Loading...
HomeMy WebLinkAbout3409_INSP_20230912NORTH CARnLINAD_E Q�� nen.mmem m c.w.o.mem.i a.i� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined LCID YW X Transfer Compost SLAS COUNTY: Forsyth MSWLF PERMIT NO.: 3409-TP- Closed xxW White Incin T&P X FIRM MSWLF goods FILE TYPE: COMPLIANCE CDLF TireT&P Tire Industrial DEMO SDTF Collection Monofill Landfill Date of Site Inspection: September 12, 2023 FACILITY NAME AND ADDRESS: Overdale Road Yard Waste Facility 4010 Old Milwaukee Lane Winston-Salem, NC 27102 GPS COORDINATES (decimal degrees): Lat.: 36.039524' FACILITY CONTACT NAME AND PHONE NUMBER: Name: Jan McHargue Telephone: (336) 747-7310 Email address: janm@cityofws.org FACILITY CONTACT ADDRESS: P.O. Box 2511 Winston-Salem, NC 27102 Date of Last Inspection: September 20, 2022 Long.:-80.226216' PARTICIPANTS: Gordan Dively, Solid Waste Operations Manager — Winston-Salem Utilities Caleb Tilly, Senior Crew Coordinator — Winston-Salem Utilities Robert Pike, Environmental Senior Specialist — Solid Waste Section STATUS OF PERMIT: Permit to Operate LCID T&P Facility Issued: December 11, 2020; expires October 6, 2025 PURPOSE OF SITE VISIT: Comprehensive Inspection STATUS OF PAST NOTED VIOLATIONS: None. OBSERVED VIOLATIONS: None. The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. Pagel of 3 FACILITY COMPLIANCE INSPECTION REPORT D_E Q�� Division of Waste Management NORTH CAROLINA O.p.N W Emir.nm l pu.lily Solid Waste Section ADDITIONAL COMMENTS 1. The facility serves as a yard waste treatment and processing facility for Forsyth County. The facility is permitted to receive land clearing debris, yard waste, and untreated, unpainted wood wastes including wooden pallets, dimensional lumber, and engineered wood products. 2. No composting takes place on site. 3. The city of Winston-Salem contracts with Wallace Farms, Inc. to manage operations at the facility. 4. Copies of the facility Permit to Operate and Operations Plan are kept on file in the scale house and are available upon request. 5. The Facility Annual Report 2022-23 indicates that the facility received 25,706 tons of wood/vegetative waste and 22 tons of pallets. The monthly tonnage records for the months of July and August were provided by Mr. Dively after the inspection by email. These records indicated that 2097.68 tons were received in July, and 2292.32 tons were received in August. 6. Proper signage was observed at the facility entrance. 7. The site is secured by a perimeter chain link fence with access controlled by two locking gates. 8. The facility was observed to be clean and well -maintained. No windblown waste was observed at the time of the inspection. 9. All incoming and outgoing loads are weighed and recorded. Preliminary waste screening takes place at the scale house, where the operator uses a closed-circuit camera system to inspect incoming loads prior to directing them to the appropriate tipping location. 10. The entire site is paved, and access roadways were found to be in good condition. The areas of broken and missing pavement that were noted in the operations areas during a previous inspection on October 30, 2020, have not been repaired. The facility continues to apply stone to the worn areas as needed to maintain the operations pad. 11. Unprocessed wood waste is stockpiled east of the scale house and appears to meet the required size requirements. 12. Untreated pallets are separated from the wood waste and stockpiled southeast of the unprocessed wood waste. 13. No unacceptable waste was observed on site at the time of the inspection. 14. Processed wood waste is loaded into trailers and transported to the Wallace Farms facility in Davie County (permit # 30-04) for further processing and composting. 15. A roll -off container is used to collect unacceptable waste that is separated from incoming loads. The container is taken to Hanes Mill Landfill (Permit # 3402) as necessary to properly dispose of the waste. 16. Storm water disperses and sheet flows across the site. An asphalt berm, situated near the top of the driveway leading to the back (southeastern) gate, slows the flow of surface water and directs it to the grassy area along the southern property line. No evidence of erosion or sedimentation was visible during this inspection. 17. No ponding water was observed in or around the piles of wood waste. 18. The facility appeared to be in compliance with the required setbacks. Please contact me if you have any questions or concerns regarding this inspection report. Digitally signed by James R. Pike James R. n a Date: 2023.09.25 17:02:58-04'00' Phone: (336) 776-9672 _ Robert Pike Environmental Senior Specialist Regional Representative Page 2 of 3 NORTH CARnLINAD_E Q�� o.n.mm.m m c.w.mmen.i a.i� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Sent on: September 25, 2023 X Email Hand delivery US Mail Certified No. j_ _] Copies: Deb Aja, Eastern/Western District Supervisor - Solid Waste Section Gordan Dively, Solid Waste Operations Manager — Winston-Salem Utilities Page 3 of 3