HomeMy WebLinkAbout0904T_Bladen_TS_Approval_Cost_FID1809797_20230620Moutos, Sarah
From:
Sent:
To:
Cc:
Subject:
Attachments:
Follow Up Flag:
Flag Status:
laserfiche.ncdenr.gov@mccicloud.io
Tuesday, June 20, 2023 3:25 PM
kmcclary@bladenco.org; lou@smithgardnerinc.com
Moutos, Sarah; Stanley, Sherri; Yitbarek, Diana
[External] APPROVAL -Transfer Station Financial Assurance Cost Estimate - 0904T-
TRANSFER-1995 Bladen County Transfer Station
BC TS Closure Cost Estimate 2023-05-24.pdf
Follow up
Flagged
CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message
button located on your Outlook menu bar on the Home tab.
D,E Q`�
_A •
ND. TF CAF.CLIN.4
6/20/2023
Kip McClary
General Services Manager
Bladen County
RE: Approved Cost Estimate
Transfer Station - Bladen County Transfer Station
Bladen County
Dear Kip McClary,
A review of the Transfer Station Cost Estimate for 0904T-TRANSFER-1995 Bladen County Transfer Station submitted on
5/24/2023 has been completed. The estimate meets the site -specific operations and appears to be appropriate.
Initial Review Comments: 20230530 - The Section appreciates the receipt of the electronic form submittal on behalf of
Bladen County.
1
Permitting Engineer's Review Comments: 20230620 - No concerns. Cost estimates appear to be satisfactory
The Division of Waste Management - Solid Waste Section has reviewed and approved the provided cost estimate
required for establishing financial assurance for a transfer station. The cost estimate is provided for your use.
Approved Cost Estimate = $ 63030.00
At this time, you may work with your Finance Department Director and have the approved cost estimate incorporated
into the December 2023 Local Government or Capital Reserve submittal to the Section. Financial Assurance mechanism
templates, NC Rules for financial assurance, and inflation multipliers are among the pertinent information you can find
at the Section's Financial Assurance website: http://deq.nc.gov/swsfa. Should you or your Finance Department require
any assistance, feel free to reach out to Sarah Moutos at 919-707-8287 or Sarah.Moutos@ncdenr.gov .
Sincerely,
Sarah Moutos
Environmental Program Consultant
Division of Waste Management - Solid Waste Section
CC: Sherri Stanley
Diana Yitbarek
Lou J. Krasuski
SMITH GARDNER
Blade County Transfer Station (NC Solid Waste Permit No. 09-04T)
Closure Cost Estimate
DATE: May 24,2023
BY. WK
Item
Item
Contractor
No.
Description
Unit
Quantity
Unit Price
Total Price
Comments
1.0
Preliminary Activities
Subtotal
$5,000.00
1.1
Coordination, Contracts, and Management
LS
1
$5,000.00
$5,000.00
S+G Estimate
2.0
Closure Activities
$46,300.00
2.1
Surveys and Layout
LS
1
$3,500.00
$3,500.00
S+G Estimate
2.2
Mobilization, Demobilization, and Project Closeout
LS
1
$5,000.00
$5,000.00
S+G Estimate
2.3
Disposal of Excess Waste
TN
200
$46.00
$9,200.00
Assumes two (2) days of waste at 100 tons/day for
MSW and C60 disposal at the Sampson County
Landfill.
2.4
Disposal Transortation
HR
30
$200.00
$6,000.00
Assumes a three (3) hour roundtrip with an average
payload of 20 tons per trip and disposal at the
Sampson County Landfill.
2.5
lWash Down G Cleanup of the Transfer Station
DY
2
$1,800.00
$3,600.00
Assume single work crew per day.
2.6
Removal of Leachate from Leachate Tank
LS
1
$1,500.00
$1,500.00
S+G Estimate
2.7
Excavation, Transport, and Disposal of Leachate Tank
LS
1
$5,000.00
$5,000.00
S+G Estimate
2.7
Fencing G Concrete Barrier Protection
LS
1
$5,000.00
$5,000.00
Assume close process area and place concrete
barriers across access road.
2.8
Erosion G Sediment Control (grading, silt fence, maintenance, etc.)
LS
1
$5,000.00
$5,000.00
S+G Estimate
2.9
Revegetation
LS
1
$2,500.00
$2,500.00
S+G Estimate
3.0
quality Assurance, Certification, 8 Deed Notation
$6,000.00
3.1
Engineering and Reporting
LS
1
$3,500.00
$3,500.00
S+G Estimate
3.2
Surveying and Deed Notation
LS
1
$2,500.00
$2,500.00
S+G Estimate
Subtotal -----> $57,300 (2023$)
10%Contingency ----- > $5,730 (2023$)
Total Estimate ----> $63,030 (2023$) (See Notes 1 G 2)
Notes:
1. All costs are presented in current dollars and should be increased at an inflation rate prescribed by the NCDEQ Division of Waste Management per
https:Hdeq.nc.gov/about/divisions/waste-management/solid-waste-section/financial-assurance-solid-waste-management-facilities if additional review is not performed annually.
2. This ESTIMATE has been prepared for financial assurance purposes only and shall not be considered a replacement far an actual bid from a licensed contractor and is considered acceptable
within a +/-10% of the Total Estimate value.