[External] APPROVAL -Transfer Station Financial Assurance Cost Estimate - 9234-
TRANSFER-2012 Wake Transfer Station
Attachments:
Wake FA Estimate Sept 2022.pdf
Follow Up Flag:
Follow up
Flag Status:
Flagged
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
D,E Q`�
_A •
ND. TF CAF.CLIN.4
6/19/2023
John Pfleger
Regional Environmental Compliance Manager
GFL Environmental Inc.
RE: Approved Cost Estimate
Transfer Station - Wake Transfer Station
Wake County
Dear John Pfleger,
A review of the Transfer Station Cost Estimate for 9234-TRANSFER-2012, Wake Transfer Station submitted on 5/17/2023
has been completed. The estimate meets the site -specific operations and appears to be appropriate. The Division of
Waste Management - Solid Waste Section has reviewed and approved the provided cost estimate required for
establishing financial assurance for a transfer station.
Initial Review Comments: 20230517 - The Section is in receipt of the electronic submittal for Wake Transfer Station.
Permitting Engineer Review Comments: 20230619 -Approving based on the assumption that item 2.3 of the cost
estimate, $3600 will cover wash down and leachate collection system decommission and disposal. Please include
specific amounts for these in your upcoming submittal. Detailed costs are included in the closure plan. The cost of
removal of waste based on two days of waste has been approved by Management.
This approval letter is for your use in establishing an appropriate financial assurance mechanism. The below are the
provided legal entity, facility name via onsite signage, assigned permit number, and approved cost estimate in 2022-year
dollars.
Owner Name: GFL Environmental Inc.
Facility Name: Wake Transfer Station
Permit Number: 9234-TRANSFER-2012
Approved Cost Estimate = $ 49971.00
At this time, you may work with your Corporate Finance Officer and establish the appropriate financial assurance
mechanism(s). GFL Environmental Inc. has 60 calendar days from the date of this approval to establish required
financial assurance mechanisms. Financial Assurance mechanism templates, NC Rules for financial assurance, and
inflation multipliers are among the pertinent information you can find at the Section's Financial Assurance website:
http://deq.nc.gov/swsfa. Should you or your Finance Department require any assistance, feel free to reach out to Sarah
Moutos at 919-707-8287 or Sarah.Moutos@ncdenr.gov.
Sincerely,
Sarah Moutos
Environmental Program Consultant
Division of Waste Management - Solid Waste Section
CC: Sherri Stanley
Diana Yitbarek
Lou J. Krasuski
SMITH GARDNER
Wake Transfer Station NC Solid Waste Permit No. 92-34)
Engineer's Closure Construction Cost Estimate
OATS: 21-Jun-22
Item
No.
Item
Description
Unit
Contractor
Comments
Quantity Unit Price Total Price
Facility Area (HorizontaIPlan) ---- > AC 4
1.0
Pre -Remedial Response
Subtotal
$2,000.00
1.1
Coordination, Contracts, and Management
AC
4
$500.00
$2,000.00
2.0
Remedial Response Activities
$38,928.00
2.1
Surveys and Layout
AC
4
$350.00
$1,400.00
S+G Estimate
2.2
Mobilization, Demobilization, and Project Closeout
AC
4
$500.00
$2,000.00
S+G Estimate
2.3
Wash Down R Cleanup of the Recover Area & Leachate Collection System
BY
2
$1,800.00
$3,600.00
Assume single work crew per day.
2.4
Fencinq & Concrete Barrier Protection
LS
1
$5,000.00
$5,000.00
Assume close process area and place concrete
barriers across access road.
2.5
Excess Disposal
TN
320
$46.00
$14,720.00
Assumes a waste volume fortwo (2) days at 160
tons/day of ICED and disposal atthe Sampson County
Landfill.
2.6
Excess Recvc[in.Q & Processinq Material
TN
48
$46.00
$2,208.00
Assumes maximum storage volume of recyclables
materials for two (2)trailers and disposal at Sampson
County Landfill.
2.7
Erosion RSediment Control (grading, silt fence, maintenance, etc.)
AC
4
$750.00
$3,000.00
S+GEstimate
2.8
Reve etation
AC
4
$1,750.00
$7,000.00
S+G Estimate
3.03.1
Certification, a Deed Notation
$4,500.00
En ineerin and Re ortin
LS
1
$3,000.00
$3,000.00
S+G Estimate
3.1QualityAssurance,
3 22
Surve in and Deed Notation
LS
1
$1,500.00
$1,500.00
S+G Estimate
Remedial Response Estimate -----> $45,428 (2022$)
10% Contingency -----> $4,543 (2022$)
Total Estimate ----> $49,971 (2022$) (See Notes 1 & 2)
Notes:
1. All costs are presented in current dollars and should be increased at an inflation rate prescribed bythe NCDENR Division of Waste Management per http://Portal.ncdenr.org/web/wm/sw/financia[assurance
if additional review is not performed annually.
2. This ESTIMATE has been prepared forfinancial assurance purposes only and shall not he considered a replacement for an actual bid from a licensed contractor and is considered acceptable
within a+/- lovo of the Total Estimate value.
_ Denotes values calculated in spreadsheet.