HomeMy WebLinkAboutNCD980602163_19980601_Warren County PCB Landfill_SERB C_PCB Landfill Monthly Inspection-OCR:~-. WAYN.E McDEVlTT
-~\SECRETARY .· •'.' ,:,._.:
'-~-f_: :-~ ·: ·:
-DIRECTOR
. ·,:~ ·: :-.-. \,;• ,' ·
. ·•·-:.: ........ :
..,h• •~
·.,.,;
,,,
NORTH CAROLINA DEPARTMENT OF
ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WASTE MANAGEMENT
June 1, 1998
MEMORANDUM
TO:
FROM:
RE:
Mr. Carlton Myrick, Deputy Secretary
Department of Administration
Larry Rose
Field Operations Branch
Solid Waste Section
PCB Landfill Monthly Inspection
The PCB Landfill Monthly Report for the May inspection is enclosed for your
review. The landfill continues to be in good condition.
Water and leachate levels were measured at their respective locations. The
leachate sump was pumped and samples were collected for pH and specific
conductance measurements
The first required semi-annual sampling event for 1998 was done May 18 and 19 .
A select group of monitoring wells and all surface water and sediment locations
were sampled for the presence of PCBs. The_ analyses will be done by the State
Laboratory of Public Health.·
If you have any questions about the PCB Landfill, please call this office at (919)
733-0692.
cc: Bill Meyer
Enclosure
401 OBERLIN ROAD, SUITE 150, RALEIGH , NC 27605
PHONE 919-733-4996 FAX 919-715-3605
AN EQUAL OPPORTUNITY/ AFFIRMATIVE ACTION EMPLOYER· 50% RECYCLE0/1 0o/o POST-CONSUMER PAPER
.CI...D LJ-U'I.Ul: .l.l.JL .1'.1U.l.1.l..1.1J.J..l. =-..T.t\...l. \ '--V._,..L • 7
pumping Times
Pumping Volume
~rrigation Data
Irrigation Times
Irrigating Volume
1~u~ ~Frwe-d
(JH c 1,/0 -c;,s,
11 UrAJ _, /,ZO/ ~<tq