Loading...
HomeMy WebLinkAbout1812_DukeMarshall_2023Q2_GWCR_FID1812705_20230731(� DUKE ENERGY July 31, 2023 North Carolina Department of Environmental Quality Division of Waste Management Solid Waste Section 2090 U.S. Highway 70 Swannanoa, NC 28778 Attn: Ms. Sarah Moutos (submitted electronically) Re: Groundwater Condition Quarterly Report — April 2023 through June 2023 Industrial Landfill No.1 Permit No.: 1812-INDUS-2008 Marshall Steam Station Terrell, North Carolina 28682 Dear Ms. Moutos: 526 South Church St. Charlotte, NC 28202 Mailing Address P.O. Box 1006 Mail Code EC 12J. Charlotte, NC 28201-1006 In accordance with the NCDEQ DWM September 17, 2021, Phase 2 Permit Modification Approval letter, Duke Energy is providing the quarterly report describing groundwater conditions in the area of the Marshall Steam Station Industrial Landfill No.1 (ILF, 1812-INDUS-2008) Phases 2, 3, and 4. The report is for the quarterly period of April 2023 through June 2023 (Q2 2023). The quarterly report includes an analysis of groundwater levels and dewatering pump flowrates within Phases 2, 3 and 4, with updated water level maps, hydrographs, pump flowrate plots, and well construction and water level data tables. An evaluation of groundwater levels and pump flowrates compared to model predictions is included. All groundwater transducer data, groundwater model trend data, and dewatering pump data are provided in an excel file format as the report Appendices. Groundwater conditions in the vicinity of Marshall Steam Station's Industrial Landfill No.1 continue to be monitored and evaluated. The next quarterly report (Q3 2023) will be submitted by November 1, 2023. If you need additional information regarding this submittal do not hesitate to email or call me at Ashley. Healy cDduke-energy.com or (717) 982-0986. Respectfully submitted, j4VAi Ashley Healy, P.G. Environmental Services Attachments: Industrial Landfill No.1 (1812-INDUS-2008) Groundwater Conditions Quarterly Report — April 2023 through June 2023 (SynTerra; July 2023) Appendices in excel format: 1) Appendix A Water Level Monitoring Data Files 2) Appendix B Groundwater Model Predicted Trend Files 3) Appendix C Dewatering/Underdrain Pumping Data Files 4) Appendix D Mann -Kendall Results www.duke-energy.com Page 1 of 2 cc (via e-mail): Claire Osborn, NCDEQ Elizabeth Werner, NCDEQ Sherri Stanley, NCDEQ Ed Mussler, NCDEQ Scott Saunders, Duke Energy Dan Zakary, Duke Energy Chris Varner, Duke Energy Tyler Hardin, Duke Energy Ed Sullivan, Duke Energy Thomas Colton, SynTerra Craig Eady, SynTerra www.duke-energy.com Page 2 of 2 L1 synTerra Science & Engineering Consultants synterracorp.com GROUNDWATER CONDITIONS QUARTERLY REPORT - APRIL 2023 TO JUNE 2023 INDUSTRIAL LANDFILL NO. 1 (1812-INDUS-2008) FOR MARSHALL STEAM STATION 8320 EAST CAROLINA HIGHWAY 150 TERRELL, NC 28682 JULY 31, 2023 PREPARED FOR DUKE ENERGY DUKE ENERGY CAROLINAS, LLC Kathryn W. Webb, LG Senior Peer Reviewer X J. Thomas Colton X%%1Cg1111f/i • FENS X. • SEAL =_ 1599 �i'9i •'•:cOLOO •� �� "/ 0 ••.... g �� '/i70OUG;,P Project Manager :raig Eady, NC LG #1599 Senior Project Manager Groundwater Conditions Quarterly Report — April 2023 to June 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION..........................................................................................................1-1 1.1 Objectives and Purpose..............................................................................................1-1 1.2 Key Findings...............................................................................................................1-1 2.0 QUARTERLY MONITORING RESULTS........................................................................... 2-1 2.1 Current Groundwater Conditions...............................................................................2-1 2.2 Groundwater Trends..................................................................................................2-1 2.2.1 Water -Level Hydrographs and Model Trends.......................................................2-1 2.3 Dewatering and Underdrain Pump Performance.......................................................2-3 3.0 QUARTERLY WATER -LEVEL REDUCTION ACTIVITIES.................................................... 3-1 4.0 REFERENCES...............................................................................................................4-1 2023 Pagei Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — April 2023 to June 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina S1.1tel29LCT11Ci*1 Figure 1 Monitoring Location Map Figure 2 Area of Focus Water -Level Map — Upper Flow Zone (May 2023) Figure 3A Background Monitoring Well Hydrographs (GWA-4S/D and MW-4/D) Figure 313 Perimeter Hydrographs (MW-7 (013-3) and ILF-2S/D) Figure 3C Northwest of Cell 5 Hydrographs (CLF21-10 and CLF21-11) Figure 3D CLF-UD and Southwest of Cell 5 Hydrographs (CLF-UD and CLF21-12) Figure 3E East of Cell 6 Hydrographs (CLF21-14/R and CLF21-15) Figure 3F Future Phase 3 and 4 Hydrographs (CLF-301 and CLF-402) Figure 3G Cell 5 and Future Phase 5 (CLF21-13/R and CLF-401) Figure 3H South of Future Phase 3 Hydrographs (CLF-303 and CLF-304) Figure 31 Phase 3 Hydrographs (CLF22-305 and CLF22-306) Figure 3J Within and South of Phase 4 Hydrographs (CLF22-307 and CLF23-405) Figure 3K Future Phase 4 and 5 Hydrographs (CLF23-406 and CLF23-407) Figure 3L Within Phase 4 Hydrographs (CLF23-408) Figure 4A Cell 5 (Underdrain) Pumping Flow Rate Vs. Simulated Flow Rate Figure 413 Phase 3-5 Pumping Flow Rate Vs. Simulated Flow Rate LIST OF TABLES Table 1 Groundwater Monitoring Network Well Information and Water Levels LIST OF APPENDICES Appendix A Water -Level Monitoring Data Files Appendix B Groundwater Model Predicted Trend File Appendix C Dewatering/Underdrain Pumping Data Files Appendix D Mann -Kendall Data 2023 Pageii Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — April 2023 to June 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina LIST OF ACRONYMS CCR coal combustion residuals Duke Energy Duke Energy Carolinas, LLC DWM Division of Waste Management Future Phases ILF Phases 3, 4, and 5 expansion gpm gallons per minute ILF Industrial Landfill 1812-INDUS-2008 NCDEQ North Carolina Department of Environmental Quality reporting period second quarter 2023 (April 2023 to June 2023) Site Marshall Steam Station 2023 Page iii Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — April 2023 to June 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina 1.0 INTRODUCTION 1.1 Objectives and Purpose • SynTerra prepared this Groundwater Conditions Quarterly Report on behalf of Duke Energy Carolinas, LLC (Duke Energy) to document the water -level monitoring data and dewatering/underdrain pumping records in the vicinity of the Industrial Landfill No.1 (ILF) (Permit No. 1812-INDUS-2008) at the Marshall Steam Station (Site). This report is prepared in response to condition #3 in the North Carolina Department of Environmental Quality (NCDEQ) Division of Waste Management (DWM) September 17, 2021, Phase 2 Permit Modification Approval letter. • Data collected during the second quarter of 2023 (April 2023 to June 2023) reporting period were used to evaluate groundwater conditions for the ILF Phase 2 expansion (includes Cell 5 and Cell 6) and ILF Future Phases 3, 4, and 5 expansion (Future Phases). Specifically, this report evaluates the groundwater levels, dewatering/underdrain pumping flow rates, and efforts to expedite reducing and maintaining groundwater levels near the ILF during the reporting period. 1.2 Key Findings Key findings of the evaluation conducted during this reporting period include: • Groundwater levels in the area have generally stabilized. • Water levels have been maintained at less than or approximately equal to modeled predictions in most areas, with the exception of ten locations (CLF-301, CLF-303, CLF- 401, CLF-402, CLF21-12, CLF21-13R, CLF22-305, CLF22-306, CLF22-307, and ILF-2D). However, during the reporting period, water levels were stable. Water levels higher than model predictions generally represent the effects of a slower excavation rate than assumed in the model. The Cell 5 underdrain pump has been operational for 22 months with an average pumping rate of 10 gallons per minute (gpm). The Future Phases dewatering pump flow rate pumps at an average flow rate of 177 gpm. While the flow rates vary, the overall trends reasonably match the model predictions. The model predicted the underdrain to become dry after approximately 19 months of operation; however, the slower excavation rate has contributed to the underdrain drying slower than predicted. 2023 Pagel-1 Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — April 2023 to June 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina 2.0 QUARTERLY MONITORING RESULTS The established network of temporary and long-term piezometers and groundwater wells for monitoring groundwater conditions in the ILF Phase 2 expansion area is shown on Figure 1. Piezometer and groundwater well construction information (including water level and groundwater elevations) for the monitoring network is included in Table 1. 2.1 Current Groundwater Conditions Area of focus water levels were collected on May 1, 2023, for the upper (shallow) flow zone and were used to generate a groundwater level map (Figure 2). In addition, area of focus water levels and pressure transducer data from select groundwater monitoring wells, piezometers and the Cell 5 underdrain pump were collected on June 28, 2023 and July 5, 2023. Site -wide water level sweeps occur semiannually during the second and fourth quarter. Observed groundwater levels during this reporting period indicate: • Groundwater is generally flowing north to south through the ILF area (Figure 2). • Some groundwater levels within and near the ILF have decreased slightly, relative to groundwater levels from Quarter 1, 2023. However, most of the groundwater levels near the ILF remain relatively similar in elevation to that of Quarter 1, 2023. • Underdrain operations in Cell 5 have maintained a cone of groundwater depression around the Cell 5 blanket underdrain sump (CLF-UD, Figure 2). 2.2 Groundwater Trends A series of groundwater monitoring wells, piezometers, and the Cell 5 underdrain pump transducers are used to monitor water -level trends through June 2023 (Figures 3A through 3J). The following are key observations of overall trend data: • Groundwater level data collected from July 2021 (when close monitoring started) through June 2023 were evaluated using Mann -Kendall analysis to determine water - level trends. Statistically significant decreasing trends were observed in 21 of 26 locations. Stable trends were observed at four locations (CLF21-12, CLF21-14, CLF22- 305, CLF22-306). • Generally, decreasing trends were observed in locations downgradient of the Future Phases area during the reporting period and decreasing trends for the overall reporting period. 2.2.1 Water -Level Hydrographs and Model Trends Pressure transducers are used to record high -resolution groundwater elevation data for evaluation of groundwater conditions resulting from dewatering and excavation. Transducer data in Excel spreadsheets are included in Appendix A. Manual water -level measurements and transducer records were used to generate hydrographs. Predicted groundwater level trends from the transient groundwater models are included in the 2023 Page 2-1 Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — April 2023 to June 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina hydrographs (Figures 3A through 3L). Appendix B contains Excel spreadsheets with the predicted transient groundwater level trends exported from the models. Upgradient of the Phase 2 Expansion: • Monitoring locations GWA-4S/D and CLF21-10 are west of the ILF Phase 2 expansion (Figure 1). The shallow and deep flow zone water levels at those locations have overall decreasing trends and showed decreasing to stable trends during the reporting period (Figures 3A and 3C). ILF-2S/D are located north of the ILF (Figure 1). The shallow and deep flow zones water levels have an overall decreasing trend and show stable trends during the reporting period (Figure 313). MW-4/41D are located east of the ILF Phase 2 expansion (Figure 1). The shallow and deep flow zone water levels at those locations have overall decreasing trends. MW-4 shows a significantly decreasing trend over the reporting period whereas MW-41D is stable during the reporting period (Figure 3A). Within the Phase 2 Expansion: • A transducer, identified as CLF-UD, was installed to monitor the Cell 5 underdrain sump water level with the temporary pump operations (Figure 1). In October 2022, a permanent pump was installed; the water level in the permanent pump is recorded manually every week. The water levels within the sump demonstrate that the underdrain continues to operate as intended, maintaining a steady water level controlled by the pump settings (Figure 3D). Perimeter of the Phase 2 Expansion: • CLF21-11, CLF21-12, and CLF21-13R are located west and south of Cell 5. Shallow water levels at CLF21-11 and CLF21-13R have overall decreasing trends but show a general stable trend during the reporting period. Water levels in CLF-21-12 are stable overall since completion of the Cell 5 underdrain construction and remain stable during the reporting period (Figures 3C, 313, and 3G). Monitoring locations CLF21-14R and CLF21-15 are west of Cell 6 (Figure 1). Water levels in CLF21-14R have an overall stable trend since ash excavation is complete for Cell 6 and the water levels are stabilizing. Water levels in CLF21-15 had an overall decreasing trend (Figure 3E). 2023 Page 2-2 Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — April 2023 to June 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina Within the Future Phase 3 Expansion: • Monitoring locations CLF-301 and CLF22-305 are within the Future Phase 3 expansion (Figure 1). Shallow water levels at CLF-301 and CLF22-305 have an overall decreasing trend; both locations have a decreasing trend during the reporting period (Figures 3F and 31). Downgradient of the Phase 2 Expansion (Future Phases Area): Monitoring location MW-7 (OB-3) is downgradient of the ILF Phase 2 expansion and was abandoned on April 3, 2023 to support construction of the geosynthetic cap for the Dry Ash Landfill Phase II (1804-INDUS). Therefore, MW-7 (OB-3) cannot be analyzed for trends during the reporting period (Figure 1). Shallow water levels at MW-7 (OB-3) had an overall decreasing trend prior to abandonment (Figure 3B). • Monitoring locations CLF-401 and CLF-402 are within Future Phases 4 and 5 expansion (Figure 1). Shallow water levels at CLF-401 and CLF-402 have an overall decreasing trend and were decreasing during the reporting period (Figures 3G and 3F). • Monitoring locations CLF22-306, and CLF22-307 are downgradient of the Future Phase 3 expansion (Figure 1). Shallow water levels at CLF22-306 are stable overall while CLF22-307 water level was decreasing overall. Both CLF22-306 and CLF22-307 show decreasing trends during the reporting period (Figures 31 and 3J). Monitoring locations CLF23-405, CLF23-406, CLF23-407, and CLF23-408 were installed, in the Future Phases 3 and 4, during the previous reporting period. Water levels in CLF23-405, CLF23-406, CLF23-407 and CLF23-408 decreased during the reporting period. Overall water levels have a decreasing trend (Figure 3J, 3K, and 3L). 2.3 Dewatering and Underdrain Pump Performance A primary excavation and construction dewatering pump is located at the downgradient edge of ILF Future Phases (Figure 1). An underdrain pump is installed within the Cell 5 underdrain (CLF-UD). The dewatering pump removes ash pore water and precipitation runoff to support ash excavation, while the underdrain pump removes groundwater from below the ILF Phase 2, Cell 5. The Cell 5 underdrain pump does not receive precipitation runoff; the underdrain is enclosed. Water removed by each pump is discharged to the lower portion of the ash basin. The Cell 5 underdrain pumping and model -predicted dewatering rates are shown on Figure 4A. Model -predicted and measured flow rates from the Future Phases excavation dewatering pump are shown on Figure 4B. 2023 Page 2-3 Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — April 2023 to June 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina The Cell 5 underdrain pump has been operational for 22 months, at an average pumping rate for the reporting period of 10 gpm. The flow rate of the Future Phases dewatering pump increased to an average of 177 gpm from an average of 55 gpm. ILF Cell 5 and Future Phases pumping data, including the calculated monthly total volume pumped and monthly average flow rate, per location, are included in Appendix C. Combined pumping operations for Cell 5 and the Future Phases area have removed approximately 24.5 million gallons of water during the reporting period. For each pump, the average flow rates for the reporting period and each month are listed below. • The Cell 5 underdrain pump had an average flow rate of 10 gpm overall during the reporting period and monthly average flow rates of: o 11 gpm during April 2023 o 12.4 gpm during May 2023 o 8 gpm during June 2023 • The Future Phases pump had an average flow rate of 177 gpm overall during the reporting period and monthly average flow rates of: o 189.8 gpm during April 2023 o 197 gpm during May 2023 o 144.6 gpm during June 2023 2023 Page 2-4 Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — April 2023 to June 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina 3.0 QUARTERLY WATER -LEVEL REDUCTION ACTIVITIES Efforts made during the reporting period by Duke Energy to safely expedite the reduction of groundwater levels within the ILF Phase 2 expansion and the Future Phases include: Cell 5 • Underdrain operations continued, with an average flow rate of approximately 10 gpm. • Cell 5 operations continue. Cell 6 • Construction of Cell 6 is ongoing with completion of the leak detection sump, leachate collection sump, sideslope risers, leachate pumping system, and leachate force main connections during the reporting period. Future Phases • Excavation of coal combustion residuals (CCR) in the Future Phases continued during the reporting period. • Dewatering of excavation rim ditches is being maintained, with an average flow rate of approximately 177 gpm. Stability Features The installation of approximately 136 dewatering wells began during the reporting period to support the construction of the Structural Fill (CC130031) northern stability feature. The dewatering wells are phase 1 of a larger scale dewatering system that is expected to temporarily influence the groundwater elevations in the vicinity of ILF Future Phases nearest the stability feature dewatering system. Note the dewatering system to support construction of the stability feature was not included in the groundwater model simulations. 2023 Page 3-1 Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — April 2023 to June 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina 4.0 REFERENCES SynTerra (2021). Technical Memorandum: Modeling Support for the ILF Phase 2 Permit to Construct Modification, Marshall Steam Station. October S, 2021. 2023 Page 4-1 Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — April 2023 to June 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina FIGURES L7 synTerra Science & Engineering Consultants M J� INDUSTRIAL LANDFILL #1 0 950 PERMIT NO. 1812 CLF21-10 " 920 ® + \ "s 900 -890 fl CLF21-18 850 850 CLF21-19 7 CLF21-11 -m 830 T r CLF21-16 t i +•. CLF21-20 n f # y �, CLF-UD I `` CLF21-12 4 ral CLF21-17 f CLF t ' �' • ' ' " CLF21-13R 30 CLF-401 101 F luCLF23-406� CLF-402 - }�• °�- CLF-403 n ' F ffiF o• d� r� *`' FUTURE L PHASES PUMP CLF21-14 CLF21-15 " LEGEND LONG-TERM PIEZOMETERAND/OR 4 GROUNDWATER MONITORING WELL QII!) TEMPORARY PIEZOMETER DEWATERING OR UNDERDRAIN PUMP ABANDONED PIEZOMETER ASH BASIN WASTE BOUNDARY — - — - GEOGRAPHIC LIMITATION LANDFILL COMPLIANCE BOUNDARY STRUCTURAL FILL BOUNDARY • LANDFILL BOUNDARY LEACHATE BASIN — - - DUKE ENERGY CAROLINAS PROPERTY LINE TOPOGRAPHIC CONTOUR (10' INTERVAL) 1 STREAM (MCKIM & CREED) L WETLAND (MCKIM & CREED) �� DUKE 4 GRAPHIC SCALE 200 0 200 400 ENERGY CAROLINAS IN FEET) DRAWN BY. T. KING DATE: 04/28/2022 REVISED BY: C. HARRISON DATE: 07/24/2023 161p CHECKED BY: T. COLTON DATE: 07/24/2023 APPROVED BY: T. COLTON DATE: 07/24/2023 svnTerra PROJECT MANAGER T COLTON NOTES: 1. THE CLF UD LOCATION WAS FORMERLY KNOWN AS CELL 5 PUMP 2. ALL BOUNDARIES ARE APPROXIMATE. 3. THE STREAMS AND WETLANDS JURISDICTIONAL DETERMINATION WAS APPROVED BY THE US ARMY CORPS OF ENGINEERS ON OCTOBER 25, 2017 (SAW-2015-01412). WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL AND INFRASTRUCTURE, INC. NATURAL RESOURCES TECHNICAL REPORT (NRTR) DATED JUNE 2015. 4. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS 5. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES. TOPOGRAPHY PROVIDED BY TRANSASH. 6. AERIAL IMAGERY IS A COMBINATION OF DUKE ENERGY PROPELLER AERIAL PHOTOGRAPHY COLLECTED ON MAY 8, 2023, AND MAXAR SATELLITE IMAGERY OBTAINED FROM ESRI ONLINE, COLLECTED ON AUGUST 23, 2021. 7. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM RIPS 3200 (NAD83). FIGURE 1 MONITORING LOCATION MAP GROUNDWATER CONDITIONS QUARTERLY REPORT APRIL 2023 THROUGH JUNE 2023 MARSHALL STEAM STATION TERRELL, NORTH CAROLINA 7 { . ILF 2S 840 10 .• Ile -n l0000 SID 4 LEGEND CLF21-10 "g325 - 940 840.70 930 �`920 -6s WELL ID GWA-4S SK 4 910-930 g00 � - c - - 765.80 WATER LEVEL (NAVD 88, FEET) ( / a r 847.19 ., / 8j°_-- 880 r - _ MW-4 " � BACKGROUND MONITORING WELL .100, aso'� 8275__ ��� 825.97 , MONITORING WELL /sso �a PIEZOMETER I,.,,CLF21-11 a30-��E25� 1 a' '•'. �/r .��' 825.79 ,^z 7--p ���� '. •. ABANDONED PIEZOMETER \v WELLABANDONED / �+ ' ; �u R DEWATERING OR UNDERDRAIN PUMP 822.5 x ��� L r! t 82o 21-15 a -INFERRED WATER LEVEL CONTOUR (2.5' INTERVAL) CLF-UD `� ` CLF- 823.02 �. /CLF21-12 1♦ e°o ��. '' GROUNDWATER FLOW DIRECTION 820.85 �25 �h� §'� . �\ �� FUTURE PHASES /t - •' F;, �® �' � ,r.CLF21-13Rc 1 J b _� ° p� ��� ���`� 10 z' ASH BASIN WASTE BOUNDARY 818.92CLF2- - - GEOGRAPHIC LIMITATION /'r ' �s17.5•�'�� 817.4 9 R -- 4 7.48 0 ��L� ;� � � LANDFILL COMPLIANCE BOUNDARY i CLF-301 "'` / , 81 r - STRUCTURAL FILL BOUNDARY A 815, 1 2 N -. - - 83.5 �♦ 850 / - MW-3 LANDFILL BOUNDARY s50 / - �_�•�812.5• CLF23-407 _ i ) gLo 803.69 f LANDFILL CELL 5 AND 6 BOUNDARY -- / f -- --- aoJJ® �w' -' ��� �t 810.13 �'-.�\ 7 ` t .;1�N�J�J�$ e % \ �o LEACHATE BASIN sQ° /CLF 401 809.48 T•. s2o l ♦02 <�♦ o ; - - DUKE ENERGY CAROLINAS PROPERTY LINE � I -' a `-�, "Z ,, -" �� > .ram `a ����,§" a*°bI� 1'1��➢d; � ' 90 `n aa° ;�. I j `•.� mot '�1.� C��;>1�,� /:a -'' .. e1 '' TOPOGRAPHIC CONTOUR (10' INTERVAL) �sJ ti � aW' STREAM (MCKIM &CREED) o �0 / / CLF23-406 ` '4: �� �$ 1 -.1 1 t l AL-3S > , o WETLAND MCKIM &CREED ' 804.49 i 'Y A m ° ( ) ,, p / / / /� CLF-402 �C{��fiP7 xr�iy,Y �' i> , h No 9 807.24 ®� Aa$ F' a iCI F 3O; ^° NOTES: � � / CLF-403) � 1 JQ�n � �! ' • MW 7 (OB-3) � / _ �J i•� 0 i s a _ - - -1. WATER LEVELS WERE COLLECTED ON MAY 1, 2023. 80, CLF23-408-- • ,ti, f.; V S 803.67 ;; 3; 2. * - UNDERDRAIN/DEWATERING PUMP ELEVATION. WATER LEVEL CONTROL POINT. V' �, ♦ / ��-i ` ,. CLF22-305 3. ** - FUTURE PHASES PUMP LOCATION IS FOR REFERENCE ONLY. NOT WATER w. -g�� 807.69 807.5�".•-- LEVEL CONTROL POINT. vo C ,� °• 9 L\ _�'� �� - - 4. ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF CLF22-306 3� 1988 (NAVD 88). 3 )1 CLF-404 802.37 - J oz 5 o - 5. THE STREAMS AND WETLANDS JURISDICTIONAL DETERMINATION WAS m 'k, 8 CLF-303 `90 APPROVED BY THE US ARMY CORPS OF ENGINEERS ON OCTOBER 25, 2017 CLF23-405 ; ' °�. (SAW-2015-01412 . WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM L 4'� PVSF 2S� �x- ti. 803.56 AMEC FOSTER WHEELER ENVIRONMENTAL AND INFRASTRUCTURE, INC. NATURAL ,' RESOURCES TECHNICAL REPORT (NRTR) DATED JUNE 2015. gg c c i ABA 5S ti;.•.` yse :,° r �:. ��\ / 6. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES. TOPOGRAPHY PROVIDED BY TRANSASH. 7. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS. �'y a l '` _ �Z`' ix` �� •{f,' L� PHASES PUM �� 8. ALL BOUNDARIES ARE APPROXIMATE. � CLF23-307' � , 9. AERIAL IMAGERY IS A COMBINATION OF DUKE ENERGY PROPELLER AERIAL PHOTOGRAPHY COLLECTED ON MAY 8, 2023, AND MAXAR SATELLITE IMAGERY CLF-304 / . - OBTAINED FROM ESRI ONLINE, COLLECTED ON AUGUST 23, 2021. cl.( �,�` _ � � P ��`"• 10. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE C r : �Naa �, • 1 R '•`t PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). �- 1 ,'� DUDE GRAPHIC SCALE • C� zoo o zoo 400 FIGURE 2 ENERGY® N FEET) AREA OF FOCUS WATER -LEVEL MAP S CAROLINAS UPPER FLOW ZONE MAY 2023 DRAWN BYT KING DATE: 05/12/2022 GROUNDWATER CONDITIONS QUARTERLY REPORT REVISED BY C. HARRISON DATE' 01/25/2023 CHECKED BY.T.COLTON DATE:07/25/2023 APRIL 2023 THROUGH JUNE 2023 APPROVED BY:T.CGLTON DATE:07/25/2023 MARSHALL STEAM STATION PROJECT MANAGER T. COLTON (� > synTero TERRELL, NORTH CAROLINA www.s nterracor .com P:\O ARCGIS PRO PROJECTS\DUKE ENERGY\MARSHAL1\2023\GW CONDITIONS OUARTERLY REPORT\GW CONDITIONS OUARTERLY REPORT 02 APR% GWA-04S/D M W-04/D 833 4 852 4 O 851 832 00 3 00 ♦ 3 Q 850 Q 831 Z 'O Z O ♦ �♦ c 849 2 c 830 O 2 > .7 � c v °C u' 848 LL' 829 847 °�' 828 I' M M 827 L 0 846 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 Date Date GWA-04S - Total water level change from transducer installation on 07/30/2021 to 06/28/2023 is -3.2 feet. MW-04 - Total water level change from transducer installation on 07/30/2021 to 06/28/2023 is -3.6 feet. GWA-04D - Total water level change from transducer installation on 07/30/2021 to 06/28/2023 is -3.6 feet. MW-04D - Total water level change from transducer installation on 07/30/2021 to 06/28/2023 is -3.9 feet. GWA-04S/D MW-04/D 837 858 855 00 o a 834 a I Z — Z i O v 852 p O c --- — a 831 > I p Uj 849 0 O D � DO O w Op p O p0 O J O O O O O J 0 �' O' 1 828 L (I; 846 �• c0 825 843 T 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 Date Date LEGEND Notes: Cell 5 construction start (05/31/2021) NAVD 88 —North American Vertical DUKE r� DRAWN BY: D.AVARD DATE:07/21/2021 FIGURE 3A BACKGROUND MONTIORING WELL HYDROGRAPHS— Future Phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 ENERGY, REVISED BY: D. AVARD DATE:07/05/2023 INDUSTRIAL LANDFILL NO 1. Cell 5 Blanket Underdrain construction start (9/20/2021) Ft - Feet ROLINAS CHECKED BY: T. COLTON DATE:07/10/2023 (1812-INDUS) PHASE 2 EXPANSION Cell 5 Blanket Underdrain construction completion (10/22/2021) in - inches APPROVED BY:T. COLTON DATE:07/10/2023 GROUNDWATER CONDITIONS QUARTERLY REPORT Shallow Groundwater Flow Zone (Transducer Data) APRIL 2023 —JUNE 2023 Deep Groundwater Flow Zone (Transducer Data) ♦ Manual Water Level Measurement PROJECT MANAGER:T. COLTON MARSHALL STEAM STATION Bedrock Groundwater Flow Zone (Transducer Data) Daily Total Rainfall (inches)1Ta TERRELL NORTH CAROLINA — — - Transient Groundwater Model Water Level Predicted Trend www.synterracorp.com MW-07 (013-3) ILF-02S/D 819 818 00 a > 817 z c 816 O u' 815 a� > a� 814 co 813 4 3 C 2 c 1 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 Date MW-07 (013-3) - Total water level change from transducer installation on 07/30/2021 to 04/03/2023 is -3.5 feet. MW-07 (013-3) was abandoned April 3, 2023. MW-07 (013-3) 822 0 819 a z W 0 816 > N W G1 > 813 v M 00 0- O- p O O p O I Q- J I .� HII, 1 111.11 n U 846 845 844 843 842 841 840 4 3 1 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 Date ILF-02S - Total water level change from transducer installation on 07/30/2021 to 06/28/2023 is -0.6 feet. ILF-02D - Total water level change from transducer installation on 07/30/2021 to 06/28/2023 is -0.6 feet. ILF-02S/D 849 840 ■ 810 837 -L+— 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 Date Date LEGEND Cell 5 construction start (05/31/2021) Notes: NAVD 88 — North American Vertical DUKE DRAWN BY: D. AVARD DATE:07/21/2021 FIGURE 3B PERIMETER HYDROGRAPHS — INDUSTRIAL LANDFILL NO 1. ENERGY. REVISED BY: D. AVARD DATE:07/05/2023 Future Phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 CAROLINAS (1812-INDUS) PHASE 2 EXPANSION Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet CHECKED BY: T. COLTON DATE:07/10/2023 GROUNDWATER CONDITIONS QUARTERLY REPORT `� Cell 5 Blanket Underdrain construction completion (10/22/2021) in -inches APPROVED BY: T. COLTON DATE: 07/10/2023 APRIL 2023 — J U N E 2023 Shallow Groundwater Flow Zone (Transducer Data) ♦ Manual Water Level Measurement PROJECT MANAGER:T. COLTON MARSHALL STEAM STATION Deep Groundwater Flow Zone (Transducer Data) — — - Transient Groundwater Model Water Level Predicted Trend Daily Total Rainfall (inches) synTerra TERRELL, NORTH CAROLINA www.synterracorp.com CLF21-10 843 842 00 00 a > 841 z LLLL O m Qj �iD2•J a� v 838 c� 837 4 3 C 2 4- 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 Date CLF21-10 - Total water level change from transducer installation on 08/10/2021 to 06/28/2023 is -0.5 feet. CLF21-10 846 0 843 a z LPL 00 0 840 > N LU Gl > 837 a� M 834 -L+-- 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 Date - CLF21-11 832 830 828 826 824 822 820 4 3 1 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 Date CLF21-11- Total water level change from transducer installation on 08/09/2021 to 6/28/2023 is -4.2 feet. 834 831 828 825 I CLF21-11 �O 'Q � 822 11 6/1 /2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 Date LEGEND Cell 5 construction start (05/31/2021) Notes: NAVD 88 - North American Vertical DUKE DRAWN BY: D.AVARD DATE:07/21/2021 FIGURE 3C NORTHWEST OF CELL 5 HYDROGRAPHS- INDUSTRIAL LANDFILL NO 1. ENERGY. REVISED BY: D. AVARD DATE:07/05/2023 Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 CAROI INAS (1812-INDUS) PHASE 2 EXPANSION Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet CHECKED BY: T. COLTON DATE:07/10/2023 GROUNDWATER CONDITIONS QUARTERLY REPORT Cell 5 Blanket Underdrain construction completion (10/22/2021) in - inches APPROVED BY: T. COLTON DATE:07/10/2023 APRIL 2023 -JUNE 2023 Shallow Groundwater Flow Zone (Transducer Data) � Manual Water Level Measurement 10, PROJECT MANAGER: T. COLTON MARSHALL STEAM STATION -Transient Groundwater Model water level predicted trend Daily Total Rainfall (inches) synTerra www.synterracorp.com TERRELL, NORTH CAROLINA 818 - 1.15IIT 00 00 0 a z 814 +. LL C 0 > 812 v W Gl > 810 - c� CLF-LID oil 711�1 0 3 %i 1 C 4- C 808 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 Date CLF-UD— Water level is stable during underdrain operations. Water levels spikes represent when pump was temporarily out of service. CLF-LID 819 0 816 a z LLLL C 813 > N LU Gl > N 810 a� M 807 ' 1 11 1 1 1 1 ' 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 Date 00 a z .LL-. C 0 co > a� LL! GJ > a� J L M - CLF21-12 824 823 822 821 820 819 818 4 3 C 2 1 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 Date CLF21-12 - Total water level change from transducer installation on 10/03/2021 to 06/28/2023 is -2.2 feet. CLF21-12 825 820 815 810 805 6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 Date LEGEND Cell 5 construction start (05/31/2021) Notes: DUKE DRAWN BY: D. AVARD DATE:07/21/2021 FIGURE 3D CLII AND SOUTHWEST OF CELL 5 HYDROGRAPHS — NAVD 88 — North American Vertical ENERGY REVISED BY: D. AVARD DATE:07/12/2023 Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 INDUSTRIAL LANDFILL NO 1. Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet CAROLINAS CHECKED BY: T. COLTON DATE:07/10/2023 (1812-INDUS) PHASE 2 EXPANSION Cell 5 Blanket Underdrain construction completion (10/22/2021) in -inches APPROVED BY:T. COLTON DATE:07/10/2023 GROUNDWATER CONDITIONS QUARTERLY REPORT Shallow Groundwater Flow Zone (Transducer Data) `� PROJECT MANAGER: T. COLTON APRIL 2023 —JUNE 2023 - Transient Groundwater Model water level predicted trend Manual Water Level Measurement MARSHALL STEAM STATION www.synterracorp.com Daily Total Rainfall (inches) Ta TERRELL, NORTH CAROLINA CLF21-14/R CLF21-15 823 822 00 a Q 821 z LL c 820 O a� d 818 - c0 4 3 KA 1 817-1 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 Date CLF21-14R - Total water level change from transducer installation on 04/08/2022 to 06/28/2023 is +2.8 feet. • • • • • CLF21-14 - Total water level change from transducer installation on 08/13/2021 to 03/22/2022 is -3.3 feet. CLF21-14/R 830 00 825 0 a z LLLL 0 820 > N LU Gl > 815 a� M 810 -L+-- 6/1 /2021 0 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 Date C 00 Q z 4.: .LLL O > LL! v N J L M - 827 826 825 824 823 822 3 1 821 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 Date CLF21-15 - Total water level change from transducer installation on 08/13/2021 to 03/30/2023 is -3.5 feet. CLF21-15 828 825 822 819 816 ' 1 1- 6/1 /2021 90 0 o 0 �� o 0 0 0 0 0 0 .yL�Y�l41 12/1 /2021 6/1 /2022 12/1 /2022 Date LEGEND Cell 5 construction start (05/31/2021) Notes: NAVD 88 - North American Vertical DUKE DRAWN BY: D.AVARD DATE:07/21/2021 FIGURE 3E EAST OF CELL 6 HYDROGRAPHS - INDUSTRIAL LANDFILL NO 1. ENERGY. REVISED BY: D. AVARD DATE:07/05/2023 Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 CAROI INAS (1812-INDUS) PHASE 2 EXPANSION Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet CHECKED BY: T. COLTON DATE:07/10/2023 GROUNDWATER CONDITIONS QUARTERLY REPORT � Cell 5 Blanket Underdrain construction completion (10/22/2021) in - inches APPROVED BY: T. COLTON DATE:07/10/2023 APRIL 2023 -JUNE 2023 Shallow Groundwater Flow Zone (Transducer Data) � Manual Water Level Measurement PROJECT MANAGER: T. COLTON MARSHALL STEAM STATION -Transient Groundwater Model water level predicted trend Daily Total Rainfall (inches) synTerra www.synterracorp.com TERRELL, NORTH CAROLINA CLF-301 818 817 00 a > 816 z LL c 815 0 m d u' 814 Gl > v °�' 813 c� 812 4 3 C 2 ._ c 1 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 Date CLF-301- Total water level change from transducer installation on 07/27/2021 to 06/28/2023 is -4.4 feet. CLF-301 819 0 816 a z LPL 0 813 > N LU Gl > J 810 L GJ M 42 807 -L+-- 6/1 /2021 >oo 00 0 O Q O O' 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 Date 00 Q z LL C 2 a� W GJ > aj J a� M - i 813 811 :I• 807 o.J CLF-402 n 4 3 1 805 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 Date CLF-402 - Total water level change from transducer installation on 07/27/2021 to 06/28/2023 is -6.4 feet. CLF-402 815 810 805 : 795 ' 1 L 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 Date LEGEND Cell 5 construction start (05/31/2021) Notes: NAVD 88 — North American Vertical DUKE DRAWN BY: D. AVARD DATE:07/21/2021 FIGURE 3F FUTURE PHASE 3 AND 4 HYDROGRAPHS — INDUSTRIAL LANDFILL NO 1. ENERGY. REVISED BY: D. AVARD DATE:07/05/2023 Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 CAROI INAS (1812-INDUS) PHASE 2 EXPANSION Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet CHECKED BY: T. COLTON DATE:07/10/2023 GROUNDWATER CONDITIONS QUARTERLY REPORT Cell 5 Blanket Underdrain construction completion (10/22/2021) in - inches APPROVED BY: T. COLTON DATE:07/10/2023 APRIL 2023 —JUNE 2023 Shallow Groundwater Flow Zone (Transducer Data) � Manual Water Level Measurement 10, PROJECT MANAGER: T. COLTON MARSHALL STEAM STATION -Transient Groundwater Model water level predicted trend Daily Total Rainfall (inches) synTerra www.synterracorp.com TERRELL, NORTH CAROLINA CLF21-13/R 822 820 00 > 818 z LL c 816 0 v u' 814 Gl > v °�' 812 c� 810 4 3 2 1 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 Date CLF21-13R - Total water level change from transducer installation on 11/08/2021 to 03/31/2023 is +0.5 feet. CLF21-13 - Total water level change from transducer installation on 08/09/2021 to 10/01/2021 is -0.2 feet. CLF21-13/R 0 820 a z LL C 815 > N W Gl > 810 M CLF21-13 was abandoned and replaced on November 4, 2021. O< O � O O I O � II 805 -L+-- 6/1 /2021 o ° °* o ° o O' 12/1 /2021 6/1 /2022 Date 12/1/2022 6/1/2023 - 816 814 812 810 CLF-401 M 3 KA 1 808 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 Date CLF-401- Total water level change from transducer installation on 07/27/2021 to 06/28/2023 is -6.5 feet. CLF-401 820 I-I&S 810 TM 795 ' 1 L 6/1 /2021 �000 o _ -M 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 Date C LEGEND Cell 5 construction start (05/31/2021) Notes: DUKE DRAWN BY: D. AVARD DATE:07/21/2021 FIGURE 3G CELL 5 AND FUTURE PHASE 5 HYDROGRAPHS— NAVD 88 — North American Vertical ENERGY REVISED BY: D. AVARD DATE: Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 INDUSTRIAL LANDFILL NO 1. Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet CAROLINAS CHECKED BY: T. COLTON DATE:07/10/2023 (1812-INDUS) PHASE 2 EXPANSION Cell 5 Blanket Underdrain construction completion (10/22/2021) in -inches APPROVED BY: T. COLTON DATE: 07/10/2023 GROUNDWATER CONDITIONS QUARTERLY REPORT Shallow Groundwater Flow Zone (Transducer Data) `� PROJECT MANAGER: T. COLTON APRIL 2023 —JUNE 2023 - Transient Groundwater Model water level predicted trend Manual Water Level Measurement MARSHALL STEAM STATION www.synterracorp.com Daily Total Rainfall (inches) Ta TERRELL, NORTH CAROLINA CLF-303 802 801 00 a > 800 z c 799 0 v W 798 v v J L 797 c0 796 4 3 c 2 _ �a c 1 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 Date CLF-303 - Total water level change from transducer installation on 07/27/2021 to 01/11/2023 is +0.5 feet. CLF-303 810 00 805 a z LA. 0 800 > N W Gl > 795 a� M 790 -L+-- 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 Date - CLF-304 801 800 799 798 797 796 795 4 3 1 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 Date CLF-304 - Total water level change from transducer installation on 07/27/2021 to 01/18/2023 is +0.2 feet. CLF-304 807 804 801 798 o �0 IrA,� • 0•• OO O aw 795 ' 1 L 6/1 /2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 Date LEGEND Cell 5 05/31/2021 Notes: DUKE DRAWN BY: D. AVARD DATE:07/21/2021 FIGURE 3H SOUTH OF FUTURE PHASE 3 HYDROGRAPHS- construction start ( ) NAVD 88 -North American Vertical ENERGY REVISED BY: D. AVARD DATE:07/OS/2023 INDUSTRIAL LANDFILL NO 1. Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 CAROLINAS CHECKED BY: T. COLTON DATE:07/10/2023 (1812-INDUS) PHASE 2 EXPANSION Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet Cell 5 Blanket Underdrain construction completion (10/22/2021) in - inches APPROVED BY: T. COLTON DATE: 07/10/2023 GROUNDWATER CONDITIONS QUARTERLY REPORT Shallow Groundwater Flow Zone (Transducer Data) � PROJECT MANAGER: T. COLTON APRIL 2023 —JUNE 2023 - Transient Groundwater Model water level predicted trend ♦ Manual Water Level Measurement MARSHALL STEAM STATION www.synterracorp.com Daily Total Rainfall (inches) synTem TERRELL, NORTH CAROLINA CLF22-305 CLF22-306 i� 813 810 807 804 4 3 1 801 0 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 816 E:5191 804 792 786 Date CLF22-305 - Total water level change from transducer installation on 08/10/2021 to 06/28/2023 is -2.8 feet. CLF22-305 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 Date CLF22-305 was not used in the Transient Groundwater Model calibration, water level predictions were prepared following installation of CLF22-305 (after Transient Groundwater Model calibration) LEGEND Notes: DUKE Cell 5 construction start (05/31/2021) NAVD 88 — North American Vertical ENERGY. Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 Cell 5 Blanket Underdrain construction start (9/20/2021) CAROI INAS Ft -Feet Cell 5 Blanket Underdrain construction completion (10/22/2021) in - inches Shallow Groundwater Flow Zone (Transducer Data) -Transient Groundwater Model water level predicted trend � Manual Water Level Measurement 110 Daily Total Rainfall (inches) synTem 00 Q z C 0 c� > a� W GJ > aj J L M i 807 804 801 798 �o ti jilull I..11 I I ,,, -L 795 0 6/1 /2021 9/1 /2021 12/1 /20213/1 /2022 6/1 /2022 9/1 /202212/1 /20223/1 /2023 6/1 /2023 Date CLF22-306 - Total water level change from transducer installation on 08/13/2021 to 06/28/2023 is -1.6 feet. M 3 :e1 792 784 - CLF22-306 C �a 4- 1 776 6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 Date CLF22-306 was not used in the Transient Groundwater Model calibration, water level predictions were prepared following installation of CLF22-306 (after Transient Groundwater Model calibration) DRAWN BY: D. AVARD DATE:07/21/2021 FIGURE 31 REVISED BY: D. AVARD DATE:07/05/2023 PHASE 3 HYDROGRAPHS — INDUSTRIAL LANDFILL NO 1. CHECKED BY: T. COLTON DATE:07/10/2023 (1812-INDUS) PHASE 2 EXPANSION GROUNDWATER CONDITIONS QUARTERLY REPORT APPROVED BY: T. COLTON DATE: 07/10/2023 APRI L 2023 — J U N E 2023 PROJECT MANAGER: T. COLTON MARSHALL STEAM STATION www.synterracorp.com TERRELL, NORTH CAROLINA CLF22-307 CLF23-405 00 804 0 Q z LLLL c 802 0 v LLI G1 a>i 800 - J L i� 4 3 KA 1 798 0 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 Date CLF22-307 - Total water level change from transducer installation on 04/08/2022 to 06/28/2023 is -2.6 feet. CLF22-307 810 1 \ O 00 800 a z ILL. 0 790 > N LU Gl > J 780 i GJ M U C 4- c i i 807 804 801 798 4 3 1 795 0 6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 Date CLF23-405 - Total water level change from transducer installation on 03/01/2023 to 06/28/2023 is -3.8 feet. 812 - 804 - 796 - 788 - 770 780 6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 6/1/2021 12/1/2021 Date CLF22-307 was not used in the Transient Groundwater Model calibration, water level predictions were prepared following installation of CLF22-307 (after Transient Groundwater Model calibration) LEGEND Notes: Cell 5 construction start (05/31/2021) NAVD 88 — North American Vertical DUKE DRAWN BY: D.AVARD ENERGY. REVISED BY: D. AVARD Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 CAROI INAS CHECKED BY: T. COLTON Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet Cell 5 Blanket Underdrain construction completion (10/22/2021) in - inches APPROVED BY: T. COLTON Shallow Groundwater Flow Zone (Transducer Data) � Manual Water Level Measurement 110 PROJECT MANAGER: T. COLTON -Transient Groundwater Model water level predicted trend p www.synterracorp.com Daily Total Rainfall (inches) synTei ery � CLF23-405 O 6/1 /2022 12/1 /2022 6/1 /2023 Date DATE:07/21/2021 FIGURE 3.11 WITHIN AND SOUTH OF PHASE 4 HYDROGRAPHS — DATE: 07/05/2023 INDUSTRIAL LANDFILL NO 1. DATE:07/10/2023 (1812-INDUS) PHASE 2 EXPANSION DATE: 07/10/2023 GROUNDWATER CONDITIONS QUARTERLY REPORT APRIL 2023 — JUNE 2023 MARSHALL STEAM STATION TERRELL, NORTH CAROLINA CLF23-406 CLF23-407 810 4 810 4 0 O 00 807 3 00 809 3 o a > > Q Q Z Z c 804 2 c 808 o — o — fa > c > v W ca W W ca d W 801 1 GJ W 807 1 J J f0 M 798 14k 0 806 0 12/1 /2022 2/1 /2023 4/1 /2023 6/1 /2023 12/1 /2022 2/1 /2023 4/1 /2023 6/1 /2023 Date Date CLF23-406 - Total water level change from transducer installation on 03/01/2023 to 03/30/2023 is -1.7 feet. CLF23-407 - Total water level change from transducer installation on 03/01/2023 to 06/28/2023 is -1.1 feet. CLF23-406 CLF23-407 818 818 � I o0 00 00 810 > 812 > \ Z LPL i O \ 0 802 > 806 \ > ` W W \ ; N J > 794 — +; 800 o - 786 794 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 Date Date CLF22-307 was not used in the Transient Groundwater Model calibration, water level predictions were prepared following installation of CLF22-307 (after Transient Groundwater Model calibration) LEGEND Cell 5 construction start (05/31/2021) Notes: NAVD 88 — North American Vertical DUKE DRAWN BY: D. AVARD DATE:07/21/2021 FIGURE 3K FUTURE PHASE 4 AND 5 HYDROGRAPHS — INDUSTRIAL LANDFILL NO 1. ENERGY. REVISED BY: D. AVARD DATE:07/12/2023 Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 CAROI INAS (1812-INDUS) PHASE 2 EXPANSION Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet CHECKED BY: T. COLTON DATE:07/10/2023 GROUNDWATER CONDITIONS QUARTERLY REPORT Cell 5 Blanket Underdrain construction completion (10/22/2021) in - inches APPROVED BY: T. COLTON DATE:07/10/2023 APRIL 2023 —JUNE 2023 Shallow Groundwater Flow Zone (Transducer Data) � Manual Water Level Measurement 101 PROJECT MANAGER: T. COLTON MARSHALL STEAM STATION -Transient Groundwater Model water level predicted trend Daily Total Rainfall (inches) synTerra www.synterracorp.com TERRELL, NORTH CAROLINA CLF23-408 807 4 00 00 804 3 t7 Q Z +; c 801 2 = Space Not Used o — > 'ca v W GJ 0>i 798 1 J N f0 795 0 12/1 /2022 2/1 /2023 4/1 /2023 6/1 /2023 Date CLF23-408 - Total water level change from transducer installation on 03/21/2023 to 06/28/2023 is -3.4 feet. CLF23-408 812 e 00 805 Q Z L4L ° 798 Space Not Used v W Gl \> 791 a� M 784 6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 Date LEGEND Cell 5 construction start (05/31/2021) Notes: NAVD 88 — North American Vertical DUKE DRAWN BY: D.AVARD DATE:07/21/2021 FIGURE 3L WITHIN PHASE 4 HYDROGRAPHS — INDUSTRIAL LANDFILL NO 1. ENERGY. REVISED BY: D. AVARD DATE:07/12/2023 Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 CAROI INAS (1812-INDUS) PHASE 2 EXPANSION Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet CHECKED BY: T. COLTON DATE:07/10/2023 GROUNDWATER CONDITIONS QUARTERLY REPORT Cell 5 Blanket Underdrain construction completion (10/22/2021) in - inches APPROVED BY: T. COLTON DATE:07/10/2023 APRIL 2023 —JUNE 2023 Shallow Groundwater Flow Zone (Transducer Data) � Manual Water Level Measurement 10, PROJECT MANAGER: T. COLTON MARSHALL STEAM STATION -Transient Groundwater Model water level predicted trend Daily Total Rainfall (inches) synTerra www.synterracorp.com TERRELL, NORTH CAROLINA CL wo a� co re O LL N c- Ln 0) U 140 120 100 :1 M 20 I 3 2 1 Ic 9/1/2021 3/1/2022 9/1/2022 3/1/2023 Years of Operation Notes: 1. gpm = gallons per minute. 2. Flow data from the first day following a period of no flow were not plotted. DUKE DRAWN BY: T. COLTON DATE: 10/13/2021 FIGURE 4A 4 ENERGY c REVISED BY: D. AVARD CHECKED BY: T. COLTON DATE: 07/12/2023 DATE: 07/05/2023 CELL 5 (UNDERDRAIN) PUMPING FLOW RATE VS. SIMULATED FLOW RATE APPROVED BY: T. COLTON DATE: 07/05/2023 GROUNDWATER CONDITIONS QUARTERLY REPORT �� PROJECT MANAGER: T. COLTON APRIL 2023 THROUGH JUNE 2023 synTena MARSHALL STEAM STATION TERRELL, NORTH CAROLINA www.synterracorp.com 500 A CL aA a) 300 ca oC _O LL 200 Ln W cN ca v 100 40 S LL ■ x x X x x x ■ ■ Xx x x �� ■ ■ XX ■ ■ X x is x ° 0 Xx X x i_i ■ x X ■ XX � �� ■ X � x X x X X X Xx CC x � x x � J 3 2 V) U O 1 ro Q X 0 0 9/1/2021 3/1/2022 9/1/2022 3/1/2023 X Actual Pumping Flow Rate (gpm) Years of Operation ■ Model Flow Rate (gpm) Rainfall Daily Total (in) Notes: 1. gpm = gallons per minute. 2. Flow data from the first day following a period of no flow were not plotted. DUKE DRAWN BY: T. COLTON DATE: 10/13/2021 FIGURE 413 4 ENERGY c REVISED BY: D. AVARD CHECKED BY: T. COLTON DATE: 07/12/2023 DATE: 07/05/2023 PHASE 3-5 PUMPING FLOW RATE VS. SIMULATED FLOW RATE APPROVED BY: T. COLTON DATE: 07/05/2023 GROUNDWATER CONDITIONS QUARTERLY REPORT �� PROJECT MANAGER: T. COLTON APRIL 2023 THROUGH JUNE 2023 synTena MARSHALL STEAM STATION TERRELL, NORTH CAROLINA www.synterracorp.com Groundwater Conditions Quarterly Report — April 2023 to June 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina TABLE L7 synTerra Science & Engineering Consultants TABLE 1 GROUNDWATER MONITORING NETWORK WELL INFORMATION AND WATER LEVELS GROUNDWATER CONDITIONS QUARTERLY REPORT APRIL 2023 THROUGH JUNE 2023 MARSHALL STEAM STATION DUKE ENERGY CAROLINAS, LLC, TERRELL, NC Well ID Date Well/ Piezometer Installed Date Transducer Installed Monitoring Zone Northing (Ft-NAD 83) Easting (Ft-NAD 83) Measuring Point TOC Elevation (Ft-NAVD 88) Ground Surface Elevation (Ft-NAVD 88) Total Well 2,3 Depth (Ft-BGS) Measured i Well Depth (Ft-TOC) Screened 3 Interval (Ft TOC) Top of Screen Elevation (Ft-NAVD 88) Bottom of Screen Elevation (Ft-NAVD 88) Water Level Measurement (Ft-TOC) 5/01/2023 Groundwater Elevation (Ft -NAND 88) 5/01/2023 Water Level Measurement (Ft-TOC) 6/28/2023 Groundwater Elevation (Ft -NAND 88) 6/28/2023 CLF-301 5/21/2021 7/27/2021 Shallow 685838.40 1413513.30 847.46 844.46 62.00 65.00 52.00 62.00 795.46 785.46 34.21 813.25 34.55 812.91 CLF-303 5/12/2021 7/27/2021 Shallow 684951.10 1413840.30 824.31 822.31 40.00 42.00 30.00 40.00 794.31 784.31 Abandoned Abandoned CLF-304 5/24/2021 7/27/2021 Shallow 684062.20 1413563.40 823.28 821.28 60.00 62.00 50.00 60.00 773.28 763.28 Abandoned Abandoned CLF-401 5/17/2021 7/27/2021 Shallow 685783.50 1412779.50 832.44 830.44 39.00 41.00 29.00 39.00 803.44 793.44 22.31 810.13 23.50 808.94 CLF-402 5/21/2021 7/27/2021 Shallow 685598.80 1413217.80 818.41 816.41 50.00 52.00 40.00 50.00 778.41 768.41 11.17 807.24 12.90 805.51 CLF21-10 8/6/2021 8/6/2021 Shallow 687020.10 1412353.40 857.75 857.75 32.00 32.00 22.00 32.00 835.75 825.75 17.05 840.70 17.16 840.59 CLF21-11 8/5/2021 8/5/2021 Shallow 686572.30 1412572.20 850.17 850.08 40.00 41.64 31.64 41.64 818.53 808.53 24.38 825.79 23.96 826.21 CLF21-12 8/5/2021 8/5/2021 Shallow 686217.40 1412518.20 839.06 838.96 40.00 43.22 31.22 41.22 807.84 797.84 18.21 820.85 18.45 820.61 CLF21-13R 11/4/2021 11/8/2021 Shallow 686085.92 1412818.66 836.21 836.2 35.00 37.46 25.46 35.46 810.75 800.75 17.29 818.92 16.95 819.26 CLF21-14R 4/18/2022 4/18/2022 Shallow 686027.10 1414268.70 847.54 844.0 41.50 38.19 28.19 38.19 819.35 809.35 26.75 820.79 26.60 820.94 CLF21-15 8/10/2021 8/10/2021 Shallow 686307.70 1414410.00 864.37 864.37 55.00 55.00 45.00 55.00 819.37 809.37 41.35 823.02 Abandoned CLF22-305 3/22/2022 4/8/2022 Shallow 685228.95 1413445.92 819.21 816.94 16.00 16.00 6.00 16.00 813.21 803.21 11.52 807.69 15.20* 804.01 CLF22-306 3/22/2022 4/8/2022 Shallow 685033.00 1413752.34 816.36 813.57 25.00 25.00 15.00 25.00 801.36 791.36 13.99 802.37 15.67* 800.69 CLF22-307 3/22/2022 4/8/2022 Shallow 684539.89 1413247.50 825.96 823.40 40.00 40.00 30.00 40.00 795.96 785.96 24.83 801.13 26.17* 799.79 CLF23-405 2/14/2022 3/1/2022 Shallow 684920.61 1413022.90 810.29 807.29 42.00 42.00 32.00 42.00 778.29 768.29 7.04 803.25 9.55* 800.74 CLF23-406 2/14/2022 3/1/2022 Shallow 685463.34 1412717.51 813.96 810.77 43.00 43.00 33.00 43.00 780.96 770.96 9.71 804.25 12.30 801.66 CLF23-407 2/15/2023 3/1/2022 Shallow 685796.44 1413229.69 828.87 826.33 43.00 43.00 33.00 43.00 795.87 785.87 19.82 809.05 20.80 808.07 CLF23-408 2/15/2023 3/1/2022 Shallow 685262.35 1413270.88 810.81 808.07 35.00 35.00 25.00 35.00 785.81 775.81 7.31 803.50 10.75 800.06 GWA-4D 6/12/2015 7/30/2021 Deep 686783.39 1411776.91 902.45 899.38 90.07 93.14 84.07 89.07 818.38 813.38 54.38 848.07 NM NM GWA-4S 5/19/2015 7/30/2021 Shallow 686776.57 1411777.34 901.97 898.98 67.99 70.98 52.19 67.19 849.78 834.78 54.78 847.19 NM NM MW-4 6/30/1989 7/30/2021 Shallow 686723.00 1414467.00 867.15 863.81 50.20 49.93 49.93 49.93 823.55 813.55 38.24 825.97 NM NM MW-41) 10/12/2006 7/30/2021 Bedrock 686715.00 1414462.00 866.74 863.42 64.18 67.55 56.65 61.65 807.87 802.87 38.64 828.10 38.80 827.94 MW-7 (06-3) 12/16/2010 7/30/2021 Shallow 685380.10 1414418.00 859.16 856.56 51.40 54.00 39.00 54.00 820.16 805.16 Abandoned Abandoned ILF-21) 3/31/2019 7/30/2021 Deep 687699.24 1413205.78 885.14 885.57 107.00 106.57 91.57 101.57 793.57 783.57 41.32 843.82 43.66 841.48 ILF-2S 3/31/2019 7/30/2021 Shallow 687699.26 1413214.68 884.79 885.21 52.00 51.58 41.58 51.58 843.21 833.21 43.69 841.10 41.30 843.49 11 Notes: 1 Well depths initially measured during well installation and updated as new wells are installed. Z "Total Well Depth" is the depth to the bottom of the filter pack. 3 Values measured during well installation * - Water level measured on July S, 2023. BGS - Below ground surface TOC - Top of casing Ft - Feet NAD 83 - North American Datum of 1983 NAVD 88 - North American Vertical Datum of 1988 NM - Not measured Prepared by: KCO Checked by: DAA Page 1 of 1 Groundwater Conditions Quarterly Report — April 2023 to June 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina APPENDIX A WATER -LEVEL MONITORING DATA FILES INCLUDED AS EXCEL FILE) L7 synTerra Science & Engineering Consultants Groundwater Conditions Quarterly Report — April 2023 to June 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina APPENDIX B GROUNDWATER MODEL PREDICTED TREND FILES INCLUDED AS EXCEL FILE) t L7 synTerra Science & Engineering Consultants Groundwater Conditions Quarterly Report — April 2023 to June 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina APPENDIX C DEWATERING/UNDERDRAIN PUMPING DATA FILES INCLUDED AS EXCEL FILE) 141 synTerra Science & Engineering Consultants Groundwater Conditions Quarterly Report — April 2023 to June 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina APPENDIX D MANN-KENDALL DATA INCLUDED AS EXCEL FILE) L7 synTerra Science & Engineering Consultants