>i 798 -
4-1
GJ
M
1�
4
3
KA
1
795 0
6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023
Date
CLF22-307 - Total water level change from transducer installation on 04/08/2022 to 09/26/2023 is -6.2 feet.
CLF22-307
810
p 800
a
z
0 790
M
>
GJ
W
N
>
GJ
780
N
M
c
4-
c
i
807
804
801
798
4
3
1
795 0
6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023
Date
CLF23-405 - Total water level change from transducer installation on 03/01/2023 to 09/26/2023 is -6.7 feet.
CLF23-405
812
804
796
788
770 -L+-- 1. r T T 1 1780 'i ' - 1. 1-
6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 6/1/2021 12/1/2021
Date
6/1/2022 12/1/2022 6/1/2023
Date
CLF22-307 was not used in the Transient Groundwater Model calibration, water level predictions were prepared following installation of
CLF22-307 (after Transient Groundwater Model calibration)
LEGEND
Notes:
t DUKE
DRAWN BY: D.AVARD
DATE:07/21/2021
FIGURE 31
Cell 5 construction start 05/31/2021
( )
NAVD 88 —North American Vertical
ENERGY
REVISED BY: D. AVARD
DATE: 10/09/2023
WITHIN AND SOUTH OF PHASE 4 HYDROGRAPHS
Future phases 3 through 5 CCR excavation start (06/18/2021)
Datum 1988
INDUSTRIAL LANDFILL NO 1. - (1812-INDUS) PHASE 2 EXPANSION
Cell 5 Blanket Underdrain construction start (9/20/2021)
Ft - Feet
CAROLINAS
CHECKED BY: T. COLTON
DATE: 10/11/2023
GROUNDWATER CONDITIONS QUARTERLY REPORT
Cell 5 Blanket Underdrain construction completion (10/22/2021) in - inches
APPROVED BY: T. COLTON
DATE: 10/11/2023
JULY 2023 THROUGH SEPTEMBER 2023
Shallow Groundwater Flow Zone (Transducer Data)
�
Manual Water Level Measurement
PROJECT MANAGER: T. COLTON
MARSHALL STEAM STATION
-Transient Groundwater Model water level predicted trend
Daily Total Rainfall (inches)
WnTerra
TERRELL, NORTH CAROLINA
www.synterracorp.com
CLF23-406
CLF23-407
810
00 807
0
a
z
41
Lj-
c 804
0
.41
v
W
N
a, 801
J
L
M
798
6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023
Date
CLF23-406 - Total water level change from transducer installation on 03/01/2023 to 09/26/2023 is -9.7 feet.
CLF23-406
818
a
00
810
a
z
LL
c
0 802
++
M
>
GJ
W
N
>
OJ
794
a�
r
m
4
3
KA
1
0
c
i
sE
812
810
804
6/1 /2021 12/1 /2021 6/1/2022 12/1 /2022 6/1 /2023
Date
CLF23-407 - Total water level change from transducer installation on 03/01/2023 to 09/26/2023 is -2.5 feet.
CLF23-407
818
812
:I.
786 -4- '. 1 T T 1 1794 'i ' - '. 1
6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 6/1/2021 12/1/2021
Date
�o
0
6/1/2022 12/1/2022 6/1/2023
Date
M
3
1
0
CLF22-307 was not used in the Transient Groundwater Model calibration, water level predictions were prepared following installation of
CLF22-307 (after Transient Groundwater Model calibration)
LEGEND
Notes:
t DUKE
DRAWN BY: D.AVARD
DATE:07/21/2021
FIGURE 3.1
Cell 5 construction start 05/31/2021
( )
NAVD 88 -North American Vertical
ENERGY
REVISED BY: D. AVARD
DATE: 10/09/2023
FUTURE PHASE 4 AND 5 HYDROGRAPHS -INDUSTRIAL LANDFILL NO 1.
Future phases 3 through 5 CCR excavation start (06/18/2021)
Datum 1988
CAROLINAS
(1812-INDUS) PHASE 2 EXPANSION
Cell 5 Blanket Underdrain construction start (9/20/2021)
Ft -Feet
CHECKED BY: T. COLTON
DATE: 10/11/2023
GROUNDWATER CONDITIONS QUARTERLY REPORT
��
Cell 5 Blanket Underdrain construction completion (10/22/2021)
in -inches
APPROVED BY: T. COLTON
DATE: 10/11/2023
JULY 2023 THROUGH SEPTEMBER 2023
Shallow Groundwater Flow Zone (Transducer Data)
Manual Water Level Measurement
PROJECT MANAGER:T.COLTON
MARSHALL STEAM STATION
- Transient Groundwater Model water level predicted trend
Daily Total Rainfall (inches)
T�.pi ery �r—
�
TERRELL ' NORTH CAROLINA
www.synterracorp.com
CLF23-408
807 -
00 804
f7
a
z
ILL
c 801
0
41
M
a�
W
N
a>i 798 -
4-1
41
M
i
0
3
KA
1
795 0
6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023
Date
CLF23-408 - Total water level change from transducer installation on 03/21/2023 to 09/26/2023 is -5.9 feet.
CLF23-408
812
a
00
805
>
Q
z
a+
U-
r-
0 798
+j
M
a1
W
N
>
O1
791
a�
r
m
784 -L+---
6/1 /2021
<3
12/1/2021 6/1/2022 12/1/2022 6/1/2023
Date
c
4-
c
Space Not Used
Space Not Used
LEGEND
Cell 5 construction start (05/31/2021)
Notes:
NAVD 88 — North American Vertical
DUKE
DRAWN BY: D.AVARD
DATE:07/21/2021
FIGURE 3K
WITHIN PHASE 4 HYDROGRAPHS — INDUSTRIAL LANDFILL NO 1.
ENERGY.
REVISED BY: D. AVARD
DATE: 10/09/2023
Future phases 3 through 5 CCR excavation start (06/18/2021)
Datum 1988
CARC]LINAS
(1812-INDUS) PHASE 2 EXPANSION
Cell 5 Blanket Underdrain construction start (9/20/2021)
Ft -Feet
CHECKED BY: T. COLTON
DATE: 10/11/2023
GROUNDWATER CONDITIONS QUARTERLY REPORT
`�
Cell 5 Blanket Underdrain construction completion (10/22/2021)
in -inches
APPROVED BY: T. COLTON
DATE: 10/11/2023
JULY 2023 THROUGH SEPTEMBER 2023
Shallow Groundwater Flow Zone (Transducer Data)
Manual Water Level Measurement
PROJECT MANAGER:T.COLTON
MARSHALL STEAM STATION
- Transient Groundwater Model water level predicted trend
p
Daily Total Rainfall (inches)
�1��..i ery �
TERRELL ' NORTH CAROLINA
www.synterracorp.com
0-
W
a�
co
oc
O
U-
.ru
N
S✓
Ln
N
U
140
120
100
E1
FA
❑1
3
2
1
I
9/1/2021
3/1/2022
9/1/2022 3/1/2023 9/1/2023
Years
of Operation
Notes:
1. gpm = gallons per
minute.
2. Flow data from
the first day following a period of no flow were not plotted.
DUKE
DRAWN BY: T. COLTON
DATE: 10/13/2021
FIGURE 4A
4 ENERGY
c
REVISED BY: D. AVARD
CHECKED BY: T. COLTON
DATE: 10/09/2023
DATE: 10/11/2023
CELL 5 (UNDERDRAIN) PUMPING FLOW RATE VS. SIMULATED FLOW RATE
APPROVED BY: T. COLTON
DATE: 10/11/2023
GROUNDWATER CONDITIONS QUARTERLY REPORT
46�
PROJECT MANAGER: T. COLTON
JULY 2023 THROUGH SEPTEMBER 2023
synTerra
MARSHALL STEAM STATION
TERRELL, NORTH CAROLINA
www.synterracorp.com
500
A
CL
a0
(D 300
ca
DC
0
IL 200
Ln
W
cN
ca
100
4
LL
0 i -- - -
9/1/2021 12/1/2021 3/1/2022 6/1/2022 9/1/2022 12/1/2022 3/1/2023 6/1/2023
X Actual Pumping Flow Rate (gpm)
Years of Operation ■ Model Flow Rate (gpm)
Notes: Rainfall Daily Total (in)
1. gpm = gallons per minute.
2. Flow data from the first day following a period of no flow were not plotted.
3. Data through 7/15/2023
3
2
Ln
U
0
1 �
�U
v
0
DUKE
DRAWN BY: T. COLTON
DATE: 10/13/2021
FIGURE 413
4 ENERGY
REVISED BY: D. AVARD
DATE: 10/23/2023
c
CHECKED BY: T. COLTON
DATE: 10/23/2023
PHASE 3-5 PUMPING FLOW RATE VS. SIMULATED FLOW RATE
APPROVED BY: T. COLTON
DATE: 10/23/2023
GROUNDWATER CONDITIONS QUARTERLY REPORT
4610
PROJECT MANAGER: T. COLTON
JULY 2023 THROUGH SEPTEMBER 2023
MARSHALL STEAM STATION
synTena
www.synterracorp.com
TERRELL, NORTH CAROLINA
Groundwater Conditions Quarterly Report — July 2023 to September 2023
Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1
Terrell, North Carolina
TABLE
L7
synTerra
Science & Engineering Consultants
TABLE 1
GROUNDWATER MONITORING NETWORK WELL INFORMATION AND WATER LEVELS
GROUNDWATER CONDITIONS QUARTERLY REPORT
JULY 2023 THROUGH SEPTEMBER 2023
MARSHALL STEAM STATION
DUKE ENERGY CAROLINAS, LLC, TERRELL, NC
Well ID
Date Well/
Piezometer
Installed
Date
Transducer
Installed
Monitoring
Zone
Northing
(Ft-NAD 83)
Easting
(Ft-NAD 83)
Measuring Point
TOC Elevation
(Ft-NAVD 88)
Ground Surface
Elevation
(Ft-NAVD 88)
Total Well
Depth 2,3
(Ft-BGS)
Measured
Well Depth'
(Ft-TOC)
Screened
Interval 3
(Ft TOC)
Top of
Screen
Elevation
(Ft-NAVD 88)
Bottom
of Screen
Elevation
(Ft-NAVD 88)
Water Level
Measurement
(Ft-TOC)
08/08/2023
Groundwater
Elevation
(Ft-NAVD 88)
08/08/2023
Water Level
Measurement
(Ft-TOC)
09/07/2023
Groundwater
Elevation
(Ft-NAVD 88)
09/07/2023
Water Level
Measurement
(Ft-TOC)
9/27/2023
Groundwater
Elevation
(Ft-NAVD 88)
9/27/2023
CLF-301
5/21/2021
7/27/2021
Shallow
685838.40
1413513.30
847.46
844.46
62.00
65.00
52.00
62.00
795.46
785.46
34.89
812.57
35.21
812.25
35.42
812.04
CLF-303
5/12/2021
7/27/2021
Shallow
684951.10
1413840.30
824.31
822.31
40.00
42.00
30.00
40.00
794.31
784.31
Abandoned
Abandoned
Abandoned
CLF-304
5/24/2021
7/27/2021
Shallow
684062.20
1413563.40
823.28
821.28
60.00
62.00
50.00
60.00
773.28
763.28
Abandoned
Abandoned
Abandoned
CLF-401
5/17/2021
7/27/2021
Shallow
685783.50
1412779.50
832.44
830.44
39.00
41.00
29.00
39.00
803.44
793.44
24.55
807.89
25.19
807.25
25.65
806.79
CLF-402
5/21/2021
7/27/2021
Shallow
685598.80
1413217.80
818.41
816.41
50.00
52.00
40.00
50.00
778.41
768.41
14.13
804.28
15.00
803.41
15.55
802.86
CLF21-10
8/6/2021
8/6/2021
Shallow
687020.10
1412353.40
857.75
857.75
32.00
32.00
22.00
32.00
835.75
825.75
17.27
840.48
17.38
840.37
17.61
840.14
CLF21-11
8/5/2021
8/5/2021
Shallow
686572.30
1412572.20
850.17
850.08
40.00
41.64
31.64
41.64
818.53
808.53
23.73
826.44
23.75
826.42
23.68
826.49
CLF21-12
8/5/2021
8/5/2021
Shallow
686217.40
1412518.20
839.06
838.96
40.00
43.22
31.22
41.22
807.84
797.84
18.46
820.60
Inaccessible
18.76
820.30
CLF21-13R
11/4/2021
11/8/2021
Shallow
686085.92
1412818.66
836.21
836.2
35.00
37.46
25.46
35.46
810.75
800.75
17.60
818.61
Inaccessible
19.13
817.08
CLF21-14R
4/18/2022
4/18/2022
Shallow
686027.10
1414268.70
847.54
844.0
41.50
38.19
28.19
38.19
819.35
809.35
26.70
820.84
26.97
1 820.57
27.27
820.27
CLF21-15
8/10/2021
8/10/2021
Shallow
686307.70
1414410.00
864.37
864.37
55.00
55.00
45.00
55.00
819.37
809.37
Inaccessible
Inaccessible
40.48
823.89
CLF22-305
3/22/2022
4/8/2022
Shallow
685228.95
1413445.92
819.21
816.94
16.00
16.00
6.00
16.00
813.21
803.21
17.78
801.43
18.61
800.60
18.59
800.62
CLF22-306
3/22/2022
4/8/2022
Shallow
685033.00
1413752.34
816.36
813.57
25.00
25.00
15.00
25.00
801.36
791.36
16.96
799.40
18.03
798.33
18.73
797.63
CLF22-307
3/22/2022
4/8/2022
Shallow
684539.89
1413247.50
825.96
823.40
40.00
40.00
30.00
40.00
795.96
785.96
27.52
798.44
28.58
797.38
29.36
796.60
CLF23-405
2/14/2022
3/1/2022
Shallow
684920.61
1413022.90
810.29
807.29
42.00
42.00
32.00
42.00
778.29
768.29
10.75
799.54
11.84
798.45
12.37
797.92
CLF23-406
2/14/2022
3/1/2022
Shallow
685463.34
1412717.51
813.96
810.77
43.00
43.00
33.00
43.00
780.96
770.96
13.50
800.46
14.80
799.16
14.85
799.11
CLF23-407
2/15/2023
3/1/2022
Shallow
685796.44
1413229.69
828.87
826.33
43.00
43.00
33.00
43.00
795.87
785.87
21.61
807.26
44.18
784.69
22.75
806.12
CLF23-408
2/15/2023
3/1/2022
Shallow
685262.35
1413270.88
810.81
808.07
35.00
35.00
25.00
35.00
785.81
775.81
11.60
799.21
12.63
798.18
13.00
797.81
GWA-41)
6/12/2015
7/30/2021
Deep
686783.39
1411776.91
902.45
899.38
90.07
93.14
84.07
89.07
818.38
813.38
54.15
848.30
54.35
848.10
54.54
847.91
GWA-4S
5/19/2015
7/30/2021
Shallow
686776.57
1411777.34
901.97
898.98
67.99
70.98
52.19
67.19
849.78
834.78
54.43
847.54
54.48
847.49
54.66
847.31
MW-4
6/30/1989
7/30/2021
Shallow
686723.00
1414467.00
867.15
863.81
50.20
49.93
49.93
49.93
823.55
813.55
NM
NM
38.61
828.54
38.64
828.51
MW-4D
10/12/2006
7/30/2021
Bedrock
686715.00
1414462.00
866.74
863.42
64.18
67.55
56.65
61.65
807.87
802.87
38.80
827.94
38.94
827.80
39.06
827.68
MW-7 (OB 3)
12/16/2010
7/30/2021
Shallow
685380.10
1414418.00
859.16
856.56
51.40
54.00
39.00
54.00
820.16
805.16
Abandoned
Abandoned
Abandoned
ILF-21)
3/31/2019
7/30/2021
Deep
687699.24
1413205.78
885.14
885.57
107.00
106.57
91.57
101.57
793.57
783.57
41.23
843.91
41.27
843.87
41.51
843.63
ILF-2S
3/31/2019
7/30/2021
Shallow
687699.26
1413214.68
884.79
885.21
52.00
51.58
41.58
1 51.58
843.21
833.21
43.65
841.14
43.76
841.03
43.90
840.89
Notes:
' Well depths initially measured during well installation and updated as new wells are installed.
z "Total Well Depth" is the depth to the bottom of the filter pack.
3 Values measured during well installation
BGS - Below ground surface
TOC - Top of casing
Ft - Feet
NAD 83 - North American Datum of 1983
NAVD 88 - North American Vertical Datum of 1988
NM - Not measured
Prepared by: GTC Checked by: DAA
Page 1 of 1
Groundwater Conditions Quarterly Report — July 2023 to September 2023
Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1
Terrell, North Carolina
APPENDIX A
WATER -LEVEL MONITORING DATA FILES
INCLUDED AS EXCEL FILE)
L7
synTerra
Science & Engineering Consultants
Groundwater Conditions Quarterly Report — July 2023 to September 2023
Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1
Terrell, North Carolina
APPENDIX B
GROUNDWATER MODEL PREDICTED TREND FILES
INCLUDED AS EXCEL FILE)
L7
synTerra
Science & Engineering Consultants
Groundwater Conditions Quarterly Report — July 2023 to September 2023
Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1
Terrell, North Carolina
APPENDIX C
DEWATERING/UNDERDRAIN PUMPING DATA FILES
INCLUDED AS EXCEL FILE)
L7
synTerra
Science & Engineering Consultants
Groundwater Conditions Quarterly Report — July 2023 to September 2023
Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1
Terrell, North Carolina
APPENDIX D
MANN-KENDALL DATA
INCLUDED AS EXCEL FILE)