Loading...
HomeMy WebLinkAbout4302_INSP_20230906NORTH CARnLINAD_E Q�� o.n.mm.m m c.wm..rem.i a.i� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined LCID X YW X Transfer Compost SLAS COUNTY: HARNETT MSWLF PERMIT NO.: 4302-CDLF-1998 Closed X HHW White X Incin T&P FIRM MSWLF goods 4302-CDLF-2018 4302-MSWLF-1988 4302-LCI D-1998 FILE TYPE: COMPLIANCE CDFF X TireT&P/ Tire Industrial DEMO sDTF Collection Monofill Landfill Date of Site Inspection: September 6, 2023 FACILITY NAME AND ADDRESS: Harnett County Dunn -Erwin Landfill 449 Daniels Road Dunn, NC 28334 GPS COORDINATES: Lat.: 35.36564 Long.:-78.64981 FACILITY CONTACT NAME AND PHONE NUMBER: Name: Chad Beane Phone: (910) 814-6004 Email address: FACILITY CONTACT ADDRESS: Chad Beane Harnett County Solid Waste Director PO Box 2773, Lillington, NC 27546 Phone: (910) 814-6004 Fax: (910) 814-6156 Date of Last Inspection: July 19, 2023 PARTICIPANTS: Amanda Thompson, NCDEQ, Solid Waste Section Denise Bruce, NCDEQ, Division of Energy, Mineral, and Land Resources Chad Beane, Harnett County Solid Waste Director STATUS OF PERMIT: 4302-LCID-1998 Permit to Operate issued May 26, 2015. Permit expired on May 26, 2020. Permit renewal paperwork was submitted May 22, 2020. Life of Site Permits issued for 4302-CDLF-1998 and 4302-CDLF-2018 on July 23, 2020. The Life of Site Permits will expire on March 2, 2058. PURPOSE OF SITE VISIT: Partial Inspection and DEMLR Inspection STATUS OF PAST NOTED VIOLATIONS: None. OBSERVED VIOLATIONS: None. Page 1 of 4 NORTH CARnLINAD_E Q�� o.n.mm.m m c.w.mmen.i a.i� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. ADDITIONAL COMMENTS Facility Inspection 1. The facility is fenced and secured by a locking gate when it is not open for operation. 2. The correct signage is at the entrance of the facility listing the facility name, permit number and emergency contact information as well as materials accepted at the facility. 3. The facility accepts waste Monday, Tuesday, Thursday, and Friday from 7:30 am until 4:00 pm, and Wednesday and Saturday from 7:30 am until 12:00 pm. This inspection was conducted after the facility had closed at noon. 4. The C&D cover log was verified through July 19, 2023. CDLF Area 2 5. The total working face area was approaching the 1/2 acre size limit. Ms. Thompson recommended that the facility utilize early closing on Wednesdays to catch up on covering the waste and staging cover soil at the top of the CDLF. Mr. Beane provided photographs of cover placed on the working face on September 7, 2023. Ensure that the waste is covered with a minimum of six inches of soil once weekly or when the working face reaches 1/Z acre in size, whichever occurs first. Also, as per 15A NCAC 13B .0542 (f) (3), aeras that will not have additional waste placed on them for three months or more, shall be covered and stabilized with intermediate cover. 6. Little vegetation and numerous erosion rills were identified on the side slopes of CDLF Area 2. Some exposed waste was also observed near the erosion in the side slopes. Monitor the CDLF Area 2 for erosion and exposed waste and repair any problem areas as they are observed. 7. One tire was observed to be partially buried within the waste stream. Mr. Beane stated that the fire would be removed by the operators prior to the covering of the waste. Ensure that unacceptable wastes are removed from the waste stream as they are identified. 8. Reminder that the County cannot move into the new cell until all items are addressed from the pre -op inspection. 9. Ms. Denise Bruce, DEMLR, stated that she would provide Mr. Beane with a report for the facility. LCID 10. The top of the LCID was being used to store uncovered vegetative waste. The vegetative waste was actively being ground during this inspection. 11. The side slopes of the LCID had been covered since the last inspection. Continue to ensure that the LCID is covered with six inches of soil monthly or when the working face reaches one acre in size, if Harnett County wishes to utilize the LCID. 12. In accordance with 15A NCAC 13B .0564 (7), the facility must maintain an access roadway around the LCID. 13. Photographs were taken during this inspection. Page 2 of 4 FACILITY COMPLIANCE INSPECTION REPORT D_E Q�� Division of Waste Management NORTH CAROLINA OepaNnent W Environnnnbl puelily Solid Waste Section Please contact me if you have any questions or concerns regarding this inspection report. Amanda Digitally signed by Amanda Thompson 2023.09.14 Thompson Date:48-04'00' 07:54:48-04'00' Amanda Thompson Environmental Senior Specialist Regional Representative Email: Amanda.thompson@deq.nc.gov Phone: (910) 433-3352 Sent on: September 14, 2023 X Email Hand delivery US Mail Certified No. Copies: Drew Hammonds, Eastern District Supervisor — Solid Waste Section Jordan Russ, Permitting Engineer — Solid Waste Section Elizabeth Werner, Hydrogeologist — Solid Waste Section Elizabeth Werner, Hydrogeologist — Solid Waste Section Jordan Russ, Permitting Engineer — Solid Waste Section Lori Britt, Environmental Program Consultant — DEMLR Denise Bruce, Environmental Specialist — DEMLR Page 3 of 4 NORTH CARnLINAD_E Q�� o.n.mm.m m c.w.mmen.i a.i� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section 2023. View of the grinding of vegetative waste. View of the cover side slopes of the LCID. Page 4 of 4