HomeMy WebLinkAboutNCD980602163_19971103_Warren County PCB Landfill_SERB C_Semi-Annual Testing at Landfill-OCRState of North Carolina
Department of Environment,
Health and Natural Resources
Division of Waste Management
James B. Hunt, Jr., Governor
Wayne McDevitt, Secretary
William L. Meyer, Director
MEMORANDUM:
TO:
FROM: MIKE KELL
SUBJECT:
November 3, 1997
As you are aware, the Division of Waste Management is required by the EPA as a
condition of the permit for the PCB landfill to conduct semi-annual monitoring of the landfill.
The fir.st part of the testing for this year was done during the Site Investigation Work which
started (on site) in February.
We will be sending a crew out to the landfill within the next two to three weeks to do the
second round of sampling. I am enclosing the sampling locations we plan to use, and you will
note that we have added additional points, specifically six of the monitoring wells installed this
spring which are closest to the landfill.
The testing requirement calls for PCB's, specific conductance, pH and temperature.
Copy: Bill Meyer
Henry Lancaster
Larry Rose
P.O. Box 29603, Raleigh, North Carolina 27611-9603 Telephone 919-733-4996
An Equal Opportunity Affirmative Action Employer 50% Recycled / 10% Post-Consumer Paper
Sampling Locations -PCB Landfill November 1997 Sampling Event
WELLS SW SEDIMENT
1 RCUS RCUS
lA RCDS RCDS
2 UTUS UTUS
3 UTDS UTDS
5(deep)
?(shallow)
11
12
RCUS = Richneck Creek Upstream
RCDS = Richneck Creek Downstream
UTUS = Unnamed Tributary Upstream
UTDS = Unnamed Tributary Downstream
LEACHATE
INFLUENT
EFFLUENT
.:. --· .... _
.· ..
~o
0~ □'□ '