Loading...
HomeMy WebLinkAboutNCD980602163_19980121_Warren County PCB Landfill_SERB C_Re Research at PCB Landfill-OCRJanuary 21, 1998 MEMORANDUM To: From: Re: Bill Meyer I _,-· Matt Gamble Jl /~ Research at PCB Landfill Warren County Dear Bill, I have mapped out the next couple of steps for my work at the PCB landfill. These steps include modeling of the landfill, a field trip, and some field surveys. First, we will model the landfill itself. Dave Evans and I are currently working to find a good way to numerically represent the system. As you may know from Ed Mussier' s work, with few exceptions leachate level within the landfill is directly proportional to barometric pressure. The model should provide answers to the anomalous readings and offer explanations ( other than leakage) for the water level fluctuations. When completed, the model will provide our most thorough understanding of the landfill to date. I am leading a field trip to the site on Friday, February 13, 1997. The trip will consist of a short presentation and site walk over for my advisor and some other students. The purpose of the visit is to familiarize Dr. Evans with the site and to select wells to be included in several aquifer pumping tests. In addition, we will measure the magnetic field at several locations. If there is sufficient variability in the magnetic field at the site, I will complete a formal magnetometer survey in the future. I will update you again toward the end of February. If you have any questions before then, please don't hesitate to ask. Matt