Loading...
HomeMy WebLinkAbout7407_Pitt_C&DLandfillInc_CDLF_Phase1_Phase2_GWCA_FID1817248_20230901�<ve SOt& W UO DQ DN44T a ELM Site Solutions, Inc. P. O. Box 97607 Raleigh, North Carolina 27624 (919) 792-3733 September 1, 2023 Submitted via Electronic Mail Ms. Jaclynne Drummond Hydrogeologist North Carolina Department of Environmental Quality Division of Waste Management - Solid Waste Section 2090 US Highway 70 Swannanoa, North Carolina 28778 Subject: Groundwater Corrective Action Plan Addendum, MNA Screening Model, and Alternate Source Demonstration for Inorganics C&D Landfill, Inc. Pitt County Solid Waste Permit Numbers 7407-CDLF-2001 and 7407-CDLF-2009 Dear Ms. Drummond: ELM Site Solutions, Inc. (ELMSS), on behalf of C&D Landfill, Inc., provides the following response to the department's correspondence of July 6, 2023 for the above -referenced site. The department's correspondence specifically requires the following three items (in italics) which are discussed below. 1. Within 60 days, submit a Groundwater Corrective Action Plan Addendum for Phase 1. C&D Landfill, Inc. and ELMSS are preparing the CAP Addendum and will submit the document in early September, coinciding with the requested 60-day response. 2. Within 60 days, submit a MNA EPA screening model depicting the attenuation processes at the landfill. C&D Landfill, Inc. and ELMSS are working on this analysis and subsequent report. As we discussed previously, additional data is required to complete the analysis and verify the site's conceptual site model. We are requesting a 90-day extension (i.e., December 8, Ms. Jaclynne Drummond Response to July 6, 2023 Correspondence September 1, 2023 2023) to obtain new data, complete the technical analysis and submit the associated report to the department. 3. Within 60 days, submit an Alternate Source Demonstration (ASD) for the inorganic exceedances as indicated within the approved 2022 Groundwater Corrective Action Plan. Similar to the MNA evaluation, C&D Landfill, Inc. and ELMSS are working on this analysis and the subsequent report. As also discussed with the department, additional background soil data is required to complete the analysis. We are requesting a 90-day extension (i.e., December 8, 2023) to obtain new data, complete the technical analysis and submit the associated report to the department. Please confirm the information above is acceptable and contact us if you have any questions or require additional information. Sincerely, ELM Site Solutions, Inc. Rusty Norris, PE, PLS, RSM Senior Engineer c Judson Whitehurst, C&D Landfill, Inc. 2