Loading...
HomeMy WebLinkAbout7305-INDUS-2012_FAR-FY2022-23_Capacity ReportGood afternoon, Geof - Please find below the capacity information for Mayo Monofill Phase 1. Status Source Open Date 7/10/2014 Added Initial Permit to Operate Survey Date 4/18/2023 Correct Annual Facility Report Years Open 9 Added Calculated Fiscal Year Tons Tons 667,644.0 Correct Annual Facility Report Total Tons Disposed to Date Tons 1,602,288.0 Correct Annual Facility Report Average Tons per Year Tons 178,032.0 Added Calculated Volume Used Cubic yards 1,149,245.0 Correct Annual Facility Report Volume Constructed Cubic yards 2,227,886.0 Corrected Duke Representative Total Permitted Volume Cubic yards 12,010,584.0 Corrected July 31, 2019 Permit (Estimated gross capacity, page 10) Compaction Density Tons/Cubic yards 1.4 (Total Tons) / (Volume Used) Remaining Volume for Future Construction Cubic yards 1,078,641.0 (Volume Constructed) - (Volume Used) Remaining Permitted Volume Cubic yards 10,861,339.0 (Volume Overall) - (Volume Used) Approximate Constructed Remaining in Tons Tons 1,503,851.3 (Volume Constructed Remaining) x (Compaction Density) Approximate Constructed Remaining in Years Years 8.4 (Volume Constructed Remaining in Tons) / (Average Tons) Remaining Constructed in Fiscal Year Tons 2.25 (Volume Constructed Remaining in Tons) / (Fiscal Year Tons) Approximate Total Permitted Volume Remaining in Tons 15,142,979.2 (Volume Overall Remaining) x (Compaction Density) Approximate Total Permitted Volume Remaining in Years 85.1 (Volume Overall Remaining in Tons) / (Average Tons) Approximate Total Tonnage Remaining in Fiscal Year Tons 22.7 (Volume Overall Remaining in Tons) / (Fiscal Year Tons) ________________________________ From: Martin, Melonie Y <Melonie.Martin@duke-energy.com> Sent: Monday, September 25, 2023 12:57 To: Yitbarek, Diana <diana.yitbarek@deq.nc.gov> Subject: RE: [EXTERNAL] Mayo _7305_Capacity Report CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. Hi Deana! The Mayo Monofill Phase 1 volume is 2,227,886 cubic yards (gross capacity). Please let me know if you need any additional information. Respectfully, Melonie Martin Duke Energy | EHS | Groundwater & Waste Programs From: Yitbarek, Diana <diana.yitbarek@deq.nc.gov> Sent: Friday, September 22, 2023 5:09 PM To: Martin, Melonie Y <Melonie.Martin@duke-energy.com> Subject: [EXTERNAL] Mayo _7305_Capacity Report *** CAUTION! EXTERNAL SENDER *** STOP. ASSESS. VERIFY!! Were you expecting this email? Are grammar and spelling correct? Does the content make sense? Can you verify the sender? If suspicious report it, then do not click links, open attachments or enter your ID or password. Hi Melonie, Hope you are well. I need your support with the table below. Mainly with the volume constructed. Would you mind providing the Volume Constructed, cubic yards? I would appreciate it if you could get back to me sometime next week. Thank you and have a good weekend! Source Open Date 7/10/2014 Initial Permit to Operate Survey Date 4/18/2023 Annual Facility Report Years Open 9 Calculated Fiscal Year Tons Tons 667,644.0 Annual Facility Report Total Tons Disposed to Date Tons 1,602,288.0 Annual Facility Report Average Tons per Year Tons 178,032.0 Calculated Volume Used Cubic yards 1,149,245.0 Annual Facility Report Volume Constructed Cubic yards 1,592,000.0 ? Total Permitted Volume Cubic yards 12,010,584.0 July 31, 2019, Permit (Estimated gross capacity, page 10) Compaction Density Tons/Cubic yards 1.4 (Total Tons) / (Volume Used) Remaining Volume for Future Construction Cubic yards 442,755.0 (Volume Constructed) - (Volume Used) Remaining Permitted Volume Cubic yards 10,861,339.0 (Volume Overall) - (Volume Used) Approximate Constructed Remaining in Tons Tons 617,293.1 (Volume Constructed Remaining) x (Compaction Density) Approximate Constructed Remaining in Years Years 3.5 (Volume Constructed Remaining in Tons) / (Average Tons) Remaining Constructed in Fiscal Year Tons 0.92 (Volume Constructed Remaining in Tons) / (Fiscal Year Tons) Approximate Total Permitted Volume Remaining in Tons 15,142,979.2 (Volume Overall Remaining) x (Compaction Density) Approximate Total Permitted Volume Remaining in Years 85.1 (Volume Overall Remaining in Tons) / (Average Tons) Approximate Total Tonnage Remaining in Fiscal Year Tons 22.7 (Volume Overall Remaining in Tons) / (Fiscal Year Tons) ________________________________ Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official.