Loading...
HomeMy WebLinkAbout23076_RalMGP2_VIAWP_20210329Mid Atlantic Engineering & Environmental Solutions March 29, 2021 Hayley Irick NC Brownfields Program NC Department of Environmental Quality Division of Waste Management Mail Service Center 1646 Raleigh, North Carolina 27699-1646 Subject: SUB -SLAB SOIL GAS ASSESSMENT WORK PLAN FORMER RALEIGH MGP NO. 2 600 CABARRUS STREET RALEIGH, NORTH CAROLINA BROWNFIELDS PROJECT NO.: 13022-09-92 MID -ATLANTIC PE LICENSE: F-0967 REVISION NO.: 0 MID -ATLANTIC JOB NO. 00OR3746.00 Dear Ms. Irick: 409 Rogers View Court Raleigh. NC 27610 office 919,250.9918 Facsimile 919.250.99SO MAAONLINE.COM On behalf of Cabarrus LLC, Mid -Atlantic Associates, Inc. (Mid -Atlantic) has prepared this Sub -Slab Soil Gas Assessment Work Plan associated with the redevelopment project Former Raleigh MGP No. 2 located at 600 Cabarrus Street in Raleigh, North Carolina (Drawing 1). The objective of this Work Plan is to outline environmental assessment activities requested by the North Carolina Brownfields Program (NCBP) to establish `baseline' sub -slab soil gas conditions at the Clancy Shop and Amtrak buildings on the site. INTRODUCTION The subject site is comprised of three parcels totaling 5.91 acres and situated northwest of the intersection of South West Street and West Cabarrus Street (600 Cabarrus Street) in Raleigh, North Carolina. In 2011 a Brownfield Agreement was completed for a 4.08-acre portion of the subject site. The Department of Environmental Quality (DEQ) has — EXPERIENCED CUSTOMER FOCUSED INNOVATIVE — Sub -Slab Soil Gas Assessment Work Plan Former Raleigh MGP Site 2 Raleigh, North Carolina March 29, 2021 Page 2 determined that the remaining 1.83 acres associated with the subject site can participate in the Brownfield Program. The process of consolidating the entire 5.91 acres into the existing Brownfield Agreement is currently underway. The subject site has been used for various industrial purposes, including a manufactured gas plant, since the late 1800s. Environmental assessment activities conducted at the subject site have identified the presence of volatile organic compounds (VOCs) in the soil and groundwater at the site. Both chlorinated and petroleum -related VOCs have been identified in the groundwater at the site. Mr. John Gallagher, PE, a representative of the Prospective Developer, and the NCBP have agreed that assessing sub -slab soil gas conditions at the Clancy Shop and the Amtrak Building would provide `baseline' data related to the potential for vapor intrusion issues at the site. This Work Plan was developed to collect the data requested by the NCBP. SCOPE OF WORK Mid -Atlantic proposes the following scope of work: • Collect a total of six sub -slab soil gas samples (Drawing 2). Three sub -slab soil gas samples will be collected in the Clancy Shop (approximately 5,600 ft2) and three sub -slab soil gas samples will be collected in the Amtrack Building (approximately 8,700 ft2). • Preparation of a Sub -Slab Soil Gas Assessment Report to document field activities and provide analysis of the data collected. SAMPLING METHODOLOGY At each sub -slab location, a rotary -impact drill equipped with a decontaminated spline drill bit will be utilized to drill a 5/8-inch diameter hole through the concrete slab. At each location the field technician will log the materials and condition beneath the slab. A vapor sampling probe will be established using a new "Vapor Pin TM", a brass barb fitting with a silicone sleeve that creates a seal with the concrete when inserted using an installation/extraction tool. The Vapor Pin will then be fitted with 1/4-inch outer diameter rigid -wall Teflon tubing to complete the vapor sampling probe assembly. A leak check will be performed at each probe location using a plastic shroud, helium gas, and a portable helium gas detector. A plastic shroud will be placed over the sub -slab vapor probe location with the tubing of the probe exiting the shroud through a small hole. A 3- way valve will be placed on the probe termination and connected to the sampling apparatus. Helium will be released into the shroud via tubing from the cylinder, and a Mid Atlantic Sub -Slab Soil Gas Assessment Work Plan Former Raleigh MGP Site 2 Raleigh, North Carolina March 29, 2021 Page 3 grab sample collected by filling a Tedlar bag using the exhaust port of the purge syringe. Sub -slab samples will then be collected using 1-liter stainless steel canisters at a maximum flow rate of 200 milliliters per minute (ml/min). Mid -Atlantic will fill the laboratory provided Summa canister such that the final vacuum in the canister is at least three to four inches of mercury. The sub -slab samples will be collected in accordance with the NCDEQ Division of Waste Management (DWM) Vapor Intrusion Guidance Document (March 2018). LABORATORY ANALYSIS The soil gas samples will be submitted to Pace Analytical Laboratory (Pace) of Mount Juliette, Tennessee for analysis. Soil gas samples will be analyzed for VOCs in accordance with the EPA Compendium Method TO-15. The sampling and analysis plan for soil gas is summarized in Table 1. Reporting limits and method detection limits will meet applicable screening criteria including the reporting of estimated concentrations as "J" flags. Laboratory Level II QA/QC will be provided. QA/QC One duplicate sub -slab soil gas sample will be collected in the field. The duplicate sample will be analyzed for EPA Compendium Method TO-15 (Table 1). The laboratory provided Summa canister will be closed with a final vacuum in the canister is at least three to four inches of mercury to assist in the evaluation of sample integrity during transit. The chain - of -custody will be completed in the field and packed with the samples. The Mid -Atlantic field technician will return to the office with the packed boxes which will be shipped to the laboratory located in Mount Juliette, Tennessee. INVESTIGATION DERIVED WASTE OQW) MANAGEMENT Investigation derived waste, aside from de minimus amounts of concrete, will not be generated during this assessment. REPORTING Following completion of assessment field activities and receipt of laboratory analytical data, Mid -Atlantic will prepare a Soil Gas Assessment Report to document field activities and provide analysis of the data collected. Each concentration detected in the sub -slab soil gas samples collected will be evaluated using the NCDEQ risk calculator for cumulative risk evaluation(s). At a minimum, the reports will include: Mid Atlantic Sub -Slab Soil Gas Assessment Work Plan Former Raleigh MGP Site 2 Raleigh, North Carolina March 29, 2021 Page 4 • Reporting/summary of site work conducted for all sections outlined above; • Summary of findings and possible recommendations; • All applicable tables and figures including tabulated analytical data, cumulative risk evaluations, and figures depicting sample locations; • Mid -Atlantic's PE/PG License Number; and • The Professional Engineer's or Licensed Geologist's individual PE/LG seal and signature. CLOSING We appreciate the opportunity to submit this Work Plan. Should you have any questions please do not hesitate to reach me at 919-250-9918. Sincerely, MID-ATLANTI e OCIATES, INC. D Nielsen Principal fd�uoy,� NCPE Licens�,l6:F{l'8tl�, �®'®'aao-�AbA4�wu Darin M. McClure, PE Principal Engineer Attachments: Table 1 — Sampling and Analysis Plan Drawing 1 —Topographic Site Map Drawing 2 — Proposed Sampling Locations 0 Mid Atlantic TABLE 0 Mid Atlantic TABLE 1 SAMLPING AND ANALYSIS PLAN SUB -SLAB SOIL GAS ASSESSMENT FORMER RALEIGH MGP NO. 2 600 CABARRUS STREET RALEIGH, NORTH CAROLINA Analysis EPA Method TO-15 Samples Samples Location Sample ID Proposed # of Samples Proposed Sample Interval SG-1 1 Sub -slab 1 SG-2 1 Sub -slab 1 Clancy Shop SG-3 1 Sub -slab 1 Soil Gas Samples SG-4 1 Sub -slab 1 SG-5 1 Sub -slab 1 Amtrak Building SG-6 1 Sub -slab 1 Duplicate Samples 1 TOTALS: 7 DRAWINGS 0 Mid Atlantic a REFERENCES: 1. RALEIGH WEST, NC DIGITAL RASTER GRAPHICS, USGS. SCANNED FROM 1:24,000-SCALE WAKE, NC TOPOGRAPHIC MAPS, PUBLISHED 2019, USGS. SCALE: 1:9,000 2. INSET MAP DIGITAL DATA FROM 2002 NATIONAL TRANSPORTATION ATLAS, Feet BUREAU OF TRANSPORTATION STATISTICS, WASHINGTON, D.C. 6OO 1,ZOO 3. PROPERTY BOUNDARY DATA FROM WAKE COUNTY GIS. DRAWN DATE: TOPOGRAPHIC SITE MAP BY: GCH MARCH 2O21 FORMER RALEIGH MGP SITE NO. 2 DRAFT JOB NO: Mid Atlantic 600 W CABARRUS STREET CHECK: OOOR3746.01 Engineering & Environmental Solutions ENG. GIS NO: RALEIGH, NORTH CAROLINA �HFrK- 9G-R374fi_DO- N T "14 of -, MAIIIII& , f7 1 7 It tiY� Abf O G-1 0 SG-2 SG-3 0 IN � a - w 4 NI r. SG- i Legend O Proposed Sub Slab Locations Subject Property Property Boundaries3 , I REFERENCES: 1. MID -ATLANTIC FIELD NOTES. 2. NCONE MAP LATEST ORTHOIMAGERY 3. PROPERTY BOUNDARY AND ROAD SHAPEFILES SCALE:1 inch equals 100 feet PROVIDED BY WAKE COUNTY GIs Feet 0 100 200 PROPOSED SAMPLE LOCATION MAP DRAWN BY: GCH DATE: MARCH 2O21 DRAFT CHECK: JOB NO: OOOR3746.00 Mid Atlantic Engineering & Environmental Solutions FORMER RALEIGH MGP NO. 2 600 W CABARRUS STREET RALEIGH, NORTH CAROLINA ENG. CHECK: GIs NO: 2G-R3746.00-2 APPROVAL: DWG NO: 2