HomeMy WebLinkAbout5203_INSP_20230630FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
MSWLF LCID
T&P YW Transfer Compost SLAS COUNTY: Jones
Closed
MSWLF HHW White
goods Incin C&D
T&P FIRM PERMIT NO.: 5203-CDLF-2013
CDLF X Tire T&P /
Collection Tire
Monofill Industrial
Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Inspection: 30 June 2023 Date of Last Inspection: 1 August 2022
FACILITY NAME AND ADDRESS:
Maysville Construction and Demolition Debris Landfill
11710 NC Highway 17
Maysville, NC 28555
GPS COORDINATES: N: 34.93213 E: -077.24436
FACILITY CONTACT NAME AND PHONE NUMBER:
James E Maides
910.938.5900
FACILITY CONTACT ADDRESS:
Green Recycling Solutions, LLC
166 Center Street
Jacksonville, NC 28546
E-mail: jamesmaides@csbenc.com
PARTICIPANTS:
Kevin Dail; Green Recycling Solutions
James Maides; Green Recycling Solutions
Dave Wasiela; Wasiela Consulting LLC
Jason Watkins; DEQ-Solid Waste
Ray Williams; DEQ-Solid Waste
STATUS OF PERMIT:
Active: Permit to Construct (PTC) Construction and Demolition (C&D) Landfill, Phases 1 & 2; Life-of-site Permit to
Operate (PTO) issued 9 September 2022. In accordance with 130A-294 (a 2), life-of-site ends when the facility
reaches its final permitted elevations or by 6 April 2075, whichever occurs first. Any significant site changes may
require permit modification. The owner or operator must contact the North Carolina Department of Environmental
Quality, Division of Waste Management, Solid Waste Section for coordination of significant site changes, including,
but not limited to, pertinent Site, Operation, and Waste Screening plans.
PURPOSE OF SITE VISIT:
Partial Facility Compliance Inspection without records review.
STATUS OF PAST NOTED VIOLATIONS:
None applicable
OBSERVED VIOLATIONS:
1) 15A NCAC 13B .0542 (a) states “The owner or operator of a C&DLF unit shall maintain and operate the
facility in accordance with the operation plan prepared in accordance with this Rule.”
2) 15A NCAC 13B .0542 (f) (2) states “Except as provided in Subparagraph (4) of this Paragraph, the owners
and operators of all C&DLF units shall cover the solid waste with six inches of earthen material when the
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
5203_INSP_20230630
Page 2 of 3
waste disposal area exceeds one-half acre and no less than once weekly. Cover shall be placed at more
frequent intervals if necessary to prevent the escape of waste and the attraction of vectors and scavenging,
and to minimize fires and the generation of odors...”
3) 15A NCAC 13B .0542 (f) (3) states “Areas that will not have additional wastes placed on them for three
months or more, but where final termination of disposal operations has not occurred, shall be covered and
stabilized with vegetative ground cover or other stabilizing material as provided for in Subparagraph (4) of
this Paragraph.”
4) 15A NCAC 13B .0542 (g) states “Windblown waste requirements. Methods such as fencing and diking shall
be provided within the area to confine solid waste that is subject to be blown by the wind. At the conclusion of
each operating day, all windblown material resulting from the operation shall be collected and disposed of by
the owner or operator.”
5) 15A NCAC 13B .0542 (k) states “Erosion and sedimentation control requirements. Erosion control
measures consisting of vegetative cover, materials, structures, or other devices shall be utilized to prevent silt
from leaving the site and to prevent on-site erosion, and shall comply with 15A NCAC 04, which is
incorporated by reference including subsequent amendments and editions.”
*Please see the ADDITIONAL COMMENTS section below for details concerning this inspection and the observed
violations.
ADDITIONAL COMMENTS:
1) This facility is a Construction and Demolition (C&D) waste Landfill and a Temporary Debris Storage and
Reduction Site (TDSR).
2) This Facility is permitted to receive Construction and Demolition (C&D) waste as defined in NCGS 130A-
290(a)(4), Inert debris as defined in NCGS 130A-290.(a)(14); Land-clearing debris as defined in NCGS
130A-290.(a)(15), and Asphalt in accordance with NCGS generated in Brunswick, Carteret, Craven, Duplin,
Jones, New Hanover, Onslow, Pamlico, Pender, Pitt, and Wayne Counties.
3) This facility does not accept regulated asbestos-containing material.
4) The Facility is secured by means of a locked gate at the Facility entrance. The gate was open upon my arrival
and Green Recycling Solutions Personnel were on-site during this Facility Compliance Inspection.
5) This Facility is currently operating in Phase 2.
6) Permanent, highly visible, edge-of-liner markers delineating the waste disposal limits are installed and
maintained as required.
7) Facility monitoring wells were reviewed. All reviewed wells were properly labeled and secured from
unauthorized access. Brushy and/or woody type vegetation was observed growing around several of the
landfill monitoring wells. *Within thirty days of receipt of this Facility Compliance Inspection Report, please
remove all brushy/woody type vegetation from these areas. Moving forward, a regular mowing maintenance
schedule should be established to prevent the growth of brushy or woody type vegetation in these and all
areas of the landfill.
8) Soil is stockpiled in an area adjacent to the landfill for use as cover.
9) An area of seeping leachate was observed on the western outside slope near the northwest corner of the
landfill. No leachate was observed leaving the landfill liner system. *Within thirty days of receipt of this
Facility Compliance Inspection report, please repair the area of seeping leachate. Any repaired areas should
be filled and graded at a slope not greater than 3:1, seeded and mulched to establish a groundcover suitable to
prevent erosion of the landfill cap system. Please monitor all repaired areas. Further seep events should be
addressed promptly to prevent the release of leachate from the landfill.
10) Areas lacking groundcover suitable to prevent erosion of the landfill cap system were observed throughout the
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
5203_INSP_20230630
Page 3 of 3
facility. *Within thirty days of receipt of this Facility Compliance Inspection Report, please seed and mulch
all sparse/bare areas to establish a groundcover suitable to prevent erosion of the landfill cap.
11) The active working face appears to have greater than one half acre of exposed waste. *Please cover the active
working area with six inches of suitable soil. Moving forward, the active working area should be covered at a
minimum of once per week, or when it exceeds one-half acre in size, whichever occurs first.
12) Wind-blown debris was observed in various areas around the facility. *Within thirty days of receipt of this
Facility Compliance Inspection Report, please collect and properly dispose all wind-blown debris on-site.
Moving Forward, please ensure that all wind-blown debris is collected and properly disposed at the active
working face at the end of each workday.
13) Disaster generated debris remains staged in the TDSR area of the facility. *Within thirty days of receipt of
this Facility Compliance Inspection Report, please submit for approval, a written plan of action/cleanup
schedule detailing actions to be taken to properly process and dispose of all disaster generated debris staged
on-site.
14) *Corrective measures are required as a result of this Facility Compliance Inspection.
Please contact me if you have any questions or concerns regarding this Facility Compliance Inspection Report.
Ray Williams; Environmental Senior Specialist Phone: 252.948.3955 E-mail: ray.williams@ncdenr.gov
Regional Representative
Delivered on: 10 July 2023by X Electronic delivery US Mail Certified No. [ _]
cc: Andrew Hammonds; FOB Eastern District Supervisor/SWS: andrew.hammonds@ncdenro.gov
Kevin Dail; Operations Supervisor/Green Recycling Solutions: kdail.gwr@gmail.com
Dave Wasiela; Wasiela Consulting, LLC: dwasiela@wasielallc.com
C: \2023\Jones\Facilities\52-03 Maysville C&D\Inspections\5203_INSP_20230630
NCDEQ DWM Laserfiche Online Document Management System:
https://edocs.deq.nc.gov/WasteManagement/Browse.aspx?id=411&dbid=0&repo=WasteManagement
Go Green! Thank you for helping NCDEQ be environmentally responsible.