NCD980602163_20020318_Warren County PCB Landfill_SERB C_IT Invoices Nos. 10 - 12-OCR
10 Parewood Drive, Bldg. VI, Suire 500, Greenville, South CarolinJ 29615 March 18, 2002 Ms. Patricia M. Backus, P.E. North Carolina Department of Environment and Natural Resources Division of Waste Management 401 Oberlin Road, Suite 150 Raleigh, NC 27605 RE: IT Application for Payment No. 12 Warren County Detoxification Oversight Project NC SCO ID No. 010440101A Dear Pat: Attached is my Certificate for Payment for the referenced document, which still doesn't include a progress payment to Midwest Soil Remediation, Inc. but does include a list of vendors that have not been paid by IT but for whom IT has been paid by the NCDENR. The retainage amount is slightly less than five percent to account for a slight error in the previous application (see column Q on the second page of the spreadsheet). Please feel free to call me at (864) 234-3056 if you have any questions or require additional information. Regards, Jim Cloonan, P.E. Project Manager /attachment c: John Funk, Raleigh EARTH ©T EC H A tqca INTERNATIONAL LTD. COMPANY Telephone 864.234.3000 Facsimile 864 234.3069 Page 198 1995 North Carolina State Construction Manual DESIGNER'S CERTIFICATION The herein named designer certifies to the owner, based on information contained in this application and from observations and at on-site visits to the project, that the work has progressed to the stage indicated; that to the best of his knowledge and belief, the quality of the work is in accordance with the Contract Documents and that the contractor is entitled to payment in the amount cert~e~W.- ,c-..,..,..-."''\" CARO[ '#1,, AMOUNT CERTIFIED: $ ::> I 5 IT-'3 '} ..,..,.,, .. ~r::::,~arts·s·0,00°000/,t~',, ~ ,l'f\.'-t. r/j,o., -Y i "' or,,,.V ''--7°• ,,. (Attach explanation if amount certified differs from the amount applied for.) ~ o,,_~ -7~ o • f f' SEAL "'i \ : t 1s216 I = DESIGNER: ~ _.-:,o l~ S · 11 ~ ~ ~ 00(,t,c, Nt t~•·\~~t· l BY: l,,,l{//)(.µ--_ DATE: '3 -18 ~ O 2i!f .1asrp··~·~\,~~ ...... " ,,, n ,,, ,,,,,,,, .. ,,, This certi is not negotiable. The amount certified is payable only to the contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the owner or contractor under this contract. North Carolina State Construction Manual 1995 Page 197 SECTION 323 APPLICATION AND CERTIFICATE FOR PAYMENT; TO: (Owner) NC Dept of Environment & Natural Resources PROJECT: Warren County PCB Landfill Remediation NC SCO #010440101A CODE ___ ITEM DESIGNER Earth Tech 10 Patewood Drive Building VI, Suite 500 Greenville, SC 29616 CHANGE ORDER SUMMARY Change Orders Additions Deductions Approved in Previous Mos. $539.00 by the Owner TOTAL $0 APPROVED THIS MONTH NO Date Appr. Additions Deductions TOTALS Net Change by Change Orders$0.00 CONTRACTOR'S CERTIFICATION APPLICATION NO. APPLICATION DATE PERIOD FROM TO CONTRACT DATE CONTRACT FOR 12 3/11/02 2/01/02 2/28/02 2/16/01 CONTRACTOR _I_T_C_o_r~p----~- 200 Horizon Center Blvd Trenton, NJ 08691 CONTRACT STATUS Original Contract Sum$6 , 658, ooo Net Change by Change Order $ 539 . oo Contract Sum to Date $6,658 ,539 Total Completed and Stored to Date . .$4 ,030 ,579 .03 Retainage __ 5_%. . . $2 01,528 .91 Total Earned Less Retainage . . $3 ,82 9,050 .12 Less Previous Certifi- cates for Payment. . $3 ,823 ,532 .73 Current Payment Due. $ 5,517.39 The herein named contractor certifies that based on current information and to the best of his knowledge and belief, the work covered by this Application for Payment has been constructed in accordance with the contract documents; that all amounts have been paid by him for work for which previous Certificates for Payment were issued and payments received from the owner* (see attached supplemental page for list of exceptions), and that current payment shown herein is now due. CONTRACTOR: IT Corp. BY: Gary W. Duke .,4 ~_/~DATE: _3_/..,,...11_/_0_2 ______ _ State of: New Jersey~ County of_: ________ _ Subscribed andc~ ~o ~e :his 11th day of March, 2002 . Notary Public~~,v1-zz£; My Commission Expires: i;1s;/za~S- PATRICIA A. DEKOVITCH NOTARY PUBLIC Of NEW J&-~ Commission etplles 11/15/m Supplemental page to Section 323 form for Application for Payment # 11 The following subcontractors and/or vendors have outstanding invoices with IT Corp which have not been paid as of the date of this application. At least a portion of each invoice covers work for which IT Corp has received payment from the owner. This list is largely unchanged since last month since no additional payments have been received from the owner during this period. The only exception is Henderson Travellodge, which has been updated to reflect additional invoices received from them. The following vendors have filed claims with ITCorp's surety company as of 3/8/02, checks are expected to be mailed not later than the week of 3/11 to those vendors who have submitted completed claim forms: Yancey Electric Service (electrical installation) $33,916.28, invoiced 12/7/01 (check mailed week of ¾) Yancey Electric Service (copay with CED) (electrical installation) $6,695.72, invoiced 12/7/01 KPH Trucking & Landscaping (seeding & maintenance) $9,486.25 , invoiced 11/16/01 KPH Trucking & Landscaping (seeding & maintenance) $3 ,600.00, invoiced 12/20/01 Ellington & Sons (concrete sealing & building erection) $49,139.00, invoiced 12/17/01 Kearneco Grading (road installation) $30,800.00, invoiced 12/17/01 Aiken & Yelle (surveying) $10,080.56, invoiced 1/10/02 The following vendors have indicated intent to file claims with the surety company: Williams Engineering (management services) $16,284.62, invoiced 12/2/01 Williams Engineering (management services) $8,291.00, invoiced 1/2/02 Henderson Travellodge (hotel) $7,400.47, multiple invoices from 10/1 7 to 12/7 The following vendors have not indicated an intent to file claims with the surety: Bailey Co (portable toilet rental/service) $362.01, invoiced 11/28/01 Geotechnics ( civil laboratory services) $1 ,600.00, invoiced 11/30/0 I Geotechnics (civil laboratory services) $300.00, invoiced 12/31 /01 TOTAL: $177,955.91 Submitted by contractor: IT Corp Gary W. Duke Project Manager FORMAT, CFP14 REMIT TO , IT CORPORATION PO BOX 2483 CAROL STREAM IL 60132-2483 INVOICE NO INVOICE DATE APPLICATION NO CLIENT ORDER NO, 480881 03/11/02 17 INQUIRIES , The IT Group 200 Horizon Center Blvd Trenton NJ 08691-1904 PAYMBHT AMOUNT IT PROJECT NO IT PROJECT NAME IT PROJECT DESC s ,S.5/7, 3? Payment Terms are NET 30 Checks should be made payable to IT Corporation. To expedite your payment, please return this page with your remittance. Thank you for your business. 1277440 NC DEPT OF ENVIRONMENTAL NATURAL RESOURCES PO BOX 1507 WARRENTON NC 27589 827062 NC DEPT OF ENVIRONMENT AND NATURAL RESOURCES WARREN CNTY PCB LANDFILL THERMAL TREATMENT ~~~\ y)tt1;-'~ ~/41/02-f FORMAT, CFP14 INVOICE NUMBER INVOICE DATE APPLICATION NO CL !ENT ORDER NO CLIENT NUMBER CLIENT NAME CL !ENT PHONE Fixed Price Totals 480881 03/11/02 17 1277440 NC DEPT OF ENVIRONMENTAL I l DES CR I PT ION TOTAL NIOUNT DUE Payment Terms Are: NET 30 Please make checks payable to IT Corporation and indicate invoice number and client number REMIT TO IT CORPORATION PO BOX 2483 CAROL STREAM INQUIRIES , The IT Group IL 200 Horizon Center Blvd Page 2 60132-2483 Trenton NJ 08691-1904 Project No. 827062 Billing No. 827062 CURRENT PER !OD AMOUNT RETA IN AGE 5,800.03 282.64-5,800.03 282.64-TOTAL 5,517.39 5,517.39 5,517.39 (609) 584-8900 CUMULATIVE PERIOD PROJECT AMOUNT RETAINAGE TOTAL BUDGET 4,030,579.03 201,528.91-3,829,050.12 6,658,000.00 4,030,579.03 201,528.91-3,829,050.12 6,658,000.00 PCT COMPL 60.54 60.54 WARREN COUNTY PCB LANDFILL NC SCO project# 010440101A, IT Corp project #827062 IT Corp. Application for Payment #12, covers period February 1 through February 28, 2002 B C D E J K L M N 0 p a R s Work Completed Materials Total Completed Total Balance Retainage (5%} Total Due Now From Previous This Presently and Stored Percent to Finish From Previous This Total On This Invoice, Bid item# Description Scheduled Application Period Stored to Date Complete Application Period to date (net of retainage} Value (prev mo col M} (not in J or K} (J+K+L} (M/E} (E-M} (prev mo col R} ((K+L}".05) (P+Q} (M-(J+Q}} 1 DESIGN\ PERMITS\ MO Bl LIZA TION IT submit bonds $ 128,000.00 $ 128,000.00 $ $ $ 128,000.00 100.00% $ -$ 6,400.00 $ -$ 6,400.00 $ -Permitting $ $ TSCApermit $ 15,000.00 $ 14,500.00 $ $ $ 14,500.00 96.67% $ 500.00 $ 725.00 $ $ 725.00 $ Other permits $ 3,000.00 $ 3,000.00 $ $ $ 3,000.00 100.00% $ $ 150.00 $ -$ 150.00 $ -Premob plans & submittals $ 30,000.00 $ 30,000.00 $ $ $ 30,000.00 100.00% $ -$ 1,500.00 $ -$ 1,500.00 $ -Procurement of Midwest subcontract $ 7,500.00 $ 7,500.00 $ $ $ 7,500.00 100.00% $ -$ 375.00 $ $ 375.00 $ Procurement of $1.3M other ODCs $ 17,500.00 $ 17,500.00 $ $ $ 17,500.00 100.00% $ -$ 875.00 $ -$ 875.00 $ IT equipment to Midwest@ NTP+30 $ 100,000.00 $ 100,000.00 $ $ $ 100,000.00 100.00% $ -$ 5,000.00 $ -$ 5,000.00 $ IT payment #1 to Midwest@ NTP+30 $ 750,000.00 $ 750,000.00 $ $ $ 750,000.00 100.00% $ $ 37,500.00 $ -$ 37,500.00 $ -IT payment #2 to Midwest @ NTP+60 $ 500,000.00 $ 500,000.00 $ $ $ 500,000.00 100.00% $ -$ 25,000.00 $ $ 25,000.00 $ IT payment #3 to Midwest @ NTP+90 $ 750,000.00 $ 649,900.00 $ $ $ 649,900.00 86.65% $ 100,100.00 $ 32,495.00 $ $ 32,495.00 $ IT payment #4 to Midwest@ NTP+150 $ 300,000.00 $ $ $ $ -0.00% $ 300,000.00 $ $ -$ $ IT mobilization $ 69,000.00 $ 34,500.00 $ $ $ 34,500.00 50.00% $ 34,500.00 $ 1,725.00 $ $ 1,725.00 $ Midwest mobilization (not setup) $ 290,000.00 $ $ $ $ -0.00% $ 290,000.00 $ $ $ $ BID ITEM TOTAL $ 2,960,000.00 $ 2,234,900.00 $ $ $ 2,234,900.00 75.50% $ 725,100.00 $ 111,745.00 $ $111,745.00 $ 2 SITE PREPARA TIONI CONSTRUCTION Midwest bond to IT Corp $ 60,000.00 $ 60,000.00 $ $ $ 60,000.00 100.00% $ -$ 3,000.00 $ $ 3,000.00 $ Site access E&S controls $ 30,000.00 $ 30,000.00 $ -$ $ 30,000.00 100.00% $ $ 1,500.00 $ $ 1,500.00 $ Clear & Grub $ 45,000.00 $ 45,000.00 $ $ $ 45,000.00 100.00% $ $ 2,250.00 $ $ 2,250.00 $ Grading $ 85,000.00 $ 85,000.00 $ $ $ 85,000.00 100.00% $ $ 4,250.00 $ $ 4,250.00 $ Access road & parking $ 40,000.00 $ 40,000.00 $ $ $ 40,000.00 100.00% $ $ 2,000.00 $ $ 2,000.00 $ Fencing $ 25,000.00 $ 25,000.00 $ $ $ 25,000.00 100.00% $ -$ 1,250.00 $ $ 1,250.00 $ Line new pond $ 75,000.00 $ 75,000.00 $ $ $ 75,000.00 100.00% $ $ 3,750.00 $ -$ 3,750.00 $ Site utilities CP&L electric service $ 35,000.00 $ 35,000.00 $ $ 35,000.00 100.00% $ $ 1,750.00 $ $ 1,750.00 $ Site electrical sub -part 1 $ 102,000.00 $ 102,000.00 $ $ $ 102,000.00 100.00% $ -$ 5,100.00 $ -$ 5,100.00 $ Site electrical sub -part 2 $ 68,000.00 $ 68,000.00 $ $ $ 68,000.00 100.00% $ -$ 3,400.00 $ -$ 3,400.00 $ 6" water main $ 45,000.00 $ 45,000.00 $ $ $ 45,000.00 100.00% $ $ 2,250.00 $ -$ 2,250.00 $ Site facilities Trailers, furnished, w/phones $ 30,000.00 $ 20,000.00 $ $ $ 20,000.00 66.67% $ 10,000.00 $ 1,000.00 $ -$ 1,000.00 $ Monitoring well abandonment $ 5,000.00 $ 5,000.00 $ $ $ 5,000.00 100.00% $ -$ 250.00 $ -$ 250.00 $ -Process structures Concrete pad & base stone $ 375,000.00 $ 375,000.00 $ $ $ 375,000.00 100.00% $ -$ 18,750.00 $ $ 18,750.00 $ Concrete sealant $ 75,000.00 $ 75,000.00 $ $ $ 75,000.00 100.00% $ $ 3,750.00 $ -$ 3,750.00 $ Pole barn $ 110,000.00 $ 110,000.00 $ $ -$ 110,000.00 100.00% $ (0.00) $ 5,500.00 $ $ 5,500.00 $ Treated soil bins $ 45,000.00 $ 9,000.00 $ -$ $ 9,000.00 20.00% $ 36,000.00 $ 450.00 $ $ 450.00 $ Stormwater treatment plant $ 75,000.00 $ 11,250.00 $ $ $ 11,250.00 15.00% $ 63,750.00 $ 562.50 $ -$ 562.50 $ -Force main STP to existing pond $ 6,000.00 $ 6,000.00 $ -$ $ 6,000.00 100.00% $ $ 300.00 $ $ 300.00 $ Force main lined pond to STP $ 3,000.00 $ 90.00 $ $ $ 90.00 3.00% $ 2,910.00 $ 4.50 $ -$ 4.50 $ Contaminated area work Initial haul roads $ 25,000.00 $ 5,000.00 $ -$ $ 5,000.00 20.00% $ 20,000.00 $ 250.00 $ $ 250.00 $ Midwest setup of thermal & BCD process $ 820,000.00 $ $ $ -$ 0.00% $ 820,000.00 $ $ $ $ -Support functions Survey, initial layout $ 9,000.00 $ 9,000.00 $ $ $ 9,000.00 100.00% $ -$ 450.00 $ -$ 450.00 $ Survey, progress verification $ 9,000.00 $ 9,000.00 $ -$ $ 9,000.00 100.00% $ -$ 450.00 $ $ 450.00 $ Survey, as-built $ 7,000.00 $ 6,250.00 $ 750.00 $ $ 7,000.00 100.00% $ -$ 312.50 $ 37.50 $ 350.00 $ 712.50 Security, over est. 90 days $ 30,000.00 $ -$ $ $ -0.00% $ 30,000.00 $ -$ $ $ -IT Corp A&S, H&S, travel, diems $ 538,300.00 $ 528,249.97 $ 5,050.03 $ $ 533,300.00 99.07% $ 5,000.00 $ 26,412.49 $ 252.50 $ 26,665.00 $ 4,797.53 over est 193 cal days BID ITEM TOTAL $ 2,772,300.00 $ 1,778,839.97 $ 5,800.03 $ $ 1,784,640.00 64.37% $ 987,660.00 $ 88,941.99 $ 290.00 $ 89,232.00 $ 5,510.03 3 PERFORMANCE DEMONSTRATION Soil excavation & screening $ 30,000.00 $ $ $ $ -0.00% $ 30,000.00 $ $ $ $ -Treated soil backfill $ 20,000.00 $ $ $ $ -0.00% $ 20,000.00 $ -$ $ $ WARREN COUNTY PCB LANDFILL NC SCO project# 010440101A, IT Corp project #827062 IT Corp. Application for Payment #12, covers period February 1 through February 28, 2002 . B C D E J K L M N 0 p Q R s Work Completed Materials Total Completed Total Balance Retainage {5%) Total Due Now From Previous This Presently and Stored Percent to Finish From Previous This Total On This Invoice, . Bid item# Description Scheduled Application Period Stored to Date Complete Application Period to date {net of retainage) Value (prev mo col M) {not in J or K) {J+K+L) {M/E) {E-M) (prev mo col R) {(K+L)".05) {P+Q) {M-{J+Q)) Midwest thermal & BCD processing $ 93,000.00 $ $ $ . $ 0.00% $ 93,000.00 $ . $ $ . $ Support functions Security, 11 days $ 4,000.00 $ $ $ $ . 0.00% $ 4,000.00 $ . $ $ . $ . IT Corp A&S, H&S, travel, diems $ 86,200.00 $ $ . $ . $ . 0.00% $ 86,200.00 $ . $ $ . $ over est 14 cal days BID ITEM TOTAL $ 233,200.00 $ $ $ $ 0.00% $ 233,200.00 $ $ $ $ 4 PERFORMANCE DEMONSTRATION TESTING Midwest analytical & reporting $ 87,000.00 $ . $ $ $ . 0.00% $ 87,000.00 $ $ $ $ . IT analytical $ 23,000.00 $ $ $ $ . 0.00% $ 23,000.00 $ $ $ . $ IT reporting & review $ 25,000.00 $ . $ $ $ 0.00% $ 25,000.00 $ $ . $ $ BID ITEM TOTAL $ 135,000.00 $ $ $ $ 0.00% $ 135,000.00 $ $ $ $ 5 PERFORMANCE DEMONSTRATION TEST DECONI DISMANTLEMENn DEMOBE Decon & demob Midwest BCD equipment $ 342,000.00 $ . $ $ $ 0.00% $ 342,000.00 $ $ . $ . $ Decon IT equipment $ 40,000.00 $ $ $ $ 0.00% $ 40,000.00 $ $ $ $ Demob IT equipment $ 40,000.00 $ . $ $ $ 0.00% $ 40,000.00 $ $ . $ $ Support functions IT Corp A&S, H&S, travel, diems $ 82,200.00 $ . $ $ $ 0.00% $ 82,200.00 $ $ . $ $ over est 21 cal days BID ITEM TOTAL $ 504,200.00 $ $ $ $ 0.00% $ 504,200.00 $ $ $ $ 6 PERFORMANCE DEMONSTRATION SITE RESTORATION Regrade landfill area $ 13,000.00 $ . $ $ $ 0.00% $ 13,000.00 $ . $ $ . $ Seed regraded area $ 1,300.00 $ $ $ $ . 0.00% $ 1,300.00 $ . $ $ $ BID ITEM TOTAL $ 14,300.00 $ $ $ $ 0.00% $ 14,300.00 $ $ $ $ 7 COMMUNITY OUTREACH PROGRAM •• PHASE I invoice 1112th each month to correct error Assumed 12 month period for Phase 1 restarting in March 2002 on Application #11 Manager. community relations, 2hr/mo $ 1,772.00 $ 1,329.02 $ $ $ 1,329.02 75.00% $ 442.98 $ 73.78 $ {7.36) $ 66.42 $ 7.36 Engineer, 16 hrs/mo $ 8,928.00 $ 6,696.00 $ $ $ 6,696.00 75.00% $ 2,232.00 $ 334.80 $ $ 334.80 $ 8 hr/mo for CAB meeting prep & followup 8 hr/mo for monthly report prep Reproduction costs, $75/mo. $ 900.00 $ 675.00 $ $ $ 675.00 75.00% $ 225.00 $ 33.75 $ $ 33.75 $ Postage/Fed Ex. $200/mo $ 2,400.00 $ 1,800.00 $ $ $ 1,800.00 75.00% $ 600.00 $ 90.00 $ $ 90.00 $ BID ITEM TOTAL $ 14,000.00 $ 10,500.02 $ $ $ 10,500.02 75.00% $ 3,499.98 $ 532.33 $ {7.36) $ 524.97 $ 7.36 8 COMMUNITY REDEVELOPMENT· PHASE I Allowance per bid form $ 25,000.00 $ . $ $ $ . 0.00% $ 25,000.00 $ . $ $ $ BID ITEM TOTAL $ 25,000.00 $ $ $ $ 0.00% $ 25,000.00 $ $ $ $ N/A PHASE 1 CHANGE ORDERS 1 Time extension • E&S plan delays $ 2 Time extension • August, 2001 rain days $ 3 Removal of construction landfill debris $ 539.00 $ 539.00 $ . $ . $ 539.00 100.00% $ $ 26.95 $ $ 26.95 $ PHASE 1 CHANGE ORDERS TOTAL $ 539.00 $ 539.00 $ $ $ 539.00 100.00% $ $ 26.95 $ $ 26.95 $ TOTAL FOR PHASE 1 {BID ITEMS 1 to 8 & Change Orders) $ 6,658,539.00 $ 4,024,779.00 $ 5,800.03 $ $ 4,030,579.03 60.53% $ 2,627,959.97 $ 201,246.27 $ 282.64 $ 201,528.91 $ 5,517.39 see note Totals due for this invoice: Gross {before retainage) = Col K + Col L = $ 5,800.03 Net (after retainage) = Col S = $ 5,517.39 I I I I Note: State cashflow estimates should also allow for potential payment for up to 20,000 tons processed durng POP, at $88.40/ton unit rate for bid line item #11, total up to $1,768,000.00 I I I I I I I I WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT Notes for IT Corp Application for Payment #12, covers period February 1 through February 31, 2002 NC SCO project #010440101A IT Corp project #827062 (formerly 823851) Duke filename: Application #12 notes.xis Item description Amount CONTRACT BID LINE ITEM #1 Permitting TSCA permit $ - SUBTOTAL BID LINE ITEM #1 $0.00 CONTRACT BID LINE ITEM #2 Survey, as-built $750.00 IT Corp A&S, H&S, travel, diems $5,050.03 SUBTOTAL BID LINE ITEM #2 $5,800.03 CONTRACT BID LINE ITEM #7 Community Outreach, 1 month $0.00 SUBTOTAL BID LINE ITEM #7 $0.00 CHANGE ORDERS $0.00 SUBTOTAL CHANGE ORDERS $0.00 TOTAL (before retainage) $5,800.03 Notes No significant work completed this period Transmittal #58 to Earthtech 2/8/02, item complete. Billing approx half of remaining balance, to cover off-site work performed in February on ongoing plans & submittals. Billing on this item suspended for Jan and Feb, minimal activity No change order work billed on this invoice. Change Order #4 pending approval by surety. 10 Patewood Drive, Bldg. VI, Suite 500, Greenvi ll e, South Carolina 29615 March 4, 2002 Ms. Patricia M. Backus, P.E. North Carolina Department of Environment and Natural Resources Division of Waste Management 401 Oberlin Road, Suite 150 Raleigh, NC 27605 RE: IT Application for Payment No. 11 Warren County Detoxification Oversight Project NC SCO ID No. 010440101A w 7 ti 2002 • ,1 Dear Pat: Telephone Attached is my Certificate for Payment for the referenced document, which doesn't include a s 6 4 · progress payment to Midwest Soil Remediation, Inc. since IT could not obtain a consent of surety from the bonding company in time. Please feel free to call me at (864) 234-3056 if 234.3000 Fa cs imil e you have any questions or require additional information. 864.234 3069 Regards, Jim Cloonan, P.E. Project Manager /attachment c: John Funk, Raleigh E A R T H © T E C H A tqca INTERNATIONAL LTD. COMPANY • IT Corporation 200 Horizon Cl'nter Bouh·1·ard Trenton.\) 0869/-/904 '/'cl. 609.584.8900 _he'1(; group Fax. 609.588.6300 \ \l,·111/u·r 11/' '/'lw IT l:mup February 5, 2002 Earth Tech 10 Patewood Drive Building VI, Suite 500 Greenville, SC 29616 Attn: Mr. Jim Cloonan, P.E. (864) 234-3056 phone (864) 234-3069 fax Subject: Application for Payment #11 Warren County Landfill PCB Detoxification NCSCO ID #010440101A, IT Corp Project# 827062 Dear Mr. Cloonan, Enclosed is ITCorp's Application for Payment #11 for the referenced project. It has been revised to reflect your comments on the draft invoice. As I previously informed you, this invoice does not include any billing for work performed by Midwest Soil Remediation, due to difficulties in obtaining consent of surety. You will note that the Section 323 form has been modified by the addition of a supplemental page listing vendors with outstanding invoices for work for which IT Corp has received payment from the owner. Should you have any questions in regard to this matter please contact me at (609) 588-6373 at your earliest convenience to discuss them. Sincerely, 4~~L Gary W. Duke, P.E. Project Manager Enclosures: Application for Payment #11 and support documents Dukefile: App for Pay #1 I 020502.doc North Carolina State Construction Manual 1995 Page 197 SECTION323 APPLICATION AND CERTIFICATE FOR PAYMENT; TO: (Owner) NC Dept of Environment & Natural Resources PROJECT: Warren County PCB Landfill Remediation NC SCO #010440101A CODE ___ ITEM DESIGNER Earth Tech 10 Patewood Drive Building VI, Suite 500 Greenville, SC 29616 CHANGE ORDER SUMMARY Change Orders Additions Deductions Approved in Previous Mos. $539.00 by the Owner TOTAL $0 APPROVED THIS MONTH NO Date Appr. Additions Deductions TOTALS Net Change by Change Orders$0.00 CONTRACTOR'S CERTIFICATION APPLICATION NO. APPLICATION DATE PERIOD FROM TO CONTRACT DATE CONTRACT FOR 11 2/05/02 1/01/02 1/31/02 2/16/01 CONTRACTOR _I_T_C_o_r~p----~~ .2 00 Horizon Center Blvd Trenton, NJ 08691 CONTRACT STATUS Original Contract Sum$6 , 658 , ooo Net Change by Change Order $ 53 9. 00 Contract Sum to Date $6 ,658 ,539 Total Completed and Stored to Date . . $4 ,024 ,779 . oo Retainage 5 %. • .$20 1,24 6.27 Total Earnecr- Less Retainage . . $3 ,823 ,53 2.7 3 Less Previous Certifi- cates for Payment. . $3 ,811 ,427 .59 Current Payment Due. $ 12 ,105 .14 The herein named contractor certifies that based on current information and to the best of his knowledge and belief, the work covered by this Application for Payment has been constructed in accordance with the contract documents; that all amounts have been paid by him for work for which previous Certificates for Payment were issued and payments received from the owner* (see attached supplemental page for list of exceptions), and that current payment shown herein is now due. PATRICIA A. DEKOVliCH NOTARY PUBLIC OF NEW JEllSFf Commission Expires 11/15/2005 My Commission Expires: ijfaizod~ Page 198 1995 North Carolina State Construction Manual DESIGNER'S CERTIFICATION The herein named designer certifies to the owner, based on information contained in this application and from observations and at on-site visits to the project, that the work has progressed to the stage indicated; that to the best of his knowledge and belief, the quality of the work is in accordance with the Contract Documents and that the contractor is entitled to payment in the amount certifo~dbetow .• 1.' I "', I e--• ~~\,\ O..''v j '/ ,,,, AMOUNT CERTIFIED:$ I 2 I O =>. I'-/-l '~~:,•r{ss/u'•,-::1/\ :-.••o.._\J /v .. ,~ : ·<:i::--~. .. (Attach explanation if amount certified differs from the amount applied for.) : : SE Al <" \ : ~ \ 18276 J :: DESIGNER: ._ ~ •. f', : ~ :: d' ~ ~, ~;• .. 4-C/Nct~ •• •~"x' f '? l _/ !'6"? " <::O •• L •• f'\."° , BY: ~ DATE: ..J -,-OL-', u.1,•······•••(J\J .. .. . ..,____ ,,,#ii,,0SE PH e,~,,,, .. .. ,,,,,. ... ,,,, This cert e is not negotiable. The amount certified is payable only to the contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the owner or contractor under this contract. ( Supplemental page to Section 323 form for Application for Payment #11 The following subcontractors and/or vendors have outstanding invoices with IT Corp which have not been paid as of the date of this application. At least a portion of each invoice covers work for which IT Corp has received payment from the owner. Bailey Co (portable toilet rental/servise) $362.01, invoiced 11/28/01 Williams Engineering (management services) $16,284.62, invoiced 12/2/01 Williams Engineering (management services) $8,291.00, invoiced 1/2/02 Yancey Electric Service (electrical installation) $33,916.28, invoiced 12/7/01 Yancey Electric Service (copay with CED) (electrical installation) $6,695.72, invoiced 12/7/01 KPH Trucking & Landscaping (seeding & maintenance) $9,486.25, invoiced 11/16/01 KPH Trucking & Landscaping (seeding & maintenance) $3,600.00, invoiced 12/20/01 Geotechnics (civil laboratory services) $1,600.00, invoiced 11/30/01 Ge.,otechnics ( civil laboratory services) $300.00, invoiced 12/31/01 Ellington & Sons (concrete sealing & building erection) $49,139.00, invoiced 12/17/01 Keameco Grading (road installation) $30,800.00, invoiced 12/17/01 Henderson Travellodge (hotel) $5,809.02, multiple invoices from 10/17 to 11/26, approved 12/28 after removal of improper charges not covered by purchase order Aiken & Yelle (surveying) $10,080.56, invoiced 1/10/02 TOT AL: $176,364.46 Submitted by contractor: IT Corp Gary W. Duke Project Manager s;gnature: ~ ./4------J P~ -- Date: Februa5 FORMAT, CPP14 REMIT TO , IT CORPORATION PO BOX 2483 CAROL STREAM IL 60132-2483 INVOICE NO , 4 7l793 INVOICE DATE , 02/05/02 APPLICATION NO , 16 CLIENT ORDER NO, PATIIIIIIT llNOl9T $ ----INQUIRIES 'The IT Group 200 Horizon Center Blvd Trenton NJ 08691-1904 IT PROJECT NO , 827062 IT PROJECT NAME, NC DEPT OP ENVIRONMENT AND IT PROJECT DESC, NATURAL RESOURCES WARREN CNTY PCB LANDFILL TI!ERMAL TREATMENT l:l'-IOS: /J/-~ ~~ Payment Terms are NET 30 Checks should be made payable to IT Corporation. To expedite your payment. please return this page with your remittance. Thank you for your buaineea. '-Pa ~~ 41'I/02.. 1277440 NC DEPT OF ENVIRONMENTAL NATURAL RESOURCES PO BOX 1507 WARRENTON NC l7589 r-. FORMAT, CFP14 INVOICE NUMBER INVOICE DATE APPLICATION NO CLIENT ORDER NO CLIENT NUMBER CLIENT NAME CLIENT PHONE , 472793 , 02/05/02 , 16 , 1277440 , NC DEPT OP ENVIRONMENTAL ' ( ) Payment Terms Are, NET 30 Please make checks payable to IT Corporation and indicate invoice number and client number -.......................................................................... Project No., 827062 Billing No., 827062 REMIT TO , IT CORPORATION PO BOX 2483 CAROL STREAM INQUIRIES, The IT Group IL 200 Horizon Center Blvd Page 2 60132-2483 Trenton NJ 08691-1904 (609) 584-8900 ••'••···················································································································································· CURRENT PERIOD CUMULATIVE PERIOD PROJECT PCT DESCRIPTION AMOUNT RETAINAGE TOTAL AMOUNT RETAINAGE TOTAL BUDGET COMPL Pixed Price 12,750.00 644. 86-12,105.14 4,024,779.00 201,246 .27-3,823,532.73 6,658,000.00 60.45 Totals 12,750.00 644.86-12,105.14 4,024,779.00 201,246 .27-3,823,532.73 6,658,000.00 60.45 TOrAL JIIIO{aT DOIi 120105.H (' ---,-._ WARREN COUNTY Pt IDFILL NC SCO project# 010440101A, IT Corp project #827062 IT Corp. Application for Payment #11, covers period January 1 through January 31, 2002 -B C D E J K L M N 0 p Q R s . Work Completed Materials Total Completed Total Balance Retalnage (5•/4) Total Due Now From Previous This Presently and Stored Percent to Finish From Previous This Total On This Invoice, Bid item# Description Scheduled Application Period Stored to Date Complete Application Period to date (net of retalnage) • Value (prev mo col M) (not In J or K) (J+K+L) (M/E) (E-M) (prev mo col R) ((K+L)".05) (P+Q) (M-{J+Q)) 1 DESIGN\ PERMITS\ MOBILIZATION IT submit bonds $ 128,000.00 $ 128,000.00 $ $ $ 128,000.00 100.00% $ $ 6,400.00 $ -$ 6,400.00 $ Pennilling $ $ TSCApennil $ 15,000.00 $ 14,250.00 $ 250.00 $ $ 14,500.00 96.67% $ 500.00 $ 712.50 $ 12.50 $ 725.00 $ 237.50 Other pennils $ 3,000.00 $ 3,000.00 $ $ $ 3,000.00 100.00% $ $ 150.00 $ $ 150.00 $ Premob plans & submiltals $ 30,000.00 $ 30,000.00 $ $ $ 30,000.00 100.00% $ $ 1,500.00 $ $ 1,500.00 $ Procurement of Midwest subcontract $ 7,500.00 $ 7,500.00 $ $ $ 7,500.00 100.00% $ $ 375.00 $ -$ 375.00 $ Procurement of $1.3M other ODCs $ 17,500.00 $ 17,500.00 $ $ -$ 17,500.00 100.00% $ $ 875.00 $ -$ 875.00 $ IT equipment lo Midwest@ NTP+30 $ 100,000.00 $ 100,000.00 $ $ -$ 100,000.00 100.00% $ $ 5,000.00 $ -$ 5,000.00 $ -IT payment #1 lo Midwest@ NTP+30 $ 750,000.00 $ 750,000.00 $ $ . $ 750,000.00 100.00% $ $ 37,500.00 $ -$ 37,500.00 $ IT payment #2 to Midwest @ NTP+60 $ 500,000.00 $ 500,000.0Q $ $ . $ 500,000.00 100.00% $ $ 25,000.00 $ . $ 25,000.00 $ IT payment #3 lo Midwest @ NTP+90 $ 750,000.00 $ 649,900.00 $ 649,900.00 86.65% $ 100,100.00 $ 32,495.00 $ -$ 32,495.00 ..$ IT payment #4 lo Midwest@ NTP+150 $ 300,000.00 $ . $ -$ $ -0.00% $ 300,000.00 $ . $ . $ $ IT mobilization $ 69,000.00 $ 34,500.00 $ $ $ 34,500.00 50.00% $ 34,500.00 $ 1,725.00 $ . $ 1,725.00 $ Midwest mobilization (not setup) $ 290,000.00 $ . $ $ $ -0.00% $ 290,000.00 $ -$ . $ . $ BID ITEM TOTAL $ 2,960,000.00 $ 2,234,650.00 $ 250.00 $ $ 2,234,900.00 75.50o/. $ 725,100.00 $ 111,732.50 s, 12.50 $111,745.00 $ 237.50 2 SITE PREPARA TIONI CONSTRUCTION Midwest bond lo IT Corp $ 60,000.00 $ 60,000.00 $ . $ $ 60,000.00 100.00% $ . $ 3,000.00 $ . $ 3,000.00 $ Sile access E&S controls $ 30,000.00 $ 30,000.00 $ -$ $ 30,000.00 100.00% $ . $ 1,500.00 $ $ 1,500.00 $ Clear & Grub $ 45.000.00 $ 45,000.00 $ . $ $ 45,000.00 100.00% $ . $ 2,250.00 $ $ 2,250.00 $ . Grading $ 85,000.00 $ 85,000.00 $ -$ $ 85,000.00 100.00% $ $ 4,250.00 $ . $ 4,250.00 $ . Access road & parking $ 40,000.00 $ 40,000.00 $ -$ $ 40,000.00 100.00% $ $ 2,000.00 $ . $ 2,000.00 $ Fencing $ 25.000.00 $ 25,000.00 $ . $ $ 25,000.00 100.00% $ $ 1,250.00 $ $ 1,250.00 $ Line new pond $ 75,000.00 $ 75,000.00 $ $ $ 75,000.00 100.00% $ $ 3,750.00 $ $ 3,750.00 $ Sile utilities CP&L electric service $ 35,000.00 $ 31,500.00 $ 3,500.00 $ $ 35,000.00 100.00% $ $ 1,575.00 $ 175.00 $ 1,750.00 $ 3,325.00 Sile electrical sub -part 1 $ 102,000.00 $ 102,000.00 $ . $ . $ 102,000.00 100.00% $ $ 5,100.00 $ . $ 5,100.00 $ Sile electrical sub -part 2 $ 68,000.00 $ 68,000.00 $ . $ . $ 66,000.00 100.00% $ . $ 3,400.00 $ . $ 3,400.00 $ 6" waler main $ 45,000.00 $ 45,000.00 $ . $ $ 45,000.00 100.00% $ $ 2,250.00 $ . $ 2,250.00 $ Sile facilities Trailers, furnished, w/phones $ 30,000.00 $ 20,000.00 $ $ $ 20,000.00 66.67% $ 10,000.00 $ 1,000.00 $ .. $ 1,000.00 $ Monitoring well abandonment $ 5,000.00 $ 5,000.00 $ -$ $ 5,000.00 100.00% $ $ 250.00 $ $ 250.00 $ Process structures Concrete pad & base stone $ 375,000.00 $ 375,000.00 $ . $ $ 375,000.00 100.00% $ . $ 18,750.00 $ . $ 18,750.00 $ Concrete sealant $ 75,000.00 $ 75,000.00 $ . $ $ 75,000.00 100.00% $ . $ 3,750.00 $ . $ 3,750.00 $ Polebam $ 110,000.00 $ 110,000.00 $ . $ -$ 110,000.00 100.00% $ (0.00) $ 5,500.00 $ . $ 5,500.00 $ . Treated soil bins $ 45,000.00 $ 9,000.00 $ . $ $ 9,000.00 20.00% $ 38,000.00 $ 450.00 $ . $ 450.00 $ -Stonnwater treatment plant $ 75,000.00 $ 11,250.00 $ . $ $ 11,250.00 15.00% $ 63,750.00 $ 562.50 $ -$ 562.50 $ Force main STP to existing pond $ 6,000.00 $ 6,000.00 $ . $ $ 6,000.00 100.00% $ . $ 300.00 $ -$ 300.00 $ Force main lined pond lo STP $ 3,000.00 $ 90.00 $ . $ $ 90.00 3.00% $ 2,910.00 $ 4.50 $ . $ 4.50 $ -Contaminated area work Initial haul roads $ 25,000.00 $ 5,000.00 $ -$ $ 5,000.00 20.00% $ 20,000.00 $ 250.00 $ . $ 250.00 $ Midwest setup of lhennal & BCD process $ 820,000.00 $ $ . $ . $ . 0.00% $ 820,000.00 $ -$ . $ . $ . Support functions Survey, Initial layout $ 9,000.00 $ 9,000.00 $ . $ . $ 9,000.00 100.00% $ $ 450.00 $ . $ 450.00 $ . Survey, progress verification $ 9,000.00 $ 9,000.00 $ $ . $ 9,000.00 100.00% $ . $ 450.00 $ . $ 450.00 $ -Survey, as-built $ 7,000.00 $ 5,250.00 $ 1,000.00 $ $ 6,250.00 89.29% $ 750.00 $ 262.50 $ 50.00 $ 312.50 $ 950.00 Security, over est. 90 days $ 30,000.00 $ -$ $ $ -0.00% $ 30,000.00 $ . $ -$ . $ IT Corp A&S, H&S, travel, diems $ 538,300.00 $ 520,249.97 $ 8,000.00 $ . $ 528,249.97 98.13% $ 10,050.03 $ 26,012.49 $ 400.00 $ 26,412.49 $ 7,600.00 over est 193 cal days BID ITEM TOTAL $ 2,772,300.00 $ 1,766,339.97 $ 12,500.00 $ . $ 1,778,839.97 64.16% $ 993,460.03 $ 88,316.99 $ 625.00 $ 88,941.99 $ 11,875.00 3 PERFORMANCE DEMONSTRATION Soil excavation & screening $ 30.000.00 $ . $ $ . $ -0.00% $ 30,000.00 $ -$ -$ $ Treated soil backfill $ 20,000.00 $ $ $ . $ -0.00% $ 20,000.00 $ -$ $ $ -0 WARREN COUNTY PC. lDFILL NC SCO project# 010440101A, IT Corp project #827062 IT Corp. Application for Payment #11, covers period January 1 through January 31, 2002 B C D E J K L M N 0 p a R s Work Completed Materials Total Completed Total Balance Retalnage (5%) Total Due Now From Previous This Presently and Stored Percent to Finish From Previous This Total On This Invoice, Bid Item# Description Scheduled Application Period Stored to Date Complete Application Period Iodate (net olretalnage) ' Value (prev mo col M) (not In J or K) (J+K+L) (M/E) (E-M) (prev mo col R) ((K+L)'.05) (P+Q) (M-(J+Q)) Midwest thermal & BCD processing $ 93,000.00 $ $ $ $ 0.00% $ 93,000.00 $ $ $ $ Support functions Security. 11 days $ 4,000.00 $ $ $ $ 0.00% $ 4,000.00 $ . $ $ $ IT Corp A&S, H&S. travel. diems $ 86,200.00 $ $ $ $ 0.00% $ 86,200.00 $ . $ . $ . $ over est 14 cal days BID ITEM TOTAL $ 233,200.00 $ $ $ $ 0.00% $ 233,200.00 $ $ . $ $ . 4 PERFORMANCE DEMONSTRATION TESTING i Midwest analytical & reporting $ 87.000.00 $ . $ . $ $ 0.00% $ 87,000.00 $ . $ . $ -$ I IT analytical $ 23,000.00 $ . $ $ $ 0.00% $ 23,000.00 $ . $ . $ . $ I IT reporting & review $ 25,000.00 $ $ $ -$ 0.00% $ 25,000.00 $ . $ . $ $ BID ITEM TOTAL $ 135,000.00 $ . $ . $ -$ . 0.00'h $ 135,000.00 $ $ $ -$ ! 5 PERFORMANCE DEMONSTRATION TEST DECON\ DISMANTLEMENn DEMOBE Decon & demob Midwest BCD equipment $ 342,000.00 $ -$ -$ $ . 0.00% $ 342,000.00 $ . $ . $ . $ . Decon IT equipment $ 40,000.00 $ $ . $ $ 0.00% $ 40,000.00 $ $, . $ . $ -Demob IT equipment $ 40.000.00 $ $ . $ $ 0.00% $ 40.000.00 $ . $ . $ . $ Support functions-IT Corp A&S. H&S, travel, diems $ 82,200.00 $ $ -$ $ 0.00% $ 82,200.00 $ . $ $ . $ over est 21 cal days BID ITEM TOTAL $ 504,200.00 $ $ . $ $ 0.00'h $ 504,200.00 $ -$ . $ -$ 6 PERFORMANCE DEMONSTRATION SITE RESTORATION Regrade landfill area $ 13,000.00 $ . $ $ . $ . 0.00% $ 13,000.00 $ -$ $ -$ I -Seed regraded area $ 1,300.00 $ . $ $ . $ -0.00% $ 1,300.00 s -$ s -s BID ITEM TOTAL $ 14,300.00 $ $ -s $ 0.00% $ 14,300.00 $ -$ $ -s I 7 COMMUNITY OUTREACH PROGRAM -PHASE I Invoice 1112th each month Assumed 12 month period for Phase 1 restarting In March 2002 Manager, community relations, 2hr/mo $ 1,772.00 s 1,329.02 $ -s . s 1,329.02 75.00% S 442.98 $ 86.41 s 7.36 $ 73.77 s (7.36) Engineer, 16 hrs/mo s 8,928.00 s 6,696.00 s s . s 6,696.00 75.00% S 2,232.00 s 334.80 s . s 334.80 $ . 8 hr/mo for CAB meeting prep & followup 6 hr/mo for monthly report prep Reproduction costs, S75/mo. $ 900.00 s 875.00 $ . $ $ 675.00 75.00% $ 225.00 $ 33.75 $ $ 33.75 $ Postage/Fed Ex, $200/mo $ 2,400.00 $ 1,800.00 $ $ . $ 1,600.00 75.00% $ 600.00 $ 90.00 $ $ 90.00 $ BID ITEM TOTAL $ 14,000.00 $ 10,500.02 $ $ $ 10,500.02 75.00% $ 3,499.98 $ 524.96 $ 7.36 $ 532.32 s (7.36) a COMMUNITY REDEVELOPMENT· PHASE I Nlowance per bid form s 25,000.00 $ . $ s -$ 0.00% S 25,000.00 s $ . $ -s BID ITEM TOTAL $ 25,000.00 $ $ $ . $ . 0.00'h $ 25,000,00 $ -$ $ $ NIA PHASE 1 CHANGE ORDERS 1 Time extension • E&S plan delays $ . 2 Time extension -August, 2001 rain days $ . 3 Removal of construction landfill debris $ 539.00 $ 539.00 s s -s 539.00 100.00% S -$ 28.95 s -$ 26.95 s -PHASE 1 CHANGE ORDERS TOTAL $ 539.00 $ 539.00 $ $ $ 539.00 100.00'h $ $ 26.95 s $ 26.95 s TOTAL FOR PHASE 1 (BID ITEMS 1 to 8 & Change Orders) $ 6,658,539.00 $ 4,012,029.00 $ 12,750.00 $ s 4,024,779.00 60.45% $ 2,633,760.00 $ 200,601.41 s 644.86 $ 201,248.27 $ 12,105.14 see note Totals due for this Invoice: Gross (before retalnage)" Col K + Col L • $ 12,750.00 Net (after retalnage) • Col S • $ 12,105.14 I I I I Note: State cashflow estimates should also allow for potential payment for up to 20,000 tons processed dumg POP, 1I $88.40/ton unit rate for bid line Item #11, total up to $1,768,000.00 I I I I I I I I ( ( WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT Notes for IT Corp Application for Payment #11, covers period January 1 through January 31, 2002 NC SCO project #010440101A IT Corp project #827062 (formerly 823851) Duke filename: Application #11 notes.xis Item description Amount CONTRACT BID LINE ITEM #1 Permitting TSCA permit $ 250.00 SUBTOTAL BID LINE ITEM #1 $250.00 CONTRACT BID LINE ITEM #2 CP&L electric service $3,500.00 Survey, as-built $1,000.00 IT Corp A&S, H&S, travel; diems $8,000.00 SUBTOTAL BID LINE ITEM #2 $12,500.00 CONTRACT BID LINE ITEM #7 Community Outreach, 1 month $0.00 SUBTOTAL BID LINE ITEM #7 $0.00 CHANGE ORDERS $0.00 SUBTOTAL CHANGE ORDERS $0.00 TOTAL (before retainage) $12,750.00 Notes Correspondence and conference calls with EPA on "water criteria" issue. Final wiring connections for 480 volt service completed 1/4/02. Final draft of drawing provided to IT for comment, expect to submit to Earthtech in early February. Billing just under half of remaining balance, to cover off-site work performed in Dec. and January on ongoing plans & submittals. Billing on this item suspended for Jan and Feb, minimal activity No change order work billed on this invoice. 10 Patewood Drive , Building. VI , Suite. 500, Greenville, SC 29615 • P.O. Box 24000 Greenville , SC 29616 January 9, 2002 Ms. Patricia M. Backus, P.E. North Carolina Department of Environment and Natural Resources Division of Waste Management 401 Oberlin Road, Suite 150 Raleigh, NC 27605 RE: IT Application for Payment No. 10 Warren County Detoxification Oversight Project NC SCO ID No. 010440101A Dear Pat: Attached is my Certificate for Payment for the referenced document, which doesn't include a progress payment to Midwest Soil Remediation, Inc. since IT could not obtain a consent of surety from the bonding company in time. Please feel free to call me at (864) 234-3056 if you have any questions or require additional information. Regards, Jim Cloonan, P.E. Project Manager /attachment c: John Funk, Raleigh E A R T H ® T E A "tqca INTERNATIONAL LTD. COMPANY C H Telephone 86-i • 2:',-i • 3000 Facsimile January 8, 2002 Earth Tech 10 Patewood Drive Building VI, Suite 500 Greenville, SC 29616 Attn: Mr. Jim Cloonan, P.E. (864) 234-3056 phone (864) 234-3069 fax Subject: Application for Payment #10 Warren County Landfill PCB Detoxification NCSCO ID #010440101A, IT Corp Project# 827062 Dear Mr. Cloonan, IT Corporation 200 Horizon Center Boulevard Trenton, NJ 08691-1904 Tel. 609.584.8900 Fax. 609.588.6300 A ,\l<-111bcr u/' The IT Gruup Enclosed is ITCorp's Application for Payment #10 for the referenced project. It has been revised to reflect your comments on the draft invoice. As I informed you via e-mail, this invoice does not include any billing for work performed by Midwest Soil Remediation, due to difficulties in obtaining consent of surety. You will note that the Section 323 form has been modified by the addition of a supplemental page listing vendors with outstanding invoices for work for which IT Corp has received payment from the owner. This format was discussed with Patricia Backus earlier today in your absence. Should you have any questions in regard to this matter please contact me at (609) 588-6373 at your earliest convenience to discuss them. Sincerely, ~~.~~ Gary~,P.E. Project Manager Enclosures: Application for Payment #10 and support documents Dukefile: App for Pay #10 010802.doc North Carolina State Construction Manual 1995 Page 197 SECTION 323 APPLICATION AND CERTIFICATE FOR PAYMENT; TO: (Owner) NC Dept of Environment & Natural Resources PROJECT: Warren County PCB Landfill Remediatio n NC SCO #010440101A CODE ___ ITEM DESIGNER Earth Tech 10 Patewood Drive Building VI, Suite 500 Greenville, SC 29616 CHANGE ORDER SUMMARY Change Orders Additions Deductions Approved in Previous Mos. $539.00 b y the Owner TOTAL $0 APPROVED THIS MONTH NO Date Appr. Additions Deductions TOTALS Net Change by Change Orders$0.00 CONTRACTOR'S CERTIFICATION APPLICATION NO. APPLICATION DATE PERIOD FROM TO CONTRACT DATE CONTRACT FOR 10 1/08/02 12/01/01 12/31/01 2/16/01 CONTRACTOR _I_T_C_o_r~p _____ _ 200 Horizon Center Blvd Trenton, NJ 08691 CONTRACT STATUS Original Contract Sum$6,658,000 Net Change by Change Order $ 539 . oo Contract Sum to Date $6 ,658 ,539 Total Completed and Stored to Date . . $4 ,012 ,029 . oo Retainage 5 % • • . $200 ,601 .41 Total Earn~ Less Retainage . . $3 ,811 ,427 .59 Less Previ ous Certifi- cates for Payment. . $3 ,675 ,220 .92 Current Payment Due. $136 ,206 .67 The herein named contractor certifies that based on current information and to the best of his knowledge and belief, the work covered by this Application for Payment has been constructed in accordance with the contract documents; that all amounts have been paid by him for work for which previous Certificates for Payment were issued and payments received from the owner* (see attached supplemental page for list of exceptions), and that current payment shown herein is now due. CONTRACTOR: IT Corp. BY: Gary W. Duke±: ~22-L--DATE: _1_/0_8_/_0_2 ______ _ State of: New Jer~ County of : ~~----~....,....,,,~-Subscribed and~ :~e this Gth day of January, 2002. Notary Publi~~l'-d~ My Commission Expires: 1fs/zoa~ PATRICIA A. DEKOViTCH NOTARY PUBLIC OF NEW JERSEY Commission Expires 11/15/2005 Page 198 1995 North Carolina State Construction Manual DESIGNER'S CERTIFICATION The herein named designer certifies to the owner, based on information contained in this application and from observations and at on-site visits to the project, that the work has progressed to the stage indicated; that to the best of his knowledge and belief, the quality of the work is in accordance with the Contract Documents and that the contractor is entitled to payment in the amount certifie~,below., ,,, CA ,,, 13(;, /} Q / /' ~ .,~.,~"c::,~\~emo!O{;~:,,, AMOUNT CERTIFIED: $ I V (0 • lo I .. ,~ Go css 0o 'Y. , I J' •••<:)~ t. f 011!•• '-? -=:. ~ .,.~ ''-9'.·· -;. (Attach explanation if amount certified differs from the amount applied for.) f {q: Sf Al 1"\ ~ .. C a DESIGNER: \-18276 l ff . ~ ~ o~_o0 /"Jt, ~ • ~, I Q "'7 '1 ~o.,;G'/Nl.£ ···~~ ~ BY: DATE: -1-0 .£-110 i.P;o••· .. ·••••(:)~ .. ~ .. ------~-------------~,,t"11, ~f PH C,\) ,,,,, .. ,,,,,,., .. ,,,,, This certifica · s not negotiable. The amount certified is payable only to the contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the owner or contractor under this contract. Supplemental page to Section 323 form for Application for Payment #10 The following subcontractors and/or vendors have outstanding invoices with IT Corp which have not been paid as of the date of this application. At least a portion of each invoice covers work for which IT Corp has received payment from the owner. Bailey Co (portable toilet rental/service) $362.01, invoiced 11/28/01 Williams Engineering (management services) $16,284.62, invoiced 12/2/01 Yancey Electric Service ( electrical installation) $33,916.28, invoiced 12/7/01 KPH Trucking & Landscaping (seeding & maintenance) $9,486.25, invoiced 11/16/01 Geotechnics (civil laboratory services) $1,600.00, invoiced 11/30/01 Ellington & Sons (concrete installation) $418,521.57, invoiced 10/23/01, final approval for payment 12/19 after receiving acceptable 56 day break test results (28 day break test results received in November did not meet specifications) Ellington & Sons (concrete sealing & building erection) $49,139.00, invoiced 12/17/01 Keameco Grading (road installation) $30,800.00, invoiced 12/17/01 Henderson Travellodge (hotel) $5,809.02, multiple invoices from 10/17 to 11/26, approved 12/28 after removal of improper charges not covered by purchase order Submitted by contractor: IT Corp Gary W. Duke Project Manager Signature ~ ~--z:J~ Date: Janua~ FORMAT, CFP14 REMIT TO IT CORPORATION PO BOX 2483 CAROL STREAM IL 60132-2483 INVOICE NO INVOICE DATE APPLICATION NO CLIENT ORDER NO 466193 01/08/02 , 15 INQUIRIES The IT Group 200 Horizon Center Blvd Trenton NJ 08691-1904 PAYIIIIIIT JIIIOOll'l" IT PROJECT NO IT PROJECT NAME IT PROJECT DESC $ 13'11 -<b~-~ 7 Payment Terms are NET 30 Checks should be made payable to IT Corporation. To expedite your payment, please return this page with your remittance. Thank you for your business. 1277440 NC DEPT OF ENVIRONMENTAL NATURAL RESOURCES PO BOX 1507 WARRENTON NC 27589 827062 NC DEPT OF ENVIRONMENT AND NATURAL RESOURCES WARREN CNTY PCB LANDFILL THERMAL TREATMENT ~~· flrJ~ ;11~&~t_ FORMAT, CFP14 INVOICE NUMBER INVOICE DATE APPLICATION NO CLIENT ORDER NO CLIENT NUMBER CLIENT NAME CL I ENT PHONE Fixed Price Totals 466193 01/08/02 15 1277440 NC DEPT OF ENVIRONMENTAL ( ) DESCRIPTION TOTAL A11001rr DOIi Payment Terms Are: NET 30 Please make checks payable to IT Corporation and indicate invoice number and client number REMIT TO IT CORPORATION PO BOX 2483 CAROL STREAM Page 2 IL 60132-2483 ******************************************************* INQUIRIES The IT Group AMOUNT 143,375.42 143,375.42 Project No.: 827062 Billing No., 827062 CURRENT PER I OD RETAINAGE TOTAL 7,168.75-136,206.67 7,168.75-136,206.67 136,:106.67 AMOUNT 4,012,029.00 4,012,029.00 200 Horizon Center Blvd Trenton NJ 08691-1904 (609) 584-8900 CUMULATIVE PERIOD PROJECT PCT RETAINAGE TOTAL BUDGET COMPL 200,601.41-3,811,427.59 6,658,000.00 60.26 200, 601.41-3,811,427.59 6,658,000.00 60 .26 WARREN COUNTY PCB LANDFILL NC SCO project# 010440101A, IT Corp project #827062 IT Corp. Application for Payment #10, covers period December 1 through December 31, 2001 B C D E J K L M N 0 p Q R s Work Completed Materials Total Completed Total Balance Retainage (5%) Total Due Now From Previous This Presently and Stored Percent to Finish From Previous This Total On This Invoice, Bid item# Description Scheduled Application Period Stored to Date Complete Application Period to date (net of retainage) Value (prev mo col M) (not in J or K) (J+K+L) (M/E) (E-M) (prev mo col R) ((K+L)*.05) (P+Q) (M-(J+Q)) 1 DESIGN\ PERMITS\ MOBILIZATION IT submit bonds $ 128,000.00 $ 128,000.00 $ $ $ 128,000.00 100.00% $ -$ 6,400.00 $ . $ 6,400.00 $ Permitting $ $ TSCApermit $ 15,000.00 $ 13,750.00 $ 500.00 $ $ 14,250.00 95.00% $ 750.00 $ 687.50 $ 25.00 $ 712.50 $ 475.00 Other permits $ 3,000.00 $ 3,000.00 $ $ $ 3,000.00 100.00% $ . $ 150.00 $ . $ 150.00 $ Premob plans & submittals $ 30,000.00 $ 30,000.00 $ $ $ 30,000.00 100.00% $ -$ 1,500.00 $ -$ 1,500.00 $ Procurement of Midwest subcontract $ 7,500.00 $ 7,500.00 $ $ $ 7,500.00 100.00% $ . $ 375.00 $ . $ 375.00 $ Procurement of $1.3M other ODCs $ 17,500.00 $ 17,500.00 $ $ $ 17,500.00 100.00% $ -$ 875.00 $ -$ 875.00 $ . IT equipment to Midwest @ NTP+30 $ 100,000.00 $ 100,000.00 $ -$ $ 100,000.00 100.00% $ . $ 5,000.00 $ $ 5,000.00 $ IT payment #1 to Midwest @ NTP+30 $ 750,000.00 $ 750,000.00 $ $ $ 750,000.00 100.00% $ . $ 37,500.00 $ $ 37,500.00 $ IT payment #2 to Midwest @ NTP+60 $ 500,000.00 $ 500,000.00 $ $ $ 500,000.00 100.00% $ -$ 25,000.00 $ $ 25,000.00 $ IT payment #3 to Midwest @ NTP+90 $ 750,000.00 $ 649,900.00 $ 649,900.00 86.65% $ 100,100.00 $ 32,495.00 $ $ 32,495.00 $ IT payment #4 to Midwest @ NTP+150 $ 300,000.00 $ . $ $ $ . 0.00% $ 300,000.00 $ . $ $ $ -IT mobilization $ 69,000.00 $ 34,500.00 $ -$ $ 34,500.00 50.00% $ 34,500.00 $ 1,725.00 $ $ 1,725.00 $ Midwest mobilization (not setup) $ 290,000.00 $ $ -$ $ . 0.00% $ 290,000.00 $ . $ $ -$ BID ITEM TOTAL $ 2,960,000.00 $ 2,234,150.00 $ 500.00 $ $ 2,234,650.00 75.49% $ 725,350.00 $ 111,707.50 $ 25.00 $111,732.50 $ 475.00 2 SITE PREPARATIONICONSTRUCTION Midwest bond to IT Corp $ 60,000.00 $ 60,000.00 $ $ $ 60,000.00 100.00% $ $ 3,000.00 $ $ 3,000.00 $ -Site access E&S controls $ 30,000.00 $ 30,000.00 $ $ $ 30,000.00 100.00% $ $ 1,500.00 $ $ 1,500.00 $ Clear& Grub $ 45,000.00 $ 45,000.00 $ $ $ 45,000.00 100.00% $ -$ 2,250.00 $ $ 2,250.00 $ Grading $ 85,000.00 $ 85,000.00 $ $ $ 85,000.00 100.00% $ -$ 4,250.00 $ $ 4,250.00 $ Access road & parking $ 40,000.00 $ 40,000.00 $ $ $ 40,000.00 100.00% $ $ 2,000.00 $ $ 2,000.00 $ Fencing $ 25,000.00 $ 25,000.00 $ -$ $ 25,000.00 100.00% $ -$ 1,250.00 $ $ 1,250.00 $ Line new pond $ 75,000.00 $ 67,500.00 $ 7,500.00 $ $ 75,000.00 100.00% $ $ 3,375.00 $ 375.00 $ 3,750.00 $ 7,125.00 Site utilities CP&L electric service $ 35,000.00 $ 31,500.00 $ -$ $ 31,500.00 90.00% $ 3,500.00 $ 1,575.00 $ $ 1,575.00 $ Site electrical sub -part 1 $ 102,000.00 $ 102,000.00 $ $ $ 102,000.00 100.00% $ . $ 5,100.00 $ $ 5,100.00 $ Site electrical sub • part 2 $ 68,000.00 $ 51,000.00 $ 17,000.00 $ $ 68,000.00 100.00% $ -$ 2,550.00 $ 850.00 $ 3,400.00 $ 16,150.00 6" water main $ 45,000.00 $ 45,000.00 $ $ $ 45,000.00 100.00% $ -$ 2,250.00 $ $ 2,250.00 $ Site facilities Trailers, furnished, w/phones $ 30,000.00 $ 20,000.00 $ $ $ 20,000.00 66.67% $ 10,000.00 $ 1,000.00 $ . $ 1,000.00 $ Monitoring well abandonment $ 5,000.00 $ 5,000.00 $ $ $ 5,000.00 100.00% $ -$ 250.00 $ $ 250.00 $ Process structures Concrete pad & base stone $ 375,000.00 $ 356,250.00 $ 18,750.00 $ $ 375,000.00 100.00% $ -$ 17,812.50 $ 937.50 $ 18,750.00 $ 17,812.50 Concrete sealant $ 75,000.00 $ 3,750.00 $ 71,250.00 $ $ 75,000.00 100.00% $ -$ 187.50 $ 3,562.50 $ 3,750.00 $ 67,687.50 Pole barn $ 110,000.00 $ 104,500.00 $ 5,500.00 $ $ 110,000.00 100.00% $ (0.00) $ 5,225.00 $ 275.00 $ 5,500.00 $ 5,225.00 Treated soil bins $ 45,000.00 $ 9,000.00 $ . $ $ 9,000.00 20.00% $ 36,000.00 $ 450.00 $ -$ 450.00 $ . Stormwater treatment plant $ 75,000.00 $ 11,250.00 $ -$ $ 11,250.00 15.00% $ 63,750.00 $ 562.50 $ . $ 562.50 $ -Force main STP to existing pond $ 6,000.00 $ 6,000.00 $ . $ $ 6,000.00 100.00% $ $ 300.00 $ -$ 300.00 $ Force main lined pond to STP $ 3,000.00 $ 90.00 $ $ $ 90.00 3.00% $ 2,910.00 $ 4.50 $ $ 4.50 $ Contaminated area work Initial haul roads $ 25,000.00 $ 5,000.00 $ $ $ 5,000.00 20.00% $ 20,000.00 $ 250.00 $ $ 250.00 $ Midwest setup of thermal & BCD process $ 820,000.00 $ -$ $ $ -0.00% $ 820,000.00 $ $ $ $ Support functions Survey, initial layout $ 9,000.00 $ 9,000.00 $ $ . $ 9,000.00 100.00% $ . $ 450.00 $ $ 450.00 $ Survey, progress verification $ 9,000.00 $ 9,000.00 $ $ $ 9,000.00 100.00% $ -$ 450.00 $ -$ 450.00 $ Survey, as-built $ 7,000.00 $ 1,750.00 $ 3,500.00 $ $ 5,250.00 75.00% $ 1,750.00 $ 87.50 $ 175.00 $ 262.50 $ 3,325.00 Security, over est. 90 days $ 30,000.00 $ $ . $ $ 0.00% $ 30,000.00 $ -$ -$ $ IT Corp A&S, H&S, travel, diems $ 538,300.00 $ 502,041.22 $ 18,208.75 $ $ 520,249.97 96.65% $ 18,050.03 $ 25,102.06 $ 910.44 $ 26,012.49 $ 17,298.31 over est 193 cal days BID ITEM TOTAL $ 2,772,300.00 $ 1,624,631.22 $ 141,708.75 $ $ 1,766,339.97 63.71% $ 1,005,960.03 $ 81,231.56 $ 7,085.44 $ 88,316.99 $ 134,623.31 3 PERFORMANCE DEMONSTRATION Soil excavation & screening $ 30,000.00 $ $ . $ $ 0.00% $ 30,000.00 $ $ $ $ -Trealed soil backfill $ 20,000.00 $ $ . $ $ . 0.00% $ 20,000.00 $ $ $ $ WARREN COUNTY PCB LANDFILL NC SCO project# 010440101A, IT Corp project #827062 IT Corp. Application for Payment #10, covers period December 1 through December 31, 2001 B C D E J K L M N 0 p Q R s Work Completed Materials Total Completed Total Balance Retainage (5%) Total Due Now From Previous This Presently and Stored Percent to Finish From Previous This Total On This Invoice, Bid item# Description Scheduled Application Period Stored to Date Complete Application Period to date (net of retainage) Value (prev mo col M) (not in J or K) (J+K+L) (M/E) (E-M) (prev mo col R) ((K+L)*.05) (P+Q) (M-{J+Q)) Midwest thennal & BCD processing $ 93,000.00 $ $ . $ $ 0.00% $ 93,000.00 $ $ $ $ Support functions Security, 11 days $ 4,000.00 $ $ $ . $ 0.00% $ 4,000.00 $ . $ $ $ IT Corp A&S, H&S, travel, diems $ 86,200.00 $ $ . $ $ 0.00% $ 86,200.00 $ $ $ $ over est 14 cal days BID ITEM TOTAL $ 233,200.00 $ $ $ $ 0.00% $ 233,200.00 $ $ $ $ 4 PERFORMANCE DEMONSTRATION TESTING Midwest analytical & reporting $ 87,000.00 $ $ $ . $ 0.00% $ 87,000.00 $ . $ $ $ IT analy1ical $ 23,000.00 $ $ $ $ 0.00% $ 23,000.00 $ . $ $ $ IT reporting & review $ 25,000.00 $ $ $ . $ 0.00% $ 25,000.00 $ . $ $ $ BID ITEM TOTAL $ 135,000.00 $ $ $ $ 0.00% $ 135,000.00 $ $ . $ $ 5 PERFORMANCE DEMONSTRATION TEST DECON\ DISMANTLEMENn DEMOBE Decon & demob Midwest BCD equipment $ 342,000.00 $ $ $ . $ 0.00% $ 342,000.00 $ . $ $ $ Decon IT equipment $ 40,000.00 $ $ $ . $ 0.00% $ 40,000.00 $ . $ $ $ Demob IT equipment $ 40,000.00 $ $ . $ . $ 0.00% $ 40,000.00 $ . $ $ . $ . Support functions IT Corp A&S, H&S, travel, diems $ 82,200.00 $ $ . $ . $ 0.00% $ 82,200.00 $ . $ $ $ . over est 21 cal days BID ITEM TOTAL $ 504,200.00 $ $ $ . $ 0.00% $ 774,200.00 $ . $ $ $ 6 PERFORMANCE DEMONSTRATION SITE RESTORATION Regrade landfill area $ 13,000.00 $ . $ . $ $ . 0.00% $ 13,000.00 $ $ . $ . $ Seed regraded area $ 1,300.00 $ . $ . $ $ . 0.00% $ 1,300.00 $ $ . $ . $ BID ITEM TOTAL $ 14,300.00 $ $ $ $ 0.00% $ 14,300.00 $ $ $ . $ 7 COMMUNITY OUTREACH PROGRAM ·· PHASE I invoice 1112th Assumed 12 month period for Phase 1 each month Manager, community relations, 2hr/mo $ 1,772.00 $ 1,181.36 $ 147.67 $ $ 1,329.02 75.00% $ 442.98 $ 59.05 $ 7.36 $ 66.41 $ 140.31 Engineer, 16 hrs/mo $ 8,928.00 $ 5,952.00 $ 744.00 $ . $ 6,696.00 75.00% $ 2,232.00 $ 297.60 $ 37.20 $ 334.80 $ 706.80 8 hr/mo for CAB meeting prep & followup 8 hr/mo for monthly report prep Reproduction costs, $75/mo. $ 900.00 $ 600.00 $ 75.00 $ . $ 675.00 75.00% $ 225.00 $ 30.00 $ 3.75 $ 33.75 $ 71.25 Postage/Fed Ex, $200/mo $ 2,400.00 $ 1,600.00 $ 200.00 $ . $ 1,800.00 75.00% $ 600.00 $ 80.00 $ 10.00 $ 90.00 $ 190.00 BID ITEM TOTAL $ 14,000.00 $ 9,333.36 $ 1,166.67 $ $ 10,500.02 75.00% $ 3,499.98 $ 466.65 $ 58.31 $ 524.96 $ 1,108.36 8 COMMUNITY REDEVELOPMENT -PHASE I Allowance per bid fonn $ 25,000.00 $ . $ $ $ . 0.00% $ 25,000.00 $ $ . $ . $ BID ITEM TOTAL $ 25,000.00 $ $ $ . $ 0.00% $ 25,000.00 $ $ $ $ N/A PHASE 1 CHANGE ORDERS 1 Time extension -E&S plan delays $ 2 Time extension -August, 2001 rain days $ 3 Removal of construction landfill debris $ 539.00 $ 539.00 $ $ $ 539.00 100.00% $ . $ 26.95 $ . $ 26.95 $ . PHASE 1 CHANGE ORDERS TOTAL $ 539,00 $ 539.00 $ $ $ 539.00 100.00% $ . $ 26.95 $ $ 26.95 $ TOTAL FOR PHASE 1 (BID ITEMS 1 to 8 & Change Orders) $ 6,658,539.00 $ 3,868,653.58 $ 143,375.42 $ $ 4,012,029.00 60.25% $2,781,510.00 $ 193,432.66 $ 7,168.75 $ 200,601.41 $ 136,206.67 see note Totals due for this invoice: Gross (before retainage) = Col K + Col L = $ 143,375.42 Net (after retainage) = Col S = $ 136,206.67 I I I I Note: State cashflow estimates should also allow for potential payment for up to 20,000 tons processed durng POP, at $88.40/ton unit rate for bid line item #11, total up to $1,768,000.00 I I I I I I I I WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT Notes for IT Corp Application for Payment #10, covers period December 1 through December 31 , 2001 NC SCO project #010440101A IT Corp project #827062 (formerly 823851) Duke filename: Application #1 o. notes.xis Item description Amount CONTRACT BID LINE ITEM #1 Permitting TSCA permit $ 500.00 Other permits $0.00 IT payment #3 to Midwest @ NTP+90 SUBTOTAL BID LINE ITEM #1 $500.00 CONTRACT BID LINE ITEM #2 Line new pond $7,500.00 CP&L electric service $0.00 Site electrical sub -part 2 $17,000.00 Concrete pad & base stone $18,750.00 Concrete sealant $71,250.00 Pole barn $5,500.00 Survey, as-built $3,500.00 IT Corp A&S, H&S, travel, diems $18,208.75 SUBTOTAL BID LINE ITEM #2 $141,708.75 Notes Reviewed second draft of EPA-ORD's QAPP, responded to EPA verbal comment on water criteria issue. Total 95% complete, still need HAZOP review. Application for SIDS permit resubmitted to state 11/13, this replaces NPDES permit in original schedule. No billing on this item pending consent of surety. Invoicing the remaining balance of this item, all work complete, certification letter provided in December. Still need final wiring connections for 480 volt service, scheduled for January per 12/17 call Duke to CP&L. Invoicing the remaining balance of this item, all work complete, copy of local inspector's report submitted. Invoicing the remaining balance of this item, all work complete, 56 day break test results were acceptable. Invoicing the remaining balance of this item, all work complete. Invoicing the remaining balance of this item, all work complete. Invoicing to 75% for all field surveying done, 2nd & 3rd drafts of drawing provided to IT for comment and markup, expect to submit to Earthtech in January. Invoicing 7 of estimated 193 calendar days, for on-site period December 1-7. Will bill balance in January to cover off-site work performed in Dec. and January on ongoing plans & submittals. WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT Notes for IT Corp Application for Payment #10, covers period December 1 through December 31, 2001 NC SCO project #010440101 A IT Corp project #827062 (formerly 823851) Duke filename: Application #10 notes.xis Item description Amount CONTRACT BID LINE ITEM #7 Community Outreach, 1 month $1,166.67 SUBTOTAL BID LINE ITEM #7 $1,166.67 CHANGE ORDERS $0.00 SUBTOTAL CHANGE ORDERS $0.00 TOTAL (before retainage) $143,375.42 Notes Provided information on local subcontractor/vendor status, met with CAB. No change order work billed on this invoice.