August 10, 2023
North Carolina Department of Environmental Quality
Division of Waste Management
Solid Waste Section
2090 U.S. Highway 70
Swannanoa, NC 28778
Attn: Ms. Sarah Moutos (submitted electronically)
526 South Church St.
Charlotte, NC 28202
Mailing Address
P.O. Box 1006
Mail Code EC 13K.
Charlotte, NC 28201-1006
Re: South Stability Feature — Phase I Dewatering and Observation Well Install Request
Permit Numbers: Structural Fill (CCB0031)
Marshall Steam Station
Terrell, North Carolina 28682
Dear Ms. Moutos,
Duke Energy Carolinas, LLC (Duke Energy) requests approval to install dewatering and observation wells
within the vicinity of the Structural Fill (CCB0031) at the Marshall Steam Station in Catawba County, North
Carolina.
Dewatering and excavation to construct the stability features will be conducted in phases. A combination of
deep dewatering wells and shallow well points will be installed as a system to lower the water table to support
initial excavation and construction of the Structural Fill southern stability feature. Observation wells will be
installed to monitor water levels during each phase of dewatering and excavation. The first phase of dewatering
and observation wells to be installed with this request include:
• Fifteen (15) deep dewatering wells,
• Thirteen (13) shallow dewatering well points,
• Three (3) deep observation wells, and
• Three (3) shallow observation wells.
Attached to this letter is a plan view figure and cross section depicting the approximate location of each
dewatering and observation well. A well construction summary table is included on the attached plan view
figure, and well schematics for each type of well are included in the attached details. All wells will be installed
and screened in ash.
The dewatering wells are expected to be operational throughout the duration of the northern stability feature
construction, estimated to be at least 6 months from the start of dewatering. Water extracted with the system
will be routed within the ash basin for treatment at the onsite water treatment system prior to discharge through
an NPDES outfall.
As necessary, dewatering and observation wells may be preserved to continue dewatering during installation
of the geosynthetic cap over the stability feature. Those wells would be amended with a vertical penetration
boot similar to those detailed in the Stability Feature Engineering Design Report (Rev 2; AECOM, 2023)
drawing MAR_C999.003.044. Wells will be abandoned, and geomembrane patched as necessary, at each
location once the dewatering system is decommissioned.
Note, subsequent requests will be submitted as the need to build out the dewatering system develops to
support the following phases of construction for the stability feature.
www.duke-energy.com Page 1 of 2
If you have any questions or need additional information regarding this request, please contact me at
Ashley.Healy(a�duke-enerqv.com or (717) 982-0986.
Respectfully submitted,
j4VAi
Ashley Healy, P.G.
Environmental Services
Attachments: Structural Fill South Stability Feature Plan View and Cross Section —
Phase I Dewatering Well Drawings - KI I-301, KI I-302, KI I-306, and KI I-307 (Keller,
2023)
cc (via e-mail): Claire Osborn, NCDEQ
Ed Mussler, NCDEQ
Sherri Stanley, NCDEQ
Scott Saunders, Duke Energy
Chris Varner, Duke Energy
Dan Zakary, Duke Energy
Tyler Hardin, Duke Energy
Kim Witt, Duke Energy
Ed Sullivan, Duke Energy
www.duke-energy.com Page 2 of 2
Strxtural Fill CCBOQ31Sourh StatdlityFealture Proposed Dewatering Well ConstruttioniDetails
Appro.. Ground
_
Plopoied
az.rerter:,a
5urlrae
Line
Number
'4P P��- Wet
+tPProti Well
Well Se"
W"e een
We�saleen
Well Llile
stee;}n
Lenph
aeptn
SP i
oeptf�ItanRe
Sequence
Method
Elevatlon
(it1
of Devkrs
Ift hg5-1
[tf. on mMen
tengfth'Rj
@ft. bei.1
Lue•lien
It[ r J.]
—Ami
De -Am i
r
DWA
Weill
Sto{
834)
1550
:.
35
58
20
1%10 35
witee
pW2
Oaffbi inq
20
Is. to15
A i't
Wells
t4'P7L
Wellpel Ms
S.W.R7,
130
]I
75
ld
10
SS le 25
Ash pa. e
W a*i
Cwr P
oaWlm
46dEf+ua,iJ li
S.?-.
826
I;'a
i
25
M1/3
-10
151025
+sn pole
Ww_a
WO Is
witA
Shafow
_
Observation
7.:-
8L1
rra
s
24
N�
1D
151025
SOW-6-6
xrlh
Wade
NOTES
1, DISCHARGE FROM THE DEWATERING SYSTEMS WILL HE KEPT
WITHIN THE ASH BASIN AND PUMPED THROUGH THE `
TREATMENT SYSTEM PRIOR TO DISC ARGE THROUGH NPDES
MFALL 002.
2. ALL WELLS WILL BE KE'T WITHIN ASH BOUNDARY.
�er
LEGEND
0
DEEP DEWATERING WELL —
EXISTING MAJOR
7:77_
TOPOGRAPHIC CONTOUR
•
WELLPOINT
EXISTING MINOR
DRILLED DEEP OBSERVATION WELL
TOPOGRAPHIC CONTOUR
HAND JETTED SHALLOW — —
— ASH BASIN BOUNDARY
OBSERVATION WELL
(APPROXIMATE)
=
DW HEADER PIPING ..............
ILF PHASE LIMIT
(APPROXIhAATE)
WPT VACUUM HEADER PIPING
EXISTING SITE FEATURE
—
DISCHARGE PIPING ..............
(APPROXIMATE)
l 4 ;t`, } � ti S►lt}j 1�l i l�
ki�1 I �
17
• �,�y �xt�s15'�14` {t��ke
QVLRALL SITE PLAN
SCALE: 1' = 1 CO'
TO DISCHARGE SYSTIM TO
3YSTEIA = 4210ft
424ft + 5DOft = 924k TOTAL
DISCHARGE
(SEE NOTE 1)
:Z1,
>StJ1i� i' a. ioC r
o nor zao'
F SHEET IS LESS TWA Vr x I I' WALE AICCVRUNGLY
aC
a
100STICKLE AVENUE
ROCKAWAY, NJ 07866
973-627-21 OO
WINW-KELLER-NA-COM
a
J
M/ }
—
CL
Q
❑
g
LL
LLJ
L
f
Q
�U
y"t
rn
Engineer of Record:
TH15 ITEM HAS BEEN ELECTRONICALLY
SIGTQFD AND SEALED uSING A DIGITAL
$IGfNATURE.
PRINTED COPIES OF THIS DOCUMENT
ARE NCT CONSIDERED SIGNEDAND
$EALEE, AND THE SlQkATURE MUST BE
VERIFIED ON ANY ELECTRONIC CORES.
Drawn by. Checked by:
RRC I AHC
Project Number; Data:
17451031 0611912023
Sheet No-
IIm01
saa
91�
Il10
1i00
IAO
B�
SAO
B78
IFM
B00
790
7W
770
790
O}00 1+00 2+00 34W 4+00 5+00 d+00 7+00
C
40
G1
a
E
SECTION A —A
Y PRE -PHASE PHASE
a HORIZONTAL SCALE: 1' = 100'
m
VERTICAL SCALE: I' = 50'
Y
SF SOUTH: INITIAL PRE —PHASE (PHASE 1) CROSS SECTION A —A
3TACKE6
EYISTINC OiE�4OE
� �
O
4
I
`
TARGET
REk-IC SURFAiM
DNI
S
-1
DUN-2
ESTIMATE] BOTTOUC
F ASH
815 FT
--
D4N-3
901F16 EL_ Bun FT
93.0
220
910
900
$90
870
8so
Wo
840
8Z4
810
800
790
780
7n
M
d440 S+00 10+00 11+00
LIZUawa
' — DOTTOM Or AS"
------- FY�fiT.atcc�rAaE
PROPOSED CRAVE
TARGET P74REATIG CAM
aC
a
100STICKLE AVENUE
ROCKAWAY, NJ 07866
973-627-2100
W1NW_KELLER-NA_COM
a
w
—
3
<
M
cm
=
�
�o
C
LL
E
L)
GlfC
_
�
CD
}
1__I
o
g
L
Q
L
m
f
LU
L)
Engineer of Record:
TH15 ITEM HAS BEEN ELECTRONICALLY
SIGTQED AND SEALED uSING A DIGITAL
$IGNATURE.
PRINTED COPIES OF THIS DOCUMENT
ARE NCT CONSIDERED SIGNEDAND
$EALEE, AND THE SIGnATURE MUST BE
VERIFIED ON ANY ELECTRONIC COPIES.
Drawn by:
Checked by:
I
vUCTcu SC E, r - 5v
RRC
AHC
o So'
1W
Project Number; Data:
iiiia
17451031 0611912023
HORIZONTAL SCALE- 1• - 18O'
Sheei No-
1
_
Kllm302
MEN"
IFSHEET IS LE SE THAN r X 1 1' SCALE ACCORONGLY
INSTALL GRADE
WPT-1 +815
WPT-2 +815
WFT-3 +823
JP TO 25' BGS
OR T4 PRACTICAL
REFUSAL.
WHICHEVER 15
ENCOUNTERED
FIRST
1 _5' 0 VAL VF
TEMPORARY SCH40
PVC VACUUM HEADER
2"0 SCH40 PVC
WELL SCREEN
0.020" SLOT SIZE
#1A FILTER PACK (DSI)
1.25" 0 SCH40 PVC
DRAWDOWN TUBE
APPROXIMATE
6-0BOREHOLE
TYPICAL WFLLPOINT DETAIL
SCALE: N/A
UP TO 25' BG5
OR TO PRACTICAL
R15EFUSAL WHICHCVER
EINcbLJNTERED
FIRST
rnD
2"0 SCH40 PVC
WELL SCREEN
0.020' SLOT 512E
#1A FILTER PACK {DSI)
APPROXIMATE
6'0 BOREHOLE
TYPICAL SHALLOW OBSERVATION
WELL DETAIL (SOW-1 to SOW— 5�
SCALE: N/A
100 STICKLE AVENUE
ROCKAWAY, VJ D7866
975-627-2100
WVVW.KELLER-NA.COM
J
r�
�0
Z
-W
0
0
M
C
a:=�
�r
(D
E_
w J
CD
__
CL
�
M �
0
�_
CIO
2
cts
06 w
IL
CL
W
LCn
Engireer of Record:
c
2
C.]
t:
4
z
t
a
LL
i17
- PRELIMINARY -
NQT FOR
CONSTRUCTION
THIS DOCUMENT IS
RELEASED FOR THE
PURPOSE OF INTERIM
REVIEW_ IT IS NOT TO BE
USED FOR CONSTRUCTION
THIS ITEM HAS BEEN ELECTRONICALLY
SIGNED AND SEALED USING ADIGITAL
SIGw41uRE_
IPRINTED COPIES OF T-IIS DOCUMENT I
ARE NOT CONSI❑ERED 51GNEDANQ
SEALED AND THE SIGHATuRE MUST SE
VERIFIED ON ANY E L E �,TRONIC COPIES.
RR(: Drawn by:I AHC Checked by: I
Project Number: Date:
17451031 0611912023
5hee: No.
Kllm306
INSTALL GWE
DW-1 +830
DW-2 +823
Pt1MP CONTROL
PANEL
SURTACE
ARIESj
UP TC 35 FEET,
BOTTOM OF ASH,
OR TO PRACTICAL
DRILL REFUSAL, WHICHEVER
IS ENCOUNTERED FIRST
1/4- 0 BRASS
BALL VALVE
20'
2` PVC BALL
VALVE
PVC CHECK
VALVE
r,H
2' PVC
BALL
VALVE
5 if .1a
V 4' 0 PVC SCH40
WELL CASING
(SOLVENT WELDED)
rr J I A FILTER PACK (OSI)
4' 0 SCH40 WELL SCREEN
•: p
0.020' SLOT SIZE
(SOLVENT WELDED)
2- 0 SCH40 PVC
'
DISCHARGE PIPE
.•'+.'
(SOLVENT WELDED)
GRUNDFOS 25SD7-5
' ,•'
'
SUBMERSIBLE PUMP
r
«•
0.75' 0 SCH40
'
_
PVC STILLING TUBE
(SOLVENT WELDED)
'
•, ..
•r'
4- 0 SCH40
PVC CAP
_
APPROX. 8" 0
®OREHOLE
DEWATERING WELL DETAIL
SCALE: N/A
2" PVC
BALL
VALVE
6' 0 HDPE
DISCHARGE
MANIFOLD
UP TO 30' BG5
OR TO PRACTICAL
REFUSAL WHICHE-VER
IS ENCbUNTERED
FIRST
PAD
2'0 SCH40 PVC
WELL SCREEN
0.020' SLOT SIZE
0 1 A FILTER PACK (DSI)
'VC CAP
:I HATE
v-unl v-
TYPICAL DEEP OBSERVATION
WELL DETAIL (DOWN-1 to DQW-3�
SCALE: N/A
100 STICKLE AVENUE
ROCKAWAY, VJ D7866
975-627-2100
WVVW.KELLER-NA.00M
C] J
Z
< F-
r
J Q
�
LU
J
�
c
2
L
:
LL.
W
r37
00
L
rLLLl
L
W
F_ LU
Cn
Engireer of Record:
THIS ITEM HAS BEEN ELEC7RONICALLY
SIGNED AND SEALED USING ADIGITAIL
SIGw41uRE_
PRINTED COPIES OF T-IIS DOCUMENT
ARE NOT CONSIDERED 5IGNEOAND
SEALED AND THE SIGm7uRE MUST SE
VERIFIED ON ANY E L E �,TRONIC COPIES.
Drawn by: Checked by:
RR(: I AH0
Project Number: Lake:
17451031 06119/2023
5hee: No.
Kllm307