Loading...
HomeMy WebLinkAbout1118_DannysDumpster_tempOperation_20201022From: Wilson, Donna J Sent: Thursday, October 22, 2020 2:22 PM To: danny keaton Cc: Kris Riddle (kris.riddle@ncdenr.gov); Jes Foster Qesfoster@ashevillenc.gov) Subject: Danny's Dumpster Compost Facility, 1118-COMPOST-2016 Hello Danny, The Solid Waste Section does not object to your plans to temporarily change the composting method at your site from aerated static bins to traditional windrow method. The change is proposed due to your plans to close out your existing compost site and move to a new site, which involves moving your aerated static bins. The windrow compost method operation would be: 1. Operated on the exact same site as the current aerated static bins 2. Compost process water and leachate would not run-off the area 3. Time and temperature, 15 days at 131 degrees, would be met, with 5 turnings during the high temperature period 4. Other siting requirements, such as distance to property lines, residences, are met The duration of the approval is only for moving of the aerated static bins from your original site to the newly permitted site. Once the new site is permitted, the windrow operation at the existing site would promptly cease (within 2 weeks unless otherwise approved). If you have any questions please let me know. Donna Don a J" Wilson Ena ineering Project Vfanager, Solid haste Section Division of MasteManagement North CarolinaDepartment of Environmental Quality, 919"707"8255 (Office) Donqa.lyilson,cY cdear.go " Physical Address: 217 West Jones Street, Raleigh NC 27603 -_-Mail- z address: 1646 Mail Service Center" Raleigh NC 27699 EmaO ums f z l lu V.0 I*Xul (;wCMIU u PLK-LwasLdwv arpu rrray be Gismo to �w padk-,a From: danny keaton [mailto:dannysdumpster@gmail.com] Sent: Wednesday, October 21, 2020 6:58 PM To: Wilson, Donna J <donna.wilson@ncdenr.gov> Subject: [External] Dannys Dumpster External email. Do not click links or open attachments unless you verif report.spam@nc.gov Hi Donna Thank you for getting back to me yesterday, As we discussed I would like to temporarily change my method of composting. We are moving our facility and need to move our in -vessel composting bins. During this transition period we would like to continue to process our material on the same site using the same process flow, but rather than using the forced air system we would like to use the windrow method. (13) Process to Further Reduce Pathogens (PFRP). The composting process shall qualify as a process to further reduce pathogens for all Type 3 and Type 4 facilities. The following shall be acceptable methods: (a) the windrow composting method, in which the following requirements apply: (i) aerobic conditions shall be maintained during the composting process; (ii) a temperature of 131 degrees F (55 degrees Celsius) or greater shall be maintained in the windrow for at least 15 days; and (iii) during the high temperature period, the windrow shall be turned at least five times. Thank you for your help during this transition. Danny 60 Huckleberry Cove Leicester, NC 28748 828.380.9094 dannysdumpster@gmail.com www.dannvsdumpster.com