Loading...
HomeMy WebLinkAbout4122T_WI_BurntPoplar_2023TS_FAApproval_FID1809871_20230619Moutos, Sarah From: Sent: To: Cc: Subject: Attachments: Follow Up Flag: Flag Status: laserfiche.ncdenr.gov@mccicloud.io Monday, June 19, 2023 4:40 PM john.pfleger@gflenv.com; lou@smithgardnerinc.com Moutos, Sarah; Stanley, Sherri; Yitbarek, Diana; lou@smithgardnerinc.com [External] APPROVAL -Transfer Station Financial Assurance Cost Estimate - 4122T- TRANSFER-2012 Burnt Poplar Transfer Station FA Estimate Oct2022.pdf Follow up Flagged CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. D,E Q`� _A • ND. TF CAF.CLIN.4 6/19/2023 John Pfleger Regional Environmental Compliance Manager Waste Industries, LLC, subsidiary of GFL RE: Approved Cost Estimate Transfer Station - Burnt Poplar Transfer Station Guilford County Dear John Pfleger, A review of the Transfer Station Cost Estimate for 4122T-TRANSFER-2012, Burnt Poplar Transfer Station submitted on 5/17/2023 has been completed. The estimate meets the site -specific operations and appears to be appropriate. The Division of Waste Management - Solid Waste Section has reviewed and approved the provided cost estimate required for establishing financial assurance for a transfer station. Initial Review Comments: 20230517 - The Section is in receipt of the electronic submittal for Burnt Poplar TS. Permitting Engineer Review Comments: 20230619 -Approving based on the assumption that item 2.3 of the cost estimate, $3600 will cover wash down and leachate collection system decommission and disposal. Please include specific amounts for these in your upcoming submittal. Detailed costs are included in the closure plan. The cost of removal of waste based on two days of waste has been approved by Management. This approval letter is for your use in establishing an appropriate financial assurance mechanism. The below are the provided legal entity, facility name via onsite signage, assigned permit number, and approved cost estimate in 2022-year dollars. Owner Name: Waste Industries, LLC, subsidiary of GFL Facility Name: Burnt Poplar Transfer Station Permit Number: 4122T-TRANSFER-2012 Approved Cost Estimate = $ 102058.00 At this time, you may work with your Corporate Finance Officer and establish the appropriate financial assurance mechanism(s). Waste Industries, LLC, subsidiary of GFL has 60 calendar days from the date of this approval to establish required financial assurance mechanisms. Financial Assurance mechanism templates, NC Rules for financial assurance, and inflation multipliers are among the pertinent information you can find at the Section's Financial Assurance website: http://deq.nc.gov/swsfa. Should you or your Finance Department require any assistance, feel free to reach out to Sarah Moutos at 919-707-8287 or Sarah.Moutos@ncdenr.gov. Sincerely, Sarah Moutos Environmental Program Consultant Division of Waste Management - Solid Waste Section CC: Sherri Stanley Diana Yitbarek Lou J. Krasuski SMITH GARDNER WI Burnt PoplatTransfer Station, LLC NC Solid Waste Permit No.41-22T) Engineer's Closure Construction Cast Estimate BATE: 26-Oct-22 BY: LJ K tem No. Item Description Unit Contractor Comments I Luantity Unit Price Total Price 1.0 Facility Area (HorizontaL Plan) ---- > AC fi.8 Pre -Remedial Response Subtotal $3,400.00 1.1 Coordination, Contracts, and Management AC 7 $500.00 $3,400.00 2.0 Remedial Response Activities $84,880.00 2.1 Surveys and Layout AC 7 $350.00 $2,380.00 S+G Estimate 2.2 Mobilization,Demobilization, and Project Closeout AC 7 $500.00 $3,400.00 S+GEstimate 2.3 Wash Down 6 Cleanup of the Recovery Area 6 Leachate Collection System OY 2 $1,B00.00 $3,600.00 Assume single work crew per day. (See Note 3) 2.4 Fencing 6 Concrete Barrier Protection LS 1 $5,000.00 $5,000.00 Assume close process area and place concrete barriers across access road. 2.5 Excess Disposal TN 800 $65.00 $52,000.00 Assumes a waste volume for two (2) days at 400 tons/day of MSW and C60 and disposal at the City of High Point Landfill. 2.6 Excess Rec clin 6 Processing Material CY 300 $5.00 $1,500.00 Assumes maximum storage volume of recyclables materials forthree (3) trailers and disposal at City of High Point Landfill. 2.7 Erosion 6Sediment Control (grading, silt fence, maintenance, etc.) AC 7 $750.00 $5,100.00 S+GEstimate 2.8 Reve etation AC 7 $1,750.00 $11,900.00 S+G Estimate 3.0 Quality Assurance, Certification, 6 Deed Notation $4,500.00 3.1 Engineering and Reporting LS 1 $3,000.00 $3,000.00 S+G Estimate 3.2 JSurveying and Deed Notation LS 1 $1,500.00 $1,500.00 S+G Estimate Remedial Response Estimate -----> $92,780 (2022$) 10% Contingency ----- > $9,278 (2022$) TotalEstimate ----> $102,058 (2022$) (See Notes 16 2) Notes: 1. All costs are presented in current dollars and should be increased at an inflation rate prescribed by the NCDENR Division of Waste Management per http://portal.ncdenr.org/web/wm/sw/financialassurance if additional review is not performed annually. 2. This ESTIMATE has been prepared forfinancial assurance purposes only and shall not be considered a replacementfor an actual bid from a licensed contractor and is considered acceptable within a +/-10% of the Total Estimate value. 3. Costfor wash down and cleanup of leachate collection system includes leachate disposal and system abandonment. _ Denotes values calculated in spreadsheet.