Loading...
HomeMy WebLinkAboutNCD980602163_19780911_Warren County PCB Landfill_SERB C_Investigation for Disposal Site for the PCB-OCRJAMES B. HUNT,JR. GOVERNOR THOMAS W. BRADSHAW, JR. SECRETARY STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. RALEIGH 27611 September 11, 1978 DIVISION OF HIGHWAYS MEMORANDUM TO: Mr. M.C. Adams, Maintenance Unit Head FROM: W.D. Bingham, Head of Geotechnical Unit SUBJECT: Investigation _for Disposal Site for the PCB (W.O. 4.5401101) Attached are boring logs and sketch of a site we have investigated for PCB disposal in Chatham County. The site was drilled and sampled to a depth ranging from 14 to 34 feet. Thirteen (13) samples were delivered to the Department o.f Transportation Laboratory to be tested for: Minus 200 Material, Plastic Index, Liquid Limit and pH values. If we can be of further help in this matter please let us lmow. WDB:NH Att&chments ~ ~ . r0 -i;-0 ('I ~ -STRIKE AND DIP Of· BEDS STRIKE N45E DIP 20°SE 5 0 PCB PIT ill COUNTY -Q:!ATHAM PROJECT NO. 4.5401101 GEOLOGIST J.S. BRITT DATE SE PT. 8: 1978 4 0 3 0 2 0 ~ -SlT.E NO: 3 NOT DRILLED ,, , SCALE· 1 : 100 1~ ,-.'" ·~ .. ~;~:..~ .... ' ..... . . ,; , :, ,:-~ ~ . ~ . . 11~. THE BROADEST MEANING;· HARlt.ROCK 1s~-cONSIDERED TO .·BE THAT· INDURATED EARTH MATERIAL WHICH '.f,~ CANNOT BE.,SAMPL ED BY'··CONVENl-lONAl SOil> SAMPLING TOOLS OR TECH~I QUES. THE BOUtilIARY BETWEEN '. · SOI L AND ,ROCK~ IS ARBHRARY;i~.TRANSLTION-BETWEEN SOIL AND ROCK IS OFTEN REPRESEtHED BY A ZONE · OF EATHEREIJ;;ROCK"''::r'j,.;FOR THE.PURPOS~OF THIS INVESTIGATION; THESE MATERIALS . ARE DIVIDED As :,,.~,., FOLLOWS:••,);' . .:-~ .'f· ~;tth. ~ i{(~· . ~-· .i~4F; ... :/:t.11 -·.· .· .. ·.. . ,· .· . ..-.. ,.~:·· . . , ·;.. -~-· .. ?·.-::,c ... . -~ •. SYMBOt'iJ'(l'••· 'i;, '. •• a·;,.·-··~~--· ., ···'!';f';"'· . ·;-.•,:-.,, ' :' . ', . -· '-~--.. \ MATERIAL THAT C'Actf; BE PENETRUEO •tTH . SOME DIFFICUL T't~lLSlttltt ftOIE.R AUGER HlrllELDS S.P.T.:~'.:iJ VALUES. >100 ;. B:~P,~F.~ BUt < S.P. T"'.V~E~USAL . --·c ·:-•·.·: . . ..~-:r. . •. ~-... ,.o:-}:~. . .. . .;-., • MUERIAlTHATi CAMi' BS;~PENETRATEal tl'.TtJ.·GREAT ~i< . ., 0 I FF-I cu LT~~-us I iG ftO WE.R: ·AUG ER' .A"a ,y l ELO.S. S~P-£t: .;~;;,t:-~~ ·--.. REFllSAL.•-·~,,--: _,,,,~,:~_,. -,;·::'.· -::'.·>0-·,.-~·-.-:,--••• ··:,~,""~~- NOTE -The above terminology was used in describing materials on the attached boring logs. Ground water occurs in thin seams between jointing and bedding planes of the Triassic sediments. The weathered rock above and below these seams was dry. N. C. DEPARTMENT OF TRANSPORTATION Division of Highways PCB PIT BORING LOO G-5 1-78 PRL_ ...-vT 4. 5401101 COUNTY _C __ tl __ a_t_harn ________ .DATE 9-B-78 ROUTE RES. ENGINEER ----------__________ PIT NO. PCB Pit #3 -WUIP. USED _23"-7"--0_00_l _________ INVESTIGATED BY J.S. Britt 6" Augers (W /Rock Teeth) ~&1 DEPTHS eH!1 REMARKS: i.e. groundwater data H~ 'J;',::,,::, p... ~ DESCRIPTION OF MATERIAL @~ FRCM TO ~~ moisture content; etc. 1 0 10 1-A Red-Brown Clayey Silt ·Dr:v 1 10 12 SWR-Weathered siltstone Dry 1 12 16 HWR-Siltstone Dry 1 16 18.5 SWR-Weathered Siltstone Dry 1 18.5 23.0 H HWR-Siltstone-Claystone Dry , , 'Pr;:icti c<>l A11=r Refusal at 23.0 Grmmdwater 15. O-OHR. , 11.0-24HR. , ll.0-48HR. --2 0 9 2A Red BRN Clavev Silt Dry 2 9 13 2B SWR-Weathered Siltstone Dry 2 11 14.5 + HWR-Siltstone Dry 2 14.5 19 2C SWR-Weathered Siltstone Dry 2 19 20. 5 + HWR-Siltstone Dry 2 20.5 22 2D SWR-Weathered Siltstone Wet. Seam 19.0' 2 22 225 + HWR-Siltstone-Claystones Dry , Practical Auger refusal at 22.5 r. .. ~ .. ,~ er drv OHR. , 11-.li.-2li.HR. , 11. t;-/,~H,... 4 0 8 4A Brown Clay Silt Dry 4 8 10 NS SWR-Weathered Sandstone Dry (Not enough for sampli~ 4 10 15 4B SWR-Weathered Siltstone Dry 4 15 16.5 + HWR-Siltstone Dry 4 16. ~ 25.5 4C SWR-Weathered S::'.ltstone Dry ,_Ji 25 ~5 34.0 4D HWR-Siltstone-Claystone Dry , Terminated Boring at 34.0 Gronndwater Drv-OHR . " 18.4-24HR. " •. 18. 5-48HR . ) N. C. DEP AR'IMENT OF TRANSPORTATION Division of Highways PCB PIT BORING Iffi G-5 1-78 PROJECT __ 4-'--....... 5 __ 40_1_1...;.0_l _____ COUNTY __ Ch_a_t_h_am _______ .DATE ROUTE RF.s. ENGINEER __________ PIT NO. N:B Pit lf3 ~UIP. USED --'2=3'-'-7_-00~0=l ________ INVESTIGATED BY J.S. Britt 6n Augers(W/Rock Teeth) ~&i P'RlHS ~~ REMARKS: i.e. gl"Oundwater data H~ p.. ~ DESCRIPTION OF MATERIAL §~ FRCM TO !~ moisture content, etc. 5 0 13. 5 5A SWR,...Weathered Siltstone Firm at Surf ace 5 13. 5 17 5B HWR-Siltstone-Claystone Dry 5 17-20 SWR-Siltstone Dry 5 20 21 0 HWR,...Siltstone-Claystone-Practical Dry Arn:rP.,.. l"Pf',.,cc,l at 21.0 , Groundwater D:Qt-OHR. Dcy:-24HR . Dcy-48HR . ..- 6 0 l.i. 6A Red BRN Clay Silt Dry 6 4 6 + SWR,...Weathered Siltstone Dry 6 6 9 6I HWR,...Siltstone-Claystone Dry 6 9 10 SWR,...Weathered Siltstone Dry 6 10 14 V HWR,...Siltstone--Terminated Boring at Dry Gr01mdwater Dry-01-IR. 14' Dry-24HR. Dry-48HR . . -