Loading...
HomeMy WebLinkAboutNCD980602163_19811103_Warren County PCB Landfill_SERB C_Draft PCB Sampling MOA between the State of NC and US-EPA-OCR' ' • PCB SA.1\f PL ING MEMORANDUM OF UNDERSTANDING BETWEEN THE STATE OF NORTH CAROLINA AND THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION IV . 11/3/81 DRAFT I. BACKGROUND STATEMENT OF PROBLEM Between June, 1978 and August, 1978, several thousand gallons of industrial liquid waste material identified as polychlorinated biphenyl (PCB) were deliberately discharged along 210 miles of highway shoulders in 14 North Carolina counties. The PCB waste sites are centered around Raleigh, where the material was distributed for disposal. This area includes a variety of geological, biological, topographical, peological, and environmental settings that may offer differing degree.s of contamination through migration. See also Environmental Impact Statement Historic Resume Attachment "A", whi_ch by reference is made a part of this MOU. II. GENERAL OBJECTIVES OF PROJECT A statistical study has been designed to redefine the physical limits of the PCB laced oil and associated contaminated soil along 210 miles of North Carolina roadway •. Specifically, the investigation is .designed to identify any later-al and vertical migration of PCB contaminants as well as any-dilutions or .reconcentrations that may have occurred due to natural processes. III. TO ACCOMPLISH THESE OBJECTIVES, THE STATE AND EPA AGREE AFTER EXECUTION OF THIS MEMORANDUM OF 'UNDERSTANDING THAT: A. EPA will fund the required sampling program through Federal contracting authority. The major contracting mechaniEm to be used will be the EPA Field Investigation Team (FIT) from the firm of Ecology and Environment, Inc. EPA will be directly responsible for supervision of the FIT Team and will consult with the appropriate State official, as specified in this Memorandum of Understanding, before major decisions are made. B. Both the State and EPA agree to the sampling program scope of work as shown in Attachment "B" to this Memorandum of Understanding. All analytical work will be performed by a laboratory(s) approved by EPA . and reviewed by the State. The EPA, Region IV, Environmental Services Division will assume primary responsibility for quality control of all analytical data, including protocols for sample collecting and shipping. The State may perform such additional quality assurances as it deems advisable, but at its own expense. The State will be responsible for securing proper site access permits that may be required for both public and private sampling sites. c. Both the State and EPA agree to the Community Relations Program as outlined in the Community Relations Plan in Attachment "C" to this Memorandum of Understanding which by reference is made a part of this MOU. News media contacts will be managed by the State and EPA representatives named in Attachment "C". D. In the event the National Response Team (NRT} or Regional Response Team (RRT) determi nes that an environmenta l emergency exists, the NRT or RRT in fulfilling their responsibilities may temporarily suspend this Memorandum of Understanding. The NRT or RRT will assume primary responsibility for emergency response and mitigation and will determine when the emergency is over~ Recovery of any funds expended by the NRT and RRT is not pre-empted by this Memorandum of Understanding. E. Termination of this Agreement may occur in any of the following ways: 1. Termination due to conflicts that cannot be resolved between parties to the Memorandum within thirty (30) days. 2. Substantial non-compliance by any party with terms of the Agreement. 3. Mutual termination after completion of the report specified in paragraph A herein. F. This Agreement may be modified by mutual consent of the parties to delete, augment, or revise any of the provisions herein. IV. NORTH CAROLINA DECISION MAKING Sampling program inquiries should go to the State Coordinator, Tom Karnoski (see chart). Major program decisions will be made by 0. W. · Strickland, Head of Solid and Hazardous Waste Management Branch. Technical decisions will be cleared by Tom Karnoski through Bill Meyer and O. W. Strickland at the Branch level. Technical assistance on the State/EPA MOU will be provided by Emil Breckling, Environmental Planner with the Branch. Decisions involving Secretary Morrow or Governor Hunt will be cleared by o. W. Strickland through the proper official {s) to Secretary Morrow. Community relations/newsrelease inquiries should go to Bryant Haskins, Public Affairs Coordinator for the hazardous waste management program. Bryant will be responsible for coordinating with.Gary Pearce, the Governor's press Secretary, and with EPA media contact person on the release of information. 2 * ( 919) 733-5811 III. STATE PCB SA~PLING DECISION MAKING CHART Governor James B. Hunt Governor's Press Secretary * Gary Pearce (919) 733-5612 _ * Sarah T. Morrow Secretarial Dept. ( 919) 733-4534 --of Human Resources * Division Level (919) 733-4534 Proper Official Public Information * Bryant Haskins (919) 733-4471 ~ r-----1------- (919) 733-2178 * o. W. Strickland Haz ardous Waste William r-l~_r * Tom Karnoski (919)-733-2178 3 Director of Health Services Dr. Ron Levine Environmental Health Jim Stamey Solid and Hazardous Waste Mgt. Branch * Emil Breckling V. STATE AGENCIES PCB PROJECT RESPONSIBILITIES (See Chart) Department of Human Resources Environmental Health Section -Solid and Hazardous Waste Management Branch The Solid and .Hazardous Waste Management Branch is responsible for State coordination of the sampling project. State Coordinator Tom Karnoski will be responsible for coordination as indicated in the project decision making chart . Department of Justice The Department of Justice provides legal support and is responsible for legal action as a result of the PCB spill. Department of Crime Control and Public Safety Coorqj.n~.:t_~_s ~:ll l_aw enforcement and traffic control measures. Provides any services or logistical support as may be directed. Department of Transportation Erects and maintains signs, lights, barricades, or other traffic control devices as deemed appropriate to maintain or control traffic along affected routes during sampling. VI. PARTICIPATION IN DATA: COLLECTION, ANALYSIS, AND INTERPRETATION EPA agrees to share with the state all information and data collected relevant to this project. North Carolina will be provided with multiple hard .copies. of all records, written observations, documents, analysis, etc. that are generated by and are directly related to the . sampling prog·ram. North Carolina will accept all data (in finaf form) generated by the sampling program to be factual. Final conclusions, recommendations, interpretations, etc., based on the factual data, will be reviewed by EPA and North Carolina, and will be publicly released according to the community relations plan. North Carolina may provide representatives to be present during all procedures and processes of the sampling program. These representatives will me-et the following requirements: 1. Have prior approval from the North Carolina Solid and Hazardous Waste Management Branch. 2. Will act only as observers. 4 CJ1 [ Dept. of Justice AG Rufus Edmisten 733 l 3377 Legal -nill Raney 733-5725 Robert '-Reilly 733-4618 IV. STATE AGENCIES PROJEC_T RESPONSIBILITIES Governor James B. Hunt I Dept. of Natural Resources and Community Devel. Secretary -Joseph , • Grimsley 733 I 4984 Environmental '-Management Bob Helms 733-7015 I I Dept. of Human Resources Secretary -~arah T. Morrow 733 I 4534 Public Information Bryant:Haskins· 1-733-4471 Solid and.Hazar-dous Waste Manage-,_ment Branch O. w. Strickland Tom l}arnoski 733-2178 I Dept. of Crime Control and Public Safety Secretary -Burley Mitchell 733 I 2126 Assistant Secretary of 1-Public Safety Dave Kelly 733-2126 Emergency L-Management Division Jim Buffaloe 733-3867 L Dept. of Transporta-tion Secretarr 7331 2520 Head of Equipme ._ Branch M. C. Adams 73j-233 3. Will not hinder or obstruct the sampling program as outlined in the work plan. 4. · Will not release any information except as outlined in the community relations plan. VII. ACCESS TO STATE AND PRIVATELY OWNED LAND Permission to go on property and collect soil samples from sampling points will be -received in written form . As outlined in the work ·plan; an initial survey will locate all sample points in the field. At this time the appropriate landowners (North Carolina Department . of Transportation or private individuals) will be identified so that written permission to enter the property can be secured from them. In the event a particular private landowner cannot be fourid or actually denies entry to his property, an attempt will be made to secure a warrant from the local magistrate. VIII. QA/QC EPA will conduct a quality assurance/quality control program on · random selection of soil samples collected by their contractor.. North Carolina will b·e provided with results of this program and will be notified immediately of any discrepancies discovered or implied. IX. EMER.GENCY SITUTATIONS The North Carolina Solid and Hazardous Waste Management Branch will provide individuals responsible for 24-hour call should unexpected or emergency situtations arise. The designees are: Thomas C. Karnoski Bryant Haskins Emil Breckling \ STATE OF NORTH CAROLINA Department of Human Resources By: Date: 6 Home Phone (919) 851-1517 (919) 787-7841 ( 919) 467-6571 Office Phone (919) 733-2178 (919) 733-4471 (919) 733-2178 U.S. ENVIRONMENTAL PROTECTION AGENCY REGION IV By: Date: Attachment "A" Environmental Impact Statement Historical Resume The first deliberate discharge of what was later identified as PCll liquid materials took place the last week •)f June, 1978, on remote roads of the Fort Bragg Military Reservat:i.on. The discharge was investigated by Fort. Bragg persc.;nnel who secured liquid saraples of the material, The next discharge occurred on July 27 and July 29 on -L-he roadway shoulders of NC 58. north of Centerville in Warren County. This discharge was reported hy private citizens to the N. C. Highway Patrol, who alerted the Division of Health Services, Water Supply Branch. Water Supply Branch personnel notified Division of Environmental Management, Water Quality Program personnel in the Raleigh Field Office of the spills. Raleigh Field Office personnel investigated the spill on July 31 as an oil spill and on finding no oil ponded or evidence in surface waters, returned to their office without taking further action. On August 2, the Water Quality Operations Branch, Division of Environmental Management, received a call from a Johnston County farmer concerning a spill on NC 210 in front of his farm. Because\of the -:lescription of the odor and the effects on field workers being reported, a staff chemist was immediately dispatched to investigate the spill and to take kppropriate samples. Grass, soil, and water samples were hand delivered to the Division of Environmental Manageme:nt Laboral01·y for analysis later that afternoon, Au~ust 2. The same chemist who investigated the Johnston County spill encountered [a similar spill near Snow Camp, North Carolina on SR 1004, Alamance County, while returning to his home. A sample was taken from the spill area and hand deli ve~ed to the laboratory the foll01'1ing morning for analysis. On August 4, the Laboratol'y's Analytical Section Chief notified the Water Quality Operations Branch that the material spilled jn Johnston County appeared to be Aroclor-1260, a Polychlorinated Biphenyl (PCB) substance. The Water Quality Operations Branch immediately notified the Chief of the Environmental Protection Acency, Region IV, Emergency Resµonse Branch, of the Laboratory's findings. After briefing the Director, Division of Environmental Management, a meeting was called with representatives of the Attorney qeneral's Office, the Department of Crime Control and Public Safety, and Public Information representatives of the Secretary of the Department of Natural Resources and Community Development. A notification to all law enforcement officials was 1repared and sent over the Police Information Network system during the late evenin hours of August 4. A news release was prepared and sent to local newspapers for publication in the Saturday morning newspaper. The same day, the laboratoiry confirmed material discharged in Alamance and Chatham Counties was Aroclor-1260, the same form of PCB material found in Johnston and Harnett Counties. Also on August 4, the N. C. Highway Patrol delivered soil samples obtained from Chatham County to EPA. The results of the EPA laboratory analysis were reported to SBI on August 8. On August 5, Water Quality Operations Branch met with concerned citizens in Johnston County, investigated the spill areas in Johnston and Harne tt Counties, and conducted a door-to-door contact with people residing along NC 210. Because of concern by some residents along NC 210, the Division of Highways, Department of Transportation was requested to cover the spill with a layer of sand in order to suppress the noxious odors present. This was completed in late afternoon August 5 and continued on August 6. On August 6, the Raleigh Regiona l Office was directed to secure samples of the spill area in Warren County to determine if similar material had been deposited along NC 58. Because of the publicity being given by the newspaper and TV to the spills, the Fort Bragg Environmental Coordinator requested the Water Quality Operations Branch to analyze material secured from the spill at Fort Bragg to determine if similar material was spilled on the military reser- vation. Because of the publicity, reports of spills began coming in from many different sources such as Highway Patrol, Department of Transportation Division Engineers, private citizens, and others in nine additional counties. It appeared that most of the spills took place in the evenings of August 1, 2, and 3. While it has not been conclusively determined, spills may have occured in Wilson County the evenings of August 5 and August 8. The Division of Environmental Management Laboratory continued to work around the clock to verify the material in the spills in the other counties. On August 7, a preliminary conference was held with representatives of the Division of Highways, Division of Health Services, Attorney General's Office, and Public Information personnel. Specific information gathering activities were spelled out and assigned to specific people. A coordination conference was held with representatives of the Department of Human Resources, Department of Agriculture, Attorney General's Office, the Department of Transportation, Environmental Protection Agency, and the news media, on August 10. A working session was held following the briefing to news media to provide direction, identify responsibilities and initiate specific actions concerning the spilled material. Advice was solicited from the Environmental Protection Agency Office of Toxic Substances, the National Center for Disease Control, Hevi Duty Electric Company, the EPA Health Effects Research Laboratory, and various academic and private sector personalities known as having expertise in handling this type of material. On August 11, the EPA Health Effects Research Laboratory began ambient air sampling at spill sites. North Carolina State University was identified as having expertise in detoxifying pesticides. The University was contacted to provide expert advice and assistance. A proposal was submitted to the Governor for temporarily deactivating the PCB materials to prevent its migration and to neutralize any hazard to people coming into contact with the material on the shoulder of the highway. The Governor provided directive authority to proceed on August 15, 1978. An activated charcoal solution was applied to the PCB contaminated roadway shoulders during the latter part of August. On August 15, the Governor requested assistance from the President of United States. On August 17s a special EPA coordinator was assigned to the problem. -Because the initial sampling procedures only gave gross approximation to the concentration of PCB material on the grass and in the soil column, several cross sectional samples were taken at one-inch intervals to determine the magnitude of the penetration into the soil c~lumn and the strength of the material at various depths. These samples were taken during the period of August 21-28. 2 On August 28 and 29th, the Epidemiology Section of the North Carolina Division of Health Services convened a meeting of national experts on PCBs. Those in attendance included scientists from the Environmental Protection Agency, National Institute of Occupational Safety and Health, National Institute of Environmental Health Sciences, and the Center for Disease Control. State personnel in attendance were from the Division of Health Services. Natural Resources and Community Development, Department of Agriculture,. and the Department of Transportation. Industrial users of PCBs were represented by a person from Carolina Power and Light. The purpose of this meeting was to assess the immediate risks to the persons who live along the spill routes and to discuss the safety of those persons who would be participating in the removal and storage of the PCB contaminated soil. On September 6, 13, and 19 alternative methods of removing soil from the roadway shoulders were conducted on noncontaminated sections of roadway shoulders. When the soil removal procedure had been formulated a test removal operation was conducted. The test removal operation was performed on October 5> 1978 on a one mile PCB contaminated section of NC 58 near Inez in Warren County., The PCB contaminated soil obtained during the test removal operation has been temporarily stored at a disp0sal site in Warren County. The purpose of the test was to examine the practicality of picking up the contaminated materia:i. as well as any possible health or environmental effects . On November 6,, test results indicated that the pick up of contaminated shoulder material was not harmful to the environment or personnel. On September 29, 1978, Governor James B. Hunt's request for assistance from the Federal District Assistance Administration~ Department of Housing and Urban Development was denied. On October 4, North Carolina officials were notified by the Federal Highway Administration, U .. S. Department of Transportation, that the request for_emergency relief funds was denied. During the month of December a Draft Negative Declaration was prepared pursuant to the North Carolina Environmental Policy Act . The statement was sent to State Clearinghouse on December 21, 1978 for circulation. Comments received on the Draft Negative Declaration requested an EIS be prepared. Therefore, a Final Negative Declaration was not prepared. On December 12, an application was filed with EPA for approval of the Warren County site for placement of contaminated PCB material. On January 4, 1979 a hearing was held on the Warren County site at the National Guard Armory. During the period January 25-31, 1979 additional soil samples were taken by the Division of Environmental Management to substantiate the location of the contaminated material and determine if any migration had occurred. Test results indicated that the material was present and had not migrated. On January 29, 1979, a meeting was held in Washington, D. C. between representa- tives of the State of North Carolina and EPA officials to discuss the current PCB regulations and to discuss alternative solutions. On February 6, the state of North Carolina filed petition with EPA to amend the rules under the Toxic Substances Control Act to allow consideration of alternate methods of treatment. 3 On February 15, 1979, a test was run on a contaminated section of NC 210 in Johnston County and on March 22, on a contaminated section of SR 1004 in Alamance County to determine the feasibility of utilizing the theQry of PCB fixation with activated carbon. On June 4, 1979, the EPA Administrator, Douglas Castle~ ruled against the petition of February 6 to change the regulations to allow consideration of alternate methods of treatment. The Region IV EPA Administrator, John White, on June 4, 1979 approved the State's application to construct a land- fill in Warren County for disposal_ of the PCB contaminated soil. Definition of PCBs 1 PCBs (polychlorinated biphenyl s) are a class of chlorinated, aromatic compounds which have found widespr ad application because of their general stabilities and dielectric propert es. PCBs have been prepared industrially since 1929 and are now produced in many foreign industrial countries. The Monsanto Company's preparations of PCBs were termed "the Aroclorsn. Produc- tion of PCBs ceased in the United States in mid 1977. The outstanding physical and chemical characteristics of PCBs are their thermal stabilities, resistance to oxidation, acid, bases, and other chemical agents as well as their excellent dielectric (electrically insulating) proper- ties. These and other properties have led to numerous uses of PCB such as dielectric fluids (in capacitors and transformers), industrial fluids (use in hydraulic systems, gas turbines, and vacuum pumps), and plasticizers (adhesives, textiles, surface coating, sealants, printing, and copy paper). PCBs were prepared industrially by the chlorination of biphenyls with anhydrous chlorine, using iron filing or ferric chloride as catalysts. The crude product was generally purified to remove color, traces of hydrogen chloride, and catalyst which was usually achieved by treatment with alkali and distillation. The resulting product was a complicated mixture of chloro- phenyls with different numbers of chlorine atoms per molecule. (This fact is responsible for the physical state of PCB preparations). Most individual chlorophenyls are solid at room temperature whereas commercial mixtures are mobile oils. The most important physical properties of PCBs from an environmental point-of-view are solubility and vapor pressure. The solubility of PCBs in water is low and decreases with increasing chlorine content. Values given by Monsanto are 200 ppb (parts per billion) for Aroclor 1242, 100 ppb for Aroclor 1248, 40 ppb for Aroclor 1254, and 25 ppb for Aroclor 1260 ., Studies on the solubility of PCB in water are complicated by the fact that these compounds are strongly sorbed onto various surfaces. PCB has been shown to sorb relatively rapidly onto charcoal, plastic, glass, and silt or soil particles. l t . 0 t 1 Cl . t f PCB CC P Hu zinger • e • a • , 1en11s ry o s, R res Cleveland, Ohio, 1974. 4 PCBs have a high specific gravity (Aroclor 1260/1.566) and a relatively high density (Aroclor 1260 weighs 13.50 lbs./gallon at 250C). Loss of PCB by evaporation is extremely slow, i.e. Aroclor 1260 exposed to loooc for six hours would have an evaporation loss of Oto 0.1%. PCBs are very stable at high temperatures. A temperature of 2000°c or greater is necessary before these chemicals are destroyed. In summary, PCB compounds have been manufactured and used in this country since 1929. Their uses have varied from the manufacture of many household products to industrial uses. PCBs are very stable heat resistant compounds that are fat soluble and some are known to build up in biological food chains. PCBs are relatively insoluble in water but have strong absorption properties onto such materials as clay, soot, charcoal, and grease. PCBs are found in a wide variety of substrates throughout our environment. Regulations Pertaining to PCB Spills The Environmental Protection Agency has promulgated rules and regulations pursuant to the Toxic Substance Control Act to protect the environment from further contamination by PCBs resulting from improper handling and disposal of PCBs. Title 40 Part 761.10 (b) (3) of the Toxic Substances Control Act spells out disposal requirements of PCB mixtures in soil. The regulation · initially defined PCBs to mean any mixture with 500 parts per million (PPM) of PCB. This regulation was amended effective July 2, 1979. The amendment in 40 C.F.R. 761.1 (b) lowered the concentration of PCBs which are covered by the regulation from 500 ppm to 50 ppm {Federal Register, Vol. 44, No. 106, May 31, 1979). The regulation requires that soil and debris contaminated with PCBs must be disposed of either through incineration or in a chemical waste landfill., Criterion for any such landfill is contained in Annex II to the referenced regulation. Specific wording in C.F.R. 40, Part 761.10 (b) (3) is as follows: "Soil and debris which have been contaminated with PCB as a result of a spill or as a result of placement of PCBs in a disposal site prior to the publication date of these regula- tions shall be disposed of (i) In an incinerator which complies with Annex I, or (ii) In a chemical waste landfill." The State of North Carolina petitioned the USEPA for a change in the disposal requirements for PCB mixtures in 40 C.F.R. 761.10 (b) (3). North Carolina requested that the regional administrator be allo,~ed to approve methods of disposal other than incineration or landfilling. The petition for a rule change was denied by EPA on June~, 1979. 5 Need for the Proposed Action In early August, 1978, the Water Quality Operations Branch received a call from a Johnston County resident pertaining to an apparent chemic:al spill along the roadway shoulders of NC 210. Grass, soil and water samples were collected from the spill site and analyzed. The laboratory analysis identified the material taken from the roadway shoulders as Aroclor 1260 a polychlorinated biphenyl (PCB) substance. Reports of other chemical spills along sections of roadway in various counties were reported and investigated in the first week of August. Because the initial sampling procedure only gave gross approximation to the concentration of PCB material, a more detailed soil sampling and analysis procedure was performed during late January 1979. The soil samples taken served to quantify the PCB as to the level of concentration along the Poadway and to determine the depth in the soil column the PCB substance had penetr-ated. The deliberate discharge of industrial waste material containing poly- chlorinated biphenyl substance onto the roadway shoulders was identified in fourteen counties of the state.. The 211 shoulders miles of roadway on which the spills occurred were grouped to form 15 spill site locations. Appendix A contains county maps showing the locations where the PCB industrial waste material was discharged onto the roadway shoulders. Appendix A also contains descriptions of the sampling site locations and the soil sampling results in terms of mg/kg of Aroclor 1260, a PCB substance. Polychlorinated biphenyls are highly stable compounds that will remain unchanged in the environment for a very long time. PCB will biologically magnify in food chains and accumulate in the fatty tissue of both humans and animals. The long term effects of human and animal exposure to low levels of PCBs are not clearly documented; however, studies using laboratory animals have shown potential chronic effects such as cancer induction, pigmentation, and behavioral changes. The PCB contaminated soil may become translocated into adjacent agricultural crop lands and may have an impact on agricultural cash crops such as tobacco, feed and forage, and crops for human consumption. The State of North Carolina considers the removal of the PCB contaminated soil a necessary action to insure the protection of the natural and human environment. In addition to the above reasons for removal of the PCB contaminated soil, the North Carolina Department of Transportation must periodically reshape shoulders and ditches adjacent to state highway system travelways in order to maintain safe egress for the traveling public and to maintain proper cross slopes for storm drainage. While these operations are closely followed by necessary erosion control measures to stabilize the loosened soil, there nevertheless follows a period of time during which the shoulders and ditches are susceptible to erosion. In addition normal deterioration of the hiehways caused by traffic, climate and age will require future modifications to the contaminated areas including resurfacing and possible widening and realignment of the highway facilities. All of these operations would tend to redistribute the contaminated soil in a manner which would be very difficult if not impossible to control. 6 The presence of PCB contaminated material along state highway system routes has caused the Department of Transportation to disallow all encroachment requests along those roadway shoulders which involve activities requiring excavation or redistribution of the soil structure. This has included place- ment of utilities and cornrnerdal and private driveway pipes. These activities involving the roadway shoulders are necessary in order to provide needed services to property owners located adjacent to PCB spill areas ~ 7 Attachment "C" COMMUNITY RELATIONS PLAN--PCB IN N.C. Media coverage of the PCB dumping in North Caroli a, and the civil and criminal actions that have followed, has been ext nsive. Therefore it will not be necessary to conduct a massive media or public awareness campaign to inform the citizens of the state about the PCB problem. Several steps are recommended, however, to insure that all North Carolinians are aware of the EPA's intention to do mor sampling, the purpose of the sampling, and the. sampling -results when they become available. (1). When a -date for the sampling is established, a -press advisory should be mailed to all weekly and semi-weekly newspap as well as to all daily papers, both wire services, an all radio and television stations. The advisory should ·be designed t fit the format of the med~um to which it is being sent. A recorded pu lie service deemed appropriate by the agencies involved. Special c re should be given to fully inform the media representatives in the PCB was dumped: Alamance, Chatham, Edgecombe, Halifax, Harnett, Johnston, Lee, Nash, Person, counties. All press advisories should explain as possible the sampling procedure, the reason 4 counties where Granville, and Wilson and as completely ampling, and other pertinent information. The name of a contact per on in the state should be included in the advisories in case additional information is desired. This contact person will ·· rson for the project, and information should be released only with h"s prior approval. His telephone number should be made available to ss. Since the 2 EPA will-be the lead agency for the project, a federal spokesperson also · • should be appointed, and this person should approve all information before it is relea.sed. ( 2) All public officials in the affected counties ( county commis_sioners, city:..inanage~s, county ritartagers, city commissioners, etc.) should be informed of the sampling program before the inf_orrnation appears ·n-the media. These officials ·then will be able to respond to any general estions that might arise from their constituents. information packet c uld be provided to county and city officials as well as to the press as any potential questions. A toll ree number will be method of answering vided _through the Department of Human Resources' "C re Line" so that the eneral public can call in any questions or concerns that they might have. (3) The designated state sp kesman for the sampli visit as many sampling sites as pi ssible during the fir g project should t few days of the program to familiarize himself with the procedu~es invo ved, and to be on hand in case local media representatives have any It should be made clear to all consultants t orking with the sampl ng program that no information is to be released without the approval o · the state and I federal contact persons. (4) The consulting engineer for the project shoul be utilized as a source of information when compiling data for release to the media on the more technical issues involve~ (the sampling proced re, for instance). (5) While a state contact p¢rson should be on hanf to handle press inquiries, all written material should be released jointly through the state and the EPA, or from the EP4, regional office (with prior state I approval). At all times it shouU be made clear that infor:nation will be released as quickly and as accU1rately as possible through the proper sources. It is extremely import•r that this information come only from designated -federal and state spokespersons in order to avoid confusion, and to insure that correct information is released. 3