Loading...
HomeMy WebLinkAbout2908_INSP_20230614NORTH CARnLINAD_E Q�� nen.mmem m c.w.o.mem.i a.i� FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined LCID YW Transfer X Compost SLAS COUNTY: Davidson MSWLF PERMIT NO.: 2908-TRANSFER-2013 and Closed HHW White Incin T&P X FIRM MSWLF goods 2908-TP- FILE TYPE: COMPLIANCE CDLF TireT&P Tire Industrial DEMO SDTF Collection Monofill Landfill Date of Site Inspection: June 14, 2023 FACILITY NAME AND ADDRESS: Todco Inc. Wood Recycling Facility 1123 Roy Lopp Road Lexington, NC 27292 Date of Last Inspection: June 30, 2022 GPS COORDINATES (decimal degrees): Lat.: 35.82872' FACILITY CONTACT NAME AND PHONE NUMBER: Name: Todd Warfford, President Telephone: (336) 248-2001 (Office); (336) 240-2219 (mobile) Email address: todd@todcoinc.com FACILITY CONTACT ADDRESS: 1123 Roy Lopp Road Lexington, NC 27292 PARTICIPANTS: Todd Warfford — Todco Inc. Dalton Warfford — Todco Inc. Long.:-80.173770 Robert Pike — Senior Environmental Specialist — Solid Waste Section STATUS OF PERMIT: Transfer Station Life of Site Permit to Operate: Issued October 4, 2018; Expires June 10, 2023 Treatment & Processing Permit to Operate: Expired June 10, 2023 PURPOSE OF SITE VISIT: Comprehensive Inspection STATUS OF PAST NOTED VIOLATIONS: None. OBSERVED VIOLATIONS: A. OBSERVED VIOLATION: 15A NCAC 13B .0201(c) in part states, `No solid waste management facility shall be established, operated, maintained, constructed, expanded, or modified without a validpermit issued by the Division for the specified type of activity. It is the responsibility of every owner or operator of a proposed solid waste management facility to apply for a permit for the facility. " Todco Inc. was found to be in violation of 15A NCAC 13B .0201(c) for operating a solid waste facility without a valid permit. During the inspection the Permit to Operate the treatment and processing unit of the facility expired on June 10, 2023. At the time of the inspection no Permit to Operate renewal application had been submitted to the NCDEQ Solid Waste Section. To achieve compliance Todco Inc. shall submit a permit renewal to the Solid Waste Section for review. Please contact Jordan Russ at (919) 707-8229 or b email at jordan.russ@deq.nc.gov Page 1 of 3 FACILITY COMPLIANCE INSPECTION REPORT D_E Q�� Division of Waste Management NORTH CAROLINA OepaNnent W Environnrenbl puelily Solid Waste Section within 15 days to discuss the renewal process. The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. ADDITIONAL COMMENTS 1. The facility is permitted as a C&D transfer station and wood waste treatment and processing facility. The facility operates under two separate permits. The transfer station permit (2908-TRANSFER-2013) has been issued as a life of site permit; the treatment and processing permit (2908-TP) has expired. Please see the Observed Violation section of the report for more information. 2. The transfer station has been inactive since 2019, due to market fluctuations, and the staffing and space required to separate the recyclable materials from the C&D waste. Please contact Robert Pike at 336-776-9672, or via email at robert.pike@ncdenr.gov, to schedule an inspection prior to resuming operations at the transfer station. 3. The Permit to Operate and the approved Operations Manual are maintained at the facility's office and are available for review upon request. 4. Tonnage records for the year from were available for review upon request. Records were reviewed through May 2023 and were found to be complete. 5. The facility certified transfer station operator certifications have expired. A certified transfer station operator must be on site at all times while the transfer station is operational. Before reopening the transfer station, ensure facility staff has completed the certified transfer station operator course. 6. The site is secured by natural topography and dense woods with site access secured by two locking gates. 7. Proper signage was observed at the facility entrance. 8. The entire facility was observed to be clean and well maintained with no windblown debris observed. 9. Facility access roadways were of all-weather construction and in good condition. 10. Waste is placed on a concrete tipping floor located just southeast of the scale house to be separated and screened for any unaccepted waste to be removed and placed into waste receptacles. Waste receptacles are transported to the Davidson County Landfill (permit #2906-MSLF-2008) for proper disposal. At the time of the inspection facility staff were observed removing non -acceptable waste from the tipping floor and placing it into the waste receptacle. 11. Processed wood waste to be sold as boiler fuel is stockpiled on the concrete pad and on the southern portion of the site along with bark that is brought to the facility as finished product and offered for sale to customers. Piles were found to be of manageable size with fire lanes designed to provide easy access. 12. Brush, land clearing debris, and clean wood waste are stockpiled just northwest of the tipping floor and is ground for mulch. The mulch is stored in windrows to the north of the maintenance building and are turned/moved to prevent the compost process from occurring. The windrows are of manageable size with adequate access for fire control measures. No composting takes place at this facility. Yard trash is not permitted to be accepted at the facility. 13. The mulch and boiler fuel operations are kept separate to prevent any contamination. 14. C&D transfer station tipping floor was being used to store a large inventory of lumber. The lumber was palletized and elevated off the tipping floor. The damaged fabric canopy of the transfer building has been replaced. The picking line was idle and clean, with no accumulated waste visible. 15. The product storage area is located immediately south of the scale house and consists of a series of concrete bunkers that hold various sizes and types of stone, sand, and mulch. This area is paved and well -maintained so that it is easily accessed by customers and facility equipment operators. 16. The facility buffers were observed and appeared to meet all requirements. Page 2 of 3 FACILITY COMPLIANCE INSPECTION REPORT D_E Q�� Division of Waste Management NORTH CAROLINA OepaNnent W Environnrenbl puelily Solid Waste Section Please contact me if you have any questions or concerns regarding this inspection report. n Digitally signed by James R. Pike James R . r e Date: 2023.06.23 16:13:23-04'00' Phone: (336) 776-9672 Robert Pike Environmental Senior Specialist Regional Representative Sent on: June 23, 2023 X Email Hand delivery US Mail Certified No. j_ _] Copies: Deb Aja, Western District Supervisor - Solid Waste Section Page 3 of 3