HomeMy WebLinkAbout6014_QueenCity_2023_FACostApproval_FID1817821_20230725Moutos, Sarah
From:
Sent:
To:
Cc:
Subject:
Attachments:
Follow Up Flag:
Flag Status:
laserfiche.ncdenr.gov@mccicloud.io
Tuesday, July 25, 2023 1:08 PM
Dustin.Janes@WasteConnections.com; Susan.Reid@WasteConnections.com
Moutos, Sarah; Stanley, Sherri; Yitbarek, Diana; Susan.Reid@WasteConnections.com
[External] APPROVAL -Transfer Station Financial Assurance Cost Estimate - 6014-
TRANSFER-2009 Waste Connections of North Carolina, Inc.
NC T Station FA Detailed Calcs by CEC 6.21.23.pdf
Follow up
Completed
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
D,E Q`�
_A •
ND. TF CAF.CLIN.4
7/25/2023
Dustin Janes
Operations Manager
Waste Connections of North Carolina, Inc.
RE: Approved Cost Estimate
Transfer Station - Waste Connections of North Carolina, Inc.
Mecklenburg County
Dear Dustin Janes,
A review of the Transfer Station Cost Estimate for 6014-TRANSFER-2009, Waste Connections of North Carolina, Inc.
submitted on 6/21/2023 has been completed. The estimate meets the site -specific operations and appears to be
appropriate. The Division of Waste Management - Solid Waste Section has reviewed and approved the provided cost
estimate required for establishing financial assurance for a transfer station.
Initial Review Comments: 20230621 - The Section is in receipt of the revised closure cost estimate for the Transfer
Station in Meck Co. The electronic form appears complete and will be forwarded on to Deana Yitbarek for review. Thank
you
Permitting Engineer Review Comments: 20230725- Thank you for addressing the comments to include detailed costs.
The costs associated with waste disposal appear appropriate for this facility. Please include the updated closure cost
estimate in the Closure Plan. Thank you
This approval letter is for your use in establishing an appropriate financial assurance mechanism. The below are the
provided legal entity, facility name via onsite signage, assigned permit number, and approved cost estimate in 2022-year
dollars.
Owner Name: Waste Connections of North Carolina, Inc.
Facility Name: Waste Connections of North Carolina, Inc.
Permit Number: 6014-TRANSFER-2009
Approved Cost Estimate = $ 853000.00
At this time, you may work with your Corporate Finance Officer and establish the appropriate financial assurance
mechanism(s). Waste Connections of North Carolina, Inc. has 60 calendar days from the date of this approval to
establish required financial assurance mechanisms. Financial Assurance mechanism templates, NC Rules for financial
assurance, and inflation multipliers are among the pertinent information you can find at the Section's Financial
Assurance website: http://deq.nc.gov/swsfa. Should you or your Finance Department require any assistance, feel free to
reach out to Sarah Moutos at 919-707-8287 or Sarah.Moutos@ncdenr.gov .
Sincerely,
Sarah Moutos
Environmental Program Consultant
Division of Waste Management - Solid Waste Section
CC: Sherri Stanley
Diana Yitbarek
Susan Reid
From:
Bivins, Nathan
To:
Susan Reid
Cc:
Gingerich, Todd; Whittle, Todd
Subject:
RE: NC T Station FA Detailed Calcs
Date:
Wednesday, June 21, 2023 8:19:34 AM
Attachments:
imaae001.Dna
This Message Is From an External Sender
This message came from outside your organization.
Susan,
As requested, below are the opinions of probable cost for closure of the three transfer stations, with
detailed breakdown in the DEQ reporting format. Please let me know if you need anything else
related to this item.
Queen City:
Item
Unit
Quantity
Unit Rate
Amount
Mobilization/Demobilization:
LS
1
$3,000
$3,000
Pressure Washing:
LS
1
$2,500
$2,500
Leachate Disposal:
Gallon
9,000
$2.00
$18,000.00
Leachate Collection System
Decommission:
LS
1
$12,000
$12,000
Signage:
LS
1
$3,500
$3,500
Waste Disposal — Cleanup,
Hauling, Tipping Fee
Tons
18,000
$45.00
$810,000.00
Administration:
LS
1
$4,000
$4,000
Other:
Total:
$853,000.00
South Charlotte:
Item
Unit
Quantity
Unit Rate
Amount
Mobilization/Demobilization:
LS
1
$3,000
$3,000
Pressure Washing:
LS
1
$4,500
$4,500
Leachate Disposal:
Gallon
12,000
$2.00
$24,000.00
Leachate Collection System
Decommission:
LS
1
$20,000
$20,000
Signage:
LS
1
$3500
$3,500
Waste Disposal — Cleanup,
Hauling, Tipping Fee
Tons
18,000
$42.00
$756,000.00
Administration:
LS
1
$5,000
$5,000
Other:
Total:
$816,000.00
Currituck:
Item
Unit
Quantity
Unit
Rate
Amount
Mobilization/Demobilization:
LS
1
$1,500
$1,500
Pressure Washing:
LS
1
$1,000
$1,000
Leachate Disposal:
Gallon
3,000
$2.00
$6,000.00
Leachate Collection System
Decommission:
LS
1
$3,500
$3,500
Signage:
LS
1
$2,000
$2,000
Waste Disposal — Cleanup,
Hauling, Tipping Fee
Tons
300
$70.00
$21,000.00
Administration:
LS
1
$1,432
$1,432
Other:
Total:
$36,432.00
Nathan T. Bivins, P.E. / Project Manager
Civil & Environmental Consultants, Inc.
3701 Arco Corporate Drive - Suite 400 - Charlotte, NC 28273
Direct Line: (980) 260-2113 - Mobile: (919) 280-3637 - hU://www.cecinc.com
Senior Leadership • Integrated Services • Personal Business Relationships
From: Susan Reid <susan.reid@wasteconnections.com>
Sent: Friday, June 16, 2023 4:00 PM
To: Bivins, Nathan <nbivins@cecinc.com>; Gingerich, Todd <tgingerich@cecinc.com>
Subject: FW: INC T Station FA Detailed Calcs
Afternoon Gents,
I just got Todd's out of office reply that he's out until 7/2! I'm hoping one of you can help me with
this before then...
Sincerely,
Susan Reid, PE
Region Engineer
C: (423) 863-5045
Susan.Reid(@WasteConnections.com
Growth 4 ' Gratitude
From: Susan Reid
Sent: Friday, June 16, 2023 3:12 PM
To: Whittle, Todd <twhittle(@cecinc.com>
Subject: NC T Station FA Detailed Calcs
Hey Todd,
We need to break down the FA totals for South Charlotte and Queen City transfer stations at the
request of the state (see attached comments). Looks like you guys calculated the total costs for us
back in 2019 and 2021, respectively (also attached), so I'd like your team's support dividing out the
costs as required. Could you send me the information supporting the total cost when you have a
minute, or a proposal to do so if it's more involved than I'm thinking?
We need similar assistance for our Currituck Transfer Station (8546 Caratoke Hwy, Powells Point, NC
27909), but I don't believe you guys developed the FA total. Snip from the current and previous
revision of the Closure Plan are included below.
5.0 Closure Cast Estimates
The ck4ureiwst estimate for thQ Faolllty was prepared In support of flnxtcial assurance, as regxured by
iSA NCAC 130 ,04.04. A the putt hill be hired In tt%e event of Faclky docure.
A finaneilal assurance weiphanrsm allowable per 1SA NCAC 119 _labs should be secured to cover thlyd-
party d0ris removal and facility clean up in the event Mat the Faaaty is forced into early closure. The
fn"nY5rnpf choi4e should be subornmed tome NCDECI Drv4ion of Wiate Management aspriglnalslgmd
hard copies.
Tho closure cost estimate aak%da%ian InCluke€ the rnakjrnum tonnagk of perm tted wasbe allowed at We
Fadlity arvd Vpe t65t per tM of third-pdYry waste PuAing, haufmg, and ditpasal of wiMM t6 the nearest
Page 6 o! 18
Di%mslon faeiRty_ Additionally, the hired third -party will he instructed to prepare for the rerrroval of so (61
days of fncomirgwast+t. T?* astimsted closure costs ore 34.432.
The cost esumate for the financraI instnxnent mint be updated annually. There should be nn past -closure
rn"ltorine of athier FeaWfe-+M-s asm< *0*ith Uht facEIPN,
Section 5 — Financigi Assurance
A Sijrety Bond wail be provided to cover the oast of Cleanup by a third party
should it be needed. Our assumption of quantity of dem-olition debris
tonnage wiII be 60 tone per day. Our assumption of quantity of recyclable&
tonnage per day will be 40 tons. A:s noted, no recyclable& will be stored at
0urfaciIity that are riot directly loaded Into der 100 yd trailer and removed
daily.
Our disposal rate to have a Ihird party load_ haul and landfill (5) days worth
of demolition debris and recyclables (showing no value or oast for
recycling material) is estimated at $100 per ton. The $1C0 per ton estimate
includes $72 per ton disposal rate at PAa pie Transfer Station.
(60 torus dernalMon debris) X (5) days = 300tons
30U tons X $100 per ton = S30,000
lasing the criteria established in the regulations. we have procured a Surety
Bond in the amount of $30,000 to raver closure cleanup exper'ses through
Towne Insura-,oe - Attached
I'd like to get these numbers buttoned up and resubmitted by the end of this month. Give me a
shout if you have questions.
Hope you're doing well!
Sincerely,
Susan Reid, PE
Region Engineer
Waste Connections
11400 Parkside Drive, Ste. 500
Knoxville, Tennessee 37934
C: (423) 863-5045
Susan. Reid (@WasteConnections.com
Growth *Gratitude