Loading...
HomeMy WebLinkAbout4120T_GreensboroTS_CostApproval_FID1811106_20230712Moutos, Sarah From: Sent: To: Cc: Subject: Attachments: Follow Up Flag: Flag Status: laserfiche.ncdenr.gov@mccicloud.io Wednesday, July 12, 2023 11:05 AM Richard.Lovett@greensboro-nc.gov; emily.tucker@hdrinc.com Moutos, Sarah; Stanley, Sherri; Yitbarek, Diana [External] APPROVAL -Transfer Station Financial Assurance Cost Estimate - 4120T- TRANSFER- City of Greensboro Solid Waste Transfer Station TS Closure Cost Estimate_2023_Financial Assurance.pdf Follow up Flagged CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. F 00� 7 4N(Q)A TF • _ . CAF.CLIhL4 ;Q Oepairgt"I 9f EnwIhGIM150a101 �Nainv Mr. Richard P. Lovett, P.G., C.P.G., A.S.P. Environmental Compliance Support Manager City of Greensboro RE: Approved Cost Estimate Transfer Station - City of Greensboro Solid Waste Transfer Station Guilford County Dear Mr. Richard P. Lovett, P.G., C.P.G., A.S.P., A review of the Transfer Station Cost Estimate for 4120T-TRANSFER- City of Greensboro Solid Waste Transfer Station submitted on 6/12/2023 has been completed. The estimate meets the site -specific operations and appears to be appropriate. Initial Review Comments: 20230612 - The Section appreciates the electronic form submittal for the closure cost estimate for the City of Greensboro's transfer station. Permitting Engineer's Review Comments: 20230712 - No concerns. Cost estimates appear to be satisfactory and match the estimate in the submitted closure plan. The Division of Waste Management - Solid Waste Section has reviewed and approved the provided cost estimate required for establishing financial assurance for a transfer station. The cost estimate is provided for your use. Approved Cost Estimate = $ At this time, you may work with your Finance Department Director and have the approved cost estimate incorporated into the December 2023 Local Government or Capital Reserve submittal to the Section. Financial Assurance mechanism templates, NC Rules for financial assurance, and inflation multipliers are among the pertinent information you can find at the Section's Financial Assurance website: http://deq.nc.gov/swsfa. Should you or your Finance Department require any assistance, feel free to reach out to Sarah Moutos at 919-707-8287 or Sarah.Moutos@ncdenr.gov . Sincerely, Sarah Moutos Environmental Program Consultant Division of Waste Management - Solid Waste Section CC: Sherri Stanley Diana Yitbarek Tucker, Emily CITY OF GREENSBORO, SOLID WASTE TRANSFER STATION 2023 COST ESTIMATE FOR FUTURE CLOSURE ITEM QUANTITY UNIT UNIT COST TOTAL COST Mobilization/Demobilization (Max. 5% of the Work) 1 LS $ 11,925.00 $ 11,925.00 Pressure Washing 1 LS $ 20,000.00 $ 20,000.00 Leachate Disposal (Not Applicable) 1 LS $ - $ - Leachate Collection System Decommission 1 LS $ 100,000.00 $ 100,000.00 Decontamination of System Components, Structures and Equipment Decommissioning OWS Tank Capping Discharge Points or Open -Ended Piping Signage 1 LS $ 5,000.00 $ 5,000.00 Waste Disposal - Cleanup, Hauling, Tipping Fee 900 TONS $ 125.00 $ 112,500.00 Post -Closure Care (Not Applicable) 1 LS $ - $ - Administration(including PE Certification 1 LS $ 1,000.00 $ 1,000.00 TOTAL CLOSURE COST: $ 250,425.00 Note: 1. Transfer Station is capable of transferring a maximum average of approximately 900 tons per day of MSW based on an eight -hour operating day. 2. The estimate is based on the cost of hiring a third -party and does not incorporate any salvage value that may be realized by the sale of wastes, facility structures, or equipment, land or other facility assets at the time of closure. ENGINEER'S COST ESTIMATE `0%11111// j// 10,' A�l /1 =; Q� 41 % q�'7� SEAL. _ 051544 ��111 111� O b Emily L. Tucker, PE TS Closure Cost Estimate 2023 Financial Assurance