HomeMy WebLinkAboutNCD980602163_20011206_Warren County PCB Landfill_SERB C_No 64 - Water Main Disinfection-OCRTRANSMITTAL COVER PAGE
WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT
IT Corp. Project #827062
Submitted By: IT Corporation -200 Horizon Center Boulevard, Trenton, New Jersey 08691
Transmittal Number (chronological sequence): _Q_ll
Transmittal Date: 12/6/01
Submittal Register Item Number: _M
Resubmittal: No_x Yes __
Specification Section: 02660 3.08 J
Description: Water Line Chlorination and Pressure Test Results
Drawing/Detail Number: NIA
Subcontractor/Supplier: Keameco
Comments: NI A
Number of Copies Submitted: _4_
Number of Copies to be Returned to Contractor_0 __
Submitter's Name and Signature: Gary W. Duke, P.E. &:ff: Earth Tech Engineer's Receipt Signature: ____________________ _
Comments:
Receipt Date:
Engineer's Approval
Comments:
Reviewer's Signature
Project Manager's Signature
□ A. "Reviewed and approved, no exceptions taken"
□ B. "Reviewed and approved with comments
□ C. "Revise and Resubmit"
_______________ Date ________ _
_______________ Date ________ _
HIGH QUALITY H20
~G'r~\-a ~:;t;~()t?~3A.i
\/CJo--:~;;;~z-1 r121,Q;?lj) s.:..')t
~) ',,.-1;~ /
Filters
rt'fJ~ ~ FilterCo.
Softeners
Purifiers
BACTERIOLOGICAL ANALYSIS
Laboratory ID#: __3_ T'/ '1 5 lo /, l /
WaterSystemID#:JJJ_fl-==-----I _Cou_o/r ~, ---"-w __ a.._1/l_..,./J--1,_ .... w--"---~----------
NameofSystem: IAJt1J/,I\W Clnk,;t,1 pc B ;f(Q,(bdfJJ Q~ Paw eci
Sample Type:_\ (!=Routine; 2=Repeat; 3=Replacement; 4=Plan Approval; 5=Other/Non-compliance)
Collected on: DATE_\_(/;)_?=-'-(;MM/DD/YY) . TIMf~ L : 0 0 _8_M (HH:MM AM or PM)
Location Where Collected: (ld_ t rnd Lu aL1,, tf\lA.il,,
Location Type:_,_ (!=First User Tap; 2=General User Tap; 3=Last/End User Tap; 4=Source/Intake; 5=Other)
Loca,;on Codec J2 'D l · Collected By, 9' ~ ~ ~ dY
FOR REPEAT SAMPLE:
Previous Positive Location Code: __ _
Positive Collection Date: __ ! __ !_
Time:
Proximity: _ (1 =Same; 2=Upstream;
3=Downstream)
Telephone No . ..___.__ _____________ _
CONTAMINANT
Total Coliform
Fecal/E. Coli
Heterotrophic P.C.
RESULT
~Tll°~PRE;ENT AB~ INV~ID
_,3._L~ □ ~ □
_____ ./ml
(number)
) Repeat Samples Required
Date Analysis Begun: j_ L1_J.!}_1_Q ..1
Date Analysis Completed: L l_t..:2_ _¼_;_fl L
Laboratory Log#.,,...________ ~
:OMMENTS: Sa.01-f le. ~
FOR REPLACEMENT SAMPLE:
Original Sample Type: _ ( 1 =Routine;
2=Repeat; 3=Plan Approval; 4 =Other)
Original Collection Date: __ I __ I __
Time: __ . ___ M
Type of Supply : □ Community □ NTNC
□ Non-Community □ Adjacent
□ Private □ Campground
Type of Treatment: □ Chlorinated
□ Non-Chlorinated
Free Chlorine Residual: _____ _
Combined Chlorine Residual:
INVALID CODES
1) Confluent Growth/No Coliform Found
2) TNTC/No Coliform Found
3) Turbid Culture/No Coliform Found
4) Over 30 Hours Old
5) Improper Sample or Analysis
( ) Replacement Sample Required
Time Analysis Begun: fl. L:_f1 Q f M
Time Analysis ~L:{J __ Q_fl_ M
Certified By: ~
SOLON SMITH *123 HORNER ST. *HENDERSON, NC 27536 *(252)-438-6600
JEHNR 3757 (01/97)
'ublic Water Supply Section (Rn icw 01/99)
HIGH QUALITY H20
TJ'(J3~ ~ FilterCo.
BACTERIOLOGICAL ANALYSIS
Filters
Softeners
Purifiers
Laboratory ID#: __1_-a-_1_ 2 ~ _ ~
Water System ID#: jJJ__ fl-_-;;-_ 3~un~. ~, J -~~~..lLl<:..u..~-=-'---~--~----
Name of System: IA)a,a/11/J/ CtzflJ-!y -pcJ3 ~ fl p~ fa o/-1-C f
Sample Type: _I (!=Routine; 2=Repeat; 3=Replacement; 4=Plan Approval; 5=Other/Non-compliance)
Collected on: DA TE J__ _(I:;}_!]_, ~(MMJDDNYJ_ --TIME~ L_l 2_ /l_M (HH:MM AM or PM)
Location Where Collected, (;)J. 0 Jfcu / 0 ' ;) $0'0 fL '
Location Type:_\_ (l=First User Tap; 2=General User Tap; 3=Last/End User Tap; 4=Source/lntake; 5=Other)
Location Codec fl O d-co!lected By, ~ W J.LQ.tJ'.nOll::r::'.
FOR REPEAT SAMPLE:
Previous Positive Location Code: __ _
Positive Collection Date: __ ! __ !_
Time:
Proximity: _ (1 =Same; 2=Upstream;
3=Downstream) MailR~ultsT~t:
Telephone No . ...___..__ __________ _
RESULT
:ONTAMINANT ~TrO;Q PRE
O
SENT
'otal Coliform _iL -2.
ABSENT INVALID
~g ;ecal/E. Coli
Ieterotrophic P.C.
_3j_Jq D
) Repeat Samples Required
----~/ml
(number)
►ate Analysis Begun: j_ l_1_2_1t VJ
tate Analysis Completed: _l Lf-2.,_~_Q_ 1_
aboratory Log # . _ _ /
OMMENTS: 0~ /Jf14LJ.UL
FOR REPLACEMENT SAMPLE:
Original Sample Type:_ (!=Routine;
2=Repeat; 3=Plan Approval; 4 =Other)
Original Collection Date: __ ! __ ! __
Time: __ . ___ M
Type of Supply : D Community D NTNC
D Non-Community D Adjacent
D Private D Campground
Type of Treatment: D Chlorinated
D Non-Chlorinated
Free Chlorine Residual: ______ _
Combined Chlorine Residual :
INVALID CODES
1) Confluent Growth/No Coliform Found
2) TNTC/No Coliform Found
3) Turbid Culture/No Coliform Found
4) Over 30 Hours Old
5) Improper Sample or Analysis
( ) Replacement Sample Required
Time Analysis Begun:Ql_:6 (;, P M
Time Analysis~ j_:.fl_ Q_ fl_ M
Certified By: ,4,~:,j&-l~,.I...;;;,:~=------------
:HNR 3757(01/97)
SOLON SMITH *123 HORNER ST. *HENDERSON, NC 27536 *(252)-438-6600
blic Waitr Supply Section (Review 01/99)
~Go;i:~
Ll,~7 ,:J7fv"?Ij·]; ~ .. ~,. "--.Jt-~·-.
T!'(J3~ ~ FilterCo.
HIGH QUALITY H 20
Filters
Softeners
Purifiers
r? . 7""> 7.. 1-:,1 ~~ <...J I__,,_/,,, ~ ~1--~c/19 BACTERIOLOGICAL ANALYSIS
Laboratory ID#: _3__ 1 l"f 5 lo lJ ~
Water System ID#: -,iU il-__ -_ _ C unty: • . . .
NarneofSystem {,A}tv/,Mv C<D,My f_e,$ J!,o.,dpi ~=~ Pribµd
Sample Type: _L (!=Routine; 2=Repeat; 3=Replacement; 4=Plan Approval; 5=Other/Non-compliance)
Collected on: DATE __l _/ 1_dJcJJ~2i= TIME-L.½3_ 0 ~M (HH MM AM or PM)
Location Where Collected: 1/4.Vv Bf /Jt; !;Mu,> J ~
Location Type:_( (!=First User Tap; 2=General User Tap; 3=Last/End User Tap; 4=Source/l'lltake; 5;=Other)
Location Code: _(J.. Q J_ · Collected By: ~ I UYo,..v? l ) ,~ oY
FOR REPEAT SAMPLE:
Previous Positive Location Code: __ _
Positive Collection Date: __ ! __ !_
Time:
Proximity:_ (I =Same; 2=Upstream;
3=Downstream)
Mail Results To: ,f/ . _ /' {1_ t .
/lll[u..i,1 ..) l u2Lo . '_f/4[, ~
c2?9 r'~J~ Al
Telephone No. ~-~-----------
:ONT AMIN ANT
fotal Coliform
:;ecal/E. Coli
:-Ieterotrophic P.C.
RESULT
METHOD PRESENT ABSENJ... INVALID 3j__.c)_ □ ~ _..........-D
__3_L _,b D ~ D
----~/ml
(number)
) Repeat Samples Required
)ate Analysis Begun: _l_l_; :J _)_1_!)_!_
)ate Analysis Completed: L Lt ;;2 ~ _Q_ L
,aboratory Log#--------:~ ~ _ _/
:OMMENTS: ...5ttny2.Lt ✓ ~
FOR REPLACEMENT SAMPLE:
Original Sample Type: _ ( I =Routine;
2=Repeat; 3=Plan Approval; 4 =Other)
Original Collection Date: __ / __ / __
Time: __ . ___ M
Type of Supply : D Community D NTNC
D Non-Community D Adjacent
D Private D Campground
Type of Treatment: D Chlorinated
INV AUD CODES
D Non-Chlorinated
Free Chlorine Residual: ------
Combined Chlorine Residual:
1) Confluent Growth/No Coliform Found
2) TNTC/No Coliform Found
3) Turbid Culture/No Coliform Found
4) Over 30 Hours Old
5) Improper Sample or Analysis
( ) Replacement Sample Required
Time Analysis Begun: ..D j_:fl O £ N
TimeAnalysi~L:O Q__fJ_M
Certified By:~ ·
EHNR 3757 (01/97)
SOLON SMITH *123 HORNER ST. *HENDERSON, NC 27536 *(252)-438-6600
1blic Waler Supply Scclion (Review 01/99)
To:
Fax#:
From:
Subject:
Aiken~ Yelle Associates (919)877-9979
@ Aiken & Yelle Associates, PA
Professional Engineers & Land Surveyors
3755 Benson Drive
Raleigh, North Carolina 27609
919-877-9992 Fax 919-877-9979
e-mail ayes@intrex.net
_.BL.£.....!...!{ '--~'--..:·..wG~e~b::r.b-:e:=AEi,!cC!;,;;,...~C~fZ.:=_-_ Date: i'/ov -3 D.. ~ I 7 Z 52.--fZ 5 '1--1 '2-18 Pages: __ including this
Arnold E. Aiken cover sheet
Comments: ________________________ _
01.1 /Jcv • k 61 2..&c:? I, kc, 1}5E'l?l,/CQ '1lt6 ? Uav j.Z-.•
y' R C's-Su Rd, I 6:$T .p;, 12 ·111a 6NCd{-9vc..-!ll1r1 ll, ( l, ILJf5
,A-t-:Lo nfu q '( 6°d~4-P .Lt 1,16 -·
i
TRANSMITTAL COVER PAGE
WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT
IT Corp. Project #827062
Submitted By: IT Corporation -200 Horizon Center Boulevard, Trenton, and New Jersey 08691
Transmittal Number (chronological sequence): 043
Transmittal Date: 11/01 /01
Submittal Register Item Number: 63 partial
Resubmittal: No_.X_ Yes __
Specification Section: _02660 1.02 A
Description: Shop drawings and work drawings for the water distribution system
(Rev. 2)
Drawing/Detail Number: NI A
Subcontractor/Supplier: Keameco
Comments:
Number of Copies Submitted: _5_
Number of Copies to be returned to Contractor 0
Earth Tech Engineer's Receipt Signature: ___________________ _
Comments:
Receipt Date:
Engineer's Approval
Comments:
Reviewer's Signature
Project Manager's Signature
□ A. "Reviewed and approved, no exceptions taken"
D B. "Reviewed and approved with comments
□ C. "Revise and Resubmit"
_______________ Date ________ _
_______________ Date ________ _
The water meter and the RPZ back flow preventer will be contained in separate boxes. The RPZ back
flow preventer will be installed underground at Macon Robert's request. One to two feet of gravel will be
placed underneath the box containing the back flow preventer. The meter boxes that will be used are
noted in the vendor literature attached in this submittal.
#19811 P.002/007 OCT ,25 '200 1 11 :37 ::::0 rT1 < (J) rri
CJ
:"§:
► ri ::;o
C z
01
0
r7 (/)
~ ;~ I .,, ~ ~! I ,i; i -0:.
i
.Ii,,
I
~ I I ...
I ~
I I El
I G) z
.
__,. r
0 : ;
"' ............
N N ............
0 ........ L
r--0 0 --... ""' 0 0 "' ""' CD °' ...... 0 """ FENCE >-< ..::i 0.. "' ::::> U) 0 w:. ·~\\ FIRE HYO RANT ~ ~ TAP OFF 2" PIPE FROM 6" PIPE ------Sl1E GA TE ·\ .. )I ... ACKFLOW PREVENTER ME1ER WITH F VALVE :r: ----~ g AND RISE TO 2' BELOW GRADE. :r: r--C"> ...... ...... ..... 0 0 N Lf) N E-< l) 0 # EXIST. ACCESS ROA,.,.\ DETAIL OF WATER LINE INSTALLATlON AROUND THE HYDRANT
OCT .25'2001 11:37 HUGHES SUPPLY
Neptune® T-1 O®
Sizes: 1 ½" and 2"
f=o~urv1: ~ P,.nofitv
Rolr-SGal•d Aegist•r
•Magn.etk-drtv~, low to,que regl.stratlon
ensures s.cov~
-Jmp•t..1••r••N\\Mll1 '"·"'· "', .. ....,... •~·,,.. . . tor reg,~llltY
-1 ;f r,~-1 '-• I """'"" ,,,""'9,-...+,-v
detects /oo~
• Bayonet movr'lt allows
. in-fine servfccabllfty
• Tomp,.,r,:,r-r.,,:,f r.~~r (lifl rlAfAr!i th~
• Dafg of manutacturq, size,
and model stMiped on d/a/ faee
. c;;a.st Bron:ce Maincase
• Sturdy, curabl~, ~rrosion reG!st~nt
.... ,.. , ..... , ... , ..•. , ... , .. -v-
• Handles lrHln8 piping stress
• 8eotriC€1l grovnding continuity
• Residual valt.W
Nutating Oise Measuring ChamJ:>er
a WfrfF-1'11: errec11vR flqw...renr:ie
for groatG[ vti/ir.y rev.in~
• Excellent Tow now accurar;:y
• Corroslr;:n:1 resisr.ant
• F/o~Ung ct'lambsr de~r, is un~tro
by rn«~ p<>s/rlon
or in•lln~ plplnQ st.rqoo
• Thrw-p~ charnb~ tor ettSy
s-1rvlceabll/ty
sy,toms Compatibility
UOnMrUcn;;.;;. --• ·
I Ile Neptvno T 10 wo.t,:,r "'·"'"' consists ot t/We 1TI11/or component
assbmblles: a roll-sealed register, a cast
bronze mal,ic133~, 111nd a nvtatlng cit,c
m~11r,~ UI "-'" 11.>.:.i:
Th(! dlreot-~adfn9 regisf.er ~i;vnbly 1s
r•1• ...... .,,, ,..,,,,-1-~+1,.c:, ,-..,o t"Oolnc, anrf
1s couproo rnegne~Jy to
the measi.irfng ch~mber,
Th'!J register conta.lns a
low flovv Indicator for 11101<
tJt:Lt:\JIIVf I, 1:U 11) (I.If llcf1ti.lJ1 f">I.
convqnf~e, can bl) ' '
moumoo on the meler In
81"/'f of four: positions. ,AJso.,
cvaUabfa are r~rnote · ··:
n:i:idlno reof9ters for th.., · ·
~opl<11"'Q 4AR• (Ar 1lri/'rll'lf/r, Reading wid l::!lflfng :~vstehw, M"OHeso-·
ARB,· P1Jl~•RM vfsua(rer,not.lll·systern,
011!;1 TRIOON•S", TRfCON·E2", and
Flo&iarcti• rntems. The reg)ster Is
$ecured t.o the malncsse ·
Via 12 tamperproof ~al pin.
7i '""' ,_'7_ ... ,r;,•Jf""WP,.r.:'\IM,,r,,,r.nr.t -hrr::-:-• .-it, .. , •-
maiciCB9e vvlll withstand most eervioa
oondltloris: lniernnl we.trJr pr~ssurv, r¢ugh
haodling. and ln·lln1:t piping wess.
Tile lnnovFJtlw floating champer
do~lgn of tt,e rnJ1atlng disc m~vrfng
~lqmer,t protects the chrunber tn:,rn frost
damage while the vnique chamb~r seal
ext1;1nd~ the /ow llow i;,couracy by ~alfng
tM cha1T1~r 01.itlet port to me mEJ/n<;ase
01Jtlel port. The nutating dlso mGasvrlno
tlf'VrtJC:I JJ ,.u,r,r.."9~ ~IJtfV.OtVff"IIClt"'f~l-,L
#1984 P. 005/007
Residential
Meter ., ,.~.,,:~•·• .. · ············~,· ,.· ·;.
,;_ .
. ,•:. r
.. , . . . ~. ; : .. ~
.;·•··--•:.;•·;, · ..... .
,.,..(,,ltf,..,~.~.mr<.y LV 011 '"""I.JL"111~ o,._,u, .. ,,,...,
,.l'..,YI._....,..., flv,-.t,-_.Jfl'-li' ,,,.,.,,,nl..,.1 ... •• ... ., ..... ._,, •••··••t ,.,,.,.t • .tl•r• 1:"I f'"/lrr fl"\ , ,I .
min11 ru<:t-w~r. ! · 1 .• -·• · ·
Performance ... ,\ .. ,
~very Neptune T• 10 wat~r meter ' ..... ,,_ ....... ,. -. ,, ,, .. ,_ .... ".,.,.,.,,,,.
V,'YV ..., .... '"""'-""'· , ...... -· "''' .. ''-' • 1, ..... •,. II .... ,.11,,. .. ...-, ... ,.., ___ ,, ...... ,--f, .. ,,. , ..... ,, ...... .,..,.., ""'""" , .......
e\'-'-"'tQ..V'f' ~•"..:I dopOl'"ldo.biUty ,:,/r-,r;u.;1 1 OO!J, en~unng maximum vtlflty reveri1Jc;,. ',,:'' .. ~
'i,\11!!.':' ......
• • <o I ··,.
•• . ..;,I . ···•: .. ,;()~ ..... ._, .... ---,--/C;
7
OCT.25'2001 11:38
NII
warraot.y ~ miar,u'l;'ntnr~
Neptune T· 10 warer ml'.1t8rs nm wam~nted
by Schlvm~rger for perfom1,~nce, mat~a!s,
ond worl<manstJip. Schfumb9rg1a1r (urfMr
offers en op!f011al post-w.irr.i.nty rn0lnte,,ar,c-9
pr09ran, for extrmc:too »vk:e life.
Wtxm d!?SlreC, maintenance rs i;'OSlly
occornpllshed eittler by ~ac::f.!rn1mt of
mR/or assemblk~5 or lndividval CQfT1PQl1€Tlts.
Guaranteed Systems
Compatfbifity
All NepWn~ T-10 meter$ ar"e gu~r(lntfXl(.f
adaptable to our Pvl~r-RM, ARB .. ,
Prc,Read'" ARB•, CMR, TRICON·S,
, , ••••"•••"' - ' ' •• ' • • •• • • •• I • •• •• • • • •~ .. ~-• "'il,l"'fJ•..-11••.'1,l#IIII ti 11 1-1 IN Hitt 11,.1 II -I 11-1~1 fol fl IJ ~, . ., .... ""'
3peciffcations
Appl/cation
Cold watsr moom..1remerrt r.>f now in
one direot1011.
nm.1xImum vpenumg i-ressure
100 p~ (1n.~ J<Ptil
Maximum Operating Temperature
eo•F
.Registor
Direct r8aclfng, center swgqp, ro11 .. S'l)aled,
mr;i.gri'lllr.: drlw w/rh low Now lndfca1or.
Me~isuring Chamber
N1,1teitlnQ dlso, .iyntt,9t)o polymer
Qr:,tJons
Siles
1 'a" FlQ.rlgQc:I or tJ-Ore:w end
2" ffm,gQd or oorew end
Unfl'.5 ol Measure
U.S. ~lion~ Imperial Gallonti
Cubic F~ CIJblc M~,~~
Register Types
Direct Rirooing:
Bronze box .ind c~, (standard}
Rernot11 A~adfng:
Pul9er-RM AAS. ProRead AR8
TRICON·S TRICON-E2
R~i:;fr,Jm
Me<!suring Chamber
Syntt,11\i<; Polyffi€r
Comp..mion ~li:mgos
C1;1st Iron or i;!rQn;,;G
c:;,..~w,,n~• ~.,...
or~toF~
1600 Al~n MIOhWIIY 221'1
. T!tll•""""'· Al :lf1(J71l
Toil Frw 1,~!)()-MG-IS9Z
F/>X ('Oi\} 2$:H4~4
c;;rJat.crMr S.rvf<l• E,,n.ill:
rtfdell!_ortillt'IIG/b,<:Orn
()i.,,r.i;rmr ~po!l F.·rrn•/1:
lrjd11r1(_supp<;>tt@'1b.1'Qm
YJ:,t\ WI yY•l.t •ilAo ,;,.t, ........w,:>lb . .:omA-vnt.<-r,'W,:',Tr:; r,om
HUGHES SUPPLY
Mfln rcol"ffl.af Opvratlng Rimg"' s;Q @l00'% Accuracy (!1,S¾J
!'fg• 2 to 100 1.)9 ;pm
0.46 '" 'ZZ.73 ml/h
2· 21,w ro fl!ID us 'ftrn .57 t,;, 3f.l.36 m VI'\
Registration
R""Vi•fffllon (Jiff !JIW9P r,.r,d J'Y\'OM;,,,,>:
,11,• 2•
100 UIS C.QflOn,, ✓ ,I
JQ(I 1m~11 O•~on, ,I ,I
''? g~iO f~,t ✓ "; ............. r~.! ,r.:'~1.".~·~1':" ....... ,,,-::
n • ..,...., .. ~, ... ..,,.. "' 1• .. ,_, ~..--,11•••'1,
111•" a•
100,0QO,Qi?() ua 0,11<:in, ,, ✓
,a,,,,oc:w:,,,,o,x, '""'qrt-.te...-,~"" ., .,
lll,00Q,Q00 Cubic ~"I t ✓
1.000.000 c~~rrn ✓ ,,:,r,,:1,,:v:iw:,f"'I, ....... ,_,_ ,
Dimension$
A a C
·M-r S"4 illl""' Silll! fnfmm 111/1)1m . ll'Vl!1m lnfmm
JI/-/ 11?"1, ,,,1, .. 8'1• 8"/1r,
S"'°"" 1<1111 ~2! 205 z~ 21? ,,,.,. ,, fl'/"' ,,,. e"f,•
FJw!!IQdlm 0:,0 20~ 20CI 217
2" 151/◄ 8'1!• 9'if,. 9"/4
S<:rvwEn<I 0'87 ,Mo ~37 ~~
;e-17 'i>'h• 9)l," g•f•
FI01V1111;1)(1 4il! 210 £'J7 248
#1984 P.006/007
AWWA I.O'I" Flaw
Sr.andard (MS% ,4,;,~ur&ey
& r.o 100 us fJfm 1.11022.7 m /lJ ~/tUSgf,m
0.17 m Ill
a to 1eo us gfim 1.8 to 38,0 m 111 11.JS~m o.~3 1h
Put
1rrmm
9¥1n
237
<:>'/Ir, 237
1111• l?B(l
I l'f•
~S(J
0 e ·-
'Tl'!< ... ...CIJ Thrff<J ~~-fi!ll'tt
p,er Inch
111/a
-
TJl/p
-
--
~ '"'""" IJ,Sl/c-9
l'/t" 2•/ta ~,
NPT 6!i 14,J
2~1i. 1115 -ss T~.$J
12' '>'I• 40 rwr 1~ 1$.I
-rs•t• 44
79 20.0
l,,,.,,,,~ll'lllM..,.r 0•'--=•
TIIIIN11'99, Al.
l·OOO·i:l411·1/l?2 tJ'.J4) za3.~cre
fM (:,.,1J{ Zl)..)•ri~~
N1rlu1,~ T•l" J,';ij
/CIJ~~Q <;,c-/,f11m~, .,,.._,,,,,,.,..
Mcnor,mn/'/rlf s.,,,.,1eo,, lllC.
2
,---------GENER AL FOUNDRIES INC. ----------;
A I E
r s::~ r 14• m ► B -1--i B mm l ;;a ;;a l
TYPE-A
TYPE-B TYPE-C
TYPE-D TYPE-E
ITEM DIMENSIONS IN INCHES COVER EQUIVALENT
NUMBER A B E TYPE TO
52313 23-1/2 12-7/8 13 A JEFFERSON PARISH
51611 15 10 10 A&B MOBILE WTR & SWR
53018 29-3/4 17-3/4 18-1/8 C&D MBXSA
51812 18-1/2 11-9/16 11-7/8 A SCHOFIELD
52116 21 14-5/8 16 E DECATUR
'--------------Tel: (800) 222-9555, Fax: (800) 275-9555 -------------'
94
-Hersey:.}teters Model MVR
Magnetic Drive Vertical Turbine Meters
· Sizes 3/4", 1", 1-1/2", 2", 3", 4" and 6"
Performance*
Head loss -3/411 and 111
-, 18
(f) a.: 16
w 14 er: :J (f) 12
(f) 10 w er: 0.. 8 u. .. ¾" 1·
0 6
(f) .,v .,i,,..,-""'
(f) 4 0 ....J 2 l..,..,-,-' -:--...
0 5 10 20 30 40 50
RATE-OF FLOW - U.S. GPM .
Head loss 1-1/211 and 211
-, 18
(f) a.: 16
AWWA
STD. AWWA •• STD.,
w 14 er: • :J 12 (f) (f) 10 w er: 0.. 8 u. 0 6 (f)
(f) 4 0 ....J 2
, Pk" 2·,
/ /
I/ ./
./ ~-
~ .... ----
20 40 60 80 100 120 140 160
RATE OF FLOW -U.S. GPM
Head loss -311 and 411
18 ui a.: 16
I
AWWA AWWA
STD. STD.-~
,1 I
w 14 a: [/ 4•
:J 12 (f)
(f) 10 w a: 0.. 8 u. 0 6
(f)
(f) 4 0 ....J 2
/ 3" V
~ .,v ., ,,, ..;"
.,v ,V
.,v ~ i.----
t.....:: i::::--
0 50 100 200 300 400 500 600 700
RATE OF FLOW -U.S. GPM
Head loss -611
16 AWWA i-.--STD.
(f) 14 / 6" a.: I/ 12 w / er: / :J 10 (f) I/ (f) w 8 a:
.,
/ 0..
u.. 6 0
V
/
(f)
(f) 4 0
I/ --....J .-' 2
0 100 200 400 600 800 1000 1200 1400
RATE OF FLOW - U.S. GPM
*Performance curves are typical only and not a guarantee of performance.
Accuracy -3/411 and 111
102
@ 100 er: ~ 98 a 96
~ 94
~ 92 w O 90 er: ~ 88
86
¾" 1"
0 5 10 20 30 40 50
RATE OF FLOW -U.S. GPM
Accuracy 1-1/2" and 2"
104 ,...,....,...,...,..,....,...,..,...,..,-,----,-----..--...... --
102 l-,0J---id-,;;i-d--1-f'.J"'..!-...+ .. .,j.:r.._1_+-~d±-cc_--,_,--,,-l,---,,.-=-c+-_-_-_-l-,A-w-w-A __ +-_---I
1:'/;1" --
@ 100 ~
er: w 98 f-
--STD.
(f) 96 a
----w 94 er:
f-z 92 w (.) 90 er: w 88 0..
86 a++-++l-+-+++-i-+---+----+--+---+----f
0 20 40 60 80 100 120 140 160
RATE OF FLOW -U.S. GPM
Accuracy -311 and 411
104
102 H¼!±+=-=t=-=-t---=-+,--=l-=-=/=-c=-l=-=--tc__,_!-:,-d--,=.!,~l:---:+=-4
U+t~~=;=~::;=;=::;,...::.3"+-...j_~~A-WW_j._A_-~_/..1:__j @100 H ~
er: -,_ -s{D. ---~ 98 ll+l+i=..=.f=--=--F-=-'1-'=-.:::f.-=-=F=-F--=-fc..::_;;....=.4-=:..:,__,,,"'-=-J=--:=-I=-~ a 96 11+1+1---+-l------l---+-l------l---+-+---+---+-+---+-~
~ 94 11+1++--+-+-----+--+-+-----+--+-+-----+--+-+-----+---I
~ 92 11+1++---+-+--+---+-+--+---+-+--+---+-+--+---I
w O 90 ll+l'+l---+-+--+---+-+--+---+-+--+---+-+--+---1 a: ~ 88 ll+l'+l---+-+--+---+-+--+---+-+--+---+-+--+-~
86 11+1++--+-+--+--+-+--+--+-+--+--+-+---+---I
0 50 100 200 300 400 500 !300 700
RATE OF FLOW -U.S. GPM
Accuracy -611
104
102 Hcl+l±-.,,-_-:c--::_+._=-=--=-+=-=--=-±-::_;-:_::-_=-t-::_--,_,-,,-!_~A"'WWc=7'A -~~-.,,-,-I
o 1 oo ~Q~jj~:~~t~~:~~~~:j~~~~r~~~ti~s~r~D~. -!~~s~:j w 98 ..-ffi 96 ~H-l+---+---l'---+---+--1--+---1 ti 94 ~H-l+---+---1--+---+--1--+---I a 92 IJ+-~+---+--1--+---+---11----1----i
~ 90 IH-f-f---+---+--1----+---+----1'---+---I
f-88 li+-f-f---+---+--l----+---+----1--+---I
~ 86 lf+-f-H--t---+--t---+---+---1--+--~
(.) er: w 0..
100 200 400 600 800 1000 1200 1400
RATE OF FLOW -U.S. GPM 4.3
02-01
➔
Model MVR
Magnetic Drive Vertical Turbine Meters
Sizes 3/4", 1", 1-1/2", 2", 3", 4" and 611
Meter Registration
Meter Size Initial Dial * Capacity
3/4" 10 Gallons 10 Million
l " 10 Gallons 10 Million
1-1/2" 100 Gallons 100 Million
2" 100 Gallons 100 Million
3" 100 Gallons . 100 Million
4" 100 Gallons 100 Million
6" 1000 Gallons 1 Billion
* Registration equal to one full revolution of the sweep hand.
Flow Characteristics
Meter Size Typical Low Flow Typical Operating Range
(95% Minimum) (100% ± 2%)
3/4" 1/2 GPM 1 to 30 GPM
l" 3/4 GPM 1-1/2 to 50 GPM
1-1/2" 1-1/2 GPM 2 to 100 GPM
2" 2GPM 3 to 160 GPM
3" 2-1/2 GPM 4 to 350 GPM
4" 3-1/2 GPM 5 to 650 GPM
6" 5GPM 15 to 1300 GPM
4.2
02-01
-Hersey~ters
Initial Dial * Capacity
1 Cubic Foot 1 Million
1 Cubic Feet 1 Million
10 Cubic Feet 10 Million
10 Cubic Feet 10 MilHon
10 Cubic Feet 10 Million
10 Cubic Feet 10 Million
100 Cubic Feet 100 Million
Maximum Continuous Maximum Intermittent
Operation Flow
25GPM 35GPM
35GPM 55GPM
70GPM ll0GPM
115 GPM 175 GPM
240GPM 390 GPM
450GPM 715 GPM
910GPM 1430 GPM
Copyright 1995 · A subsidiary of Mueller Co.
Printed in U.S.A.
Series 009QT (¼"-2')
Reducedpressure>zone (RPZJ., backflow preventers .·.
Feaf1-1 res
• Internal relief valve for
reduced installation
clearances
• Captured springs
• Designed to protect potable water supplies in
accordance with national plumbing codes and water
authority requirements.
Protection from health hazard cross-connections or
, containment at the service line entrance.
• Line sized checks
reduce potential fouling 009QT ½"
• For continuous pressure use; protects against both
back siphonage and backpressure backflow.
Spe:cificatlvns
• Sizes: ¼" -2 (8-50 mm), NPT female connections,
quarter-turn, full port, resilient seated bronze ball
valve shutoffs (Model 009QT).
• Sizes ¼" -l" (8-25 mm) have tee handle shutoffs,
Sizes 1 ¼" -2" (32-50 mm) have lever handle shutoffs.
• Two in-line, independent check valves with
intermediate relief valve.
• Standard ball type test cocks.
Flow Charts see page 35.
Di:rnen:si.ons/'wV gts.
N
Order· Size,(DN)
Model No,§ in. .mm in.
0090T 62098 ¼ 8 10
0090T 62096 ¾ 10 10
0090T 62094 ½ 15 10
009M3QT 6303.0. ¾ 20 10¾
009M2QT 63020 1 25 16¾
009M20T 62920 1¼ 32 17¾
009M20T 62921 1½ 40 17½
009M2QT 63010 2 50. 21¾
009QT-S 62181 ¼ 8 10
009QT-S 62180 ¾ 10 10
009QT-S 62095 ½ 15 10
009M3QT-S 63031 ¾ 20 10¾
009M20T-S 63021 1 25 16¾
009M20T-S 62950 1¼ 32 17¾
009M20T-S 62952 1½ 40 17½
009M20T-S 63011 2 50 21 ¾
A *B
mm in. mm
250 4% 117
250 4% 117
250 4% 117
273 5 127
425 5½ 140
441 6 150
454 6 150
543 7¾ 197
250 6 150
250 6 150
250 6 150
273 6¼ 159
425 7¾ 197
441 7¾ 19T
454 7¾ 197
543 8¼ 210
C T
B
D t
C
in;
3¾
31/s
3¾
3½
3
3½
3½
4½
3¾
3¾
3¾
3½·
3
3½.
3½
4½
mm
86
86
86
89
76
89
89
114
86
86
86
89
76
89
89
114
• Servicing without special tools
• Top access, single cover
• Two in-line independent check valves with intermediate
relief valve
• Standard ball type test cocks
For additional information, request ES-009.
For information on Air Gaps and Vent Elbows see page 34 or request
ES-AG/EL. For WattsBox Enclosures, request ES-WB and ES-WB-T.
-Options
add Suffix:
HC -with fire hose connections (female hose swivel x
male NST)
QT -with quarter-tum, full port, resilient seated ball valve
shutoffs
S -with bronze strainer
LF -without shutoffs
AQT -elbow fittings for 360° rotation (¾" -2"only)
PC -with internal Polymer Coating
LH -with locking handle ball valves (open position)
SH -with stainless steel ball valve handles
add Prefix:
C -with clean and check strainer(¾" and l" only)
U -union connections (Send for ES-U009AQT for more
information)
SS -with 316 stainless steel backflow preventer and ball
shutoffs
D L .. M· N . Weight
in: mm in. mm in. mm in; mm lbs. kg:
1¼ 32 5½ 140 ----4.50 2.0
1¼ 32 5½ 140 --- -4.50 2.0
1¼ 32 5½ 140 -- --4.50 2.0
1½ 38 6¾ 171 ----5.75 2.6
2½ 64 9½ 241 - - --12.25 5.6
2½ 64 11¾ 289 - ---14.62 6.6
2½ 64 111/a 283 ----16.32 7.4
3¼ 83 13½ 343 -- --30.00 13.6
1¼ 32 5½ 140 2¾ 60 2½ 64 5.50 2.5
1¼ 32 5½ 140 2¾. 60 2½ 64 5,50 2.5
1¼ 32 5½ 140 2¾ 70 2¼ 57 5.50 2.5 1½ 38. 6¾ 171 31/Js 81 2¾ 70 7.75 3.5
2½ 64 9½ 241 3¾ 95 3 76 15.25 6.9
2½ 64 11 ¾ 289 4¼s 113 3½ 89 20.19 9.2
2½ 64 111/a 283 47/a 124 4 102 20.32 9.3
3¼ 83 13½ 343 513/is 15t 5 127 36.87 16.7
§-Contact your local Watts Agent or call Customer Se,vice (978) 689-6066 for other models/order numbers or refer to PL-WR.
• B dimension is from the lowest part of the valve (the relief port) to the highest part of the gate/ball valve shutoff.
watts regulator • backflow products division 7
TRANSMITTAL COVER PAGE
WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT
IT Corp. Project #823851
Submitted By: IT Corporation -200 Horizon Center Boulevard, Trenton, New Jersey 08691
Transmittal Number (chronological sequence): 024
Transmittal Date: 08/01/01
Submittal Register Item Number: ~63 __ _
Resubmittal: No _1L Yes __
Specification Section: 02660 1.02, A
Description: Shop drawings and working drawings for the water distribution system
Drawing/Detail Number: NI A
Subcontractor/Supplier: NI A
Comments: Encroachment Agreement and shop drawings
Number of Copies Submitted: _4_
Number of Copies to be Returned to Contractor 1
Earth Tech Engineer's Receipt Signature: --------------------
Comments: Recipients: Jim Cloonan, Pat Backus, John Funk, Dennis Jones
Receipt Date:
Engineer's Approval
Comments:
Reviewer's Signature
Project Manager's Signature
D A. "Reviewed and approved, no exceptions taken"
□ B. "Reviewed and approved with comments
□ C. "Revise and Resubmit"
Date -------------------------
_______________ .Date ________ _
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
MICHAEL F. EASLEY
GoVERNOR
COUNTY: Warren
DIVISION OF HIGHWAYS
Division Five
P. 0. Box205
Henderson, North Carolina 275;16 .
Telephone (252) 492-0111
Fax (252) 492-0123
7/3/01
NC Dept. of Enviroment & Natural Resources
401 Oberlin Road
Raleigh, NC 27605
Gentlemen:
LYNDO TIPPETT
SECRETARY
Subject: Encroachment Contract -NC Dept. ofEnviroment & Natural Resources
water main tap
SR 1604
ENC#: E53-41-01-062
Attached for your files is a copy of Right of Way Encroachment Contract which has been
properly executed. This contract covers the following: water main tap
This encroachment is approved subject to the applicable Special Provisions which are
attached to and made a part of the Encroachment Contract.
Please refer to Encroachment Contract E53-41-01-062 in all future correspondance with
this office about this. project.
Sincerely,
cc: John B. Williamson, Jr.
Scott Capps, P.E.
County Maintenance Engineer
E53-4 l-O l-062
Encroachment Special Provisions
Lane closures shall be restricted to between 8:30 am and 4:30 pm. NCDOT
reserves the right to further limit, restrict, or suspend operations within the right
of way if, in the opinion ofNCDOT, safety or traffic conditions warrant such
action.
2 It shall be the responsibility of the Encroacher to determine the location of
utilities within the encroachment area. The encroacher shall be responsible for
notifying other utility owners and providing protectioD:_ and safeguards to prevent
damage or interruption to existing facilities and maintain accessibility to existing
utilities.
3 Utility is to have a minimum cover of 36 inches in non-directional bore
applications.
4 The utility trench backfill material is to be placed at a maximum 6" loose layer
and each layer thoroughly compacted.
5 All utility installations shall be made in accordance with the Division of
· Highways Policies and Procedures for Accommodating Utilities on Highway
Rights of Way.
6 Pavement will be repaired with material approved by the Division of Highways
and to a strength equivalent to the existing pavement.
7 Only one-half of roadway is to be cut at one time in order to maintain traffic.
8 Excavated areas adjacent to pavement having more than a 2" drop shall be safed
up at a 6: 1 or flatter slope and designated by appropriate delineation during
periods of inactivity, including, but not limited to, night and weekend hours.
9 Excavated material shall not be placed on the roadway at anytime.
10 It is the·responsibility of the owner/agent to secure·any construction easements
(temporary or permanent) from property owners affected by the construction
limits.
11 A $1000.00 Performance and Indemnity Bond shall be executed and posted with
the Division of Highways. The Division of Highways reserves the right to retain
this bond until one calendar year after the satisfactory completion of work. A
copy of this bond will be present at the construction site at all times during
construction. The Division of Highways reserves the right to stop all work
unless evidence of approval can be shown.
E53-41-0l-062 Page 2 of5
12 Proper temporary and permanent measures shall be used to control erosion and
sedimentation in accordance with all local, State and Federal regulations.
13 Pavement cuts shall be repaired with bituminous material the same day a cut is
made. If the open cut is required for more than one day, the encroacher shall
place a temporary bituminous patch at the close of each day's operation, and
place the permanent repair immediately upon completion of the open cut
operations. Concrete or aggregate repairs are prohibited for cuts in bituminous·
pavement surfaces. Pavement repairs shall be full depth asphalt with a minimum
design as follows:
6 inches Bituminous Concrete Base Course-Type
HB
2 inches Bituminous Concrete Surface Course-Type I-2
14 Water Meters are to be placed a maximum of one foot inside the Right of Way.
15 If encroacher is within 1 O' of the travel lane( s) with any part of his operation
including but not limited to vehicles, equipment, etc., encroacher shall install a
lane closure for each lane in accordance with the latest Manual on Uniform
Traffic Control Devices (MUTCD).
16 All pavement disturbed shall be saw cut prior to removal for uniform edges.
7 Access shall be maintained to driveways at all times.
18 All trench excavations shall be completely backfilled and compacted at the end
of each construction day. No portion of the trench shall be left open overnight.
19 All traffic control shall conform to the latest edition of The Manual on Uniform
Traffic Control Devices.
E53-4 l-O l-062 Page 3 of5
Encroachment Standard Provisions
A copy of the permit and an approved plan(s) stamped by NCDOT will be on the
site and available for inspection by DOT personnel while cqnstruction is in
progress.
2 The Department of Transportation does not guarantee the right of way on this
road, nor will it be responsible for any claim for damages brought by any
property owner by reason of the installation.
3 If there are any existing traffic signals, signal equipment, or NCDOT signs in the
area of proposed work, you shall contact C.R. Woody at (919) 477-2914, in
Durham, prior to beginning any work on State right of way. Cost to repair,
relocate, or any damage to NCDOT signs, signals, or associated equipment shall
be the responsibility of the Encroacher.
4 The traveling public will be warned of the construction with signing that is in
accordance with the latest manual on Uniform Traffic Control Devices. Further,
for construction involving lane closures, either Part VI of the MUTCD or an
approved traffic control plan must accompany this agreement.
5 Two-way traffic shall be maintained at all times.
6 All materials and construction shall meet NCDOT Standards and Specifications.
7 At the end of each working day, equipment shall be parked a minimum of 20 feet
from the edge of any travel lane.
8 Any drainage structure disturbed or damaged shall be replaced to its original
condition at the discretion of the District Engineer.
9 All erosion control devices and measures shall be constructed, installed,
maintained, and removed by the Encroacher in accordance with all applicable
Federal, State, and Local laws, regulations, ordinances, and policies. All earth
areas shall be regraded and seeded in accordance with NCDOT Standards and
Specifications.
10 When surface area in excess of one acre will be disturbed, the Encroacher shall
submit a Sediment and Erosion Control Plan which has been approved by the
appropriate regulatory agency or authority prior to beginning any work on the
right of way. Failure to provide this information shall be grounds for suspension
of operations.
11 All earth areas disturbed shall be regraded and reseeded in accordance with
Division of Highways Standards and Specifications.
E53-41-0l-062 Page 4 of5
12 Trenching, bore pits and/or other excavations shall not be left open or unsafe
overnight. The contractor shall comply with all OSHA requirements and provide
a competent person on site to supervise excavation at all times.
13 The applicant is responsible for identifying project impacts to waters of the
United States (wetland, intermittent streams, perennial streams and ponds)
located within the NCDOT right-of-way. The discharge of dredged or fill
material into waters of the United Staes requires authorization from the United
States Anny Corps of Engineers (USACE) and certification from the North
Carolina Division of Water Quality (NCDWQ). The applicant is required to
obtain pertinent permits or certifcation from these regulatory agencies if
construction of the project impactswaters of the United States within the
NCDOT right-of-way. Additional infromationcan be obtµned by contacting the
USACE or NCDWQ.
14 The applicant is responsible for avoiding impacts to federally protected species
during project construction. Bald Eagle, Michaux's Sumac, smooth coneflower,
dwarf wedgemussel, harperella, red-cockaded woodpecker and tar spinymussel
are federally funded speciesthat have been identified within NCDOT right of
way in Durham, Person, Granville, Wake, Franklin, Vance and Warren counties.
Additional information can be obtained by contacting the North Carolina Natural
Heritage Program or the United States Fish and Wildlife Service.
15 The applicant is responsible for complying with the Neuse and Tar-Pamlico
Riparian Buffer Rule as regulated by the NCDWQ. The rule regulates activity
within a 50-foot buffer along perennial streams, intermittent streams and ponds.
Additional information can be obtained by contacting the NCDWQ.
E53-41 -0l-062 Page 5 of5
ROUTE S~ 1604 PROJECT PCB Landfill Detox --------
DEPARTMENT OF TRANSPORTATION
-AND-
NC Dept of Environment & Natural Resources
Division of Waste Management
-AND-
Warren County
COUNTY OF
STATE OF NORTH CAROLINA
Warren
THREE PARTY RIGHT OF WAY
ENCROACHMENT AGREEMENT ON
PRIMARY AND SECONDARY SYSTEM
THIS AGREEMENT, made and entered into this the 22t\cl day of June., 20 01 , by and between the Department
of Transportation, party of the first part;
and NC DENR, Division of Waste Management
____________________ party of the second part; and _W_a_rre_n_C_o_u_nty~--------
party of the third part,
WITNESS ETH
THAT WHEREAS, the party of the second part desires to encroach on the right of way of the public road designated as
Route(s) 1604 , located in Warren County ______ ...,__ ___________ _
with the construction and/or erection
of:
linear feet
a water main crossing SR 1604 to the PCB Landfill access road, approximately 60
WHEREAS, it is to the material advantage of the party of the second part to effect this encroachment, and the party of
the first part in the exercise of authority conferred upon it by statute, is willing to permit the encroachment within the limits of the
right of way as indicated, subject to the conditions of this agreement;
NOW, THEREFORE, IT IS AGREED that the party of the first part hereby grants to the party of the second part the
right and privilege to make this encroachment as shown on attached plan sheet(s), specifications and special provisions which
are made a part hereof upon the following conditions, to wit:
That the installation. operation. and maintenance of the above described facility will be accomplished in accordance with the parly of the
first part's latest POLICIES AND PROCEDURES FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHTS-OF-WAY, and such
... •Awciooc end emeodroeots lb6Celo as may be jn effect al the date of this agreement. Information as to these policies and procedures may
WITNESSETH
THAT WHEREAS, the party of the second part desires to encroach on the right of way of the public road designated as
Route(s) 1604 , located in Warren County -------~--------------
with the construction and/or erection
of:
linear feet
a water main crossing SR 1604 to the PCB Landfill access road, approximately 60
WHEREAS, it is to the material advantage of the party of the second part to effect this encroachment, and the party of
the first part in the exercise of authority conferred upon it by statute, is willing to permit the encroachment within the limits of the
right of way as indicated, subject to the conditions of this agreement;
NOW, THEREFORE, IT IS AGREED that the party of the first part hereby grants to the party of the second part the
right and privilege to make this encroachment as shown on attached plan sheet(s), specifications and special provisions which
are made a part hereof upon the following conditions, to wit:
That the Installation, operation, and maintenance .of the above described facility will be accomplished in accordance with the party of the
first part's latest POLICIES AND PROCEDURES FOR ACCOMMODATING UTILITIES ON HIGHWAY RIGHTS-OF-WAY, and such
revisions and amendments thereto as may be in effect at the date of this agreement. Information as to these policies and procedures may
be obtained from the Division Engineer or State Utility Agent of the party of the first part.
That the said party of the second part binds and obligates himself to Install and maintain the encroaching facility In such safe and proper
condition that it will not interfere with or endanger travel upon said highway, nor obstruct nor interfere with the proper maintenance thereof,
to reimburse the party of the first part for the cost incurred for any repairs or maintenance to its roadways and structures necessary due to
installation and existence of the facilities of the party of the second part, and if at any time the party of the first part shall require the removal
of or changes in the location of the said facilities, that the said party of the second part binds himself, his successors and assigns, to
promptly remove or alter the said facilities, In order to conform to the said requirement, without any cost to the party of the first part.
That the party of the second part agrees to provide during construction and any subsequent maintenance proper signs, signal lights,
flagmen and other warning devices for the protection of traffic in conformance with the latest Manual on Uniform Traffic Control Devices for
Streets and Highways and Amendments or Supplements thereto. Information as to the above rules and regulations may be obtained from
the Division Engineer of the party of the first.
That the party of the second part hereby agrees to Indemnify and save harmless the party of the first part from all damages and claims
for damage that may arise by reason of the installation and maintenance of this encroachment.
That the party of the second part agrees to restore all areas disturbed during Installation and maintenance to the satisfaction of the
Division Engineer of the party of the first part. The party of the second part agrees to exercise every reasonable precaution during
construction and maintenance to prevent eroding of soll; silting or pollution of rivers, streams, lakes, reservoirs, other water Impoundments,
ground surfaces or other property; or pollution of the air. There shall be compliance with applicable rules and regulations of the North
Carolina Division of Environmental Management. North Carolina Sedimentation Control Commission, and v,,ith ordinances and regulations
of various counties, municipalities and other official agencies relating to pollution prevention and control. When any Installation or
maintenance operation disturbs the ground surface and existing ground cover, the party of the second part agrees to remove and replace
the sod or otherwise reestablish the grass cover to meet the satisfaction of the Division Engineer of the party of the first part.
That the party of the second part agrees to assume the actual cost of any Inspection of the work considered to be necessary by the
Division Engineer of the party of the first part.
That the party of the second part agrees to have available at the construction site, at all times during construction, a copy of this
agreement showing evidence of approval by the party of the first pllrt. The party of the first part roserves the right to stop all work unless
evidence of approval can be shown.
Provided the work contained in this agreement is being performed on a completed highway open to traffic; the party of the second part
agrees to give written notice to the Division Engineer of the party of the first part when all work contained herein has been completed.
Unless specifically requ~sted by the party of the first part, written notice of completion of work on highway projects under construction will
not be required.
That In the case of noncompliance with the terms of this agreement by the party of the second part, the party of the first part reserves
the right to stop all work until the facility has been brought Into compliance or removed from the right of way at no cost to the party of the
first part.
FORM R/W 16.6
Rev. July 1, 1977
cs 3 -4 I -01 -~ 2
That it is 119reed by both parties that this agreement shall become void If actual construction of the work contemplated herein is not
begun within one (1) year from the date of authorization by the party of the first part unless written waiver is secured by the party of the
second part from the party of the first part.
During the performance of this contract, the second party, for Itself, Its assignees and successors In Interest (hereinafter referred to as
the ·contractor"), agrees as follows:
a. Compliance with Regulations: The contractor shall comply with the Regulations relative to nondiscrimination In Federally-
assisted programs of the U. S. Department of Transportation, TIUe 49, Code of Federal Regulations, Part 21, as they may be
amended from time to lime, (hereinafter referred to as the Regulations), which are herein incorporated by reference and made
a part of this contract.
b. Nondiscriminatlo!:1: The contractor, with regard to the work performed by II during the contract, shall not discriminate on the
grounds of race, color, or national origin in the selection and retention of subcontractors, including procurements of materials
and leases of equipment. The contractor shall not participate either directly or indirectly in the discrimination prohibited by
Section 21 .5 of the Regulations, including employment practices when the contract covers a program set forth in Appendix B
of the Regulations.
c. Solicitations for Subcontracts, including Procurements of Materials and Equipment: In all solicitations either by competitive
bidding or negotiation made by the contractor for work lo be performed under a subcontract, Including procurements of
materials or leases of equipment, each potential subcontractor or supplier shall be notified by the contractor of the contractor's
obligations under this contract and the Regulations relative lo nondiscrimination on the grounds of race, color, or national
origin.
d. Information and Reports: The contractor shall provide all information and reports required by the Regulations, or directives
issued pursuant thereto, and shall permit access lo Its books, records, accounts, other sources of information, and its facilities
as may be determined by the Department of Transportation or the Federal Highway Administration to be pertinent to ascertain
compliance with such Regulations or directives. Where any information required of a contractor is In the exclusive possession
of another who fails or refuses to furnish this information, the contractor shall so certify to the Department of Transportation, or
the Federal Highway Administration as appropriate, and shall set forth what efforts it has made to obtain the Information.
e. Sanctions for Noncompliance: In the event of the contractor's noncompliance with the nondiscrimination provisions of this
contract, the Department of Transportation shall impose such contract sanctions as ii or the Federal Highway Administration
may determine to be appropriate, including, but not limited to,
( 1) withholding of payments to the contractor under the contract until the contractor complies, and/or
(2) cancellation, termination or suspension of the contract, in whole or in part.
f. Incorporation of Provisions: The contractor shall Include the provisions of paragraphs "a" through "f" in every subcontract,
including procurements of materials and leases of equipment, unless exempt by the Regulations, or directives Issued pursuant
thereto. The contractor shall take such action with respect to any subcontract or procurement as the Department of
Transportation or the Federal Highway Administration may direct as a means of enforcing such provisions including sanctions
for noncompliance: Provided, however, that, in the event a contractor becomes involved in, or is threatened with, litigation
with a subcontractor or supplier as a result of such direction, the contractor may request the Department of Transportation lo
enter into such litigation lo protect the interests of the Slate, and, in addition, the contractor may request the United States to
enter Into such litigation to protect the interests of the United States.
That when title to the subject that constitutes the aforesaid encroachment passes from the party of the second part
and vests in the party of the third part, the party of the third part agrees to assume all responsibilities and rights and to
perform all obligations as agreed to herein by the party of the second part.
R/W (166) : Party of the Second Part certifies that this agreement is true and accurate copy of the form
R/W (166) incorporating all revisions to date.
IN WITNESS WHEREOF, each of the parties to this agreement has caused the same to be executed the day and
year first above written.
WITNESS:
WITNESS:
DEPARTMENT QF T
/ I BY: ;
William L. Meyer
Director, DENR Division of Waste Management
Second Party
u'"' ''''"'Y uo \,I0\'11:i11,,,,,o"" uy u,o L.ICJ..,a, u,10111. u, 11a11:,..,u11.ca1.1U11 ur u11::r r-t:,utHi:ll nIgnway l-\amIn1slrauon to oe penInent 10 ascenaIn
compliance with such Regulations or directives. Where any Information required of a contractor is in the exclusive possession
of another who fails or refuses to furnish this Information, the contractor shall so certify to the Department of Transportation, or
the Federal Highway Administration as appropriate, and shall set forth what efforts It has made to obtain the Information.
e. Sanctions for Noncompliance: In the event of the contractor's noncompliance with the nondiscrimination provisions of this
contract, the Department of Transportation shall Impose such contract sanctions as it or the Federal Highway Administration
may determine to be appropriate, including, but not limited to,
(1) withholding of payments to the contractor under the contract until the contractor complies, and/or
(2) cancellation, termination or suspension of the contract, in whole or in part.
f. Incorporation of Provisions: The contractor shall include the provisions of paragraphs "a" through "f' in every subcontract,
including procurements of materials and leases of equipment, unless exempt by the Regulations, or directives Issued pursuant
thereto. The contractor shall take such action with respect to any subcontract or procurement as the Department of
Transportation or the Federal Highway Administration may direct as a means of enforcing such provisions including sanctions
for noncompliance: Provided, however, that, In the event a contractor becomes involved In, or is threatened with, lltigation
with a subcontractor or supplier as a result of such direction, the contractor may request the Department of Transportation to
enter Into such litigation to protect the interests of the Slate, and, in addition, the contractor may request the United States to
enter into such litigation lo protect the interests of the United States.
That when title to the subject that constitutes the aforesaid encroachment passes from the party of the second part
and vests in the party of the third part, the party of the third part agrees to assume all responsibilities and rights and to
perform all obligations as agreed to herein by the party of the second part.
R/W (166) : Party of the Second Part certifies that this agreement is true and accurate copy of the form
R/W (166) incorporating all revisions to date.
IN WITNESS WHEREOF, each of the parties to this agreement has caused the same to be executed the day and
year first above written.
DEPARTMENT?F T
BY:
WITNESS:
William L. Meyer
Director, DENR Division of Waste Management
Second Party
WITNESS:
~-J~
Lorfa D. WIiiiams
County Manager, Warren County, NC
Third Party
cS3 -4(-0f-O/,,Z
--011:=1v· eur -__ _
·-p;--
---·----•
MUELLER® SUPER CENTURION®
FIRE HYDRANT PARTS
MUELLER Super Centurion Fire Hydrant Part•
Cat, Deacrlption part# · Material
A•I Operalln~ nut Bronze
A-2
A-J
A·4
Woathor oa0 lnot ,hown; U80d onlv on • ...,.19yg modol•l Coat iron
Hold down nut O-rlnK Rubber
Hold down nut (not shown; uocd only on pre-t 988 model,) nronu
Ru
Material 1tandard
ASTM B584
ASTM Al26 CL.B
ASTM 02000 BUNA N
ASTMB584
ASTM D2000 BUNA N
I Mualler ca.I 9.5
REV. 4-98
A-6 Anll-friotion washer
A-7 Oilolui ASTMBl6 ~ ~A-8
A·8 llonnct Cutiron ASTMA l26CL.D 'u:~ --~--A-9
A-9 Bonnet bolt and nut Steel AS'l'M A307 Plated A-1 (
Celcon
Br
A• IO \\iir~t~N,n~i.~li-~~v ~l,rn~~~:il~~kd) Rubhor ASTM D2000 BUNA N ~ -~~? A-11
A-II Ull!lcrstcm Steel ASTMA5760R.B ~~l ~~~A-1 ~ A-12 Stem O°rln2 Rubber ASTM 02000 BUNA N -A· 1 ~
A• 13 Nozzle lock Swnlm 1tu l ASTM A276 A-1 ~
A-14 Pumr,unozzle Bronze ASTMB584 / ~tr ----AAA·:1~~~il A-15 Pumpor nozzle gaal<el Rubber ASTM 02000 Neonrene -._ --
A-16 J'um11or noulcO-rinK Rubber ASTM D2000 9UNA N
lrA..,_•..,_17---lf"'p-=-·um"'11-=-'"'.c."U.::.;•cc•lcc•-=-""=<'"'------------+C=•=•l,.,l,._,ro=n---+'A""S""T""M"-'-'A""l2""6"'C""L"'.B=----.......-i f::::~ l A·1 E
11-"'--•""1~8 -+-t1~0"',e~n'-'o-=-2:t1-=-•'--------------+B"'ro""n::..:•:=.e __ ;.;A .. S.,.T .. M....a.B.'"'S'4..._ __ ---1 ~ ~ r-..._ ~ A-H
lf'A..:.·..:.19'---1f""H:.;o.::.;se'"'n"'o=zz::..:le"'•,.:a,.sk""·et._ _________ -+'R""u"'b.:::be:.:.r __ +:A.::S,.,TM-=::.Daa2000=--'"N~eon=:re""n,• ~ A-2C
~A __ -_20'--+~H=ot~e-"-no~t-=-zl~e~O~•r~ln ..... a· ---------+R __ u~b~bc~r----1 ... AccS ... TM~D~2~000.....,.B.U_N_A_N--1 11 ".......,_ "-A~21
.. A~--=-2~1-+-H~o.::.;,c'-'n~o=u.::..:.Jc~·ccca,c_o ___________ c~~-t.il'Q;...,,n __ A~S'-'T~M~A'-'-'-'l2~6~C~L::..:.D=----1 A-2~
A-22 CAo chain Steel Plate~ !'\]"~--------A-2~ A-23 Chllin rin, Steel Pla1ed " _ A-2-4
A-24 Un""r barrel less nozzles Cast iron ASTM Al26 CL.B .---;u--------A-2E
A-25 Safety couplin1 Stainle,s ste~I ASTM A890 'LJ; ~
A-26 Sofctv nan,e bolt and nut Steel ASTM A307 Plated ~ ~ 'JI~-:,...~ ~ A-2€ 1
,_~A=-:2,=::sa:fe:,y::na:n:ge:O:•:rln:a:(:1199:7::an:d=ne=w=er=m=o=d=lll=•;=====:R:u:b=be=r===::c:e1=1u:lo=sc::=::::=: ~ 11==~~:::J:~~::::::::: A-27 nro-1997 models hftve 01\t mice() ~ ~':l"-::i.....~"i-,;'1=:s;tJ~-----A-2e
A-28 Sofetv nan•c Casi Iron AS'fM A 126 CL..B ~ A 2c
A-29 Corter pin Stainloa■ ■tec:I ASTM A216 ·,.,/-+--+--~!-, ________ A:3C
A-30 Clevis Din Slalnlm 1t11el ASTM A276 i-----t,<J--------A-31
A-31 Lower stem S1eel ASTM A576 OR.S r,i,--------A-3:i
A-32 Lower bftrrel Cast iron ASTM A 126 CL.B ............ A 3"
A 13 Siem nln Stainless steel ASTM A276 """-.., ~· • .:
-" ~ . ~A-34 ~A~• .... 34--l_D __ ra_In_v_Q_lv~e-~_c_ln_~ __________ ~P~l•~1~tlc'--_-+-______ ---t1 A•3E
A-3.1 Drain valve 10rew Stainless ttul ASTM A276 11-A-----36.......; ... U---oo,e .... r ... vA ... lv~e"""n--lltU~e-<-10-~l-ude-, -A--)-,-a,-,d-A--3-5-l---~B"'"r""on"'i""e ............. A .. S_T_M_B_5_84 ___ ---tl ....._ ~ A·3€
~A~-~,,'-+s·h·uoe'""-bo~h~a~nd~,=1u~t==~-"--=-'--'--'=----+S~tec:=1.:.....--+-A~ST ... M~A--J-◊7-P-la-~-ct---11 A-37
I~-----+-=='--~ ~ ~ A-38 A-38 f,;,t:%~9ij~"e1~n~a9e'~fii.!liZ,~~tl newer models; Rubber ASTM D2000 BUNA N
A-39 Scat rln2 100 O°rln£ Rubber ASTM D2000 Bl/NAN
A-40 Drain rin2 housint Cut iron ASTM Al26 CL,,B
A-41 Dmin ring houtint boll and nut (not 1hown; used only Stul ASTM A307 Plated on cro-1997 modclnvdranrsl
A-42 Ot.lln rlna Bronr.e ASTM B~S4 -A-43
A-43 Se111 rin• Bronze ASiM B584 Zl'.l. A-44
A-44 Seat rina bottom O-ring Rubber ASTM D2000 BUNA N A-45
Rubber ASTM D2000 .-... --.~~ ---A 46 A-4j• Revmlble main valve (1997 and newer modol• only;
e:r~~r~•,i:.,~-<evenlble l'Tlllln valve and lower
A-46
:::::::: A :4 7
C6!lliron ASTMAl26CL,B A-48
A-47 C'..ap nul acal Rubber ASTM D2000
A-48 Lock wa,hcr S lnin test llleel ASTM A276
Lnwer valve ola1e nur. Coll iron ASTM A 126 CL.B
A-50 Shoe Cut iron ASTM A I 26 CL.B
A-84 Hold down nut ASTMS534
Weather !(ID! Rubber ASTM 1)2000
10.5 oz. hvdram lubr\catin1 oil (not shown)
• p,.,1997 mnd~ls may be l'Pi•&d~d to uso the roveniblc main vulve by lllso replacing the lower valve plate with 1ho 1997 model.
~dZ O: I
A•49
~r-A-50 fZ A-51
9.4
REV. 4-99
IMuall■r Ca.) MUELLER® SUPER CENTURION®
FIRE HYDRANT
D Super Centurion 250™ 3-way catalog numbers
(approved to UL 2621 FM 1120/1130, ANSI/A WW A CS02 Standards)-·
A-4214-1/2" main vnlve opening three way (two hose nozzles 1:md one pumper nozzle)
A-423 5-1/4" m.iin valve opening three way (two hose noz.zles and one pumper nozzle)
Super Centurion 200TM 2-way catalo.11 numbers
(approved to ANSI/AWWA C502 Standards)-·
A-420 4-1/2" main valve opening two way (two hose nozzles)
A-422 5-1/4" main valve opening two way (two hose nozzles)
A-425 5-1/4" main valve opening two way (two pumper nozzles)
Super Centurion 200™ 1-way catalog number
(approved to ANSI/AWWA CS02 Standl\I'd.!1)•-
A-424 4-1/2" main valve opening one way (one pumper nozzle)
D 10 year limited warranty on material and workmanship
0 Meets all applicable parts of ANSI/ A WW A C502 Standard
D Post type dry barrel design
D Dry top design with O-ring sealed oii reservoir
D Traffic foaturo with stainless steel safety stem coupling
D Compression-type main valve closes with pressure for positive seal; it is made of rubber and is conveniently reversible providing a spare for long service llfe (Patent Pending)
D Operating nut available in wide variety of shapes and sizes---cpen left or right
□ Field replaceable hose and pumper nozzles
□ Hose an<l pumper nozzles have large radius, full flow openings for low friction loss
□ Contoured shoe is designed for full flow
D Dual bronze drain valves provide effective barrel drainage
□ 250 psig (1723 kPa) maximum working_ pressure, 500 psig (3447 kPa) static test pressure
for J-way hydrants; 200 psig ( l 379 kPa) maximum working pressure, 400 pslg (2758 kPa) suitic teat pres$ure for 2-way and 1-way hydrants ·
Dimensions
1 ··
tr
Bury, 1'1' (0.4Bm)
minimum: long1I by I'
(152111111) ln1,rv,J1.
Mechanlcal Joint --standard and D-150
Flange
Non•ro1flling
boll deaign••·
M tool need
on b•ck &ide --;;::::~H+--
of boll for
11a,i~r installation
Vertlcal Flange•
* 4" Vertkal shoe available for A-420
ond A-421 hydranta,
MUELLER® SUPER CENTURION®
FIRE HYDRANT
(Muallar Ca.I 9.1
REV.HD
MUELLER SUPER CENTURION 250™ 3•Way Fire Hydrant Features
0 ANTI-FRICTION WASHER---
helps assure easy turning operalion
for the life of the hydrant. •
D HOLD-DOWN NUT---with integral weather seal, Design discourages unauthorized removal
of the hold-down nut or bronze operating nut. Resilient wiper seal be~ween ~old-down nut a~
operating nut prevents water entry to protect operating nut from freezing. Wiper seal _material ts
reslstalll 10 ultra-violet ray deterioration. O·ring seal provides second level of protechon.
□ OIL FILLER PLUG---
permit~ quick check of oil
level. Lets you add oll
without removing bonnet.
seal oil in, water out.
0 STAINLES STEEL
SAFETY STEM COUPLING---
pulls free if hydrant is hit by a vehicle
preventing damage to the stem and main
valve. Coupling wlll not break into pieceA
that could drop into lower bntrel and affec\
valve operation. Top of lower stem is
bnlow lhl lop of \tl1 l11w11r larr~l '" thRI A
tire cunnot depreas the stem and open thi::
main valve. Repair is eney and economlcnl.
0 SAFETY FLANGE---bre11ks cleanly to help
prevent bnrrel damage, yet is strong enough
. to_ withstand normal handling. Allows
economical repak, adding of extension
section, rotation or changing of upper barrel
without digging or water shut-off. ~
0 BRONZE UPPER VALVE PLATE---
conical design for smooth flow.
0 DRAINVALVEFACINGS---
speciolly designed, long-life
facings provide effective sealing.
0 DUCTILE IRON CAP NUT---
retains main valve. Seats against cap
nut gasket to prevent corrosion of stem
threads. Locked in place by a stainless
steel lock wnsher , Mueller HP Epoxy
coated for durability,
0 l50 PSIG---3-way hydrant:
250 psig ( 172.3 kPa) maximum
working ·pressure, _500 psig (3447 kPa)
0 SHOE DESIGNED FOR MAXIMUM FLOW
AND EASY CONNECTION·-·
with its smooth transitional contours, extended neck
and integral nnti-rotation pads, allowing use of
stnndard Lee-head bolts. The inside of the shoe is
covered with MUELLER HP~ Epoxy Coating. This
thermosetting epo11y forms a tough,
corrosion-resistant barrier to chemicals, physical
impact and electrical current8.
0 MEETS OR EXCEEDS···
all applicable requirements of
ANSI/ A WW A CS02 Stnndard
and UL. 246 and FM 1510
specification,.
0 O•RING SEALS AT BONNET,
GROUND, AND SHOE FLANGES--:
for better leak resistance, easier ·
maintenance.
0 SEA.LED 011; RE0ERYOm---O°rln1
seRied to prevent leakage, Provides
positive lubrication of ~tern threads and
bearing surfaces each time the hydrant is
operated, Pilled at the factory.
0 FULL FLOW OPENINGS--
l11tge radius hose and pumper openings
produce low friction Jou. ·
□ FIELD REPLACEABLE HOSE AND
PUMPER NOZZLES---O-ring sealed.
Threaded in place and retained by stainless
steel Jocks. Nozzles are easily replaced.
0 ELECTRO-GALVANIZED BOLTS
AND NUTS---provide corrosion protection.
NON-KINKING CHAINS---
heavy-duty chains are securely attached to
the hydrant. Special chain loop pennies
free turning of the c&p.
0 BRONZE SEAT RING---threaded Into
droin ring and O-ring sealed. Seat ring is
easily removed or Installed from above
ground. Each time main valve is opened or
closed, double drain valves force-flush both
drain valve openings to keep them open for
effective bnrrel draitu1ge, Bronze drain valves
arc integral pnrts of main valve auembly.
0 REVERSIBLE, COMPRESSION-TYPE
MAIN VAL VE ·-·
closes with pressure for positive seal.
Rubber material has long service life, yet
is reversible providing a convenient spare
in place.
Man"'·-"·•ed un"·· --..... ·,ore or the following: U.S. Pater· ,..,A • "1 ~ 1~Q. • QA? ?J~
......................... _9 .. J ...... 8.0_L .1 .. ·.~_N_ ............................... _3 J J ! _i\N 3}~~ .. j.o .. A 7Ad fl S_. }~ .1. WI~~ ....... ~d.8 .Q _:_ .1. .... 1. o.o.z .. .'. 6. 1.·. _I_ nt .............. .
IPS Pressure-Rated
PVC Pipe
A':;. f,..1 [).//..:. I
SOR-1 !20C P:--.1!
!._,~Hl fj I, hf/ PS!i
SPECIFICATIONS DATA
PRODUCT DESCRIPTION
Diamond IPS pressure-rated PVC pipe (2'"
through 12•1 is made of compounds
conforming to moterittl reQuirements of ASTM
02241 In accordance with AS;r'M D1784. Pipe
sizes 12" through 12") are made with an
integral bell to utilize the gasket for sealing,
and meetins 1i~e1.ifiG.tion1 defined in ASTM
F477. .
Diamond IPS pressure-rated PVC pipe meets all
the dimensional, chemical, and physical
requirements as outlined in ASTM 02241.
Potable water pipe carries the mark of NSF,
lntemationsf in accordance with Standard 61.
E\lch male end shall be beveled to fecllitate
joining and reference marked to insure proper
insertion depth. Diamond furnished lubricant is
to be used in the joining process.
Diamond IPS pressure-rated pipe is supplied in
20 foot laying lengths.
l 'd 11 LI 'UN
PROPERTIES OF PVC 12454
Property
PMVSICAL PROPERTIES
ASTM
Specific Gravity
Tensile Strength, psi
Tensile ModulJs, psi
!ZOO Impact Strength,
ft;, lb./in.
Teat
0792
0638
0638
0256
CHEMICAL RESISTANCE
ASTMTEST
93.0% Sulfurlc Acid, 0 5-43
14 Days Flotatlon at
55 + or-2•c
MlnJmum
1.40
7,000
400,000
.65
-0.1 + 5.0 Change In Weight, %
Change In Flex Strength, %
ASTM 011 No. 3, 30 Day
Immersion at 23 • C
-25.0 to + 5.0
Change In Weight, %
Short Form
Specification for Diamond
PVC Water Pipe
-1.0 to 1.0
Diamond PVC Water Pipe shalt be made of
compounds conforming to ASlM 01784 with 11
cell classification of 12454. Diamond PVC
Water Pipe must meet all the dimanaional.
chemical and physic.ti requirements 11s outlined
in ASTM 02241 e.nd will be supplied in 20 foot
t11ying len11ths. Potable water pip11 shall be
manufactured from NSF listed ingredients.
M.·~. DIAMOND ~1,-t~ PLASTICS
CORPORATION
ASTM D2241
IPS Dimension
PVC Water Pipe
Gasketed Joint
Mfg. Nominal •ust Price Outtide Minimum Joints Per Feet Per .. Feet Par
f:!ant Size Per Cft, Diemete< Wall Thickness 13undlCI Bundle Trucklo!!!1
SDR~2 6 PR ·160
215 8,800
88/95 1, 760/1,900 29,280
63 1,260 20,160
36/40 700/800 8,400
400/480 4,840
3,240
SDR-21 PR 200
M 2 .. 2.375 .113 215 4,300 68,800
M 3" 3.600 .167 88/95 1,760/1,900 29,280
MN 4" 4.500 .214 63 1,280
,., MN B" 6,626 .316 35/40 700/800
MN 8" 8.625 .410 20/24 400/480
MN 10" 10.750 .511 12/15 240/300
MN 12" 12.750 .606 9/12 180/240
•u,n Price lnclud• 11 gaskat and lubricant,
Prices ate subject 10 • firm policy ot MPrlce In effect et time of shipment on regular pureh11ses. •
Pouenion ot this pric. page dote not eonstltute an offer to sell.
0 Trarniponation regulations and eauiorneot utilited mev rlld~ m,,amum footage par truckload.
Manufacturing Plant L = Lubbock; M = Macon; N _, Golcoode, Nevede
20,160
8,400
4,840
3,240
1,960
f'', ,,.
......................... _8 ... '.d. ..... 1. I _L ,I .·.0.N ............................... -~ l J ! .0N 3_3,8~ .. ?.o .. A l_d_dfl S_. }N_I_ }.~.I~~ ....... ~d.8 _v _:_ 1 .... 1. O_O_Z_ . .'. 6. I.· .. 1. n_r ............... .
..
TRANSMITTAL COVER PAGE
WARREN COUNTY PCB LANDFILL DETOXIFICATION PROJECT
IT Corp. Project #827062
Submitted By: IT Corporation -200 Horizon Center Boulevard, Trenton, New Jersey 08691
Transmittal Number (chronological sequence): 021
Transmittal Date: 07/12/01
Submittal Register Item Number: 65
Resubmittal: No__K_ Yes __
Specification Section: 02660 3.11, C
Description: Procedure for hot tapping into the water main at SR 1604
Drawing/Detail Number: NI A
Subcontractor/Supplier: NIA
Comments: NI A
Number of Copies Submitted: _5_
Number of Copies to be Returned to Contractor 1
Earth Tech Engineer's Receipt Signature: ____________________ _
Comments:
Receipt Date:
Engineer's Approval
Comments:
Reviewer's Signature
Project Manager's Signature
D A. "Reviewed and approved, no exceptions taken"
D B. "Reviewed and approved with comments
D C. "Revise and Resubmit"
______________ Date ________ _
_______________ Date ________ _
Maintenance of Service Plan describing the proposed sequencing and
procedures to maintain service while connecting to tlie water main at SR 1604.
1. Install the Ford Tapping sleeve (as shown in the attached Figures) around
the existing 6" pipe. Bolt the sleeve to the pipe.
2. Attach the 6" tapping valve (Mueller A-2360 wedge gate with M.J x FL
ends as shown on the attached Figure).
3. Open the gate valve.
4. Attach the tapping unit to the valve. The tapping unit consists of a hole saw
that can be pushed through the open valve to cut a hole in the side of the
water pipe.
5. Perform the hot tap by forcing the hole saw into the 6" water line.
6. When the tapping is complete back-out the hole saw until it clears the valve
throat.
7. Close the gate valve.
8. Disconnect the tapping unit from the valve.
9. Inspect the tap and check for leaks.
10. If no leaks are detected, proceed with the installation of the new line.
Jun 18 01 01:40p Hendrix-Barnhill Ca. Inc. 1252) 752-9401
Specifications
Ford Tapping Sleeves
Style FAST
Ford FAST ~ 31e.-r,,ke lllo .,.,auwork uul ol la,ge p;,»e 1■pe. A QlidO■d galQI su,roun05 1he pjpc 11nd na\ ollly Clllh-the pp■
duri!IV tile cap 11111 al■o provld" pralecllon in -the ~ b1•1c&. Th• 1111,,ve OUll■t ls doOOle welded i111Mde and out
The ■IMY■ Is t:OM1rucleil ol 6'alla 1 H ll'll8 304 5'aln!N• Steel ID t)"Ol,'lde CIJlfOllon protection Wld la eay to hal\dl■. Slccw• -...,.,aorc
rn pipe 11Zn 4• lhl'OUgll 24", ~h llange ou!le1a kom 4' lhroi,gh 12·. l>elalled speci~llons and crillcal·dlmen,iol'S 11• ouUin~ below.
TettPlvg
Wlllw Wotl(s &,k ~·· with standlld square heed. Prope,
u .. oi 1'11!; leatura 111ures
pogllll,e IHI belore taDping.
Boll& ■M Nuts
18-8 Slalnl•ss Steel UNC llueeicle.
~ hftll nuta llnd weltlera •••
lilJo«>earbOft coated to p,-ent 9alling.
Lifter•••
t 8-11 Stalrilu Sleet
provides II h4.avy
boa1ing surface Inf nuts.
Annors
~
lloevy IIIIUIIO lt-8 Type 3!M
Slalnless Stoel Ar,no,a 119 bOndDd
lo ga1~et lo brfctg. the g■p
Ml\'lten1uge.
r --·
I
C
Oullat
11-.!l Slatnlnt s-Sclledul& 10 lor
•• oUl■b. Sdlfdlll■ !I klr aw oudllls
large, than 4•.
Rating
Fl11191
1M Sla,ltu StNI llar,ve 1Wllh rec.,s ID
acapt llandard !Qin; vii--Opti-i
ASTM A3e cllbon sle■I flange may 1111
Ol'Cl■rad. l'1a,,ge coolo,ms to AW-NA C207
Cius D ANSI 150 lb. dri.lng. Bolt lloles
1lr■ddla pipe c11111ar fin~.
804y
11·11 S!llln!Na &181I for IDIIII
conoslon oonllol. 1111 weldll an,
!Ully pastivaled to res1ore
llluikls!. char1ct1ritllc6.
GNMt
Gridded wgin S81'1 compouncled for
Mier s;orw:e. ASTM 02000-SDM
4AMIJ7 Full g■llrtl gtv11 360" pipe
covei-age The outi■, gasl<el is Buna-N
FAST e!Mva Is Nlc:arrim■ndoc! tor
150 PSI worlting preoouni.
FAST Dimensions
L ---------r-........,"""'11.........,~-""\.-.
14'
s
acr. 24' f-1,:;,~-i--::, ,..::.,;!'±:,-+ ~~,-1-,..;:.;;;,,.-1-..;;;,.-+-;~f-:~H='--
·~ -1
AA-4
w11~r.-n1 inn, ar·unr
p.2
Jun 1B 01 0l:40p Hendr-ix-Barnhi 11 Co. Inc. 1252) 752-9401 p.3
Ford Stainless Tapping Sleeve
Style FAST Tapping Sleeve with Stainless Steel or Carbon Steel Flange
To Onllr: Slllect lhl! Calalog SletMI Number IOI Ille Olletr.11 ranga ..id compllm, 1tte Catalog Number by OIIClll'\g Ole Fla,,oe Cade.
Example, Th9 oompfete Catalog Numl)tr !Of a 6" OUClllt fl'Ofl plpg (6,90 0.0.J df1 a ◄' Stainlau Stell Fllllge _IS l'AST-730-◄, The
FAST-7~ wltt, •-range DI 8.80 10 7.00 COulc 11150 be Uled on 6.80 0.0. pipe. Ple■se "" ,Or prtc.& and deli11e,y on pipe 0.0. IIZM
not co.,.,ed by o .. .&!andard range.
4• 4 4A 36
◄ 4A 39
8" ··-·-----· 6 6A
4 o4A .,
8" -e;;. -II
9.30-8.70 • ~.,. .
10.76-11.15 .. .....
10· 11,0S.11."5 e u.
II 8A 72
11.76-12.16 10 '°" 73
·12.75-13.20 49
53
12· 13.10-13.50 ·••·-:;a--
14.00-1•.~ n
12 12A ,ar
15.30-16.70 • ... • Ill\ 74
14" 15.80-16.20 8 8A 93
16.48-16.118 10 10A
12 12A
17."40-17.80 4 4A 7'!
6A 79
HI" 17.76-18.15 8A 100
Ul.80-111.00 10A 105
12A ·r.-i---
4A ri
19.50-19.92 8,\ 81
11· 103
19.80-20.20 -·--.. ,o• 1ue
li)A ™--
20.20-20.60 4A 87 ··M ·--i'
20· 21.20.21.80 M ns
21.M-22.21 10A 1:i!O
12A 158
4A 9:,
23.80--24.20 6A 117
2-4" BA 121
25.80-26.00 10A ,
12A -·197-. Si:w on size FAST lor 1111& t.itl\1111 1, IIOI available: see FTSS.
'·AA...S .,,,, ,.,,,on '" t ,JJnt' ,11111.11\iJII wwi,r.-n, 1nn1 01 -unr .
Jun 18 01 Ol:40p Hendrix-Barnhill Co. Inc. 1252) 752-9401
10.6 411-1211 MUELLER9 A-2360 RESILIENT WEDGE
GATE VALVES WITH M.J. x FL. ENDS
a C&I111Qs iwmber-
A-2H0-1& mcchmcal joinr x ftanced ends (wtth meclllnicll Joint
unauc:mbled """"•nrinl .
A-~11 mccbnlcal jow ll flanged eocb (leM mcdlaniul joilll -ies)
tl SizM-4°,6",8', 10', 12'
a Mom orcxceab all applicable requircmenu or ANSJ/AWWA CS09 St111darcl and i,
cutifled IO ANSI/NSP Ill
U Plugedendclimcnlion, anddrilliq 110mply with ANS( B16:1.class l2S
a M~cbulcaljoillt Clld conapli.el "(lb /.N.~T//.WWA Cl I l Scandanl
0 hoa body with nominAI 10 mils MlJl!Ll.at• Pro-Gad",. Pu.aioa E.~y CoalU int.eriar
1nd C1lcrior _.-AU,
ll !pn~:,, CfflllUII IIIDCtl or Cllif.lCCd■ all 11pplicable requircme.11 of ANSI/AWWA C5'.50
S1ancbrd wl is certified to ANSI/NSF 61
u Iron IWdce, symlllll(riail .t. fully enc:apwlated wllh molded Nbbet;
no expoec:d il'Oll
0 NNHi&illa lltm (NRS)
U Triple O-ring llC-.al Atllfting boll (21ll'PCf "l lowerO-riDKI)
CJ 2• squaro Yl'fCncb ll\lt (optional hAllclwbccl IIVlil:ihle)-ope11 left er open righl
Cl 4'•12' ai?.ci-~0 ~ (ln3 kPl)D11Xim11m Vf(irlci.q piiessure,
S()() pug ( 3447 kl',■) static lc.1l (IIU"llrC
Q UL Unld;PM Appn,,q,d-200 plig (1379 kl'a)
(>paoas
Ser paca 10.611.11111 10.6' tor lllOre iaforllllllion on .Rtllllftlt Weclp Galt V.l\'e eptloat
Q Pu1ition indice1<n □ Slailllen steel wt.cllll:r.!: Type 304, '"fype 316
□ AS'IM B98-C66J OMf04 stem 0 Handwbc:et
Re&lllant wedge gate valve parts
Clltala P.t ptlon llllerlll Material atandard
0-1<1 ___ B,~11 ,ur ........ c..i-.&lcd A.'l'l'M AlO'JOndeB.Zilttcl'IMN
q;i!_. Null c.t.an Sletl AS'JM A307 Cade B, ZJiic Plalld
D2000
9-.~. H .u=l.:m.:Jl:c._ ___ -1
~!JS ""-'8=62;;-------t
~-
Cl:~<!-~==--=
0·20I
G-209 Walp, -~~ <n~9.••
0•2lt
c•i-• AS1MAl26a..B
___ (plroa • A!l)tA126g.Jl
R11bkr ASTM 1>2000
• Pully ..,.,...tared Ill molded Nlll>aT wlm na inlft apotcd
•• l'rcvlo111 10 1999 tlll3I pam oa 4•-12,· nlves "l:RI deal pied "'idu l,IIStet l1151ud of u O•ri"g .iad
""111 addilin,,aJ halu. c..fira\ lhc 'lYPC af ocal •""" anl<ring a tep~I psllec or 0-!lq.
,,. . Wn,,nn ,,.,,
-
A-2360-16
MJ,111:,~
shippadllll.lollcmlllcd
... .... .. ., .... ... -•• --
0.11
-■,Ill" ...
,._
p.4
•
•
•