HomeMy WebLinkAbout2003_INSP_20230714NORTH CARnLINAD_E Q��
o.n.mm.m m c.w.mmen.i a.i�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
LCID
YW
Transfer
X
Compost
SLAS
COUNTY: CHEROKEE
MSWLF
PERMIT NO.: 2003-TRANSFER-2020
Closed
HHW
White
Incin
T&P
FIRM
MSWLF
goods
FILE TYPE: COMPLIANCE
CDLF
TireT&P/
Tire
Industrial
DEMO
SDTF
Collection
Monofill
Landfill
Date of Site Inspection: 07/14/2023
FACILITY NAME AND ADDRESS:
Regional Disposal & Metal Transfer Facility
9275 US Hwy 19
Marble, NC 28905
Date of Last Inspection: 02/21/2023
GPS COORDINATES (decimal degrees): Lat.: 35.176444' Long.:-83.922799'
FACILITY CONTACT NAME AND PHONE NUMBER:
Name: Jacob Anderson
Telephone: 828-837-5865
Email address: Jacob@837junk.com
FACILITY CONTACT ADDRESS:
701 Regal Rd
Murphy, NC 28906
PARTICIPANTS:
Cody McBride, Regional Disposal
Deb Aja, NCDEQ — Solid Waste Section
Charles Gerstell, NCDEQ — Solid Waste Section
Lee Hill, NCDEQ — Solid Waste Section
STATUS OF PERMIT:
Permit Issued December 10, 2020
Permit Expires December 10, 2080
PURPOSE OF SITE VISIT:
Partial Inspection
STATUS OF PAST NOTED VIOLATIONS:
A. 15A NCAC 13B .0405(11): Resolved. The dumpster that was located on the tipping floor during the February
21, 2023 inspection had been removed and it appeared all waste is being removed from the tipping floor at the
end of each operational day. Therefore, the violation is resolved.
B. 15A NCAC 13B .0405(11): Resolved. The accumulation of foam, cardboard, plastic, and other wastes that were
observed behind the push walls had been removed and the area cleaned. Therefore, the violation is resolved.
C. 15A NCAC 13B .0405(b): Resolved. During the February 21, 2023 inspection, leachate was observed flowing
out of the "vent" pipe on top of the leachate tank. The ground immediately surrounding the tank was saturated
and dark staining was visible. Regional Disposal contacted the section, submitted a soil sampling plan to the
section, conducted the soil sampling and submitted the results as required. April 27, 2023, Ervin Lane sent an
email stating "Based on the soil analytical results, additional excavation/assessment related to the February
2023 leachate release is not required." Therefore, the violation is resolved.
D. 15A NCAC 13B .0203(d): Resolved. During the February 21, 2023 inspection, leachate was observed flowing out
of the "vent" pipe on top of the leachate tank. The ground immediately surrounding the tank was saturated and
Page 1 of 5
FACILITY COMPLIANCE INSPECTION REPORT
D_E Q�� Division of Waste Management
NORTH CAROLINA
Ow-- W Emironm l puelily
Solid Waste Section
dark staining was visible. Regional Disposal contacted the Section, submitted a soil sampling plan to the section,
conducted the soil sampling and submitted the results as required. On April 27, 2023, Ervin Lane sent an email
stating "Based on the soil analytical results, additional excavation/assessment related to the February 2023
leachate release is not required." Therefore, the violation is resolved.
E. 15A NCAC 13B .0403(b)(2): Resolved. During the February 21, 2023 inspection, multiple piles of countertop
remnants and concrete were observed behind the transfer building. Intermingled in the stockpiles were nails,
plywood, painted wood, shingles, plastic sheeting, metal hardware cloth, plastic drainpipe, and metal shelving.
All waste that had been stored behind the transfer building had been removed and had been sent for disposal.
Therefore, the violation is resolved.
OBSERVED VIOLATIONS:
None
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
ADDITIONAL COMMENTS
1. All photos were taken by Lee Hill on July 14, 2023.
2. The facility hours of operation are Monday through Friday, 8:00 am to 4:00 pm.
3. The facility is secured by gates and natural terrain to prevent unauthorized access.
4. The access roads were of all weather construction and were being maintained at the time of inspection.
5. Waste is transferred from the facility to the Pine Bluff Landfill in Ballground, Georgia for final disposal.
Operations Inspection of the Transfer Station (2003T-TRANSFER-2020)
6. Windblown waste was minimal and was well managed at the time of inspection.
7. The soil around the leachate vent pipe that was observed stained during the February 21, 2023 inspection had
been removed and gravel had been added to the area. Facility staff stated that the soil had been removed and
was sent to the Pine Bluff landfill for disposal.
8. The interior walls of the transfer building had recently been pressure washed as required by 15A NCAC 13B
.0405(11).
9. All the waste that was observed behind the push walls during the February 21, 2023 inspection had been
removed and the area had been cleaned.
10. The piles of the countertop remnants and concrete and other materials that were observed behind the transfer
building during the February 21, 2023 inspection had been removed. Facility staff stated that the waste had
been sent in transfer loads to the Pine Bluff landfill for disposal.
11. The tipping floor and push walls were in good condition at the time of inspection.
12. An accumulation of waste and soil was observed in the trench drain at the entrance to the tipping floor.
However, no leachate was observed outside the transfer building. Ensure that the trench drains are being
cleaned to prevent the release of leachate into the environment.
13. One of the trench drain grates is bent and not working as designed. Replace the bent/broken trench drain
grate.
14. Pallets and yard waste was observed on the tipping floor during the inspection. On March 6, 2023, the facility
provided a document from the receiving facility stating that those items were not banned from disposal at the
Pine Bluff landfill.
Page 2 of 5
FACILITY COMPLIANCE INSPECTION REPORT
D_E Q�� Division of Waste Management
NORTH CAROLINA
Ow-- W Emironm l puelily
Solid Waste Section
Please contact me if you have any questions or concerns regarding this inspection report.
Digitally signed by Lee Hill
ON: cn=Lee Hill, o=Solid Waste
Section, ou=Field Operations Branch,
email=lee.hill@ncdenr.gov, c=US
Date: 2023.07.21 09:57:06-04'00'
Phone: 828-296-4700
Lee Hill
Environmental Senior Specialist
Regional Representative
Sent on: July 21, 2023 to
X
Email
Hand delivery
US Mail
Certified No. Lj
Jacob Anderson
Copies: Deb Aja, Western District Supervisor — Solid Waste Section
Charles Gerstell, Environmental Senior Specialist — Solid Waste Section
Page 3 of 5
Oepartmenl o� Envimnmental0uali�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
r"
Area Behind Push Walls
Area Behind Transfer Building
Page 4 of 5
NORTH CARnLINAD_E Q��
o.n.mm.m m c.w.mmen.i a.i�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Bent/Broken Trench Drain Grate
Page 5 of 5