Loading...
HomeMy WebLinkAboutNCD980602163_19960425_Warren County PCB Landfill_SERB C_Project Master Planning-OCRIMPORT ANT REASONS FOR CHANGING CURRENT STRATEGY • Field Testing of Small Amounts of Site \Vaste will not Provide Information that is more Useful than Bench-Scale Testing • Costs of T\\'O Field Tests \Vould be Extremely High • It is Necessary to Examine Other Detoxification Technologies • Current Approach Would not Provide Sufficient Detailed Information • A Much Stronger Case for Funding can be Made by Spending Money on More Thorough Site Investigation and Remedy Design KEY STEPS OF RECOMMENDED ALTERNATIVE STRATEGY • Detailed Evaluation of Detoxification Technologies and Vendors • Initiate Site Investigation • Design Soil/Waste Removal Plan/Select Vendor • Issue Feasibility Study Report • Invite Vendors to Conduct Bench-Scale Treatability Tests • Science Advisors Evaluate Test Results and Select/Rank Vendors KEY STEPS OF RECOMMENDED ALTERNATIVE STRATEGY (Continued) • Finalize Site Investigation Report • Working Group Meeting with Highest Ranked Vendors • Best Technology Vendor Selected/Pre-Qualified for Actual Cleanup • Selected Vendor -is Hired as Design Contractor (Under Current Funding) • Remedy Selection and Remedial Design Report • Report used as the Basis for Working Group/DEHNR formally Proposing the Landfill Detoxification Project to the State Legislature to Obtain Funding SITE INVESTIGATION GOALS • Establish Condition of Liner • Bedrock Condition and Topography • Transmissivity of Weathered Rock Zone • Direction of Ground'\\·ater Flo"' • Identification of Contaminant Plume • Types and Amounts of Contaminated Media Reguiring Clean-Up SITE INVESTIGATION ACTIVITIES • Collection of Samples to Conform with Permit Requirements • Analyze Existing Data • Develop and Implement Field Sampling and Testing Plan • Non-Intrusive Testing (Geophysics) • Soil Borings • Installation of Additional Monitoring Wells • Collection of Additional Surface Water and Sediment Samples MASTER PLAN PURPOSE • Guidance Document • Road Map • Operational Document • Stand Alone PLAN CONTENTS • Introduction and Background • Project Goals and Objectives • Approach for Evaluating Technologies and Selecting Remedy • Approach for Performing Site Investigation • Legislative Funding • Project Schedule PCB LANDFILL Thf PACT ASSESSMENT AND DETOXIFICATION MASTER PLAN PRELThlINARY TABLE OF CONTENTS 1.0 INTRODUCTION AND BACKGROUND 1.1 Site History 1.2 The Working Group 1.3 The Role of the State 1.4 The Role of the Science Advisors 2.0 PROJECT GOALS AND OBJECTIVES 2.1 Mission Statement 2.1. l Impact Assessment 2.1.2 Detoxification 2.1.3 Community Involvement 21.4 Responsibility of the Working Group 3.0 DEVELOPMENT OF FEASIBILITY AND REMEDY SELECTION REPORT 3.1 Detoxification Technology and Vendor Evaluation 3 .1.1 Review of Past and Current Approach 3 .1.2 Comparative Analysis 3.1.3 Recommendations 3.1 4 Work Plan for Treatability Testing 3 .2 Landfill Soil/Waste Removal Plan 3.2. l Review of Current Approach 3.2.2 Soil/Waste Removal and Vendor Selection Procedure 3 .2.3 Testing Requirements 3. 3 T reatability Testing 3 .3. I Bench Scale Testing Results 3.3.2 Analysis ofData 3.3.3 Recommendations 3 .4 Remedy Selection 3. 4. I Effectiveness/Performance 3 .4.2 Safety/Environmental Impacts 3.4.3 Cost 3.4.4 Comparative Analysis and Recommendations 3.4.5 Role and Responsibility of the Working Group 3.5 Procedure for Establishment of Remedial Goals 3.5.1 Evaluation ofTest Results 3.5.2 Ranking Procedure 3. 5. 3 Performance Standards 3.5.4 Responsibility ofWorking Group 3. 6 Procedure for Selecting and Awarding Detoxification Design Contract 95-017.00 -1- MPTOC.DOC 3.6. l Role of Science Advisors 3.6.2 Role of the Working Group 3.6.3 Role of the State 4 O DEVELOPMENT OF SITE INVESTIGATION REPORT 4. l Site Investigation 4.1. l Review of Past Sampling and Analysis 4.1.2 Field Sampling and Testing Plan 4.2 Landfill Integrity 4.2. l Leachate Collection System 4.2.2 Liner Condition 4.2.3 Water in Landfill 4.3 Scope of Off-Site Impact 4.3.1 Soil 4.3 .2 Groundwater 4.3.3 Surface Water 4.3.4 Sediment 4.3 5 Air 4.4 Contaminant/Waste Releases 4.4 1 Fate and Transport 4. 5 Estimates of Volumes Requiring Remediation 5.0 REMEDIAL DESIGN 5. I Roles of Technology Vendor, Science Advisors/ST A TE 5.2 Site Layout and Logistics 5. 3 Construction Phasing 5.4 Health and Safety Concerns 5.5 Impact Monitoring 5.6 Detoxification Field Pilot Test 5. 7 Preliminary Design and Operation Plan 5. 8 Clean-up Cost Estimates 6.0 LEGISLATIVE FUNDING 6.1 Briefing Document 6.2 Presentation Procedure and Materials 6.2.1 Role of Working Group 6.2.2 Role of Science Advisors 6.2 .3 Role of the State 7.0 PROJECT SCHEDULE 95-017.00 MPTOC.OOC -2- PCB Landfill Master Plan Implementation Schedule MONTHLY ACTMTIESfTARns=T nAT~ ····--· -···-u--~ 1--·· !Jul !Aug 1sep !Oct !Nov 10ec 96 IJan-97 IF•b IM.ar !Apr • > J>>>>>>> -----, 1. Ma:,ter Plan Development 2. Detox. Tech & Vendor Evaluation 3. SHelnvestlgatton 4. Soll/Waste Removal 5. Treateblllty Testing 6. Feasiblllty Study 7. Remedial Goel:, 8. Vendor Screening & Awarding Of Detoxification Contract 9. SHe lnve:,tigation Report 10. Remedial Design/Remedy Salee. Rpt. 11. 0 Report Submitted to Working GrouplState ~ ~~· ~ \_ ~-~ .~ ~~~ ~;~ ~~~L "[I Technical Memorandum (Procedure Document) Submitted To Working GroupfState 0 Technical Specifications Submitted To Working GroupfState PLAN1 XlS