Date of Site Inspection: July 19, 2023
FACILITY NAME AND ADDRESS:
Harnett County Dunn -Erwin Transfer Station
449 Daniels Road
Dunn, NC 28334
GPS COORDINATES: Lat.: 35.36564 Long.:-78.64981
FACILITY CONTACT NAME AND PHONE NUMBER:
Name: Chad Beane
Phone: (910) 814-6004
Email address:
FACILITY CONTACT ADDRESS:
Chad Beane
Harnett County Solid Waste Director
PO Box 2773, Lillington, NC 27546
Phone: (910) 814-6004 Fax: (910) 814-6156
PARTICIPANTS:
Amanda Thompson, NCDEQ, Solid Waste Section
Steve Berube, Harnett County Solid Waste Operations Manager
Date of Last Inspection: April 4, 2023
STATUS OF PERMIT:
Permit to Operate issued December 29, 1997.
Permit Modification #1, Permit to Operate issued February 1, 2000.
Permit Amendment, Permit to Construct & Operate issued March 28, 2013.
A Life of Site Permit was issued May 8, 2019. The Permit will expire on May 8, 2069.
PURPOSE OF SITE VISIT:
Compliance Inspection
STATUS OF PAST NOTED VIOLATIONS:
None.
OBSERVED VIOLATIONS:
A. 15A NCAC 13B .0405 (b), "Water that comes into contact with solid waste is leachate and shall be collected
from the site for disposal to an approved facility or discharged directly from the site into a sanitary sewer
line."
The Harnett County Dunn -Erwin Transfer Station is in violation of 15A NCAC 13B .0405 (b) in that leachate has
not been contained on -site. During the inspection, leachate was found to be pooling within the transfer trailer loading
bay. A soil berm had been placed at the western end of the transfer trailer loading bay. Mr. Berube state that the
Page 1 of 5
FACILITY COMPLIANCE INSPECTION REPORT
D_E Q�� Division of Waste Management
NORTH CAROLINA
OepaNnent W Environnnnbl puelily
Solid Waste Section
drain line to the leachate collection system had become plugged. Mr. Berube also stated that Mr. Alton Truelove
had noticed that the leachate was leaving the transfer trailer loading bay and had installed a soil berm to stop the
leachate from leaving the transfer trailer loading bay. Leachate-stained soils were observed following the natural
drainage across the dirt roadway to the drainage ditch north of the transfer station building. Following the inspection,
Mr. Berube provided the Section with photographs of the removal of the leachate-stained soils.
Please contact Perry Sugg (Environmental Compliance Branch Head) at perry.sugg&deq.nc.gov or (919) 707-8258,
or Elizabeth Werner (hydrogeologist) at Elizabeth.wernerkdeq.nc.gov or (919) 707-8253, to determine the
sampling protocol for the leachate release.
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
ADDITIONAL COMMENTS
1. The facility is fenced and is secured by a locking gate when it is not open for operation.
2. The correct signage is at the entrance of the facility listing the facility name, permit number and emergency contact
information as well as materials accepted at the facility.
3. The facility accepts waste Monday, Tuesday, Thursday, and Friday from 7:30 am until 4:00 pm, and Wednesday
and Saturday from 7:30 am until 12:00 pm.
4. The transfer station walls were covered with dirt and grime and are in need of cleaning. As per 15A NCAC 13B
.0405 (11), the tipping floor, the truck loading bays shall be cleaned with a pressure washer no less than once
per month and the remaining areas of the transfer station building including side walls and any material
storage areas outside of the building shall be cleaned with a pressure washer no less than twice per year.
Ensure that the entire transfer station is cleaned no less than twice per year. Cleaning and maintenance
records shall be maintained and made available to the Division upon written request.
5. During this inspection, damage to the sheet metal above the transfer trailer loading bay was observed. During
previous conversations with Mr. Beane, the damaged metal would be removed and replaced with heavy duty flexible
material prior to the end of the year.
6. The exterior leachate drains were clogged with waste and pooling leachate. The leachate drains must be cleaned
as needed to ensure that the leachate drains can properly drain leachate into the leachate collection system.
Mr. Berube provided photographs of the cleaned leachate drains after the inspection.
7. Some windblown waste was observed throughout the facility. Continue to ensure that the windblown waste is
collected and returned to the transfer station prior to the close of business daily.
8. Sections of the tipping floor were observed to be cracked and damaged to the extent that a pothole has formed in
the tipping floor. Mr. Berube also stated that pools of leachate were difficult to remove from the tipping floor due
to the cracking and subsidence. During previous conversations with Mr. Beane, the tipping floor would be repaired
prior to the end of the year. Continue to monitor the tipping floor to ensure that the damage to the floor has
not grown and that leachate has not come into contact with the soils below the tipping floor. The sampling of
soils beneath the tipping floor may be required to determine if leachate has come in contact with the soils.
9. The trailer storage area has been paved since the last inspection. The area had been sloped to drain into the leachate
collection system. Several areas of standing leachate were observed in the paved area. Mr. Berube stated that the
contractor was scheduled to return to fix the lower areas to promote drainage to the collection system.
10. Corrective measures are necessary for this site.
11. Digital photos were taken during the inspection.
Page 2 of 5
NORTH CAROLINAD_E Q��
DgnNnenl W EnvNamm�ntal0uali�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Please contact me if you have any questions or concerns regarding this inspection report.
Digitally signed by
Amanda
Amanda Thompson
Date:
023.07.31 13:17:38 Email: Amanda.thompson@ncdenr.gov
Thompson 0
Phone: (910) 433-3352
Amanda Thompson
Environmental Senior Specialist
Regional Representative
Sent on: July 31, 2023
X
Email
Hand delivery
US Mail
X
Certified No. 7015 0640
0007 8168 8407
Copies: Jason Watkins, Field Operations Branch Heas — Solid Waste Section
Drew Hammonds, Eastern District Supervisor — Solid Waste Section
Chris Hollinger, Compliance Officer — Solid Waste Section
Elizabeth Werner, Hydrogeologist — Solid Waste Section
Jordan Russ, Permitting Engineer — Solid Waste Section
Digital
i
July 19, 2023.
General view of the tipping floor and areas of pooling
leachate.
View of cracks and a pothole in the tipping floor.
Page 3 of 5
FACILITY COMPLIANCE INSPECTION REPORT
D_E Q�� Division of Waste Management
NORTH CAROLINA
°°°—°° 0E-!=�'°"""' Solid Waste Section
View of a clogged exterior leachate drain. View of the dirt berm at the end of the transfer trailer
loading bay. Leachage has been leaving the transfer trailer
View of pooling water/leachate on the newly paved trailer
storage area.
View of staining from the transfer trailer loading
View of the damage to the metal siding.
Page 4 of 5
NORTH CARnLINAD_E Q��
o.n.mm.m m c.w.m.w.ui a.i�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Photographs provided by Mr. Steve Berube on July 19, 2023.
ffnh
View of the cleaned exterior leachate drain.
View of the removal of the leachate stained soils.
View of the cleaned leachate drain within the transfer
trailer loading bay.
Page 5 of 5