Loading...
HomeMy WebLinkAbout9302T_Warren_TS_Approval_Cost_FID1809794_20230619Moutos, Sarah From: Sent: To: Cc: Subject: Attachments: Follow Up Flag: Flag Status: laserfiche.ncdenr.gov@mccicloud.io Monday, June 19, 2023 4:07 PM marshalIbrothers@warrencountync.gov; lou@smithgardnerinc.com Moutos, Sarah; Stanley, Sherri; Yitbarek, Diana [External] APPROVAL -Transfer Station Financial Assurance Cost Estimate - 9302T- TRANSFER-1995 Warren County Transfer Station Warren FA Estimate Sept 2022.pdf Follow up Flagged CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. D,E Q`� _A • ND. TF CAF.CLIN.4 6/19/2023 Marshall Brothers Public Works Director Warren County RE: Approved Cost Estimate Transfer Station - Warren County Transfer Station Warren County Dear Marshall Brothers, A review of the Transfer Station Cost Estimate for 9302T-TRANSFER-1995 Warren County Transfer Station submitted on 5/17/2023 has been completed. The estimate meets the site -specific operations and appears to be appropriate. Initial Review Comments: 20230517 - The Section is in receipt of the electronic form submittal for Warren County TS. Permitting Engineer's Review Comments: 20230619 - Approving based on the assumption that item 2.3 of the cost estimate, $3600 will cover wash down and leachate collection system decommission and disposal. Please include specific amounts for these in your upcoming submittal. Detailed costs are included in the closure plan. The cost of removal of waste based on two days of waste has been approved by Management The Division of Waste Management - Solid Waste Section has reviewed and approved the provided cost estimate required for establishing financial assurance for a transfer station. The cost estimate is provided for your use. Approved Cost Estimate = $ 40053.00 At this time, you may work with your Finance Department Director and have the approved cost estimate incorporated into the December 2023 Local Government or Capital Reserve submittal to the Section. Financial Assurance mechanism templates, NC Rules for financial assurance, and inflation multipliers are among the pertinent information you can find at the Section's Financial Assurance website: http://deq.nc.gov/swsfa. Should you or your Finance Department require any assistance, feel free to reach out to Sarah Moutos at 919-707-8287 or Sarah.Moutos@ncdenr.gov . Sincerely, Sarah Moutos Environmental Program Consultant Division of Waste Management - Solid Waste Section CC: Sherri Stanley Diana Yitbarek Lou J. Krasuski SMITH GARDNER Warren County Transfer Station (NC Salid Waste Permit No. 93-02T) Engineer's Closure Construction Cost Estimate DATE: 15-Sep-22 BY: LJK Item Item Contractor No. Description Unit quantity U -P-77 7--T TotalPricc Comments Facility Area (Horizontal Plan) ---- > AC 4 M- 1.0 Pre -Remedial Response Subtotal $2,000.00 1.1 Coordination, Contracts, and Management AC 4 $500.00 $2,000.00 2.0 Remedial Response Activities $29,912.00 2.1 Surveys and Layout AC 4 $350.00 $1,400.00 S+G Estimate 2.2 Mobilization, Demobilization, and Project Closeout AC 4 $500.00 $2,000.00 S+G Estimate 2.3 Wash Down & Cleanup of the Recovery Area & Leachate Collection System DY 2 $1,800.00 $3,600.00 Assume single work crew per day. 2.4 Fencing & Concrete Barrier Protection LS 1 $5,000.00 $5,000.00 Assume close process area and place concrete barriers across access road. 2.5 Excess Disposal TN 100 $46.00 $4,600.00 Assumes a waste volume fortwo (2) days at 50 tons/day of MSW and C&D and disposal at the Sampson County Landfill. 2.6 Excess Recycling & Processing Material TN 72 $46.00 $3,312.00 Assumes maximum storage volume of recyclables materials for three (3)trailers and disposal at Sampson County Landfill. 2.7 Erosion & Sediment Control(grading, silt fence, maintenance, etc.) AC 4 $750.00 $3,000.00 S+G Estimate 2.6 Reve etation AC 4 $1,750.00 $7,000.00 S+G Estimate 3.0 Quality Assurance, Certification, & Deed Notation $4,500.00 3.1 Engineering and Reporting LS 1 $3,000.00 $3,000.00 S+G Estimate 3.2 ISurveyingand Deed Notation LS 1 $1,500.00 $1,500.00 S+G Estimate Remedial Response Estimate -----> $36,412 (2022$) 10%Contingency ----- > $3,641 (2022$) Total Estimate ----> $40,053 (2022$) (See Notes 19 2) Notes: 1. All costs are presented in current dollars and should be increased at an inflation rate prescribed by the NCDENR Division of Waste Management per http://portal.ncdenr.org/web/wm/sw/financialassurance if additional review is not performed annually. 2. This ESTIMATE has been prepared for financial assurance purposes only and shall not be considered a replacement for an actual bid from a licensed contractor and is considered acceptable within a+/-10%of the Total Estimate value. _ Denotes values calculated in spreadsheet