HomeMy WebLinkAboutNCD980602163_20030602_Warren County PCB Landfill_SERB C_State Security-OCRSite Security Procedures Without Allied Security
Site security objectives are to prevent unauthorized site entry and protect site property.
The following procedures will be instituted to achieve these objectives using Shaw
personnel.
Shaw currently has three sampling/health and safety people (SH&S) who are on site 24/7.
The SH&S duties consist of taking a product sample every hour that the plant operates,
preparing the composite sample for submission to the laboratory, conducting the safety
meeting at the beginning of each shift, and monitoring site safety. Sampling takes at
most 10 minutes per hour and the SH&S is in sight of the gate during this time. The
SH&S has the time available to act as site security.
Shaw will relocate the SH&S office from the east end of the Shaw trailer to the current
guard office. The SH&S will monitor the site entrance from this location. Other than the
normal ET and State visitors who sign themselves in visitors are very rare. The SH&S
will be able to sign these visitors in and direct them to the person they are visiting. There
are enough people around during the day that it is very unlikely that a stranger could
come on site unchallenged.
As added security from 6 PM to 6 AM the site entrance gate will be closed but not
locked. This procedure will also be followed on weekends and holidays when a Shaw
crew is not working.
There are rare events when no work is performed at the site. This occurred during the ice
storm in December, Christmas week when MSR took the week off, and about two
Sundays this year when MSR took the day off In the future, a Shaw employee will
remain on site during these periods to provide site security. These procedures will
remain in effect at least until the thermal plant operation phase of the project is
completed. At some point after that we will follow the procedures that were followed
during the first year of the project -the gate will be locked each evening when personnel
leave the site.
All site personnel will be notified when the security service is terminated and asked to
assist with security. Personnel will be encouraged to challenge any unescorted stranger
on site.
Shaw Environmental & Infrastructure, Inc. Issue Date: 5/30/03
Rev.4 Warren County PCB Landfill Detoxification Project
Personnel Approved for Site Entry
Name Organization
Albert, Scott Shaw Environmental & Infrastructure
Backus, Pat NC Department of Natural and Env. Resources (DENR)
Bell, George Shaw Environmental & Infrastructure
Bergener, Rick Shaw Environmental & Infrastructure
Bowe, Cory Shaw Environmental & Infrastructure
Brock, Jerry MSR
Brown, Ernest Shaw Environmental & Infrastructure
Cloonan, Jim Earth Tech
Ditcher, Dave Shaw Environmental & Infrastructure
Duke, Gary Shaw Environmental & Infrastructure
Fetherling, Tony MSR
Funk,John Earth Tech
Galla!!her, Bill Shaw Environmental & Infrastructure
Halverson, Bob MSR
Harmon, Leroy TDX
Holland, Rob Earth Tech
Jones, Bolton MSR
Jones, Dennis Earth Tech
Kelly, Mike NC Department ofEnv. and Natural Resources (DENR)
Keppler, John MSR
King, Delmar Shaw Environmental & Infrastructure
Mayfield, Tony MSR
McCutcheon, Jeff TDX
Miller, Robert MSR
Mitterer, Ken Shaw Environmental & Infrastructure
Mussier, Ed NC Department of Env. and Natural Resources (DENR)
Pace, Rhett Earth Tech
Palmer, Carl TD*X
Paraf, Timothy MSR
Roberts, Paul Shaw Environmental & Infrastructure
Rose, Larry NC Department ofEnv. and Natural Resources (DENR)
Sessoms, Bill NC Department ofEnv. and Natural Resources (DENR)
Shelly Gibbons Earth Tech
Summers, Kimberly NC Department of Env. and Natural Resources (DENR)
Swanstrom, Carl MSR
Walter, Kurt TDX
White, Nat* Local Resident
Wilson, Marvin MSR
Wilson, Thomas Shaw Environmental & Infrastructure
Winberry, Jerry Earth Tech
Woods, Scott Shaw Environmental & Infrastructure
Yearick, Brian TD*X
*Mr. White has an easement across site to travel to the back gate. He may only travel
between the site entrance and the back gate. He has a key to the back gate, so check to
insure that the gate is locked each time he leaves.
Shaw Environmental & Infrastructure, Inc.
Warren County PCB Landfill Detoxification Project
Issue Date: 5/30/03
Rev. 4
Shaw Contact Phone Numbers
Name Organization Location Position Phone
Duke, Gary ShawE&I Trenton, NJ Project Manager 609-588-6373
" Home, NJ " 609-448-7802
Gallagher, Bill ShawE&I Site Site Manager 257-1713
" Henderson " 431-1364
Ditcher, Dave ShawE&I Site Site Supervisor 257-3603
" Clarksville, " 434-374-8337
VA
" Cell phone " 336-575-4839
Paul Roberts ShawE&I Site Health & Safety 257-5289
" Henderson* " 492-1126
" Cell phone " 412-607-0779
Rick Bergener ShawE&I Site Foreman 257-3603
" Cell phone " 540-570-1181
* Henderson Travel Lodge
Emergency Phone Numbers
Warren County Sheriff 911 or 257-3364
Warren County EMS (Ambulance) 911 or 257-2616
Warren County Fire Department 911 or257-3104
Shaw Environmental & Infrastructure, Inc.
Warren County PCB Landfill Detoxification Project
Site Access Rules
1. All personnel must sign in and out at with security on every visit.
Issue Date: 5/13/02
Rev.O
2. If not known personally by the acting guard, visitors on the approved list must produce
either a government issued ID with photo or employer ID with photo. Visitors not on the
approved list will not be admitted to the site when Shaw management personnel are not
present.
3. Security will notify the senior Shaw person on site when a visitor who is not on the
approved list is on site.
4. Visitors not on the approved list must see the Shaw H&S person on site for a safety
briefing before entering any restricted or contaminated area.