Loading...
HomeMy WebLinkAbout1604_CRSWMA_Carteret_TS_Approval_Cost_FID1809796_20230620Moutos, Sarah From: Sent: To: Cc: Subject: Attachments: Follow Up Flag: Flag Status: laserfiche.ncdenr.gov@mccicloud.io Tuesday, June 20, 2023 3:39 PM bdarden@crswma.com; knwaokorie@labellapc.com Moutos, Sarah; Stanley, Sherri; Yitbarek, Diana [External] APPROVAL -Transfer Station Financial Assurance Cost Estimate - 1604- TRANSFER-1993 Newport Transfer Station Newport Transfer Station - Closure Estimate (Rev May 2023).pdf Follow up Flagged CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. D,E Q`� _A • ND. TF CAF.CLIN.4 6/20/2023 Bobby Darden Executive Director Coastal Regional Solid Waste Management Authority RE: Approved Cost Estimate Transfer Station - Newport Transfer Station Carteret County Dear Bobby Darden, A review of the Transfer Station Cost Estimate for 1604-TRANSFER-1993 Newport Transfer Station submitted on 5/31/2023 has been completed. The estimate meets the site -specific operations and appears to be appropriate. Initial Review Comments: 20230531- The Section appreciates the resubmittal of the closure cost estimate for Newport Transfer Station. 1 Permitting Engineer's Review Comments: 6/20/23 - No concerns. Comments on the cost estimate review were addressed and appear to be satisfactory. The Division of Waste Management - Solid Waste Section has reviewed and approved the provided cost estimate required for establishing financial assurance for a transfer station. The cost estimate is provided for your use. Approved Cost Estimate = $ 212051.00 At this time, you may work with your Finance Department Director and have the approved cost estimate incorporated into the December 2023 Local Government or Capital Reserve submittal to the Section. Financial Assurance mechanism templates, NC Rules for financial assurance, and inflation multipliers are among the pertinent information you can find at the Section's Financial Assurance website: http://deq.nc.gov/swsfa. Should you or your Finance Department require any assistance, feel free to reach out to Sarah Moutos at 919-707-8287 or Sarah.Moutos@ncdenr.gov . Sincerely, Sarah Moutos Environmental Program Consultant Division of Waste Management - Solid Waste Section CC: Sherri Stanley Diana Yitbarek Kelechi Nwaokorie Opinion of Closure Cost: Newport Transfer Station Expansion ITEMS UNIT QUANTITY UNIT RATE AMOUNT $ MOBILIZATION/DEMOBILIZATION LS 1 $10,000 $10,000 PRESSURE WASHING SF 68,100 $0.20 $13,620 LEACHATE DISPOSAL $23,500 Leachate Pumping Cost LS 1 $10,000 $10,000 Leachate Hauling Cost Miles 600 $7.50 $4,500 Leachate Disposal Cost Gallons 1 60,000 $0.15 $9,000 SIGNAGE LS 1 $3,000 $3,000 WASTE DISPOSAL' $145,500 Waste Loading Costs Load 65 $700 $45,150 Waste Disposal Cost6 Tons 1,290 $40 $51,600 Waste Hauling Cost' Miles 6,500 $7.50 $48,750 ADMINISTRATION (including deed recordation) LS 1 $3,000 $3,000 SUBTOTAL OF ABOVE ITEMS $198,620 CONTINGENCY (5% OF SUBTOTAL) 5% $9,931 P.E. CERTIFICATION OF CLOSURE LS 1 $3,500 $3,500 TOTAL CLOSURE COST (in 2023 Dollars)1,2 2023 $212,051 Notes: 1. Costs are based on conceptual design and should be considered approximate. 2. All costs include labor by a third party. 3. This includes pumping, hauling, and disposal costs. Assumes that the 30,000 gallon FRP tank will be emptied twice during closure activities and hauled to leachate lagoon at TLTRL (100 miles roundtrip to and from Newport TS). Pumping cost = $10,000; Hauling (incl. lat fuel, and insurance = $7.50 per mile; and disposal cost = $0.15/gallon 4. This fee includes decontamination of the transfer station buildings and waste handling areas after waste disposal. 5. This line item assumes disposal of the average waste volume of 430 TPD over a period of 3 days with a disposal cost of $40 per ton. 6. This line item assumes a dump truck capacity of 20 tons and a labor + rental cost of $700 per load. 7. Assumes waste hauling cost (incl. labor, fuel, and insurance) of $7.50 per mile, assuming 100 miles roundtrip to and from TLTRL, and assuming 65 loads. NEWPORT TRANSFER STATION EXPANSION LABELLA ASSOCIATES CARTERET COUNTY. NORTH CAROLINA OCTOBER 2022: REVISED MAY 2023